COMPANY PROJECT NO: DOCUMENT TITLE: DS8 TRAIN A/C FWKO SEPARATOR – FOUNDATION GA & DETAILS DATE: AWQ0880 11 Dec 2023 CONTRACTOR PROJECT NO: COMPANY DOCUMENT NO: IQWQ-PR-CDFND-D8-0001 CONTRACTOR DOCUMENT NO: PE19526AD-D8-DW-1743-01 REVISION: 1A PE19526AD PAGE SECTION ITEM No. COMMENTS FROM CLIENT (from EMIL) RESOLUTION (from PEG) CLOSED / OPEN NO.
Please provide distance between pile and existing cable
1 trench Noted and updated. Closed
For ease of construction & to provide clearance to the existing
Please provide distance between pile and existing cable cable trench, one row of piles in the fixed saddle (North side) of the 2 Closed trench Train-C separator foundation is moved 1.3m towards the south and the pile cap is extended accordingly. X X X X X X