BDCM-PTW-WL-079
BDCM-PTW-WL-079
:
BDCM-POPS-F-001 Revision 5.1
FORM Page: 1 of 10
Kindly read the terms and conditions of this Permit to Work Form issued by Bridge Data Centres Malaysia Sdn
Bhd (BDCM). All details requested in this form must be provided and completed. Insert
requested are not applicable. This application may be rejected if insufficient or inaccurate details are given.
LEVEL MEZZANINE
: MEZZ, FLOOR,
ROOF, ROOFROOF
UPPER FLOOR 1
A) PARTICULARS OF APPLICANT
Address: NO. 65, JALAN HUJAN, OVERSEAS UNION GARDEN, 58200 KUALA LUMPUR MALAYSIA
Site Supervisor Name: ONG SEAN CHERN Site Supervisor Tel No: 0122966928
Facility: MY03 Level: MEZZ,, ROOF Room / Area: WATER PONDING AREA
UPPER ROOF
21 MAR 2023
Date of Work: Start Date: 13 MAR 2023 End Date: 31MAR
31 MAR 2023
2023
Briefly explain work methodology: (e.g.: Work at height using scissor lift, use Oxy welding, use mobile scaffolding to
repair CCTV, repair streetlight by using skylift).
- APPLY LAYER OF SCREDDING AT WATER PONDING AREA
- APPLY ADDITIONAL LAYER OF GEOTEXTILE AND WATERPROOF MEMBRANE
EHS Requirements:
1. LOTO is required whenever any work activity involved with live electric supply and operation
machineries
2. LOTO also required if operation or system involved with gas, air pressure, temperature shut down or
turned off for service
3. Work At Height (WAH) is required whenever any work activity at height (more than 2m height), by using
ladder, scaffolding, scissor lift, skyjack, boom lift or sky lift.
4. HOT work is required whenever any work involved with oxy-acetylene welding, arch welding, metal
cutting, grinding, or drilling task or using flammable material or explosive substance. Hot spot/surface is
generated from the activity.
5. Others, such as work in confined space, deep well, narrow space, required special preventive measures.
6. Multiple PTW may be required if involve various work hazard or unsafe condition.
We will take the maximum precautions to be taken and it is our responsibility to ensure safe work practices are
observed including the use of Personal Protective Equipment (PPE) required for the job. Please refer to the
appendix below for a list of required Personal Protective Equipment (PPE).
SHAFIQ PADZIL
Name of Applicant Name of Facility / Operation Head
Amount: _________________________
Note: The amount of the security deposit is set at 5% of the contract value or RM2,000.00 whichever is
higher.
1) Power Shutdown
Level : ______________________
Area : ______________________
Date : ______________________
Time : From: __________________ To: __________________
I HAVE READ AND FULLY UNDERSTOOD THE TERMS AND CONDITIONS. I ACCEPT AND SHALL
ABIDE BY ALL THE TERMS AND CONDITIONS STATED HEREIN.
FOR BDCM TENANT USE (To be filled by person authorizing the work)
We confirm that the above-mentioned company will be performing work for us and the estimated time to
complete will be ___________ days. We further confirm that we shall be liable for the performance of the
Contractor and adherence of the Contractor and its workers to the Terms and Conditions of this Application.
DOCUMENT CHECKLIST
Schedule Yes No
Deposit Yes No
Insurance Yes No
1. Contractor Information:
Name of Contractor: WAH LOON (M) SDN. BHD. PTW Number: BDCM-PTW-WL-072
BDCM-PTW-WL-079
Company: WAH LOON (M) SDN. BHD. Contractor/Supervisor H/P no: 0122966928
Work to begin (date & time): 13
20 MAR 2023
MAR 2023 BDCM Project Engineer: IR TS ZAHID
Description of work: FLOOR SCREDDING, APPLY ADDITIONAL LAYER OF WATER PROOF MEMBRANE
Area/Room: MEZZ. FLOOR, ROOF FLOOR, UPPER ROOF FLOOR
Not
2. Safe Work Requirement (Before Entering): Yes
required
1. Is safety induction training provided?
2. Is competency valid? e.g.: mobile crane, scaffolder, welder, chargeman.
Man 3. Is work permit / i-card valid? CIDB green card (submit photocopy).
4. Is RTK-Ag Self-Test Result provided?
(Submit copy for new and individuals returning from medical/sick leave).
20 MAR 2023
SHAFIQ PADZIL 13 MAR 2023
Name Signature Date
4. Checked by relevant parties during work or after work completion (Exiting)
Check Items Checked by Contractor/Supervisor Accepted BDCM Project
Engineer
Is work/installation completed with good quality & workmanship?
The BDCM is a secure facility. As such, we seek your cooperation in ensuring that all work procedures and
guidelines as well as security measures are at all times adhered to strictly. This Permit to Work (PTW) Form is
issued to the contractor to work only at the specified location(s) subject to the following terms and conditions.
It is issued only to contractors who have been duly approved by Tenants of the BDCM authorized by BDCM
Building Management:
1. All workers shall wear and display the BDCM Worke the work area. Any worker
found to be without a pass will be removed from the site immediately. The supervisor shall produce
the original copy of the approved permit to work when requested to do so by BDCM Building
Management or BDCM Security personnel, failing which the supervisor and the workers will be
removed from site immediately.
2. Prior permission must be obtained from BDCM Building Management for any work which requires
power shutdown. Prior approval shall be obtained from BDCM Building Management at least five (5)
working days if any of the above activities is deemed necessary.
3. Contractors MUST submit all the relevant documents including the layout plan, work schedule, single
line diagram, approved drawing from the customer and brief BDCM Building Management of the
work involved before carrying out any work in the building.
4. Work at the specified location(s) is allowed only during normal working hours (from 09:00AM to
05:00PM for Monday to Friday inclusive) or the time shown in the work application. Any extended
working hours can be allowed after getting written confirmation from BDCM Building Management.
5. All items including but not limited to structures, equipment, installations, and systems are deemed to
be cleaned and in good working condition prior to the contractor starting work on the floor where
access is permitted. A contractor can be held liable if any item deemed to be in good working
condition prior to him having access to the floor is found to be faulty or damaged after the contractor
has accessed the floor or has commenced work.
6. The contractor shall take all precautions to avoid causing any damage or stain to the wall/floor,
equipment, installations, structures, systems of the building during working, delivery, loading and
unloading. The contractor shall be charged for any rectification work to make good the damage or
stains caused by him.
7. Contractors are PROHIBITED from changing the status of any fire alarm system, fire-fighting
equipment and their associated parts or using the firefighting system for other purposes. A fine of
TWO THOUSAND RINGGITS (RM 2,000.00) will be imposed each time the contractor triggers a
false alarm.
8. BDCM is a non-smoking area. Any contractor who is caught smoking on the premises will be fined
FIVE HUNDRED RINGGIT (RM 500.00) each time.
9. Contractors shall ensure that all staircase doors and service lift lobby doors on the level(s) they are
working on are always kept closed. Any worker found violating this rule shall be removed from the
site immediately.
10. Prior permission shall be obtained from the tenants before entering their premises.
11. Prior permission shall be obtained from the tenant of the floor before using any facilities on that floor.
The facilities include toilets, electricity, workstations, communication equipment, kitchenware,
kitchen utensils, furniture, and the likes.
12. Contractors found in possession of key(s) that can open the lock of any door, panel, or cabinet in the
building without proper authorization shall be handed over to BDCM Security Department for further
action.
13. Contractors are STRICTLY PROHIBITED from taking any food, drinks, cigarettes, lighters and/or
match sticks into the critical area or mechanical rooms. Any workers found with such materials in the
critical area or mechanical rooms shall be fine One THOUSAND RINGGIT (RM 1,000.00) and
removed from site.
14. Prior permission shall be obtained from the building manager to enter any mechanical floor. Entry
into mechanical floors is restricted to working hours only (09:00AM to 05:00PM) unless prior
permission is obtained to enter the mechanical floors after working hours.
15. All materials, containers, tools, equipment, covers, boxes, wrappers, packing, scaffolding and the like
brought into the work area shall c n a conspicuous part of
the item for easy identification. Any item that does not clearly and conspicuo
name will be considered as unclaimed material and shall be removed as debris without notice.
16. Drilling, cutting, or covering of any openings of any description on any part of the building structure
or load bearing structure is NOT allowed. Prior approval shall be obtained from BDCM Building
Management if any of the above activities are deemed necessary.
17. Any drifting dust, rubbish, unwanted material around the work site shall be cleaned immediately,
failing which the cleaning works may be done by BDCM Building Management appointed cleaners
and all costs incurred shall be deducted from the deposit and/or charge to the contractor.
18. Garbage and debris shall be transported out of the building daily, failing which BDCM Building
Management may remove the garbage and/or debris and all costs incurred shall be deducted from the
deposit and/or charge to the contractor. Leftover food, food and drink containers must be disposed of
in rubbish bins.
19. Contractors are PROHIBITED from using the passenger lifts unless prior permission is obtained
from BDCM Building Management.
20. Use only the service lift, back staircase or loading area for transporting any equipment, material, tools,
ladders scaffolding, construction debris, rubbish, machines, chemicals, or the like.
21. The loading and/or unloading of materials shall be at the designated loading bay, contractor should
collect safety harness from BDCM Building Management before carrying out the work. Prior
arrangement must be made with BDCM Building Management on the time and duration of
loading/unloading.
22. All forms of nuisance but not limited to the following shall be controlled: - noise, noxious fumes,
major impact on the slabs and walls, drifting dust, excess fluid. Any worker found violating this rule
shall be removed from the site immediately.
23. Contractors are prohibited from carrying out any mass production works such as mass fabrication of
parts, mass shaping or mass spray painting of parts or joinery works, furniture works on the floor.
24. A TWO THOUSAND RINGGIT (RM2,000.00) Deposit or sum equivalent to 5% of the contract
value whichever is higher in the form of a Bank Draft or Company Cheque and made payable to
Bridge Data Centres Malaysia Sdn.Bhd lications by ad-hoc contractors. BDCM
reserves the right to cash the Deposit to settle any cost incurred by BDCM for making good damages
caused by the contractor and shall make further claims if the deposit is insufficient. Contractors are
required to top up their Deposit within 3 days if the balance is less than 50% of the Deposit. BDCM
reserves the right to stop works if not complied. The Bank Draft or Company Cheque will be returned
to the Contractor within 30 days of the Contractor completing the work.
26. The terms and conditions stated herein and any details such as telephone numbers provided in this
PTW form are subject to changes without prior notice. BDCM Building Management reserves the
right to request additional information pertaining to this application.
27. This PTW is automatically cancelled if any of the contract agents, or
representatives violates any term and/or condition and they will be removed from site immediately.
28. Contractors are PROHIBITED from taking any photos from BDCM building premises. Any workers
found taking photos will be fined FIVE THOUSAND RINGGIT (RM 5,000.00) and removed from
the site.
1. The contractor should submit the workers for minimum Covid-19 swab tests and only the negative
test result workers approved to enter to BDCM facility. The test results shall be completed within
24 hours prior to entry / commencement date.
2. The contractor worker only allows to use dedicated walkway.
3. The contractor shall provide proper hand sanitizer and face mask to their workers.
4. All contractor employees must wear face masks within BDCM.
5. Any contractor displaying flu like shall be refused to enter BDCM unless a medical report is issued
and reflects fit for work.
6. BDCM will dedicate a place for storage, lunch, and toilet. Contractor worker must adhere to it.
7. A self RTK-Ag Test must be completed if any of the contractor workers has been identified as Covid-
19 close contacts.
1. Evacuation Procedures
In the event of an emergency, it might become necessary to evacuate the building. All occupants
should be completely familiar with the following evacuation procedures:
In an emergency, proceed to the nearest emergency exit door and refer to the evacuation route.
If you are directed to evacuate, follow the instructions of a
Familiarize yourself with the location of all hallways and emergency exits. If a hallway is
blocked, proceed to an alternate hallway.
Use safe stairwell exit procedures; remain calm and quiet, remove high-heeled shoes, exit in a
single line, keep to the right, and use handrails, moving quickly but do not run.
Assist injured occupants and others who might have trouble on the stairs and treat injuries on
stairwell landings only when it can be done safely.
2. Minimum recommended approved PPE (Personal Protective Equipment) prior entering BDCM
Facility.
Mandatory Additional
Task
Protective Equipment Protective Equipment
- Safety Glass
Dirty / Dusty Environments - Fabric Gloves
- Half face Respirator
- Electrical Insulated Gloves
Electrical Works - ELCB/ MCB
- Fiber glass platform ladder
- Safety Helmet - Safety Glass
* Must be approved by SIRIM - Chemical Resistant gloves
Chemical Handling Malaysia. - Chemical resistant clothing
- Safety Boots - Half face respirator
* Must be approved by SIRIM - SDS - Safety Data Sheet
Malaysia. - Welding Face Shield
Light Radiation - Safety Glass (IR & UV) Protection
(Welding Operations, Laser Operations) - Safety Vest - Welding Glove
- Half face Respirator
Heights (>1.8 m) - Full Body Safety Harness
Physical hazard (hand)
- Cut resistant hand gloves
e.g.: sharp edge
Excessive noise activities / workplace - Earplugs
e.g.: >80 dB(A) - Earmuffs
i. General
1. Daily pre task analysis and briefing must be completed before commencement
2. Inspect and ensure all personnel have the required PPE and always worn while on site
3. Inspect equipment and tools for defects before using them.
4. Only authorized and certified operators can handle potentially dangerous equipment.
5. Trailing cables must be taped down, or cones must be placed to alert others to tripping hazards.
6. Loose clothing is not allowed, and long hair and beard must be secured or covered to avoid
entanglement hazards, especially when working near moving or rotating equipment.
7. For safety reasons, contractors with Bermuda/short pants and slippers will not be allowed to enter the
premises.
8. Prior disclosure to BDCM Building Management and prior permission must be obtained from BDCM
Building Management before any hazardous, toxic, corrosive, volatile or highly flammable material,
chemical, gas volatile organic compound such as but not limited to thinner, turpentine, detergent,
acetylene, methane, propane, petrol, kerosene is brought into the building. At the sole discretion of
BDCM Building Management such material, if not stored or handled properly, shall be removed from
the building without notice.
9. All hazardous/scheduled waste shall be with evidence disposed of properly and in compliance with
local regulations.
10. Contractors shall avoid manual lifting by using mechanical devices to lift and transport heavy objects
whenever possible.
11. If unable to use mechanical devices, ensure that workers receive the required manual handling
training to remind lift with their legs, not lift with their back to avoid back injuries.
12. All workers shall be closely supervised by the r whose name appears on page 1
of this work application.
13. Contractors shall be responsible for the safety of their workers and shall not expose the occupants of
the building and the public to any health, safety and security risk when carrying out any work.
Contractors always have insurance coverage for the work to be performed and associated insurance
for their workers.
14. Safety signage and hoarding/barricade shall be installed to the satisfaction of BDCM Building
Management before any work can commence. All barric
name, and telephone number. All construction materials on site shall be stored in a
safe manner. If the works are to be carried out in a public area, a sketch showing the proposed
hoarding and barricade shall be submitted.
15. Contractors shall be equipped with proper safety equipment and rubbish bin for their work conducted.
16. If the works are to be carried out on or near marble and/or granite floor, the floor shall be protected
with plastic sheets placed over a gypsum or plywood board base. Plywood shall not be used for
protection works that require a hot work application.
17. Ensure safety hazard/caution tape installed at workplace.
18. Use cut resistance gloves when work scope related to sharp edges parts.
19. Usage of pallet jack/crane/forklift shall not exceed 70 % of handled material weight.
20. Anti-slip mat shall be used as floor protection to avoid any slip hazard.
ii. Electrical
1. Prior permission shall be obtained from BDCM Building Management to work on any electrical panel
or tap power from any power point.
2. All the extension cord shall be equipped with 100 mA RCBO.
3. Any electric power tapped from the building shall be done through a portable distribution board that
has an RCBO rated at 0.1A or less. Failure to comply will result in a work stoppage and fine of ONE
HUNDRED RINGGIT (RM 100.00) each time.
4. Only non-conducting ladders are allowed for work involving electrical hazards.
iii. Mechanical
1. A maximum of 4 raised floor tiles can be opened at a time and shall be cordoned off. (If applicable)
2. Before beginning work, ensure that certified or licensed personnel are validated to handle forklifts,
cranes, gondolas, and scaffolding.
4 OUTRIGGER SUPPORT
AT EACH CORNERS
EXISTING CAT
LADDER ACCESS
PERIMETER HARD BARRICADE
PERIMETER HARD BARRICADE
SURROUND UPPER ROOF SLAB
SURROUND UPPER ROOF SLAB
PROJECT TITLE:
DESIGN AND BUILD MAIN CONTRACT FOR THE DETAILED DESIGN, AUTHORITY
SUBMISSIONS / PERMITTING, SUPPLY, DELIVERY, INSTALLATION, TESTING AND
COMMISSIONING AND SUPPORT DURING DEFECTS LIABILITY PERIOD OF PROJECT
LION-A NEW 4 MW IT POWER, GREENFIELD DATA CENTRE FOR BRIDGE DATA
CENTRES IN BUKIT JALIL, KUALA LUMPUR.
METHOD STATEMENT
FOR
REPAIR OF STAGNENT WATER ON TPO MEMBRANE
0 22-Feb-21 IFA – Issued For Approval NURUL AINI MR. LIU QING
DATE PREPARED BY CHECKED BY APPROVED BY
REV. STATUS – REVISION MEMO
DD-MMM-YY SMCC (M) SDN BHD SMCC (M) SDN BHD WAH LOON (M) SDN BHD
Sections changed in last revision are identified by a vertical line in the right margin.
Approved
Resubmit
SMCC
Table of Contents
1.0 Introduction 3
2.3 Materials 4
2.4 Manpower 5
8
SMCC
1.0 INTRODUCTION
This Method Statement (MS) is developed to serve as a guide for the REPAIR OF
STAGNANT WATER ON TOP MEMBRANE under the project named – PROJECT LION,
located at PT13746 & PT 13747 Mukim of Petaling, District Kuala Lumpur, Wilayah Kuala
Lumpur. This method statement covers the activities and work related to the repair of
stagnant water on the surface of the waterproofing membranes.
8
SMCC
2.3 Materials
3. 300gsm Geotextile
8
SMCC
2.4 Manpower
8
SMCC
• Measure and cut Geotextile 300gsm and placed it on top of existing TPO before laying new
• Lay new TPO on top and hot air weld the perimeter.
8
SMCC
PLAN VIEW
8
SMCC
ELEVATION VIEW
• Hard barricades (top rail, mid rail, toe board) with outrigger support at each corners to be
• Only existing cat ladder is allowed to be used as access to the Upper Roof.
• Materials will be transferred manually using Nylon Rope from Roof Floor to Upper Roof
Floor.
8
SMCC
Personnel
• All site personnel required document (swab test, valid work permit and valid CIDB)
must submit to WLM EHS Department.
• All personnel work in Project Lion must have completed safety induction and
required training for the task.
Environment
• All the waste generation must be segregated and dispose according to WLM Waste
Management Plan.
• To maintain good housekeeping on site as per WLM Housekeeping SOP.
• To apply proposed Contingency Plan when having bad weather during working:
1. All outdoor and exposed activities are to immediately stop if bad weather as
heavy rain and lightning strike happen.
2. All workers need to take shelter at rest area or safe area. Safe area is area
that not exposed to outdoor.
3. Hence, the building were permanently installed with lightning arrestor and
its fully operate and functional.
8
WATERPROOFING WORK FOR DC BUILDING UPPER ROOF
Risk Assessment Ref No.: BDC/RA/045
Participate in RTK
test every monthly
organize by WLM.
Risk Assessment Ref No.: BDC/RA/045
PPE:
5) Operator must be
competent and register
with Dosh
Administration:
1) To check no any
machinery park in
radius lifting
2) Unauthorized person
not allowed to enter
working area
PPE:
PPE:
Fall from height fatal/serious injury Engineering: 5 3 15 Always 100% tie off 5 2 10 Supervisor &
1) working platform must while working at height SSS
have guard rail (mid
and top) Closely monitoring and
2) To install toe board supervision
Administration:
1) don’t over reach from
railing
2) attend pre task talk and
brief SOP of working at
height
3) to apply WAH PTW
PPE:
1) additional PPE such as
inspected safety harness with
double lanyard
2c. Cleaning surface Slip, trip and fall Body injury. Administration: 3 2 6 3 1 3
by using air
compressor and 1. To ensure To carried out check
grinding surrounding at work area and
workplace is free remove any
from unwanted obstruction prior to
Supervisor &
material. performing work.
SSS
2. To provide safe
access where the
material not blocking
the access.
3. To carried out
housekeeping
regularly.
1) Ensure workers in
good health
2) Do not allowed
person wear loose
cloth while operate
the machine
1) Mandatory to wear
PPE (helmet with
chinstrap, 2inch vest,
safety glasses,
safety shoes, cut
proof gloves,)
Electric shock Serious body injury / Administration: 5 3 15 Clean the socket 5 2 10 Supervisor &
fatal before use SSS
1) Do not used damage
cable. Do not use in wet
condition.
2) To post safety
signage at working To carry out checks
area. on the cable condition
before use by the
user.
Risk Assessment Ref No.: BDC/RA/045
4) To remind workers
regarding electrical
safety during PTT.
5) To do inspection on
electrical tools by
competent person.
PPE:
1) Mandatory to wear
full PPE (helmet with
chinstrap, 2inch vest,
safety glasses,
safety shoes, cut
proof gloves,)
2d. Pour waterproof Dust Raspatory Problem, Administration: 4 2 8 Ensure workers keep 4 1 4 Supervisor &
substances on the Health Issue 4) Ensure workers in clean their cloth SSS
slab and toilet good health before left site.
surface
5) Barricade working Mask to be provided
area with awareness extra for exchange if
signage dirty
PPE:
Administration:
3) Post awareness
signage at working
zone
PPE:
1) Wear appropriate
PPE such as N95
Risk Assessment Ref No.: BDC/RA/045
2e. Water ponding Slip, Trip & Falls Bodily injury. Administration: 3 2 6 3 1 3
testing access and egress
1) To do RA briefing clear from obstruction
before start work
Supervisor &
2) Post signage at SSS
entrant
3) Close monitoring by
supervisor
PPE:
1) Mandatory to wear
PPE (helmet with
chinstrap, 2inch vest,
safety glasses,
safety shoes, cut
proof gloves)
Mosquito Health Engineering 3 2 6 Divert water to 3 1 3 Supervisor &
breeding sediment pond SSS
1) Dewatering after
testing done
Administration:
1) Supervisor to monitor
the water pond after
24hrs
2) To standby abate if
the testing of water
ponding can’t be
done after 24hrs.
3. Housekeeping Untidy work Body injury Administration: 3 2 6 3 1 1
areas with
inadequate 1) All works areas, Clear access and
access resulting access and egress egress are always to
are to be kept clean be maintained. Supervisor &
in slips and trips.
and clear of tripping SSS
hazards.
3. All waste is to be
placed in the
appropriate waste
bin.
PPE:
1. All personnel /
workers must wear
high visibility reflective
jacket.
Risk Assessment Ref No.: BDC/RA/045
3 Moderate Injury or ill-health requiring medical treatment (includes lacerations, burns, sprains, minor fractures, dermatitis and work-related
upper limb disorders).
2 Minor Injury or ill-health requiring first-aid only (includes minor cuts and bruises, irritation, ill-health with temporary discomfort).
● High Risk must be reduced to at least Medium Risk before work commences.
● There should not be any interim risk control measures. Risk control measures should not be overly dependent on PPE.
High Risk Not Acceptable
● If practicable, the hazard should be eliminated before work commences.
● Management review is required before work commences.
Catastrophic (5) 5 10 15 20 25
Major (4) 4 8 12 16 20
Moderate (3) 3 6 9 12 15
Minor (2) 2 4 6 8 10
Negligible (1) 1 2 3 4 5
SikaGrout®-215
Product identifier
Product name : SikaGrout®-215
Label elements
Hazard pictograms :
SikaGrout®-215
In case of skin contact : Take off contaminated clothing and shoes immediately.
Wash off with soap and plenty of water.
If symptoms persist, call a physician.
In case of eye contact : Small amounts splashed into eyes can cause irreversible tis-
sue damage and blindness.
In the case of contact with eyes, rinse immediately with plenty
of water and seek medical advice.
Continue rinsing eyes during transport to hospital.
Remove contact lenses.
Keep eye wide open while rinsing.
If swallowed : Clean mouth with water and drink afterwards plenty of water.
Do not give milk or alcoholic beverages.
Never give anything by mouth to an unconscious person.
Obtain medical attention.
SikaGrout®-215
Extinguishing media
Suitable extinguishing media : Use extinguishing measures that are appropriate to local cir-
cumstances and the surrounding environment.
Environmental precautions : Do not flush into surface water or sanitary sewer system.
Methods and materials for : Pick up and arrange disposal without creating dust.
containment and cleaning up Keep in suitable, closed containers for disposal.
Handling
SikaGrout®-215
Storage
Control parameters
Components CAS-No. Value type Control parame- Basis
(Form of ters / Permissible
exposure) concentration
Quartz (SiO2) 14808-60-7 TWA (Res- 0.1 mg/m3 MY PEL
pirable frac-
tion)
PEL (Respir- 0.1 mg/m3 MY PEL
able dust)
TWA (Res- 0.025 mg/m3 ACGIH
pirable par-
ticulate mat-
ter)
TWA (Res- 0.025 mg/m3 ACGIH
pirable par- (Silica)
ticulate mat-
ter)
TWA (Res- 0.025 mg/m3 ACGIH
pirable par-
ticulate mat-
ter)
TWA (Res- 0.025 mg/m3 ACGIH
pirable par- (Silica)
4/9
SAFETY DATA SHEET
SikaGrout®-215
ticulate mat-
ter)
Cement, portland, chemicals 65997-15-1 TWA 10 mg/m3 MY PEL
PEL (Respir- 5 mg/m3 MY PEL
able dust)
PEL (Total 10 mg/m3 MY PEL
dust)
TWA (Res- 1 mg/m3 ACGIH
pirable par-
ticulate mat-
ter)
Fumes, silica 69012-64-2 TWA (Res- 2 mg/m3 MY PEL
pirable frac-
tion)
Individual protection measures, such as personal protective equipment
Eye/face protection : Safety eyewear complying with an approved standard should
be used when a risk assessment indicates this is necessary.
Skin protection : Choose body protection in relation to its type, to the concen-
tration and amount of dangerous substances, and to the spe-
cific work-place.
Hygiene measures : Handle in accordance with good industrial hygiene and safety
practice.
When using do not eat or drink.
When using do not smoke.
Wash hands before breaks and at the end of workday.
Appearance : solid
Colour : grey
Odour : odourless
SikaGrout®-215
pH : Not applicable
Solubility(ies)
Water solubility : No data available
Viscosity
Viscosity, dynamic : No data available
SikaGrout®-215
tions
Skin sensitisation
May cause an allergic skin reaction.
Respiratory sensitisation
Not classified based on available information.
Germ cell mutagenicity
Not classified based on available information.
Carcinogenicity
Not classified based on available information.
Reproductive toxicity
Not classified based on available information.
STOT - single exposure
May cause respiratory irritation.
STOT - repeated exposure
Not classified based on available information.
Aspiration toxicity
Not classified based on available information.
Ecotoxicity
No data available
7/9
SAFETY DATA SHEET
SikaGrout®-215
Product:
Additional ecological infor- : There is no data available for this product.
mation
Disposal methods
Waste from residues : Do not contaminate ponds, waterways or ditches with chemi-
cal or used container.
Send to a licensed waste management company.
International Regulations
UNRTDG
Not regulated as a dangerous good
IATA-DGR
Not regulated as a dangerous good
IMDG-Code
Not regulated as a dangerous good
Transport in bulk according to Annex II of MARPOL 73/78 and the IBC Code
Not applicable for product as supplied.
Safety, health, and environmental regulations specific for the hazardous chemical
Occupational Safety and Health (Classification, Labelling and Safety Data Sheet of Hazardous
Chemicals) Regulations 2013.
Occupational Safety and Health (Use and Standards of Exposure of Chemicals Hazardous to Health)
Regulations 2000.
8/9
SAFETY DATA SHEET
SikaGrout®-215
The information contained in this Safety Data Sheet corresponds to our level of knowledge at the
time of publication. All warranties are excluded. Our most current General Sales Conditions shall
apply. Please consult the product data sheet prior to any use and processing.
MY / EN
9/9
Safety Data Sheet
according to Regulation (EC) No. 1907/2006 (REACH)
according to Regulation (EU) 2015/830
Additional information
Full text of H-phrases: see section 16.
This mixture does not contain any substances which either present a health or environmental hazard according to directive
67/548/EEC or have an occupational exposure limit assigned.
Safety Data Sheet
according to Regulation (EC) No. 1907/2006 (REACH)
according to Regulation (EU) 2015/830
The information supplied on this safety data sheet complies with our current level of knowledge as well as with national and EU
regulations. Without written approval, the product must not be used for purposes different from those mentioned in chapter 1. It
is always the user's duty to take any necessary measures for meeting the requirements laid down by local rules and regulations.
The details in this safety data sheet describe the safety requirements of our product and are not to be regarded as guaranteed
attributes of the product.
* Data changed compared with the previous version