L-1 Shift

1) Changes To the Planning Situation Automatically Result in A New ATP Availability


Check.
• TRUE
• FALSE

2) In A Production Chan, Shelf-Life Expiry Date Of Raw Material Required To Be Available in


The Finish Products Batch master Details. The functionality Can Be Achieved by.
a. Batch determination
b. Batch Transfer
c. Batch Derivation
d. Batch Status
e. None of the above

3) Is It Possible to Change Technical Types Of Bom?


• Yes
• No

4) Is It Possible To Change Technical Types Of Bom ?


• Yes
• No

5) Does The Bom Subitems Get Copied to Production Order?


a. Wes, they get copied.
b. No, Sub-items have no operation function in the BOM, so they don’t get copied.

6) When Scheduling a Routing In The Sap ECC System, Which Of The Following Time
Elements Is A Interoperation Time?
a. Safety time
b. Float before production
c. Processing time
d. Setup time

7) Which Of the Following Scheduling Types Can Only Be Used in Capacity Planning?
a. Midpoint
b. Forward
c. Only capacity requirements
d. Backward

8) Location Groups Can Be Used To Define Move times in The Work Centre.
• True
• False

9) Maximum Consumption Period That Can Be Maintained in Maternal Master.


a. 90
b. 100
c. 999
d. None

10) With Respect the MRP Controllers Following Options are available.
a. With the MRP Controller, the materials are allocated to a person or A group of persons who
are responsible for monitoring materials availability.
b. It is possible to select the planning result per MRP controller.
c. The MRP Person can either be the one person a group of persons.
d. all the above

11) When Specifying the Plant Parameters, You Have the Options Xxx_____
a. Creating the MRP parameters for a new plant
b. Deleting MRP parameters for a plant
c. Maintaining individual MRP parameters.
d. All of the above

12) What Is the Difference Between Regenerative Planning And Net Change Planning?
a. Planning all materials while generating the planning file, you can only plan materials for
which planning file exists
b. Planning all materials based on demand, you plan all materials bases on previous production
c. Planning all materials parallel, planning all materials from previous planning file
d. Planning all material online, planning is carried out as a background job

13) Which Of the Following Aspects Characterize Repetitive Manufacturing In A


Manufacturing Plant?
a. Consumption based planning of the quantities.
b. Shop fabrication
c. Period-based planning of the quantities to be produced.
d. Continuous material consumption, production flow and output

14) You Are a Demand Planner in The Company & Wars to Control The PR consumption With
Customer Requirements, Dependent Requirements, Order Reserve Which Of The
Following Will You use.
a. Consumption indicator
b. Consumption mode
c. Consumption period
d. Requirement type

15) Which Of The Following Statements is true For The Simulation Mode in The context Of
material planning in SAP ECC?
a. The umulation mode is wel in somos in which requerers planning at the procurement les
prematurely in sem of Demand
b. Assuming a delay time in the cal painos triggers multilevel betonough to the thahel proda
which therefore recevealed t
c. The simulation mode opens the analysis of the delay time. Manual rescheduling
of thereceipt in the finished product and subsequent requirements planning lead
to asolution that is feasible from the requirements planning perspective. However, thissolution
may lead to a date/time violation in the finished product
d. The sinon mode represents an interactive matinal tam of plasing the result of which it
apunancaly podels the the page

16) Which Functionally Helps In Automatic Deletion Of Firmed Planned Orders During MRP
Run
a. Reorganization
b. Roll forward period.
c. Planning time fence
d. Firming period

17) Planning Data Can Be Copied to Demand Management from?


a. CO-PA
b. SOP
c. LTP
d. MRP

18) Operative Data That is used in the LTP Ex. Sales Orders, Production Orders, Firm planned
order, Can Be Changed in The Simulate planning area.
• True
• False

19) What Is the Transaction Code To Run The Long Term Planning Run For Single tern, Multi
Level?
a. MD02
b. MS02
c. MD42
d. MS12

20) Routing Can Contain the following.


a. A sub- contractor operation
b. An alternate cost center
c. An external work center
d. A reference operation set

21) Routings Comprise of The Following


a. Component assignment
b. Operations
c. PRTS
d. Material Reservation
22) A Material Bom Is The Only Bom Category That Can Be Created in The Sap ECC System.

True

False

23) Whenever using a group BOM xx…..


• Changes to the groups leads to changes in all the plants
• Changes in the plant BOM has to be carried out separately
• Each plant BOM is separate, so has a different number
• Each plant BOM is extension of the group, so BOM number is the same

24) Back flushing Indicator Set In ……..Has The Highest Priority


• Work center/Resource
• Routing/master recipe
• Material master
• OBOM
25) Standard Value Key Helps in Calculating Costing Of The Operation Only.
• True
• False
26) You Enter A New Bom Of Materials) in Sap Eiec But Forget To Enter A Plant Reference
Whids Of The following Strement Describes What Happens When You Try to save it ?
• When saving the BOM, a group BOM is created which can, under certain conditions,
be assigned to a plant later.
• When sating the BOM , a dialog box appears prompting the user to enter a plane
• When saving the BCM, an error message appears stating that it is not posutile to save a BOM
wou plantpellierence
• When saving the BOM, a warning message appears in the compending dialog box, posatile
to omate plans-specific engineering BOM
27) Maximum How Many Parameters Can We Maintain in A Standard Value Kay
• 3
• 7
• 6
• As many as want

28) Select Each Of The Following That is Not An Item Category


• Stock item
• Class item
• Non-class item
• Text item

29) If A Header Material is Used As A Bom Item In The Same Bom The Bom Is Referred AS
• Repetitive BOM
• Alternative BOM
• Multiple BOM
• Recursive BOM

30) A Bom With Status 2 Meansxxxxxx000


• BOM’S “active” that it can be used for explosion
• Bom's is Inactive that in cannot be exploded or released for planned order
31) What Are The Types Of Discontinuation.
• Parallel
• Aggregate
• Disaggregate
• Simple
32) Which Of The Following Is Not A Pre Requisite For Component Allocation?
• Operations in the routing must exist
• Production version must exist
• BOM for the material to be produced must exist
• Backflush indicator must exist

33) There Are 2 Different Production Lines At Shop Floor And Sequence Of Operations Are Same
Except One Common Work Center How This Scenario Will Be Mapped Case?
• Rate Routing
• Reference Operation set
• Parallel Routing
• Alternate Routing

34) MPS Is Runxxxx.


• After MRP run
• Before DM but after SOP
• Before SOP & DM
• After DM before MRP

35) If You Do Not Review The Exception Messages Or Capacity Prior To Planning. Than Mos is
Not A Step You Need In You Planning Process.

True

False

36) If Safety Time is Specified One Week. The Requirement Date is Brought For One Week

True

False
37) For Bom Explosion In Mrp, You Must Set The Bom Status In The Bom Header So That Is
Active For Mrp.

True

False

38) What Are The Possible Mrp Area Types?


• Plant MRP area
• Subcontractor MRP area
• ☐ Procurement MRP area
• Storage location MRP area
39) Identify The Correct Statements
• The Planning Time Fence can be deactivated for the LTP
• Dep.reqts for Kanban and Bulk materials can be created in the planning scenario.
• Using the current stock is optional
• PIRs can be transferred to operative plan
40) The Planning Time Fence Is Only A Function Of MPS

True

False

41) In Material Requirements Planning You Can Calculate The Dates For Multi-Level Production
Automatically

True

False

42) The Final Product To Be Assembled Only Once An Order Comes in And The Sub Assemblies
Are Kept Ready Which Strategy Would You Use ?
• Strategy 20 + 70
• Strategy 30 + 70
• Strategy 40+ 70
• Strategy 50
43) To Produce Material: Plece A, S Pieces Of Component Required. Assembly Scrap Of A is 10%
And Component S Scrap Of Bis 20%. There is A Requirement Of 2 Of A What Will Be The
Requirement Quanety For A & Generated After Mrp Run

A-20, B-132

OA-22 B-110

A=20 , B =120

A=22, B=132

44) Your Customer Wants Mrp To Look Into Stock In Transit While Planning Which Long Setting
Can Help You Achieve This?
• Maintain config settings for Stock transport orde
• Maintain relevant available stock setting in MRP plant parameters
• Don’t do anything as it is as std MRP feature
45) MRP Activation Process Deals With?
• Activating MRP for plant
• Activating MRP area for plant
• Create planning file entry
46) How Are Product Cost Collectors Created In Rem?
Created manually with reference to Production version
They will be created automatically in back ground
They will be by default in the system.

• For Determining The Value Of The Unfinished Goods At The End Of Period. The Xxxx Is Used
?
• Production order settlement
• Wip determination
• Variance calculation
• Confirmation
47) When Production Order Status Is Teco Then You Can Still Make A Posting For Order

True

False

48) In An Mto Production/ Process Order Change, User Wants To Unlink Sales Order With
Production Order is it Possible?
• Yes by linking with other sales order
• Yes: by linking with WBS element
• Yes-by Re Read Master Data
• No

49) What Are The Options For The Material Staging From A Warehouse Management System?
• Create parts are ordered manually
• Release order parts are ordered manually
• Pick parts are provided for the production order in exactly the same quantity as the
requirements quantity
• Release order parts are ordered automatically

50) As A Production Manager Hove Do You Enable Process Operations Parallel To And
Independent Of Other Operations?
• Parallel sequences
• Successor relationships
• Control sequences
• Linked sequences

51) Which Types Of Objects Can Be Chariged With Engineering Change Management (Ecm)?
• Task list
• Work center
• Production version
• Bill of material

Alternative : Master Recipe , Material Master , BOM

52) What Are The Consequences Of A Confirmation Of An Operation?


• The produced and confirmed quantity is automatically posted to the warehouse stock as a
receipt
• Serial numbers are assigned for the confirmed quantity
• The operations capacity requirements are reduced
• Actual costs are posted for the production confirmed
53) Which Activity Can Tigger Ani Automatic Availability Check For The Components Of A
Production Order? Note: Please Choose The Correct answer
• Material staging
• Order rescheduling
• Order release
• Goods receipt for a missing part
54) Which Of The Following Functions Occur When A Production Order Is Created
• Calculating the lead time for the production order
• Selecting and copying a routing
• Copying a document that is assigned to the material master for the product to be produce
• Selecting and copying a bill of material
55) What Is The Master Data That Needs To Be Maintained For Manufacturing With Kanban
Replenishment?
• Control cycle
• Work center
• Production supply area
• Routing

56) Move Time Is Defined Only In The Operation Details.

True

False

57) Planned Orders Always Generate Production Dates.

True

False
58) A Material Had To Cure For A Specific Time Period Before It Could Be Passed Te The Nest
Operation, What Time Would Be Most Appropriate to Model
• Quality time
• Walt time
• Curing time
• All the above
59) Which Options Can You Use To Convert Planned Orders Into Process Orders In The Sap Ecc
System?
• Mass processing
• Automatically in the planning run (MRP)
• Background processing in a program
• Order progress report

SET:1
1) A company wishes to produce a component X. It tells its engineering department to
create a BOM for that.The material is in the product development stage and hence only
client level data is maintained in the material master.

• The BOM can be created as a group BOM

2) BOM that doesn't have any reference to a Plant is called as _______.


• Group BOM
3) A finished product has a sub-assembly and a component. Is it possible to define different
validity dates for the header, sub-assembly and the component?
• Yes
4) A BOM with status 2 means________.
• Bom's is Inactive that in cannot be exploded or released for planned order
5) Routings comprise of the following:
• Component assignment
• Operations
• PRTs
6) Routing can contain the following:
• A sub-contractor operation
• A reference operation set

7) Non stock item category does not require a material number.


• True
8) The following objects can be processed in the EWB:
• task list header
• operation
• BOM header
• BOM Item
9) The final assembly of a finished product should only be triggered when a customer order
arrives. Which planning strategy for the finished product do you use?
• 40
10) Arrange in correct sequence:
• SOP>LTP>Demand Mgt>MRP
11) Variant BOMs can be grouped together and called?
• BOM group
12) which of the following aspects characterize repetitive manufacturing in a manufacturing
plant?
• Consumption based planning of the quantities
• Period-based planning of the quantities to be produced
• Period-based planning of the quantities to be produced
13) In which of the following sequence material component allocation takes place?
• BOM> WC> routing>BOM/Routing
14) What is a feature of the simulation mode for material requirements planning in SAP ECC?
• It calculates the delay time which may occur in planning
15) Which of the following are output from MRP?
• Planned order
• purchase requisition
• schedule agreement
16) Which statements about the reorganization of planned independent requirements in SAP
ECC are true?
• The reorganization only affects planned independent requirements that lie on a time axis
to the past from a specified key date
• The reorganization can be parameterized using a plant-specific reorganization interval.
17) Which types of objects can be changed with Engineering Change Management (ECM)?
• Master Recipe
• Resource
• Material master
18) Unrestricted stock is only stock considered in the planning run.
• FALSE

19) In basic scheduling, you can trigger lead-time scheduling for the planning run by using
scheduling indicator.
• TRUE
20) If the Item is marked as a MPS Item: you cannot plan down to its required raw material.
• TRUE
21) The principle of LTP is to simulate different versions of the program.
• TRUE

22) Identify the correct statements:


• The Planning Time Fence can be deactivated for the LTP
• Dep.reqts for Kanban and Bulk materials can be created in the planning scenario.
• Using the current stock is optional
• PIRs can be transferred to operative plan
23) There is only single version of PIR.
• FALSE
24) Changes to the planning situation automatically result in a new ATP availability check.
• FALSE
25) How may demand be provided to the SOP tool?
• Statistical forecast
• Manually entered
• Copy from COPA
• All of the above
26) How can the number of rescheduling exception messages be reduced or limited?
• Tolerance Values
• Reduce all lead times to 1
27) Which of the following is not a lot sizing technique used in MRP systems?
• Two-bin system (TBS)
28) For Independent demand which of the following sentence is correct?
• customer requirements or forecast
29) Is it possible to change technical types of BOM?
• No
30) Is it possible to rename used work center?
• Yes
31) You are implementing for Pharma company which is a process industry, so which master
data will you use for sap PP-PI?
• Material master, Resource, Master Recipe, Production version, Bom.

32) In a planning requirement a multilevel BOM carries the material with A,B, C indicator
marked as A (Critical material for costing) What are the possible methods to plan it.
• Planning with MPS.
33) In the Customizing for requirements planning, a project team notices that the alternatives
P1, P2, P3 and P4 are also delivered as standard in addition to MRP type Pd) The number
in each of these alternatives represents a firming type. What does a firming type define?
• Handling existing procurement proposals within a planning time fence.
• Handling new procurement proposals that need to be created due to new requirements
within the planning time fence.
34) You enter a new BOM (Bill of Materials) in SAP ECC but forget to enter a plant reference.
Which of the following statements describes what happens when you try to save it?
• When saving the BOM, a group BOM is created which can, under certain conditions,
be assigned to a plant later.
35) Is Sales order A Qty. 15 PC and Sales order B Qty. 25 PC are booked on same date and
stock is 0 PC?
• Separate Planned Order for each Sales Order shall be created if individual indicator is set
• Only one planned order is created if Collective indicator is set
36) You are a demand planner in the company & wants to Control whether the PIR are
consumed with customer requirements or with dependent requirements and order
reservations. Which of the following will you use?
• Requirement type
37) MPS is run____.
• After DM before MRP
38) Demand planning is not used to derive future demand quantities from historical data.
• FALSE
39) What are the forecasting techniques?
• Moving average
• Forecast model
• Seasonal model
40) Long Term Planning can be executed as Gross requirement planning.
• TRUE

SET: 2 +4

1) Assume you have two buildings on the same physical grounds. Close proximity to each other. Each
building has been configured as a plant. If one plant produces a component that the other needs for
their manufacturing process how could this be modeled in SAP ERP?
• Stock transfers between the plants
• Withdrawal from another plant
2) The final assembly of a finished product should only be triggered when a customer order arrives.
Which planning strategy for the finished product do you use?
• Planning without final assembly (strategy 50)
3) What is the difference between regenerative planning and net change planning?
• Planning all materials while generating the planning file, you can only plan materials for which
planning file exists
4) Demand Management_____.
• Gives input to MRP
• Takes input from SOP
5) Consumption/Forecast Based planning procedure uses past consumption for materials .
• TRUE
6) What are the main features of the MRP types "PD" or "VM" ?
• PD triggers a BOM explosion
• VM can use the forecast for the calculation of the safety stock
7) What is the meaning of the planning time fence?
• It determines the period in which no automatic changes are to be made to the production
plan.
8) In make-to-order production when can you see the actual costs of the production order in the sale
order?
• When you settle the sale order
9) Whenever using a Group BOM______.
• Changes in the plant BOM has to be carried out separately
10) By using BOM status, the usage of the BOM can be restricted to only certain applications.
• FALSE
11) BOM usage allows you to?
• maintain separate BOMs for different organizational areas
12) Routing contains information on the following:
• Material component
• Operation
• std value key for operation
13) A routing is used in which of the following functions?
• to determine the load on a work centre
14) BOM categories that can be created are?
• material , order, document,equipment, functional location
15) If the individual/collective indicator is left "blank", the component is planned as _____.
• based on header material
16) In planning Table for a rate routing you see a message "No requirements exist".
What does this suggest?
• No production version exist
17) Issue Storage location can be maintained at ?
• Production version
• Work center
• BOM
18) Which of the following requirements for a manufacturing plant can be supported by using
process manufacturing?
• Master recipe-based manufacturing
• Variable calculation of material quantities (product output, material usage)
19) To have phantom assembly functionality, what is necessary?
• Setting in both BOM & Material master required
20) What sequence do you follow in master data maintenance to define the production of a material?
• Create BOM -> Create work centers -> Create routing -> Carry out component assignment in
BOM or routing
21) Which BOM selection possibilities are available for opening a production order?
• Selection using a production version
• Automatic selection controlled by Customizing settings
22) Which strategy is particularly useful when you want to produce regardless of whether you have
stock or not?
• strategy 11
23) Which of the following goals can be achieved using long term planning?
• demand for coming period/s
• optimize purchasing target
24) Backflushing indicator set in ________ has the highest priority.
• Routing/master recipe
25) What are all the 'Technical Types of BOM'?
• Variant BOM
• Multiple BOM
26) What is the transaction code to run the Long Term planning run for Single item, Multi level?
• MS02
27) At what levels planning can be done in SOP?
• Both Material and Product level
28) In dependent/parallel discontinuation all materials are replaced, when their inventory levels are
zero.
• FALSE
29) Standard SOP is the only functionality provided to support MRP process.
• FALSE
30) Explosion dates of BOM and Routing are identical.
• TRUE
31) If you do not review the exception messages or capacity prior to planning, than MPS is not a step
you need in you planning process.
• TRUE
32) If MRP Areas are used, Materials in the given storage locations are planned at the MRP level.
• FALSE
33) Which of the following parameters are determined by the planning strategy?
• Planned independent requirement type
• Customer requirement type
34) Material Quantity shown in t-code MD04 is calculated according to ATP logic.
• FALSE

35) For a given material , in Sales order A Qty. 15 PC and Sales order B Qty. 25 PC are booked on
same date and stock is 0 PC?
• Separate Planned Order for each Sales Order shall be created if individual indicator is set
• Only one planned order is created if Collective indicator is set
36) If you want to assign special control parameters like planning horizon, creation indicators,
document type etc to a material you define these as ______ in IMG and assign the same
to the material master.
• MRP Area
37) Which of these identifies the type of execution process in SAP ERP?
• Production Orders
• Process orders
• REM
38) Correct group of MTS strategies:
• 40,30,10,11,52,63
39) MRP Procedures:
• MRP
• MPS
• Consumption-Based Planning
40) BOM Subitems are copied to production order.
• FALSE

1. For a production version to be valid and consistent what requirements must be fulfilled?
• The lot size range must be within the lot-size range of the assigned routing
• The deletion flag must NOT be set for the bill of materials (BOM) or the routing
• The assigned routing and bill of materials (BOM) must be valid in the entire validity period

SET:3

1. What are the key aspects of SAP S/4HANA?


• SAP S/4HANA can be deployed on-premise, in the cloud, or a combination of both.
• SAP S/4HANA is built on SAP HANA
2. In a production process, you need a certain amount of liquid as input material. The
source tank is directly connected to the reactor. How can you process consumption
postings?
• Backflushing
3. Which of the following apply to MRP Live?
• The definition of the planning scope is more flexible.
• The sequence of planning materials is calculated across plants.
4. You want to create a production order from a planned order. What methods could you
use?
• Full conversion
• Partial conversion
5. Which of the following time elements does MRP use during backward scheduling for
in-house production?
• Goods receipt processing time
• Opening period
6. Advanced Planning uses master data and transaction data from SAP S/4 HANA. In
which data objects can you set the advanced planning flag?
• Work center
• Material

SET:5
1. Consider a product scenario where there is high product stability, high repetition rates, and
low product complexity. What type of manufacturing do you suggest?
• Repetitive manufacturing
2. As a production manager how do you enable process operations parallel to and independent
of other operations?
• Parallel sequences
3. What options does the SAP ECC system offer to retrieve the available capacity for Resource?
• Standard available capacity
• Interval of available capacity & Shift sequence
4. Maximum consumption period that can be maintained in Material master.
• 999
5. The objectives of capacity leveling include____.
• all of the above
6. What are the relevant views in Material master for product cost planning?
• MRP, Purchasing, costing
7. Scrap in a routing operation reduces the amount of subsequent operations and, therefore,
their production costs. Based on the yield, the costs per unit are ?
• increased
8. MPS is run____.
• After DM before MRP
9. Demand planning is not used to derive future demand quantities from historical data.
• False
10. What are the forecasting techniques?
• Moving average
• Forecast model
• Seasonal model
11. In addition to material master records, classification system can be used to classify ?
• routings, workcenters PRTs and documents
12. Which of the following are relevant for cost settlement?
• scrap
• co- product
• by product

13. Kanban Goods receipt posting - When it takes place ?


• Container status full
14. Standard Operation times are defined in _____.
• Routing

SET:6
1. You want to use the function "Read PP master data" in the process order. However, while
calling the function you receive an error message. What could be the reason?
• Goods movements have been posted.

2. A distinctive feature of you company is a relatively constant consumption of materials. For


this reason, you want to process the material flow to the work centers in production of
your company in an event-drive manner. Is there any possibility in SAP?
• SAP-SCM KANBAN

3. You want to use the different options for planning in SAP ECC. What is the correct
sequence of the planning procedures?
• Sales and operations planning -> Long-term planning -> Demand management ->
Material requirements planning -> Capacity planning

4. Which of these is the relevant Master data for product costing?


• Material Master, BOM, Routing, Workcenter,Activity price, Sub contracting info record
5. Why do we need different formula for setup requirements and processing time
requirements in capacity tab & scheduling tab?
• capacity planning
• scheduling

6. Which of the following are valid integration points between MM and PP during planning?
• Multi-level MRP can generate reservations for materials
• MRP will consider manual Purchase Orders in its planning process.

7. -Variant configuration uses ________.


• class type 300
• object dependencies in BOM and routing to select the bom and corresponding operation
in the routing

8. You can schedule teardown and wait time simultaneously.


• TRUE
9. Move time can be defined in_______.
• operation details of the routing
• location groups in the workcenter

10. Which of the following are types of PRT?


• Material
• Equipment
• Miscellaneous

11. Where can a confirmation be made?


• Operation
• Individual capacity

12. What is the master data that needs to be maintained for Manufacturing with Kanban
replenishment?
• Control cycle
• Production supply area

13. What structural elements need to be present for Repetitive Manufacturing?


• Pull list

14. What options for selecting a routing exist when creating a production order?
• Selection on the basis of the production version
• Automatic selection, controlled via settings in customizing.
• Manual selection.

15. Which of the following activities is necessary for the capacity availability when a
production order is released?
• Activate the availability check and assign an overall profile in check control for the
business
function order release.
16. The Company you advise wants to carry out the material availability check automatically
in the production order at various points in time. Which of the following options would
you recommend?
• Release of the production order
• Creation of the production order

17. Which of the following functions occur when a production order is created?
• Calculating the lead time for the production order
• Selecting and copying a routing
• Copying a document that is assigned to the material master for the product to be
produced.
• Selecting and copying a bill of material

18. Which formula parameters affect the capacity requirements "machine" (standard formula
manufacturing: machine requirements)?
• Standard value machine

19. Valid receivers during production order release?


• Settlement profile

20. Product costing data is stored at the following places:


• In the work centre but different formula can be used for calculating different activity
quantities
21. In repetitive manufacturing the following can be cost collector:
• Manually created cost collector

22. In back flushing of components stock determination strategy is defined in a combination


of ______.
• Stock determination group & Stock determination rule

23. You want to enhance the system statuses of a production order with user statuses.
How do you do this?
• Define a status profile in Customizing and assign it to the order type.

24. Which activity can trigger an automatic availability check for the components of a
production order?
• Order release

25. When are the confirmation nos. generated?


• When production order is generated

26. Trigger points in routing operation can trigger the following functions,
which of the following are correct?
• start workflow task
• release succeeding operation
• release preceding operation
27. If by- products have their own cost estimate with cost component split, the price is
deducted
from total costs of the production process according to the valuation variant.
• TRUE

28. For determining the value of the unfinished goods at the end of period, the _______ is
used.
• wip determination

29. Which options can you use to convert planned orders into process orders in the SAP ECC
system?
• Mass processing
• Background processing in a program
• Order progress report

30. ATP check is not limited to sales requirements.

• TRUE

31. If a material had to cure for a specific time period before it could be passed to the next
operation, what time would be most appropriate to model?
• Wait time

32. You can use user-defined fields to assign data fields to an operation or sub operation for
information purposes only.
• FALSE

33. In iSAP implementation methodology how many key concepts of Lean are given?
• 8

34. In iSAP implementation methodology how many unique phases are defined?
• 6

35. As per iSAP methodology Value Stream Mapping workshops done during which phase?
• Project Prep

36. Data migration strategy is the activity of which phase in isap implementation.
• Realization Build

37. Production Order status are stored in ______ table.


• AUFK

38. Which objects can affect the calculation of capacity requirements for an operation?
• Standard values (routing)
• Formulas (work center)
• Operation control key (routing)

39. In repetitive mfg individual post processing records can be created for error correction
during backflushing.
• TRUE
40. Which are the prerequisites for work centre deletion?
• It is not in use

SET:7
1. Consider a product scenario where there is high product stability, high repetition rates, and
low product complexity. What type of manufacturing do you suggest?
• Repetitive manufacturing
2. As a production manager how do you enable process operations parallel to and independent
of other operations?
• Parallel sequences
3. What options does the SAP ECC system offer to retrieve the available capacity for Resource?
• Standard available capacity
• Interval of available capacity & Shift sequence
4. Maximum consumption period that can be maintained in Material master is _____.
• 999
5. The objectives of capacity leveling include____.
• all of the above
6. What are the relevant views in Material master for product cost planning?
• MRP, Purchasing, costing
7. Scrap in a routing operation reduces the amount of subsequent operations and, therefore,
their production costs. Based on the yield, the costs per unit are:
• increased
8. In addition to material master records, classification system can be used to classify:
• routings, workcenters PRTs and documents
9. Which of the following are relevant for cost settlement?
• co- product
• by product
• waste product
10. Duration of an operation consists of maximum of 5 parameters.
• TRUE
11. An operation can start before the previous operation has finished.
• TRUE
12. The same PRT can be assigned to more than one operation on the same routing.
• TRUE
13. Kanban Goods receipt posting - When it takes place ?
• Container status full
14. Standard Operation times are defined in _____.
• Routing
15. What are the activities possible on Sub operations?
• Costing
• Capacity Planning
16. Which of the following elements do you have to prepare for costing of a production order to
function without errors?
• Use an operation control key with the indicator ‘costing-relevant’.
• Assign costing variants to order type.
• Enter formulas for costing in the work center.
17. Which production order function can no longer be carried out after the order is released?
• Switching sequences
18. What are the consequences of a confirmation of an operation?
• The operation’s capacity requirements are reduced
• Actual costs are posted for the production confirmed
19. Confirmation options of operation are defined by__________.
• Control key
20. What is the standard operation time with start time 7 AM, End time 3 PM, break time 2
hour, Efficiency set at 80%. Overload:110%,Individual capacity1 ?
• 4.8 hours
21. Which of the following can be done in through PP-PDC interface?
• Confirmation
22. When an operation is dispatched in capacity leveling?
• System status for that operation is set is dispatched
23. Capacity reduction is the result of_____________.
• TECO/ Lock of orders
• Close of orders
• Confirmation of orders
24. Which types of objects can be changed with Engineering Change Management (ECM)?
• Task list
• Bill of material
25. How are Product cost collectors created in REM ?
• Created manually with reference to Production version
26. It is possible to confirm production order with a date in future.
• FALSE
27. In joint production, the apportionment structure is maintained in the material master of
which product?
• leading co-product
28. Select the right sequence for ASAP Roadmap:
• Project preparation, Business blueprint, Realization, final preparation, Go live & support
29. Planned orders always generate production dates.
• FALSE
30. When using sub operations, costing is automatically done at the operation level regardless
of the control keys.
• FALSE
31. The planned orders that are displayed in the planning table cannot be seen in the
stock/requirements list.
• FALSE
32. What is the difference between a operation-related and order-related confirmation?
• Order confirmation is a confirmation of the entire order at order header level and an
Operation confirmation allows you to confirm an order step by step
33. Variant Configuration is typically used in:
• Make - to - Order Environment
34. In solution manager processes structure t-codes for business processes are assigned at
which level?
• 3
35. Settlement in product cost controller is based on ________.
• Period-oriented
• Costs of the product cost controller
36. When Production Order status is TECO then you can still make a posting for order.
• TRUE
37. Which of the following scheduling types can only be used in capacity planning?
• Midpoint
38. You want to enhance the system statuses of a production order with user statuses.
How do you do this?
• Define a status profile in Customizing and assign it to the order type.
39. In Repetitive mfg profile following can be assigned:
• Stock determination -rule
• Batch search procedure
40. Settlement profile can not be assigned at plant level For production order type.
• TRUE
SET:8
1. You want to use the function "Read PP master data" in the process order. However, while
calling the function you receive an error message. What could be the reason?
• Goods movements have been posted.
2. A distinctive feature of you company is a relatively constant consumption of materials.
For this reason, you want to process the material flow to the work centers in production of
your company in an event-drive manner. Is there any possibility in SAP?
• SAP-SCM KANBAN
3. You want to use the different options for planning in SAP ECC. What is the correct sequence
of the planning procedures?
• Sales and operations planning -> Long-term planning -> Demand management ->
Material requirements planning -> Capacity planning
4. Which of these is the relevant Master data for product costing?
• Material Master, BOM, Routing, Workcenter,Activity price, Sub contracting info record
5. Why do we need different formula for setup requirements and processing time
requirements in capacity tab & scheduling tab?
• capacity planning
• scheduling
6. Which of the following are valid integration points between MM and PP during planning?
• Multi-level MRP can generate reservations for materials
• MRP will consider manual Purchase Orders in its planning process.
7. Variant configuration uses ________.
• class type 300
• object dependencies in BOM and routing to select the bom and corresponding operation in
the routing
8. You can schedule teardown and wait time simultaneously.
• TRUE
9. Move time can be defined in_______.
• operation details of the routing
• location groups in the workcenter
10. Which of the following are types of PRT?
• Material
• Equipment
• Miscellaneous
11. Where can a confirmation be made?
• Operation
• Individual capacity
12. What is the master data that needs to be maintained for Manufacturing with Kanban
replenishment?
• Control cycle
• Production supply area
13. What structural elements need to be present for Repetitive Manufacturing?
• Pull list
14. What options for selecting a routing exist when creating a production order?
• Selection on the basis of the production version
• Automatic selection, controlled via settings in customizing
• Manual selection.
15. Which of the following activities is necessary for the capacity availability when a production
order is released?
• Activate the availability check and assign an overall profile in check control for the business
function order release.
16. The Company you advise wants to carry out the material availability check automatically in
the production order at various points in time. Which of the following options would you
recommend?
• Release of the production order
• Creation of the production order
17. Which of the following functions occur when a production order is created?
• Calculating the lead time for the production order
• Selecting and copying a routing
• Copying a document that is assigned to the material master for the product to be produced.
• Selecting and copying a bill of material
18. Which formula parameters affect the capacity requirements "machine" (standard formula
manufacturing: machine requirements)?
• Standard value machine
19. Valid receivers during production order release:
• Settlement profile
20. Product costing data is stored at the following places:
• In the work centre but different formula can be used for calculating different activity
quantities
21. In repetitive manufacturing the following can be cost collector:
• Manually created cost collector
22. In back flushing of components stock determination strategy is defined in a combination of
______.
• Stock determination group & Stock determination rule
23. You want to enhance the system statuses of a production order with user statuses.
How do you do this?
• Define a status profile in Customizing and assign it to the order type.
24. Which activity can trigger an automatic availability check for the components of a
production order?
• Order release
25. When are the confirmation nos. generated?
• When production order is generated
26. Trigger points in routing operation can trigger the following functions, which of the following
are correct?
• start workflow task
• release succeeding operation
• release preceding operation
27. If by- products have their own cost estimate with cost component split, the price is deducted
from total costs of the production process according to the valuation variant.
• TRUE
28. For determining the value of the unfinished goods at the end of period, the _______ is used.
• wip determination
29. Which options can you use to convert planned orders into process orders in the SAP ECC
system?
• Mass processing
• Background processing in a program
• Order progress report
30. ATP check is not limited to sales requirements.
• TRUE
31. If a material had to cure for a specific time period before it could be passed to the next
operation, what time would be most appropriate to model?
• Wait time
32. You can use user-defined fields to assign data fields to an operation or sub operation for
information purposes only.
• FALSE
33. In iSAP implementation methodology how many key concepts of Lean are given?
• 8
34. In iSAP implementation methodology how many unique phases are defined?
• 6
35. As per iSAP methodology Value Stream Mapping workshops done during which phase?
• Project Prep
36. Data migration strategy is the activity of which phase in isap implementation.
• Realization Build
37. Production Order status are stored in ______ table.
• AUFK
38. Which objects can affect the calculation of capacity requirements for an operation?
• Standard values (routing)
• In-house production time (material master)
• Operation control key (routing)
39. In repetitive mfg individual post processing records can be created for error correction
during backflushing.
• TRUE
40. Which are the prerequisites for work centre deletion?
• It is not in use