Download as pdf or txt
Download as pdf or txt
You are on page 1of 4

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

petrochem.
N FARABI

industrial
TRUE NORTH 0°
YANSAB
321° PREVAILING WIND

national
ibn Rushd
A A

270° 90°

saudi aramco
YCOTD
YANPET
MAKKAH
SAMREF

180°

B MARAFIQ B

KEY PLAN

C C

KING ABDULAZIZ Rd.

D D

TIE-INS
1. LAB
2. C10-C13 (NP)
3. C14-C17 (HNP)
4. C14 BY PRODUCT
5. KEROSENE RETURN
6. FUELGAS
E E
7. BENZENE
8. KEROSENE SUPPLY
9. DIESEL
E:199.500
E:110.850

E:229.000

E:565.000

E:668.500

E:745.000

E:884.000

E:961.600

E:1087.500

E:1317.000

E:1377.000

E:1450.000

E:1518.000

E:1600.000

E:1677.000

E:1881.000
10. HYDROGEN

319000

10850 88650 29500 336000 103500 77000 138500 77600 125900 229500 60000 73000 68000 82000 77000 204000 19000
11850

19000
N2 METERING 115 KV POWER
6000 12500 27000 25000 26000
F UNLOADING AREA UNLOADING AREA STATION PROPERTY LINE SUPPLY LINE N:530.000 F
CAT. 4 FENCE PROPERTY LINE

TRANSFORMER SMOKING SHELTER-1 CAT. 2 FENCE CAT. 2 FENCE


GROUND WATER N:511.000
PATROL ROAD (6m) HEAVY DUTY ROAD (10m) HEAVY DUTY ROAD (10m)
MONITORING WELL
REFER NOTE 8
HEAVY DUTY ROAD (10m)

SECONDARY ROAD (6.1m)

SECONDARY ROAD (6.1m)

SECONDARY ROAD (6.1m)

SECONDARY ROAD (6.1m)


11850
ELECTRICAL DUCT BANK REFER NOTE 7
BOT. OF EL.98.750 UNLOADING AREA

REFER TO EXISTING FIRE WATER NETWORK


814-TP
-52A/B
NOTE-6
EXISTING TRENCH
814-TP
-53A/B
814-TP
-54A/B
FIRE WATER LINE EXISTING TRENCH
814-TP
-57A/B
814-TP
-58A/B
EXISTING TRENCH 814-TP
-60A/B
UNLOADING
DWG.#G446-2814-DW-0290-0001-REV.Z1

ELECTRICAL CONCRETE CABLE


814-PIV-N-5 NOTE-6 BOP. OF EL.98.588 (TYP) 16"-FW

ELECTRICAL DUCT BANK


814-PIV-004 NOTE-6 814-PIV-N-15
EXISTING FIRE HYDRANT EXISTING FIRE HYDRANT
814-PIV-005
REFER TO EXISTING FIRE WATER NETWORK

900-DK-04 900-SL-02
900-DK-02
NOTE-6 DWG.#G446-2814-DW-0290-0001-REV.Z1
N- 496.518

AREA 900-DK-06
BOT. OF EL.98.750
TRENCH BOT. OF EL.99.000

6000 FGL.EL.99850
BUILDING

TOP OF FOOTING 10"-OW E- 868.145


900-DK-01

BOP.OF EL.98.588
CANTEEN

V-N-4

TOP.OF EL.99.000
NE
LIMIT 45 METERS FROM PROPERTYLINE

V-N-14
@ EL.98.900

V-N-18
BOP.OF EL.97.500

HPP
LI

HPP
INSTRUMENT BURIED CABLE INSTRUMENT DUCT BANK

V-N-6
INSTRUMENT DUCT BANK

NE

E&IDUCT BANK
814-PI
HEAVY DUTY ROAD (10m)

HEAVY DUTY ROAD (10m)


BOT. OF EL.98.750

RE W ATER LI
BOT. OF EL.98.750 TRENCH TOP. OF EL.98.550

RE W ATER
814-PIV-076

814-PI
814-PI

PROPERTY LINE
ELECTRICAL BURIED CABLE 814-PIV-N-13

814-PI
1900-TK-41A 1900-TK-41B
1900-TK-08 900-TK-01A 900-TK-01B

10"-OW

CAT. 2 FENCE
SANITARY PIT TRENCH BOT. OF EL.98.850 SLOPE SLOPE SLOPE SLOPE SLOPE SLOPE Service Change Service Change

(B-004)

ON CHANNEL
ON CHANNEL
(TYP)
INSTRUMENT DUCT BANK 803-TK-53
813-P-51A

LPP

LPP
AOS DRAIN 11000mmL X 4600mmW X 3650mmH
2"-SW BOT. OF EL.99.000

FI
813-P-51B
BOT. OF EL.99.200 10"-OW
PROPERTY LINE

10"-OW

FI
OIL HOLDING PIT (2.2x2.2x3.5m) AOS DRAIN 813-TK-51

LPP

LPP

VERSI
VERSI
BOT. OF EL.99.200 27500mmL x 7700mmW x 5000mmH 803-P-53A

PETROLAAN
LIMIT 60 METERS FROM PROPERTYLINE
(B-001)

DI
DI
Ø13.5 x 14.4m Ø13.5 x 14.4m

1201-P-05B

1201-P-06B

1201-P-06A
ELECTRICAL CONCRETE CABLE

1201-P-05A

10"-OW
R

LPP

LPP
15

ON CHANNEL
ON CHANNEL
TRENCH BOT. OF EL.98.850 0 E&I DUCT BANK

HPP
0
0
TOP. OF EL.99.000

FGL.EL.99850

1203-P-01B

1203-P-02B
1203-P-01A

1203-P-02A

BOT.OF EL.99.200
SLOPE SLOPE
TOP OF FOOTING AOS DRAIN LPP

VERSI
VERSI
@ EL.98.900

4"-CD
BOT. OF EL.99.200 DIVERSION CHANNEL

HPP
LPP

DI
DI
1814-DVS-004
1203-P-03B 1900-TK-06A

LPP

LPP
(TYP)

N
FGL.EL.99850

16"-FW

AOS DRAI
1201-V-08

LPP

LPP
1203-PW-01
4"-CD

8"-OW
UNIT
8"-OW 8"-OW
1203-P-03A 4"-CD

10"-OW
4"-CD
8"-OW

HPP

HPP
8"-OW
EXISTING
1203-P-07A
1201-V-07
1203-V-02

UNIT

12"-FW
SLOPE SLOPE

HEAVY DUTY ROAD (10m)

HEAVY DUTY ROAD (10m)

HEAVY DUTY ROAD (10m)

HEAVY DUTY ROAD (10m)

HEAVY DUTY ROAD (10m)


HPP
1203-V-04

202-PR-01
203
1201-E-04 LPP

4"-CD
1203-P-05B SLOPE DIVERSION CHANNEL SLOPE SLOPE SLOPE

GUY WIRE

HEAVY DUTY ROAD (10m)


1203-E-10

HEAVY DUTY ROAD (10m)


704-PR-01
8"-OW
1203-P-07B

HPP
LPP
ADMIN

HEAVY DUTY ROAD (10m)

2"-PW
LPP

16"-FW
DIVERSION CHANNEL
OF FARABIYANBU

1203-OS-03
1203-TS-01

704

HPP
8"-OW 1201-P-07A 10"-OW SLOPE SLOPE
LPP

INDUSTRIAL
1203-P-05A
1201-V-01 1701-TK-20

10"-OW
SLOPE SLOPE

UNIT

108-PR-01
4"-CD
1203-P-06A

ON CHANNEL
CL.
DISC. 1203-V-03
1201-P-01A
CH

1203-P-14B

1900- P- 41A

1900- P- 08A

1900- P- 08B

1900- P- 06A

1900- P- 06B

1701- P- 20A

TRENCH
1203-P-06B

LPP

LPP
1201-P-01B 1201-E-05A/B

(SAPU)

8"-OW
1203-P-14A 10"-OW

VERSI
1203-ME-04

G FGL.EL.99850 G
1203-E-09
1201-E-05C

108

176000
SECURITY
FOR W HI

HPP. EL.100000

NG
DI
R

STI
1203-E-07

F.S
15
1203-ME-05

V-N-16
1203-P-04B

EXI
HPP
1201-E-06A/B

HPP
0

1201-E-23
1201-E-22
1201-E-21
1201-ME-02A

10"-OW
1201-E-20

10"-OW
4"-CD
8"-OW

1201-E-19
1900-TK-06B

0
0

8"-OW
SLOPE SLOPE SLOPE SLOPE
1203-E-06

8"-OW

814-PI
8"-OW
1201-ME-02B 1203-P-08A
1201-R-02
1203-P-04A 1203-V-17A/B
1203-P-08B

EXISTING
8"-OW 8"-OW
10"-OW

900-SL-01 CHECK POST

4"-CD
F.S
1203-P-09A 12"-FW
1203-E-03B 1203-V-05
DVS DVS DELUGE SKIDS

8"-OW
1203-E-11 814-PIV-N-17 12"-FW FGL. EL.99850 814-PIV-N-21
1203-P-09B

UNIT 808

S
8"-OW

F.
1203-E-17

2"-PW
1201-V-20 1201-V-21
1201-V-19 1201-V-22 1201-C-01 1203-E-15
1203-R-01B

104-PR-01
F.S
8"-OW

CHECK POST N:407.500 SECONDARY ROAD (6.1m)


8"-OW
8"-OW 8"-OW
1203-V-07

SECONDARY ROAD (6.1m)

NOTE-6
1203-P-11A 1203-E-14

FUTURE 315m x 187m

2"-SW
1203-R-01A

1201-C-04A

1201-C-04B

16"-FW

702-PR-01
1203-OS-01 1203-P-11B

F.S
8"-OW
1201-ME-01A

900-DK-03 900-DK-05 900-DK-08 900-DK-07


ON.

1203-P-10A 1203-E-13

4"-CD
CONSOLE
1201-ME-01B

813-SL-01
813-ME-01
D

D
COOLING WATER 1201-E-03

L SKI

L SKI
1203-E-12C

AREA
DROP
AREA

DROP

HPP
LUBE

LUBE
PURPOSE OTHER THAN

1203-E-03A 1203-P-10B

HPP
HPP
F.S

F.S
1203-E-12A/B

8"-OW
OI

OI

4"-CD

105-PR-01
ON CHANNEL
1201-E-02

ON CHANNEL
1201-P-03A

12"-FW

F.S
4 HANDICAP + 11 VIP

16"-FW
6"-CD
1201-P-03B 8"-OW

6"-CD
8"-OW
1203-V-06B

00
FGL.EL.99850
1202-PR-01

803- V- 52
0
1203-OS-02 SLOPE SLOPE SLOPE SLOPE SLOPE SLOPE

0
1201-V-09 1203-E-02
1203-V-01

75
ZATI

VERSI
7
1203-TK-01

ON CHANNEL

VERSI
FUEL GAS
1201-P-04A 1814-DVS-006 1203-E-04

R
R

8"-OW

6"-CD
1202-P-02A

DI
1701-P-01A

1701-P-01B

DI
R

803- TK- 52
1201-P-04B 1203-P-13C

UNIT
CURB 1203-E-05

LPP

LPP

LPP

LPP

LPP

LPP
F.S
1201-V-06 1202-P-02B

803- P- 52A
WALL 1203-V-06A

4"-CD
1701-P-02

VERSI
S PROPERTY

1201-V-02 1203-P-13B

90

F.S

FYPC B/L
F.S
1203-E-16
1203-E-01 1203-P-13A

DI
1701-P-03 8"-OW
1201-P-02A

KO DRUM
1202-P-03A

ON CHANNEL

UNLOADING

OFFSITE
00 TEMPORARY
1701-V-01 1201-ME-07

4"-CD F.S
THOUT AUTHORI

702
1202-V-05
CAT. 2 FENCE

SLOPE SLOPE SLOPE SLOPE SLOPE SLOPE

HPP
1202-V-02 1202-P-03B
900-TK-95

8"-OW
UNIT 321

VERSI
4"-CD
1900-TK-02B

HPP
F.S
1900-TK-05 Service Change
1701-E-01 1202-TS-01

HPP

DI
1701-ME-01 1202-V-03 1202-V-04

1701- M E- 03
1202-P-04A

F.S
PIG RECEIVERS
SLOPE SLOPE
1202-OS-02 1202-E-04 SLOPE SLOPE

DVS
1701-V-02 1202-P-04B

16"-FW
1701-P-04A

(POLO)
F.S
1202-OS-01 4"-CD Ø15.3 x 15.25m
1202-E-05
1701-P-04B

F.S
1201-H-01
FUEL GAS SKID 1202-P-01A 1202-E-02

DVS
ACID FLARE

1900- P- 05A

1900- P- 02A

1900- P- 95A
1900- P- 05B
1202-V-01A

8"-OW

1203- P- 12
4"-CD
4"-CD

DS
112500

LPP

LPP

LPP

LPP
8"-FW

DELUGE SKI
4"-CD 1202-V-01B 1202-E-01
1202-P-01B

LPP

AREA
4"-CD
R15000

DVS
16"-FW
0 1202-V-01C 1202-E-03

8"-FW
0
E:550.000

0
15

UNIT UNIT UNIT UNIT


R

1202-V-01D

UNIT KO DRUM

ON CHANNEL
808-P-51A 1202-E-06

V-N-19

DVS
1701-H-01
1202-V-01E

1201-C-03
808-P-51B

V-N-18
V-N-16

814-PI
NED I

V-N-3

1202-V-01F

104 109 105 202

VERSI
V-N-9

6"-OW
R

2"-PW

2"-PW
SLOPE SLOPE SLOPE SLOPE

HPP
7

703

814-PI
DVS
HC FLARE
5

16"-FW
HPP
0 1900-TK-95

DI
803-TK-51 808-V-51 1900-TK-02A

814-PI
0
814-PI

1701-C-01A

814-PI
1701-C-02 1201-C-02A 1201-C-02B
1701-C-01B 814-PIV-N-19 814-PIV-077
2"-PW

4"-CD
F.S
AOS DITCH
803-V-51 16"-FW 16"-FW 814-PIV-N-20

R3
N:335.000
814-PIV-N-2 814-PIV-N-09 2"-PW (TYP.)
4"-CD
16"-FW

H
814-TP
-64A/B KO DRUM H
4"-CD

4"-CD
SECONDARY ROAD (6.1m)
ON CONTAI

00
SECONDARY ROAD (6.1m)
SCLOSED W I

NOTE-6
4"-CD 4"-CD 4"-CD
UNLOADING AREA 902-SL-02

430000
00
6"-OW 6"-OW

902-SL-03
T SHALL NOT BE USED FOR ANY

40000
1000
EXISTING PIPING
GHTS RESERVED

902-SL-01
16"-FW

2"-PW
GATE HOUSE 2 EXISTING TRENCH

814-PIV-N-1
FGL. EL.99850 U/G CORRIDOR EXISTING BURIED CABLES

(B-005B) SEARCH FACILITY-1(B-015A) REFER TO EXISTING FIRE WATER NETWORK


DWG.#G446-2814-DW-0290-0001-REV.Z1
814-PIV-040 814-PIV-041 16"-FW 814-PIV-042
REFER TO EXISTING FIRE WATER NETWORK

902-SL-04 FIRST FLUSH BASIN KEROSENE METERING


L ALMUSFAH ROAD

4"-PW DWG.#G446-2814-DW-0290-0001-REV.Z1

N:295.000 N:295.000
NFORMATI

NOTE-6

814-TP
-51A/B

E=942700 SMOKING SHELTER-3


HEAVY DUTY ROAD (10m) SECONDARY ROAD (6.1m) SECONDARY ROAD (6.1m)
BE DI

N=317700 STATION

R1
0 R1
00 50

SECONDARY ROAD (6.1m)

50
5000
SHELTER-2

00

FUTURE
SEMH-026

CAT. 2 FENCE 0

(B-012B/SS02)
R3 FGL.EL.

BUILDING
00
EXISTING SANITARY PIT

HEAVY DUTY ROAD (10m)


901-PR-01

HEAVY DUTY ROAD (10m)

HEAVY DUTY ROAD (10m)


SMOKING

CONTROL
15

HEAVY DUTY ROAD (10m)


UNIT UNIT UNIT

(B-006)
ALL RI

99850 METERING

(B-012A/SS01)
I

00

MAIN
NOT TO

MAINTENANCE (B-012C/SS03) 102 101 107


PARKING 255 CARS 0

107-PR-01
AND

CAT. 4 FENCE

BUILDING UNIT 901 UNIT ENCLOSURE

HEAVY DUTY ROAD (10m)


(B-012E/SS05) BAU
U/G PIPE CORRIDOR
301-PR-01 UNIT 814 UNIT 800

HEAVY DUTY ROAD (10m)


SECONDARY ROAD (6.1m)

UNLOADING AREA
CAT. 2 FENCE

(B-008) DRUMS RECEPTION 804 PEB

HEAVY DUTY ROAD (10m)


PARKING 26 CARS
PEM

(B-009)
126000

WAREHOUSE 800-SL-01

LOADING &
UNIT UNIT METERING
C

I FIRE STATION N:232.000 I


SAI

(901-SH-01) UNIT 301

ASU-LIGNITE
TECHNICAL

701 201
BUILDING

WAREHOUSE
(B-013A)

(B-013B)
(B-007)
AL –

(301-SH-01) 0
00

HEAVY DUTY ROAD (10m)


FUTURE
LTD..I
S DEVELOPED BY

176000
CAT. 2 FENCE
CATALYST & 5 EMERGENCY EXIT 2

(901-SH-04)
UNIT 802

101-PR-01

201-PR-01
R1
DENTI

77m x 77m DRUMMING


FUTURE CHEMICAL UNIT FUEL GAS
FABRICATION YARD

ISLAND-11
FACILITY LAB
STORAGE UNIT 301 UNIT 810

900E-SL-01
169m x 162m PARKING METERING STATION
MAINTENANCE

(901-SH-02) (B-010)
.CONFI

FIRST
CALS COMPANY

PARKING YAMA

810-JDA-16 810-JDA-17 810-JDD-17 810-JDY-16 810-JDD-16

WAREHOUSE 802
810-ME-12 A/B

810-P-12A

810-P-12B
(16 CARS)
PATROL ROAD

810-ME-01

PLATFORM
ACCESS
FGL.EL.99850 UNIT 801 R4 BENZENE

2"-PW
FLUSH
810-ME-16

810-JDA-19
810-JDA-18
60000
x 45m
70m x 20m

UNIT (301-SH-02) 50
SECONDARY ROAD (6.1m) FILLED DRUMS 311 SECONDARY ROAD (6.1m) UNIT BASIN 00 METERING STATION
N:169.000
5000 11000

CSMH

WEIGH BRIDGE WAREHOUSE SEMH-048 2"-SW

103
ED

EXISTING SANITARY PIT


S DOCUMENT I

0 SUBSTATION H2 METERING
(901-SH-03)
T W AS SUPPLI

00
OPERATIONS
70

UNLOADING

CAT. 2 FENCE
BUILDING
LIMIT 60m FROM PROPERTYLINE 0 ELECTRICAL STATION
(B-002) FUTURE 203m x 45m (B-017) 6 900E-DK-01
AREA
PETROCHEMI

R (B-011/SS00)
6200

SECURITY
69000

R
BUILDING SCRAP GROUND WATER
LIMIT 45m FROM PROPERTYLINE

DE
ACCESS W AY
J J
MONITORING WELL
1 4

WI
5

1550
2

YARD

32M
6

7.
HYDRANT 3

CSMH
N- 134.000
E- 1360.000

N:119.000

23650
THI

RADIO TOWER GATE HOUSE 3 HEAVY DUTY ROAD (10m)


I

PATROL ROAD CAT. 4 FENCE


PARKING 48 CARS
N:100.000 74800 FGL.EL.99850 (B-005C) EAST LIFTING STATION CAT. 2 FENCE
CAT. 2 FENCE CAT. 2 FENCE
6000

19000
CAT. 4 FENCE

11850

11850
WEST LIFTING STATION CAT. 4 INTERNAL FENCE LOADING/UNLOADING SEARCH PROPERTY LINE EMERGENCY EXIT 1 FGL.EL.99850 PROPERTY LINE
E:100.000

GATE HOUSE 1 FACILITY-2 26500 68500 11100


METERING ENCLOSURE BUILDING FGL.EL.99850 SOLID WASTE STORAGE NUCLEONIC SOURCE

58000
OVER WATCH
(B-005A) (B-015B)
(B-003) & SCRAP YARD SHED STORAGE BUILDING
VISITORS WAITING ROOM (B-014) MAINTENANCE GATE
ROYAL COMMISSION CHANNEL ROYAL COMMISSION CHANNEL ROYAL COMMISSION CHANNEL

K K

E:1576.000
E:1373.000

E:1453.000

E:1529.000

E:1900.000
E:1782.000
E:1110.000

E:1262.000

E:1677.000
E:556.000

E:590.150

E:623.000

E:651.500

E:711.000

E:927.000

E:980.000
E:234.750

E:478.000

GATE HOUSE 4
(B-005D)

78000 34150 32850 28500 59500 216000 53000 130000 152000 111000 80000 76000 47000 101000 105000 118000

100000 1800000 100000

SUPPORT
FYPC B/L ENTRY POINTS
BUILDING
L OFFSITE 1. SANITARY WATER L
2. INDUSTRIAL WASTE WATER
3. POTABLE WATER
4. PROCESS WATER

M M

DINESH Sivaprak
Digitally signed by DINESH Digitally signed by K.Mugesh Digitally signed by Sivaprakash
KUMAR DN: cn=K.Mugesh, o=Saipem, DN: cn=Sivaprakash,
DN: cn=DINESH KUMAR, o, ou,
email=DINESHKUMAR.THANGA K.Mugesh ou=Piping,
email=mugesh.kunjanpillai@saipe
o=SAIPEM, ou=X-SIGHT,

KUMAR
email=sivaprakash.murugan@s

ash
RAJ@SAIPEM.COM, c=IN m.com, c=IN
Date: 2022.02.11 18:16:08 Date: 2022.02.11 18:18:35 +05'30'
aipem.com, c=IN
+05'30' Date: 2022.02.11 19:11:36
+05'30'

02 11/02/22 ISSUE FOR INFORMATION TDK KM MS


0m 10m 20m 40m 100m
01 05/01/22 ISSUE FOR INFORMATION TDK KM MS

PREPARED REVIEWED APPROVED


REV. DATE DESCRIPTION
BY BY BY
GRAPHIC SCALE 1:2000
Employer Approval
Employer Document Review Status (by Employer)

NEW FACILITIES DRAWING NUMBER REFERANCE DOCUMENTS: NOTES: LEGENDS: LEGENDS: LEGENDS: FARABI YANBU 1 Rejected
N Name : N
PETROCHEMICALS COMPANY
AOS DRAIN WITH MEDIUM CAT. 2 FENCE 2 Comments as Noted
LAB UNITS CD LINE Discipline :
SR NO. DOCUMENT NUMBER DESCRIPTION 1. ALL DIMENSIONS ARE IN MILLIMETER(mm) & CO-ORDINATES DUTY GRATING COVER CAT. 4 FENCE 3 No Comments
Date :
1201 UOP PACOL PROCESS WITH DEFINE PROCESS HS0131-21201-DW-0505-0001 1 067401-2000-DW-051-001 GENERAL PLOT PLAN, YANBU ARE IN METER(m) UNLESS OTHERWISE SPECIFIED. OWS LINE AOS DRAIN WITH HEAVY
Signature: 4 Information Only
2 HS0131-21201-DW-0505-0001 EQUIPMENT LAYOUT UNIT 1201 & 1701 PACOL & HOTOIL UNIT DUTY GRATING COVER FENCE
1202 UOP PEP PROCESS UNIT 2. REFERENCE POINT COORDINATES Document Category This approval does not absolve the contractor from meeting their
FW LINE A R I contractual obligations of delivering a complete, safe and efficiently
3 HS0131-21202-DW-0505-0002 EQUIPMENT LAYOUT UNIT 1202/1203 PEP & DETAL UNIT N = 100.000 = 38864.3659 (Use Tick mark) : operating unit/facilities meeting all requirements of the contract.
1203 UOP DETAL PROCESS UNIT HS0131-21202-DW-0505-0002 HUME PIPE
4 HS0131-21900-DW-0505-0001 EQUIPMENT LAYOUT UNIT 1900 NEW TANK FARM E = 100.000 = 25542.8890 PW LINE CULVERT FEED & PMC
AUXILIARY UNITS 5 HS0131-21902-DW-0505-0002 EQUIPMENT LAYOUT UNIT 1902 INTERCONNECTI0N SLEEPERS 3. HPP (HIGH POINT OF PAVING) ELEVATION = 100.000m CORRESPONDS FIRE SEAL IN AOS DRAIN
1701 UOP HOT OIL SYSTEM HS0131-21201-DW-0505-0001 6 G446-2900-DW-0500-0001 EQUIPMENT LAYOUT UNIT 900 TANK FARM TO THE MADINAT YANBU AL-SINAIYAH PORT REFERENCE ELEVATION 9.75m. SANITARY LINE
PIPE BRIDGE
1900 NEW TANK FORM HS0131-21900-DW-0505-0001 7 HS0131-2000-DW-0790-0001 SUBSTATION EQUIPMENT LAYOUT FOR SUBSTATION SS-04 CSW DRAIN WITH RCC COVER
4. FOR ELECTRICAL, INSTRUMNET & CIVIL UG FACILITIES, REFER RELEVANT LAYOUT CD PIT
O 8 HS0131-2999-DW-0640-0005 LAYOUT DRAWING FOR CONTROL BUILDING - ITR-4 DRAWING MENTIONED IN REFERENCE DRAWING LIST. DUCT/TRENCH EMPLOYER O
1902 INTERCONNECTION SLEEPERS HS0131-21902-DW-0505-0002 OWS PIT
9 HS0131-2000-DW-0470-0001 B-017 - ARCHITECTURAL GROUND PLAN FOR OPERATIONS BUILDING UG ELECTRICAL CONCRETE
5. FOR UNDERGROUND PIPING COMPONENTS SUCH AS MANHOLE, CLEANOUT, ETCM,
10 HS0131-2902-DW-0720-0001 Cable Tray / Trench Layout For Unit-902 -Update PW PIT CABLE TRENCH GATE FARABI YANBU PETROCHEMICALS COMPANY
REFER DESIGN PHILOSOPHY-UG DRAINAGE SYSTEM ( G446-2999-PH-0595-0001).
11 HS0131-2000-DW-0720-0001 Cable Tray/Trench Layout for Substation SS-04 UG ELECTRICAL BURRIED YANBU, KINGDOM OF SAUDI ARABIA
SANITARY PIT
12 HS0131-21201-DW-0720-0001 Cable Tray/Trench Layout for Unit -1201 & 1701
6. EXISTING CSW DRAIN TRENCH TO BE MODIFIED, TO SUIT PRESENT CONDITION. EXISTING ROAD
REVAMPING EQUIPMENT LIST CABLE TRENCH LAB#4 PROJECT

13 HS0131-21202-DW-0720-0001 Cable Tray/Trench Layout for Unit -1202 & 1203 7. DURING EPC PHASE EXISTING DRAIN DITCH AT THE PROPOSED ROAD ACCESS CSW DRAIN ELECTRICAL ROAD CROSSING /
EQPT. NO DESCRIPTION SCOPE PROPERTY LINE
14 HS0131-2900-DW-0720-0001 Cable Tray/Trench Layout for Unit -New Tank Farm WAY SHALL BE DEMOLISHED AND UG PIPE DRAIN TO BE PROVIDED. ELECTRICAL DUCT BANK (ERC) TITLE:
900-TK-01A/B LAB STORAGE TANK SERVICE CHANGE SCOPE OF WORK-LAB#4
15 HS0131-2999-DW-0720-0001 Cable Tray/Trench Layout for Overall Street & Fence Area-Update GRAVEL SHOULDER
8. TENTATIVE GROUND WATER MONITORING WELL LOCATION IS PROVIDED INSTRUMENT/TELECOM CABLE
900-P-01A LAB PUMP SERVICE CHANGE 16 HS0131-2999-DW-0680-0005 Main Cable Routing Layout For 1201 & 1701 AND LOCATION SHALL BE VERIFIED/CONFIRMED DURING EPC PHASE. DUCT (UG) UNDERGROUND CONCEPTUAL LAYOUT
REVAMPING SCOPE OF
900-P-48A LAB LOADING STATION PUMP SERVICE CHANGE 17 HS0131-2999-DW-0680-0006 Main Cable Routing Layout For 1202 & 1203 MEDIUM DUTY CONCRETE
P INSTRUMENT/TELECOM BURRIED WORK-LAB#4 P
900-TK-95 LK STRIPPER SIDE DRAW TANK SERVICE CHANGE 18 HS0131-2999-DW-0680-0013 Main Cable Routing Layout For Unit -New Tank Farm PAVING (150MM THICK)
CABLE TRENCH (UG) GRAVEL PAVING
19 HS0131-2999-DW-0680-0015 Main Cable Routing Layout For Unit-902 -Update
900-P-95 A LK STRIPPER SIDE DRAW TANK PUMP SERVICE CHANGE HPP HIGHEST POINT OF PAVING
INSTRUMENT/TELECOM CONCRETE (50MM THICK) DOC. CAT : SCALE : SHEET :
20 FAR-DW-F-1000 FIRE PROTECTION SYSTEM DRAWING (EL 100.000) A 1:2000 1/4
900-P-05A/B BENZENE PUMP CAPACITY CHANGE CABLE TRENCH (UG) GRAVEL PAVING
LPP LOWEST POINT OF PAVING DOCUMENT NO : REVISION FORMAT
INSTRUMENT/TELECOM CABLE (70MM THICK)
(EL 99.850)
PULL PIT CSW DRAIN EXISTING HS0131-2999-DW-0510-0004 02 A0
1 2 3 4 5 6 7 8 9 10 11 12 13 14
A0
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

petrochem.
N FARABI

industrial
TRUE NORTH 0°
YANSAB
321° PREVAILING WIND

national
ibn Rushd
A A
FOR CONTINUATION REFER DWG. NO. CL. 10M WIDE ROAD
270° 90°

N HS0131-2999-DW-0510-0004-1

saudi aramco
ELECTRICAL DUCT BANK

YCOTD
BOT. OF EL.98.750 YANPET
MAKKAH
SAMREF
814-TP 814-TP
180°
-52A/B -53A/B

814-PIV-N-5

B ELECTRICAL CONCRETE CABLE MARAFIQ B

TRENCH BOT. OF EL.99.000

TOP OF FOOTING

V-N-4
@ EL.98.900 KEY PLAN

BOP.OF EL.97.500
V-N-6
INSTRUMENT DUCT BANK

NE
814-PI
BOT. OF EL.98.750

RE W ATER LI
814-PI
SANITARY PIT

INSTRUMENT DUCT BANK


C C
2"-SW BOT. OF EL.99.000

NO.

NO.
OIL HOLDING PIT (2.2x2.2x3.5m) AOS DRAIN

FI
BOT. OF EL.99.200

DWG.

DWG.
1201-P-05B

1201-P-06B

1201-P-06A
ELECTRICAL CONCRETE CABLE

1201-P-05A
HS0131-2999-DW-0510-0004-1

HS0131-2999-DW-0510-0004-3
R
15
TRENCH BOT. OF EL.98.850 0
0
0

REFER

REFER
TOP OF FOOTING
D @ EL.98.900 D

16"-FW
CONTINUATION

CONTINUATION
1201-V-08

4"-CD

8"-OW
8"-OW

8"-OW
1201-V-07

E 1201-E-04 E

4"-CD
2"-PW
8"-OW

FOR

FOR
1201-P-07A
1201-V-01
CL.
DISC.
1201-P-01A

1201-P-01B 1201-E-05A/B

F F

ROAD
1201-E-05C

F.S
15
1201-E-06A/B

1201-E-23
1201-E-22
1201-E-21
1201-ME-02A

1201-E-20

4"-CD
1201-E-19
0
ROAD

8"-OW

WIDE
1201-ME-02B
1201-R-02

WIDE
8"-OW 8"-OW

10M
OF FARABIYANBU
CH

G G
W HI

10M

8"-OW

CL.
FOR

1201-V-20 1201-V-21
ON.
THAN

1201-V-19 1201-V-22 1201-C-01


ZATI

CL.
PROPERTY

AUTHORI
PURPOSE OTHER

8"-OW 8"-OW

2"-SW
S
I

1201-C-04A

1201-C-04B

16"-FW
THOUT
NED

8"-OW
H 1201-ME-01A H
CONTAI

WI
ANY
RESERVED

CONSOLE
SCLOSED

1201-ME-01B
1201-E-03

D
COOLING WATER

L SKI

L SKI

AREA

DROP
AREA

DROP

LUBE

LUBE
FOR
ON

F.S
NFORMATI

OI

OI

4"-CD
1201-E-02
BE DI

1201-P-03A
BE USED
GHTS

1201-P-03B 8"-OW
ALL RI

0
I

TO

0
1201-V-09
AND

5
SHALL NOT
NOT

7
1201-P-04A 1814-DVS-006

8"-OW
PEM

1701-P-01A

1701-P-01B
I I
SAI

CURB 1201-P-04B
AL –

WALL 1201-V-06
T
LTD..I

1701-P-02
BY

1201-V-02
DENTI
DEVELOPED

1701-P-03 8"-OW
ED .CONFI
COMPANY

1201-P-02A

1701-V-01 1201-ME-07

4"-CD F.S
S
I

SUPPLI
CALS
DOCUMENT
PETROCHEMI

J 1701-E-01 J
W AS

1701-ME-01
1701- M E- 03
S
THI

T
I

1701-V-02

F.S
1701-P-04A

1701-P-04B 1201-H-01
FUEL GAS SKID

4"-CD
4"-CD
K K

4"-CD
R15000

16"-FW
0
0
0
15
R

1701-H-01

1201-C-03
V-N-3

V-N-9
R
2"-PW

7
5
0 803-TK-51
0
814-PI

L 1701-C-01A L

814-PI
1701-C-02 1201-C-02A 1201-C-02B
1701-C-01B
F.S

803-V-51
814-PIV-N-2 814-PIV-N-09 2"-PW
16"-FW
4"-CD

4"-CD

FOR CONTINUATION REFER DWG. NO.


HS0131-2999-DW-0510-0004-1 CL. 6.1M WIDE ROAD
M M

DINESH Sivapraka
Digitally signed by DINESH Digitally signed by K.Mugesh Digitally signed by Sivaprakash
KUMAR

K.Mugesh
DN: cn=K.Mugesh, o=Saipem, DN: cn=Sivaprakash, o=SAIPEM,
DN: cn=DINESH KUMAR, o, ou, ou=Piping, ou=X-SIGHT,
email=DINESHKUMAR.THANGA email=mugesh.kunjanpillai@saipem.

KUMAR sh
email=sivaprakash.murugan@saipe
RAJ@SAIPEM.COM, c=IN com, c=IN
m.com, c=IN
Date: 2022.02.11 18:16:41 Date: 2022.02.11 18:19:10 +05'30'
Date: 2022.02.11 20:22:08 +05'30'
+05'30'

10m
02 11/02/22 ISSUE FOR INFORMATION TDK KM MS
0m 2m 4m 6m

01 05/01/22 ISSUE FOR INFORMATION TDK KM MS

PREPARED REVIEWED APPROVED


REV. DATE DESCRIPTION
GRAPHIC SCALE 1:300 BY BY BY

Employer Approval
Employer Document Review Status (by Employer)

REFERANCE DOCUMENTS: NOTES: LEGENDS: LEGENDS: LEGENDS: FARABI YANBU 1 Rejected


N NEW FACILITIES DRAWING NUMBER Name : N
PETROCHEMICALS COMPANY
AOS DRAIN WITH MEDIUM CAT. 2 FENCE 2 Comments as Noted
CD LINE Discipline :
LAB UNITS SR NO. DOCUMENT NUMBER DESCRIPTION 1. ALL DIMENSIONS ARE IN MILLIMETER(mm) & CO-ORDINATES DUTY GRATING COVER CAT. 4 FENCE 3 No Comments
Date :
1 067401-2000-DW-051-001 GENERAL PLOT PLAN, YANBU ARE IN METER(m) UNLESS OTHERWISE SPECIFIED. OWS LINE AOS DRAIN WITH HEAVY
1201 UOP PACOL PROCESS WITH DEFINE PROCESS HS0131-21201-DW-0505-0001 4 Information Only
Signature:
2 HS0131-21201-DW-0505-0001 EQUIPMENT LAYOUT UNIT 1201 & 1701 PACOL & HOTOIL UNIT DUTY GRATING COVER FENCE
2. REFERENCE POINT COORDINATES This approval does not absolve the contractor from meeting their
1202 UOP PEP PROCESS UNIT FW LINE
Document Category
A R I contractual obligations of delivering a complete, safe and efficiently
3 HS0131-21202-DW-0505-0002 EQUIPMENT LAYOUT UNIT 1202/1203 PEP & DETAL UNIT N = 100.000 = 38864.3659 (Use Tick mark) : operating unit/facilities meeting all requirements of the contract.

1203 UOP DETAL PROCESS UNIT HS0131-21202-DW-0505-0002 HUME PIPE


4 HS0131-21900-DW-0505-0001 EQUIPMENT LAYOUT UNIT 1900 NEW TANK FARM E = 100.000 = 25542.8890 PW LINE CULVERT FEED & PMC
AUXILIARY UNITS 5 HS0131-21902-DW-0505-0002 EQUIPMENT LAYOUT UNIT 1902 INTERCONNECTI0N SLEEPERS 3. HPP (HIGH POINT OF PAVING) ELEVATION = 100.000m CORRESPONDS FIRE SEAL IN AOS DRAIN
6 G446-2900-DW-0500-0001 EQUIPMENT LAYOUT UNIT 900 TANK FARM TO THE MADINAT YANBU AL-SINAIYAH PORT REFERENCE ELEVATION 9.75m. SANITARY LINE
1701 UOP HOT OIL SYSTEM HS0131-21201-DW-0505-0001 PIPE BRIDGE
7 HS0131-2000-DW-0790-0001 SUBSTATION EQUIPMENT LAYOUT FOR SUBSTATION SS-04 CSW DRAIN WITH RCC COVER
1900 NEW TANK FORM HS0131-21900-DW-0505-0001 4. FOR ELECTRICAL, INSTRUMNET & CIVIL UG FACILITIES, REFER RELEVANT LAYOUT CD PIT
O 8 HS0131-2999-DW-0640-0005 LAYOUT DRAWING FOR CONTROL BUILDING - ITR-4 DRAWING MENTIONED IN REFERENCE DRAWING LIST. DUCT/TRENCH EMPLOYER O
1902 INTERCONNECTION SLEEPERS HS0131-21902-DW-0505-0002 OWS PIT
9 HS0131-2000-DW-0470-0001 B-017 - ARCHITECTURAL GROUND PLAN FOR OPERATIONS BUILDING UG ELECTRICAL CONCRETE
5. FOR UNDERGROUND PIPING COMPONENTS SUCH AS MANHOLE, CLEANOUT, ETCM,
10 HS0131-2902-DW-0720-0001 Cable Tray / Trench Layout For Unit-902 -Update PW PIT CABLE TRENCH GATE FARABI YANBU PETROCHEMICALS COMPANY
REFER DESIGN PHILOSOPHY-UG DRAINAGE SYSTEM ( G446-2999-PH-0595-0001).
11 HS0131-2000-DW-0720-0001 Cable Tray/Trench Layout for Substation SS-04 UG ELECTRICAL BURRIED YANBU, KINGDOM OF SAUDI ARABIA
SANITARY PIT
12 HS0131-21201-DW-0720-0001 Cable Tray/Trench Layout for Unit -1201 & 1701
6. EXISTING CSW DRAIN TRENCH TO BE MODIFIED, TO SUIT PRESENT CONDITION. EXISTING ROAD
REVAMPING EQUIPMENT LIST CABLE TRENCH LAB#4 PROJECT

13 HS0131-21202-DW-0720-0001 Cable Tray/Trench Layout for Unit -1202 & 1203 7. DURING EPC PHASE EXISTING DRAIN DITCH AT THE PROPOSED ROAD ACCESS CSW DRAIN ELECTRICAL ROAD CROSSING /
EQPT. NO DESCRIPTION SCOPE PROPERTY LINE
14 HS0131-2900-DW-0720-0001 Cable Tray/Trench Layout for Unit -New Tank Farm WAY SHALL BE DEMOLISHED AND UG PIPE DRAIN TO BE PROVIDED. ELECTRICAL DUCT BANK (ERC) TITLE:
900-TK-01A/B LAB STORAGE TANK SERVICE CHANGE 15 HS0131-2999-DW-0720-0001 SCOPE OF WORK-LAB#4
Cable Tray/Trench Layout for Overall Street & Fence Area-Update
8. TENTATIVE GROUND WATER MONITORING WELL LOCATION IS PROVIDED GRAVEL SHOULDER
INSTRUMENT/TELECOM CABLE
900-P-01A LAB PUMP SERVICE CHANGE 16 HS0131-2999-DW-0680-0005 Main Cable Routing Layout For 1201 & 1701 AND LOCATION SHALL BE VERIFIED/CONFIRMED DURING EPC PHASE. DUCT (UG) UNDERGROUND CONCEPTUAL LAYOUT
REVAMPING SCOPE OF
900-P-48A LAB LOADING STATION PUMP SERVICE CHANGE 17 HS0131-2999-DW-0680-0006 Main Cable Routing Layout For 1202 & 1203 MEDIUM DUTY CONCRETE
P INSTRUMENT/TELECOM BURRIED WORK-LAB#4 P
18 HS0131-2999-DW-0680-0013 Main Cable Routing Layout For Unit -New Tank Farm PAVING (150MM THICK)
900-TK-95 LK STRIPPER SIDE DRAW TANK SERVICE CHANGE CABLE TRENCH (UG) GRAVEL PAVING
19 HS0131-2999-DW-0680-0015 Main Cable Routing Layout For Unit-902 -Update
900-P-95 A LK STRIPPER SIDE DRAW TANK PUMP SERVICE CHANGE HPP HIGHEST POINT OF PAVING
INSTRUMENT/TELECOM CONCRETE (50MM THICK) DOC. CAT : SCALE : SHEET :
20 FAR-DW-F-1000 FIRE PROTECTION SYSTEM DRAWING (EL 100.000) A 1:300 2/4
900-P-05A/B BENZENE PUMP CAPACITY CHANGE CABLE TRENCH (UG) GRAVEL PAVING
LPP LOWEST POINT OF PAVING DOCUMENT NO : REVISION FORMAT
INSTRUMENT/TELECOM CABLE (70MM THICK)
(EL 99.850)
PULL PIT CSW DRAIN EXISTING HS0131-2999-DW-0510-0004 02 A0
1 2 3 4 5 6 7 8 9 10 11 12 13 14
A0
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

national petrochem.
N FARABI

industrial
TRUE NORTH 0°
YANSAB
321° PREVAILING WIND
ibn Rushd
A CL. 10M WIDE ROAD A
FOR CONTINUATION REFER DWG. NO.
270° 90° HS0131-2999-DW-0510-0004-1
N

saudi aramco
YCOTD
YANPET
MAKKAH
814-TP 814-TP SAMREF

180° -54A/B -57A/B


FIRE WATER LINE
BOP. OF EL.98.588 (TYP) 16"-FW 814-PIV-004

ELECTRICAL DUCT BANK


B MARAFIQ B
BOT. OF EL.98.750

TOP.OF EL.98.588
NE
V-N-18
TOP.OF EL.97.500
KEY PLAN

RE W ATER LI
INSTRUMENT BURIED CABLE INSTRUMENT DUCT BANK

NE
BOT. OF EL.98.750

RE W ATER LI
TRENCH TOP. OF EL.98.550

814-PI
ELECTRICAL BURIED CABLE 814-PIV-N-13
814-PIV-N-13
TRENCH BOT. OF EL.98.850

(TYP)
803-TK-53
813-P-51A
C AOS DRAIN 11000mmL X 4600mmW X 3650mmH C

FI
813-P-51B
BOT. OF EL.99.200 10"-OW

FI
813-TK-51
27500mmL x 7700mmW x 5000mmH 803-P-53A

E&I DUCT BANK


TOP. OF EL.99.000

1203-P-01B

1203-P-02B
1203-P-01A

1203-P-02A
AOS DRAIN

4"-CD
D BOT. OF EL.99.200 D

1814-DVS-004
1203-P-03B
(TYP)

1203-PW-01
8"-OW 8"-OW
1203-P-03A

4"-CD
1203-P-07A

1203-V-02

12"-FW
1203-V-04
E 1203-P-05B E
1203-E-10

8"-OW
1203-P-07B

16"-FW
1203-OS-03
1203-TS-01
1203-P-05A

4"-CD
1203-P-06A
1203-V-03
1203-P-14B
1203-P-06B

8"-OW
1203-P-14A 1203-ME-04
1203-E-09
F F
HPP. EL.100000

1203-E-07
1203-ME-05
1203-P-04B
8"-OW

ROAD

ROAD
1203-E-06

8"-OW
8"-OW
1203-P-08A
1203-P-04A 1203-V-17A/B

WIDE

WIDE
1203-P-08B

F.S
1203-P-09A
OF FARABIYANBU

1203-E-03B 1203-V-05
CH

8"-OW
G G
W HI

1203-E-11

10M

10M
1203-P-09B

S
F.
1203-E-17
FOR

2"-PW
1203-E-15
ON.
THAN

1203-R-01B

F.S
CL.

CL.
ZATI
PROPERTY

8"-OW 8"-OW
AUTHORI
PURPOSE OTHER

1203-V-07
8"-OW
1203-P-11A 1203-E-14
1203-R-01A
S
I

THOUT

1203-OS-01 1203-P-11B

F.S
NED

H H
CONTAI

WI

1203-P-10A 1203-E-13

4"-CD
ANY
RESERVED

SCLOSED

1203-E-12C
FOR

1203-E-03A 1203-P-10B
ON

F.S
1203-E-12A/B

8"-OW
NFORMATI

12"-FW

F.S
BE DI
BE USED
GHTS

16"-FW
8"-OW
1203-OS-02 1202-PR-01 1203-V-06B
ALL RI

1203-E-02
I

TO

1203-V-01
AND
SHALL NOT
NOT

1203-E-04
1202-P-02A
PEM

I 1203-P-13C I
SAI

1203-E-05
1202-P-02B
NO.

1203-V-06A
AL –

4"-CD
T
LTD..I
BY

1203-P-13B

F.S
DENTI

F.S
1203-E-16
DEVELOPED

1203-E-01 1203-P-13A
DWG.
.CONFI
COMPANY

1202-P-03A
HS0131-2999-DW-0510-0004-2

1202-V-05
S

ED
I

1202-V-02
SUPPLI
CALS

1202-P-03B
DOCUMENT

REFER

8"-OW

4"-CD

F.S
PETROCHEMI

1202-TS-01
J 1202-V-04 J
W AS

1202-V-03
1202-P-04A
S

F.S
THI

T
I

1202-OS-02 1202-E-04
CONTINUATION

1202-P-04B

1202-OS-01
1202-E-05

F.S
1202-P-01A 1202-E-02
1202-V-01A

8"-OW

8"-FW
1202-V-01B 1202-E-01
1202-P-01B
K K
1202-V-01C 1202-E-03
8"-FW

1202-V-01D
FOR

808-P-51A 1202-E-06

V-N-19
1202-V-01E 808-P-51B
V-N-16

814-PI
1202-V-01F
6"-OW

2"-PW

808-V-51
814-PI

L L

2"-PW
4"-CD

AOS DITCH
16"-FW
(TYP.)
4"-CD

FOR CONTINUATION REFER DWG. NO.


HS0131-2999-DW-0510-0004-1 CL. 6.1M WIDE ROAD
M M

K.Muges
Digitally signed by K.Mugesh

Sivaprak
Digitally signed by Sivaprakash

DINESH
Digitally signed by DINESH DN: cn=K.Mugesh, o=Saipem,
KUMAR DN: cn=Sivaprakash,
ou=Piping,
DN: cn=DINESH KUMAR, o, ou, o=SAIPEM, ou=X-SIGHT,
email=mugesh.kunjanpillai@sa

h
email=DINESHKUMAR.THANG email=sivaprakash.murugan@s

KUMAR ash
ARAJ@SAIPEM.COM, c=IN ipem.com, c=IN
aipem.com, c=IN
Date: 2022.02.11 18:17:09 Date: 2022.02.11 18:19:48
Date: 2022.02.11 20:23:12
+05'30' +05'30'
+05'30'

10m
02 11/02/22 ISSUE FOR INFORMATION TDK KM MS
0m 2m 4m 6m

01 05/01/22 ISSUE FOR INFORMATION TDK KM MS

PREPARED REVIEWED APPROVED


REV. DATE DESCRIPTION
GRAPHIC SCALE 1:300 BY BY BY

Employer Approval
Employer Document Review Status (by Employer)

REFERANCE DOCUMENTS: NOTES: LEGENDS: LEGENDS: LEGENDS: FARABI YANBU 1 Rejected


N NEW FACILITIES DRAWING NUMBER Name : N
PETROCHEMICALS COMPANY
AOS DRAIN WITH MEDIUM CAT. 2 FENCE 2 Comments as Noted
CD LINE Discipline :
LAB UNITS SR NO. DOCUMENT NUMBER DESCRIPTION 1. ALL DIMENSIONS ARE IN MILLIMETER(mm) & CO-ORDINATES DUTY GRATING COVER CAT. 4 FENCE 3 No Comments
Date :
1 067401-2000-DW-051-001 GENERAL PLOT PLAN, YANBU ARE IN METER(m) UNLESS OTHERWISE SPECIFIED. OWS LINE AOS DRAIN WITH HEAVY
1201 UOP PACOL PROCESS WITH DEFINE PROCESS HS0131-21201-DW-0505-0001 4 Information Only
Signature:
2 HS0131-21201-DW-0505-0001 EQUIPMENT LAYOUT UNIT 1201 & 1701 PACOL & HOTOIL UNIT DUTY GRATING COVER FENCE
2. REFERENCE POINT COORDINATES This approval does not absolve the contractor from meeting their
1202 UOP PEP PROCESS UNIT FW LINE
Document Category
A R I contractual obligations of delivering a complete, safe and efficiently
3 HS0131-21202-DW-0505-0002 EQUIPMENT LAYOUT UNIT 1202/1203 PEP & DETAL UNIT N = 100.000 = 38864.3659 (Use Tick mark) : operating unit/facilities meeting all requirements of the contract.

1203 UOP DETAL PROCESS UNIT HS0131-21202-DW-0505-0002 HUME PIPE


4 HS0131-21900-DW-0505-0001 EQUIPMENT LAYOUT UNIT 1900 NEW TANK FARM E = 100.000 = 25542.8890 PW LINE CULVERT FEED & PMC
AUXILIARY UNITS 5 HS0131-21902-DW-0505-0002 EQUIPMENT LAYOUT UNIT 1902 INTERCONNECTI0N SLEEPERS 3. HPP (HIGH POINT OF PAVING) ELEVATION = 100.000m CORRESPONDS FIRE SEAL IN AOS DRAIN
6 G446-2900-DW-0500-0001 EQUIPMENT LAYOUT UNIT 900 TANK FARM TO THE MADINAT YANBU AL-SINAIYAH PORT REFERENCE ELEVATION 9.75m. SANITARY LINE
1701 UOP HOT OIL SYSTEM HS0131-21201-DW-0505-0001 PIPE BRIDGE
7 HS0131-2000-DW-0790-0001 SUBSTATION EQUIPMENT LAYOUT FOR SUBSTATION SS-04 CSW DRAIN WITH RCC COVER
1900 NEW TANK FORM HS0131-21900-DW-0505-0001 4. FOR ELECTRICAL, INSTRUMNET & CIVIL UG FACILITIES, REFER RELEVANT LAYOUT CD PIT
O 8 HS0131-2999-DW-0640-0005 LAYOUT DRAWING FOR CONTROL BUILDING - ITR-4 DRAWING MENTIONED IN REFERENCE DRAWING LIST. DUCT/TRENCH EMPLOYER O
1902 INTERCONNECTION SLEEPERS HS0131-21902-DW-0505-0002 OWS PIT
9 HS0131-2000-DW-0470-0001 B-017 - ARCHITECTURAL GROUND PLAN FOR OPERATIONS BUILDING UG ELECTRICAL CONCRETE
5. FOR UNDERGROUND PIPING COMPONENTS SUCH AS MANHOLE, CLEANOUT, ETCM,
10 HS0131-2902-DW-0720-0001 Cable Tray / Trench Layout For Unit-902 -Update PW PIT CABLE TRENCH GATE FARABI YANBU PETROCHEMICALS COMPANY
REFER DESIGN PHILOSOPHY-UG DRAINAGE SYSTEM ( G446-2999-PH-0595-0001).
11 HS0131-2000-DW-0720-0001 Cable Tray/Trench Layout for Substation SS-04 UG ELECTRICAL BURRIED YANBU, KINGDOM OF SAUDI ARABIA
SANITARY PIT
12 HS0131-21201-DW-0720-0001 Cable Tray/Trench Layout for Unit -1201 & 1701
6. EXISTING CSW DRAIN TRENCH TO BE MODIFIED, TO SUIT PRESENT CONDITION. EXISTING ROAD
REVAMPING EQUIPMENT LIST CABLE TRENCH LAB#4 PROJECT

13 HS0131-21202-DW-0720-0001 Cable Tray/Trench Layout for Unit -1202 & 1203 7. DURING EPC PHASE EXISTING DRAIN DITCH AT THE PROPOSED ROAD ACCESS CSW DRAIN ELECTRICAL ROAD CROSSING /
EQPT. NO DESCRIPTION SCOPE PROPERTY LINE
14 HS0131-2900-DW-0720-0001 Cable Tray/Trench Layout for Unit -New Tank Farm WAY SHALL BE DEMOLISHED AND UG PIPE DRAIN TO BE PROVIDED. ELECTRICAL DUCT BANK (ERC) TITLE:
900-TK-01A/B LAB STORAGE TANK SERVICE CHANGE 15 HS0131-2999-DW-0720-0001 SCOPE OF WORK-LAB#4
Cable Tray/Trench Layout for Overall Street & Fence Area-Update
8. TENTATIVE GROUND WATER MONITORING WELL LOCATION IS PROVIDED GRAVEL SHOULDER
INSTRUMENT/TELECOM CABLE
900-P-01A LAB PUMP SERVICE CHANGE 16 HS0131-2999-DW-0680-0005 Main Cable Routing Layout For 1201 & 1701 AND LOCATION SHALL BE VERIFIED/CONFIRMED DURING EPC PHASE. DUCT (UG) UNDERGROUND CONCEPTUAL LAYOUT
REVAMPING SCOPE OF
900-P-48A LAB LOADING STATION PUMP SERVICE CHANGE 17 HS0131-2999-DW-0680-0006 Main Cable Routing Layout For 1202 & 1203 MEDIUM DUTY CONCRETE
P INSTRUMENT/TELECOM BURRIED WORK-LAB#4 P
18 HS0131-2999-DW-0680-0013 Main Cable Routing Layout For Unit -New Tank Farm PAVING (150MM THICK)
900-TK-95 LK STRIPPER SIDE DRAW TANK SERVICE CHANGE CABLE TRENCH (UG) GRAVEL PAVING
19 HS0131-2999-DW-0680-0015 Main Cable Routing Layout For Unit-902 -Update
900-P-95 A LK STRIPPER SIDE DRAW TANK PUMP SERVICE CHANGE HPP HIGHEST POINT OF PAVING
INSTRUMENT/TELECOM CONCRETE (50MM THICK) DOC. CAT : SCALE : SHEET :
20 FAR-DW-F-1000 FIRE PROTECTION SYSTEM DRAWING (EL 100.000) A 1:300 3/4
900-P-05A/B BENZENE PUMP CAPACITY CHANGE CABLE TRENCH (UG) GRAVEL PAVING
LPP LOWEST POINT OF PAVING DOCUMENT NO : REVISION FORMAT
INSTRUMENT/TELECOM CABLE (70MM THICK)
(EL 99.850)
PULL PIT CSW DRAIN EXISTING HS0131-2999-DW-0510-0004 02 A0
1 2 3 4 5 6 7 8 9 10 11 12 13 14
A0
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

petrochem.
N FARABI

industrial
TRUE NORTH 0° GROUND WATER YANSAB
321° PREVAILING WIND

national
FOR CONTINUATION REFER DWG. NO. CL. 10M WIDE ROAD MONITORING WELL ibn Rushd
A HS0131-2999-DW-0510-0004-1 A
REFER NOTE 8
270° 90°
REFER NOTE 7
N

saudi aramco
UNLOADING AREA

814-TP

YCOTD
YANPET
MAKKAH
-58A/B SAMREF

180°
814-PIV-N-15 814-PIV-005

N- 496.518
B MARAFIQ B
10"-OW E- 868.145

TOP.OF EL.99.000
V-N-14

HPP
HPP
E&IDUCT BANK
KEY PLAN

814-PI
1900-TK-41A 1900-TK-41B
1900-TK-08

10"-OW
SLOPE SLOPE SLOPE SLOPE SLOPE SLOPE

ON CHANNEL
ON CHANNEL

LPP

LPP
C 10"-OW C

LPP

LPP

VERSI
VERSI

DI
DI
10"-OW

LPP

LPP

ON CHANNEL
ON CHANNEL

HPP
BOT.OF EL.99.200
SLOPE SLOPE
LPP

VERSI
VERSI
DIVERSION CHANNEL

HPP
LPP

DI
DI
D D
1900-TK-06A

LPP

LPP
N
AOS DRAI

LPP

LPP
4"-CD

10"-OW
HPP

HPP
SLOPE SLOPE

HPP
SLOPE DIVERSION CHANNEL SLOPE SLOPE LPP SLOPE

HPP
E LPP DIVERSION CHANNEL LPP
E

HPP
10"-OW SLOPE SLOPE
LPP
1701-TK-20

10"-OW
SLOPE SLOPE

ON CHANNEL
1900- P- 41A

1701- P- 20A
1900- P- 08A

1900- P- 08B

1900- P- 06A

1900- P- 06B

LPP

LPP
10"-OW

VERSI
DI
F F

V-N-16

HPP

HPP
10"-OW
10"-OW
1900-TK-06B
ROAD
SLOPE SLOPE SLOPE SLOPE

814-PI

CL. 6.1M WIDE ROAD


WIDE

10"-OW

4"-CD
12"-FW
DVS DVS DELUGE SKIDS
814-PIV-N-17 12"-FW 814-PIV-N-21
OF FARABIYANBU

FGL. EL.99850
10M
CH

G G
FOR W HI

CL.
ON.
PURPOSE OTHER THAN

CL. 6.1M WIDE ROAD


ZATI
S PROPERTY

THOUT AUTHORI
NED I

H H
CONTAI

SCLOSED W I

HPP
T SHALL NOT BE USED FOR ANY
GHTS RESERVED

HPP
HPP

ON CHANNEL
ON CHANNEL
ON
NFORMATI

6"-CD
BE DI

6"-CD

00
803- V- 52

SLOPE SLOPE SLOPE SLOPE SLOPE SLOPE


75

VERSI
1203-TK-01

ON CHANNEL

VERSI
ALL RI

NOT TO

6"-CD
AND

DI
DI
803- TK- 52
PEM

LPP

LPP

LPP

LPP

LPP

LPP
F.S

NO.
NO.

803- P- 52A

I I
SAI

VERSI
AL –
LTD..I
S DEVELOPED BY

DI
DENTI

DWG.
DWG.

ON CHANNEL

HS0131-2999-DW-0510-0004-1
HS0131-2999-DW-0510-0004-3
.CONFI
CALS COMPANY

SLOPE HPP SLOPE SLOPE SLOPE SLOPE SLOPE

REFER
REFER

VERSI
ED

1900-TK-02B
S DOCUMENT I

HPP
1900-TK-05
T W AS SUPPLI

HPP

DI
PETROCHEMI

J J
SLOPE SLOPE
SLOPE SLOPE
DVS

CONTINUATION
CONTINUATION
THI

16"-FW

4"-CD
DVS

1900- P- 05A

1900- P- 02A

1900- P- 95A
1900- P- 05B
1203- P- 12

4"-CD
DS

LPP

LPP

LPP

LPP
DELUGE SKI

LPP
DVS

K K

FOR
FOR

ON CHANNEL
DVS
V-N-18

VERSI

SLOPE SLOPE SLOPE SLOPE


HPP
814-PI
DVS

HPP
1900-TK-95
DI

1900-TK-02A

L L
814-PIV-N-19

16"-FW 814-PIV-N-20

FOR CONTINUATION REFER DWG. NO.


HS0131-2999-DW-0510-0004-1 CL. 6.1M WIDE ROAD

M M

DINESH Sivaprak
Digitally signed by DINESH Digitally signed by K.Mugesh
KUMAR
Digitally signed by Sivaprakash
DN: cn=K.Mugesh, o=Saipem,

K.Mugesh
DN: cn=DINESH KUMAR, o, ou, DN: cn=Sivaprakash, o=SAIPEM,
ou=Piping, ou=X-SIGHT,
email=DINESHKUMAR.THANGA

KUMAR
email=mugesh.kunjanpillai@saipe

ash
RAJ@SAIPEM.COM, c=IN email=sivaprakash.murugan@sai
Date: 2022.02.11 18:17:40 m.com, c=IN pem.com, c=IN
+05'30' Date: 2022.02.11 18:20:31 +05'30'
Date: 2022.02.11 20:24:22 +05'30'

10m
02 11/02/22 ISSUE FOR INFORMATION TDK KM MS
0m 2m 4m 6m

01 05/01/22 ISSUE FOR INFORMATION TDK KM MS

PREPARED REVIEWED APPROVED


REV. DATE DESCRIPTION
GRAPHIC SCALE 1:300 BY BY BY

Employer Approval
Employer Document Review Status (by Employer)

REFERANCE DOCUMENTS: NOTES: LEGENDS: LEGENDS: LEGENDS: FARABI YANBU 1 Rejected


N NEW FACILITIES DRAWING NUMBER Name : N
PETROCHEMICALS COMPANY
AOS DRAIN WITH MEDIUM CAT. 2 FENCE 2 Comments as Noted
CD LINE Discipline :
LAB UNITS SR NO. DOCUMENT NUMBER DESCRIPTION 1. ALL DIMENSIONS ARE IN MILLIMETER(mm) & CO-ORDINATES DUTY GRATING COVER CAT. 4 FENCE 3 No Comments
Date :
1 067401-2000-DW-051-001 GENERAL PLOT PLAN, YANBU ARE IN METER(m) UNLESS OTHERWISE SPECIFIED. OWS LINE AOS DRAIN WITH HEAVY
1201 UOP PACOL PROCESS WITH DEFINE PROCESS HS0131-21201-DW-0505-0001 4 Information Only
Signature:
2 HS0131-21201-DW-0505-0001 EQUIPMENT LAYOUT UNIT 1201 & 1701 PACOL & HOTOIL UNIT DUTY GRATING COVER FENCE
2. REFERENCE POINT COORDINATES This approval does not absolve the contractor from meeting their
1202 UOP PEP PROCESS UNIT FW LINE
Document Category
A R I contractual obligations of delivering a complete, safe and efficiently
3 HS0131-21202-DW-0505-0002 EQUIPMENT LAYOUT UNIT 1202/1203 PEP & DETAL UNIT N = 100.000 = 38864.3659 (Use Tick mark) : operating unit/facilities meeting all requirements of the contract.

1203 UOP DETAL PROCESS UNIT HS0131-21202-DW-0505-0002 HUME PIPE


4 HS0131-21900-DW-0505-0001 EQUIPMENT LAYOUT UNIT 1900 NEW TANK FARM E = 100.000 = 25542.8890 PW LINE CULVERT FEED & PMC
AUXILIARY UNITS 5 HS0131-21902-DW-0505-0002 EQUIPMENT LAYOUT UNIT 1902 INTERCONNECTI0N SLEEPERS 3. HPP (HIGH POINT OF PAVING) ELEVATION = 100.000m CORRESPONDS FIRE SEAL IN AOS DRAIN
6 G446-2900-DW-0500-0001 EQUIPMENT LAYOUT UNIT 900 TANK FARM TO THE MADINAT YANBU AL-SINAIYAH PORT REFERENCE ELEVATION 9.75m. SANITARY LINE
1701 UOP HOT OIL SYSTEM HS0131-21201-DW-0505-0001 PIPE BRIDGE
7 HS0131-2000-DW-0790-0001 SUBSTATION EQUIPMENT LAYOUT FOR SUBSTATION SS-04 CSW DRAIN WITH RCC COVER
1900 NEW TANK FORM HS0131-21900-DW-0505-0001 4. FOR ELECTRICAL, INSTRUMNET & CIVIL UG FACILITIES, REFER RELEVANT LAYOUT CD PIT
O 8 HS0131-2999-DW-0640-0005 LAYOUT DRAWING FOR CONTROL BUILDING - ITR-4 DRAWING MENTIONED IN REFERENCE DRAWING LIST. DUCT/TRENCH EMPLOYER O
1902 INTERCONNECTION SLEEPERS HS0131-21902-DW-0505-0002 OWS PIT
9 HS0131-2000-DW-0470-0001 B-017 - ARCHITECTURAL GROUND PLAN FOR OPERATIONS BUILDING UG ELECTRICAL CONCRETE
5. FOR UNDERGROUND PIPING COMPONENTS SUCH AS MANHOLE, CLEANOUT, ETCM,
10 HS0131-2902-DW-0720-0001 Cable Tray / Trench Layout For Unit-902 -Update PW PIT CABLE TRENCH GATE FARABI YANBU PETROCHEMICALS COMPANY
REFER DESIGN PHILOSOPHY-UG DRAINAGE SYSTEM ( G446-2999-PH-0595-0001).
11 HS0131-2000-DW-0720-0001 Cable Tray/Trench Layout for Substation SS-04 UG ELECTRICAL BURRIED YANBU, KINGDOM OF SAUDI ARABIA
SANITARY PIT
12 HS0131-21201-DW-0720-0001 Cable Tray/Trench Layout for Unit -1201 & 1701
6. EXISTING CSW DRAIN TRENCH TO BE MODIFIED, TO SUIT PRESENT CONDITION. EXISTING ROAD
REVAMPING EQUIPMENT LIST CABLE TRENCH LAB#4 PROJECT

13 HS0131-21202-DW-0720-0001 Cable Tray/Trench Layout for Unit -1202 & 1203 7. DURING EPC PHASE EXISTING DRAIN DITCH AT THE PROPOSED ROAD ACCESS CSW DRAIN ELECTRICAL ROAD CROSSING /
EQPT. NO DESCRIPTION SCOPE PROPERTY LINE
14 HS0131-2900-DW-0720-0001 Cable Tray/Trench Layout for Unit -New Tank Farm WAY SHALL BE DEMOLISHED AND UG PIPE DRAIN TO BE PROVIDED. ELECTRICAL DUCT BANK (ERC) TITLE:
900-TK-01A/B LAB STORAGE TANK SERVICE CHANGE 15 HS0131-2999-DW-0720-0001 SCOPE OF WORK-LAB#4
Cable Tray/Trench Layout for Overall Street & Fence Area-Update
8. TENTATIVE GROUND WATER MONITORING WELL LOCATION IS PROVIDED GRAVEL SHOULDER
INSTRUMENT/TELECOM CABLE
900-P-01A LAB PUMP SERVICE CHANGE 16 HS0131-2999-DW-0680-0005 Main Cable Routing Layout For 1201 & 1701 AND LOCATION SHALL BE VERIFIED/CONFIRMED DURING EPC PHASE. DUCT (UG) UNDERGROUND CONCEPTUAL LAYOUT
REVAMPING SCOPE OF
900-P-48A LAB LOADING STATION PUMP SERVICE CHANGE 17 HS0131-2999-DW-0680-0006 Main Cable Routing Layout For 1202 & 1203 MEDIUM DUTY CONCRETE
P INSTRUMENT/TELECOM BURRIED WORK-LAB#4 P
18 HS0131-2999-DW-0680-0013 Main Cable Routing Layout For Unit -New Tank Farm PAVING (150MM THICK)
900-TK-95 LK STRIPPER SIDE DRAW TANK SERVICE CHANGE CABLE TRENCH (UG) GRAVEL PAVING
19 HS0131-2999-DW-0680-0015 Main Cable Routing Layout For Unit-902 -Update
900-P-95 A LK STRIPPER SIDE DRAW TANK PUMP SERVICE CHANGE HPP HIGHEST POINT OF PAVING
INSTRUMENT/TELECOM CONCRETE (50MM THICK) DOC. CAT : SCALE : SHEET :
20 FAR-DW-F-1000 FIRE PROTECTION SYSTEM DRAWING (EL 100.000) A 1:300 4/4
900-P-05A/B BENZENE PUMP CAPACITY CHANGE CABLE TRENCH (UG) GRAVEL PAVING
LPP LOWEST POINT OF PAVING DOCUMENT NO : REVISION FORMAT
INSTRUMENT/TELECOM CABLE (70MM THICK)
(EL 99.850)
PULL PIT CSW DRAIN EXISTING HS0131-2999-DW-0510-0004 02 A0
1 2 3 4 5 6 7 8 9 10 11 12 13 14
A0

You might also like