Bill of Quantities

ovisional Sum
Procument Item Details
Sl.
No. Item Description Unit Quantity Unit Rate (NPR)

1 Insurance ps 1.0 32179.59

2 Lab Test report ps 1.0 6013.86

3 Project Sign Board ps 1.0 5650.0


2 Construction work
Procument Item Details
si. Bidder’s Rate Bi
No. Item Description Unit (NPR) dder's Rate (in words)

1 Site Clearance, all unnecesary Sq.m 160.00 100


materials and bushes remove from site and
disposing of debris 5km away from the
site as per instruction all complete.

2 Earthwork in excavation in trenches, Cu.m 33.60 300


foundation of stone masonry wall in
medium soil including timbering and
pumping out water from the basement (if
necessary) dressing of sides, ramming of
bottom, lift upto 3.5m, as per specification,
drawings
& instruction of site engineer.
3 Providing and laying of single layer 15cm Cu.m 7.20 3000
thick Stone soling in foundation and
flooring area, packing the joint with coarse
sand including watering up to the
approved levels and line as per
drawing specification all complete as per
instruction of site incharge.

4 Providing, laying and curing random Cu.m 54.60 6000


rubble stone masonry works of stone
masonry fencing wall in cement, sand
mortar (1:4) in foundation finished upto
ground level in perfect lines & level
including wetting the stones, packing the
joints as per specification, drawings &
instructions of the site engineer.

5 hdpe 60 300
6 Providing, laying, compacting and Cu.m 18.65 7000
curing plain cement concrete M15 (1:2:4)
in foundation of stone masonry wall with
cement, sand and stone ballast 20mm
gauge finishing to approved level, lines
and dimensions all complete as per
drawings, specifications and instruction of
the site engineer
7 Fabricating , installing and Laying 7 mm Sq.m 160.00 2800
dia bar (62x62)mm mesh on compound
wall in between two black
iron tubular pipes of size 50mm at spacing
of 2 metres verticals and
25*25*4 angle frames horizontals and
projecting 20*3 MS grill at top of each
vertical as per design, drawing and
specifications of site engineer.

8 False Rolled Tipkar 1:2 c-s mortar Sq.m 80.00 100


on stone mansonry walland approved
quality including supply of materials
,mixing,curing at least 7 days complete as
per drawing, specification and instruction of
site engineers.
tities

Amount (NPR)

32,179.59

6,013.86

5,650.00 43,843.45

Total Amount
dder's Rate (in words) (NPR)

16000.00

10080.00

21600.00

327600.00

18000.00

130550.00
448000.00

8000.00

total B 979830.00 1713389.07


C 127377.90 222740.5791
A+B+C 1151051.35 68535.5628
2004665.2119
57.42
42.58