Document Title CPECC Waste Management Plan OPEN EPC Review CODE FYPC Review CODE
[Code 1] REJECTED - (Revise and
Resubmit)
Status SR No. Rev. TECHNICAL COMMENTS Contractor Reply Remarks
OPEN 1 01 Mention RCER instead of CPER - 4.0 Document reference Revised on page 4 etc OPEN 2 01 Mention env.coordinator responsibilities only (5.1) Revised on Page 5 Mention role of procurement manager, admin manager & site workforce in waste reduction,Transporter handling & 3R principle OPEN 3 01 (5.1) Revised on page 4 & 6 OPEN 4 01 Mention waste transporter RCER permit requirements Revised on page 11 OPEN 5 01 Specify how each type of hazardous waste will be managed(5.3.3). It contains only definition Revised on page 8 & 9 OPEN 6 01 concrete truck washing,back washing is not allowed (5.3.6). Subject to FYPC standards. Revised on page 10 OPEN 7 01 Mention storage requirements,segregation of each waste, colour codes and labelling(5.3) Revised on page 6 Waste log sheet will be submit OPEN 8 01 Add annual expected waste quantity generation of each waste type in tonnes (5.3) to Wison OPEN 9 01 Submit transporter(s) RC approved permit and agreement to contractor Noted OPEN 10 01 Recycling of hydrostatic waste water? Mention the requirements. Submit the plan if required(6.1) noted OPEN 11 01 Mention secondary containment(bunds) min capacity(110%) for spill containment (5.3.8) Revised on page 11 OPEN 12 01 Mention the KPI review and action plan for implementation (6.9).Check for spelling corrections Revised on page 14 OPEN 13 01 Mention the type of emergencies & control measures in waste management. Submit EERP seperately for approval ERP has developed OPEN 14 01 Mention training & competency requiremenets,PPE for waste handlers/workers at site with respect to each type of waste(5.3.8) Revised on page 11 OPEN 15 01 Mention how the waste manifest will be implemented, retaining period & record of documents(5.3.7) Revised on page 10 OPEN 16 01 Mention types of incompatible wastes expected and methods/rule of segregation during handling/storage(5.3.8) OPEN 17 01 mention intermediate storage requirements & maximum allowed duration(90days) for final disposal of hazardous wastes Revised on page 11 OPEN 18 01 change HSE officer to env. Coordinator(6.3)- daily inspections Revised on page 13 OPEN 19 01 Submit Environmental emergency plan for approval.mention E-ERP document number (6.5) Revised on page 13 OPEN 20 01 Mention vehicle/equipment maintenance only at offsite laydown area and waste management procedure for waste oil,greese etc Revised on page 14 Will follow WISON Waste OPEN 21 01 Attach CPECC waste manifest sample for approval Manifest Format OPEN 22 01 Change waste labelling sample of Hazardous waste labelling- UAE to KSA-page 17 Revised on page 17 OPEN 23 02 sub contractor corrections shall be highlighted in red colour within the original document.Mentioned in "notes" below. Revised