WEST QURNA I

Free Water Knock Out (FWKO) Project

COMMENTS RESOLUTION SHEET (CRS)


COMPANY PROJECT NO: DOCUMENT TITLE: DS8 TRAIN A/C FWKO SEPARATOR – FOUNDATION DETAILS 1 DATE:
AWQ0880 11 Dec 2023
CONTRACTOR PROJECT NO:
COMPANY DOCUMENT NO: IQWQ-PR-CDFND-D8-0002 CONTRACTOR DOCUMENT NO: PE19526AD-D8-DW-1743-02 REVISION: 1A
PE19526AD
PAGE SECTION
ITEM No. COMMENTS FROM CLIENT (from EMIL) RESOLUTION (from PEG) CLOSED / OPEN
NO.

For ease of construction & to provide clearance to the existing


Please provide distance between pile and existing cable cable trench, one row of piles in the fixed saddle (North side) of the
1
trench Train-C separator foundation is moved 1.3m towards the south and Closed
the pile cap is extended accordingly.