1.d.02 Schedule of Material Price

You might also like

Download as docx, pdf, or txt
Download as docx, pdf, or txt
You are on page 1of 3

SCHEDULE OF MATERIAL PRICE

Item Description Unit Rate

1.0 Piling
Supply 150mm x 150mm precast concrete Piles

1.1 Initial 3m m

1.2 Initial 6m m

1.3 Extension 3m m

1.4 Extension 6m m

2.0 Excavation
2.1 Hardcore m3
2.2 Sand m3

3.0 Bricks
3.1 Clay Brick
No
3.2 Cement and Sand Bricks
No

3.3 Facing Bricks


3.3.1 Light Red No
3.3.2 Granite No

3.4 Exmet Strip


3.4.1 63.5mm x 24m Roll
3.4.2 76.2mm x 82.90m Roll
3.5 DPC (20mm x 1m) Roll
3.6 Ventilation Block (127mm x 152.4mm x 304.8mm) PC

SOMP 1
SCHEDULE OF MATERIAL PRICE

Item Description Unit Rate

4.0 Cement
4.1 Cement (ordinary) Bg

4.2 Aggregate

Limestone
4.2.1 Limestone 20mm MT
4.2.2 Limestone 40mm MT
4.2.3 Limestone 19mm MT

Granite
4.3.1 Granite 38mm MT
4.3.2 Granite 25mm MT
4.3.3 Granite 19mm MT

5.0 Reinforcement
5.1 Mild Steel Bar 10mm Diameter MT
5.2 Ditto 12mm Dia MT
5.3 Ditto 16mm Dia MT
5.4 Ditto 20mm Dia MT
5.5 Ditto exc. 25mm Dia MT
5.6 High Tensile Bar 9/10mm Diameter MT
5.7 Ditto 16mm Dia MT
5.8 Ditto 20mm Dia MT
5.9 Ditto 25mm Dia MT
5.10 Ditto exc. 25mm Diameter MT

SOMP 2
SCHEDULE OF MATERIAL PRICE

Item Description Unit Rate

6.0 B.R.C. Weldmesh Fabric Reinforcement

6.1 A6 MS

6.2 A7 MS

6.3 B6 MS

6.4 B7 MS

6.5 B8 MS

6.6 C6 MS

6.7 C7 MS

6.8 C8 MS

7.0 Galvanised Steel Pipe

7.1 Light (A) – 13mm Dia M

7.2 Ditto – 19mm Dia M

7.3 Ditto – 25mm Dia M

7.4 Ditto – 50mm Dia M

7.5 Medium (B) – 13mm Dia M

7.6 Ditto – 19mm Dia M

7.7 Ditto – 25mm Dia M

7.8 Heavy (C) – 13mm Dia M

7.9 Ditto – 19mm Dia M

7.10 Ditto – 25mm Dia M

7.11 Ditto – 50mm Dia M

SOMP 3