CV Karya Hidup Sentosa Yogyakarta Date : Departemen Produksi (SAMPLE) Page :
Item Description : REQUESTOR
Item No : Spv / Ka.Sie Ass / Ka. Unit Product : Section : Unit : Departement : Tgl : Tgl : CHANGE REASON Productivity Cost Down Effectivity Quality Kaizen Safety Capacity Pembakuan Proses 1. 2. PCR Purpose 3. 4. BEFORE AFTER
Process Detail
Resource (Machine/Operator) * Include Quantity
Material
Target
Ingredients/BoM: pcs Ingredients/BoM: pcs
Nesting Improvement By Product/Afval: kg By Product/Afval: kg Product : pcs Product : pcs % Target Productivity : Procentage Improvement (%) % Nesting Improvement : Etc :
Note
ITEM DETAIL √/x STD PIC Name Due Date Aktual
Visualisasi Flow Proses Update Inspection Metode (CBO) Update Document Preparation Nesting Update TMS, Target Update Laporan Trial Update Program CNC / Program Mesin Update PE Alat Bantu (Dies,MF,WF,Drill Jig,dll) Order Tooling Making & Preparation Alat Bantu Ukur (IJ,Plug Gauge,dll) Order Cutting Tools Order Trial Off Line Trial Order In Line Trial Order Index Cost Cost Calculation Order PE PCR APPROVAL FOR ENGINEERING JUDGEMENT Ka.Si. PE Ka.Si. PE PCR Koord. PE Ass.Ka.Bid. PE-TM Ka.Dept. Produksi*
Tgl : Tgl : Tgl : Tgl : Tgl :
PE PCR Note: 1. Cost Up / Cost Down: % PCR Diterima PCR Diterima 2. PCR Ditolak PCR Ditolak *Jika terjadi penurunan produktivitas dan potensi Cost Up (di luar kasus Process Standardization & Quality), harus approval sampai Level Ka.Dept.Produksi
ITEM DETAIL √/x STD PIC Name Due Date Aktual
ERP Flow Process Check Check Data PE Document Preparation Check PCR Estimasi Tanggal Upload Order Stock & Transaction Oracle Check Oracle Upload Oracle Upload PIEA Cetak & Verifikasi Data Oracle Verified APPROVAL FOR IMPLEMENTATION Ka.Si. PIEA Ka.Si. PE PCR Ass. Ka. Bid. PE-TM Tgl : Tgl : Tgl :