SL.

Bidder's Rate
No Item Description Unit Quantity (NPR)

Insurance works of Manpower, 10000


Official Technicians,Plants ,
Equipments/Machinaery for anykind of
1 hazards ,minmimum 1 million NRs. for any job 1.0
kind of Casualties or Death of Manpowers
for project periods as per instructions

Lab tests ,Project Informative Board 10000


Installations and other provisional costs for
2 unseen damages and replacing them like job 1.0
drinking water
pipes or other minimum cases worth rupees
twenty thousands
Earthwork in excavation mechanically 51
for landslide clearance,foundation of plumb
3 drain,transporting of excavted materials at cu.m 943.88
defined location all complete works

4 Stone soling works (pond 0+000) cu.m 83.48 3000

Form works for plumb structures all


complete works 1564.74 50

Plumb concreting works for retaining 6700


wall and drain (plumb 60% 1:2:4 and
6 boulder 100 mm down 40%)using mixture cu.m 527.98
machine and vibrator as per
specifications and instructions of Site
Engineer
Providng , laying,spreading ,watering , 2700
levelling and compaction with steel roller 8-
7 10 ton for natural gravel subbase all cu.m 192.06
complete works as per DoR norms
/specifications and instructions all complete
works
RCC 1:2:4 for road way using mixture
machine and vibrator all complete
8
works as per specifications
cu.m 37.13 10000

Steel reinforcement works 10 mm dia 100


@ 12 cm c/c bothway laying and
9 binding works all complete as per kg 2562.15
specifications
Bidder's Rate (in Total Amount
words) (NPR)

10000.0

10000.0

48137.9

250440.0

78237.0

3537466.0

518562.0

371300.0

256215.0

total 5080357.9 10768768.99


5740804.4
53.3
Below 46.7