Disain Bendung 1 (1)

You might also like

Download as pdf or txt
Download as pdf or txt
You are on page 1of 3

Supplement-Report No.

A Bendung

1 Hidraulik

1.1 Debit Banjir Rencana

3
Q1000 = 409,9 m /detik , + 160,28 m
3
Q100 = 378,8 m /detik , + 160,17 m
3
Q25 = 272,6 m /detik , + 159,75 m
3
Q2 = 237,3 m /detik , + 159,58 m

1.2 Data Bendung

Elevasi mercu = 158,00 m


Elevasi dasar sungai = 155,00 m
Lebar total bendung ( Bt) = 72,00 m
Lebar total pilar (Bp) = 2 x 1,00 = 2,00 m
Lebar total mercu (B) = Bt - Bp = 70,00 m

1.3 Lebar Efektif Bendung

Be = B - 2 ( n Kp + Ka ) H1
n : jumlah pilar = 2
Kp : koef. Konstrakasi pilar = 0,01
Ka : koef. Konstrakasi pangkal bendung = 0,15
H1 : tinggi energi hulu, m
H2 : tinggi energi hilir = 160,17 - 158,0 = 2,17 m

Taksiran : Be = B - 0,2 Bp = 69,60 m


Koef. debit ( Cd ) = 1,22
Faktor aliran tenggelam ( f ) = 0,95

1,5
Q = 1,71 f .Cd . Be. H1
H1 = 1,962 m ---> Be = 69,33 m
H1 = 1,97 m ~ 1,962 ok
H2/H1 = 1,10 ---> f = 0,95 ok
1.4 Koefisien Debit

H1/r Co p/H1 C1 C2 H2/H1 f


1:1 3:2 3:1
0,50 1,05 0,00 0,65 0,1 1
1,00 1,17 0,25 0,86 1,030 1,025 1,008 0,2 0,99
2,00 1,33 0,50 0,93 1,012 1,017 1,005 0,3 0,98
3,00 1,41 0,75 0,95 1,004 1,010 1,004 0,4 0,97
4,00 1,46 1,00 0,97 0,998 1,006 1,002 0,5 0,95
5,00 1,47 1,50 0,99 0,993 1,000 1,000 0,6 0,92
6,00 1,48 0,7 0,86
Supplement-Report No.2

r= 1,50 m ----> H1/r = 1,31 --->Co = 1,33


p= 1,50 m ----> p/H1 = 0,76 --->C1 = 0,90
kemiringan 1:1 --->C2 = 1,018

Cd = Co.C1.C2 = 1,22 ~ 1,22 ok

1.5 Elevasi Pangkal Bendung

Ho = 2,17 m
Vo = Q / Bt ( p+Ho) = 1,43 m/detik

2
H1 = Ho + Vo /2g = 2,27 ~ 1,97 ok

Muka air banjir hulu = 158,00 + 2,17 = 160,17 meter


Tinggi jagaan = 1,35 meter
Elevasi Pangkal Bendung = 161,52 meter

Kontrol terhadap Q1000 : H1 = 2,07 m


MAB = 160,1 < 161,52 ok

1.6 Ruang Olak

Muka air banjir hilir = 160,17 m


Degradasi = 2,00 m
158,17 m
DH = 160,17 - 158,2 = 2,00 m
DH/H1 = 1,017
Tabel di KP-02 : Yu/H1 = 0,25
Yu = 0,49 m
Yd/H1 = 1,40
Yd = 2,75 m
Elevasi dasar kolam : 158,17 - 2,75 = 155,42 ~ 155,50
Vu = 10,7003 < 15 m/detik
Fru = 4,87 > 4,5
USBR Tipe III

Panjang kolam (L) = 2.7 Yd = 7,434 ~ 11,50 meter


Ambang muka : h1=s1=w1=Yu = 0,49 ~ 0,75 meter
Ambang ujung : h2=Yu(18+Fru)/18 = 0,62 ~ 1,00 meter
Blok halang :h3=Yu(4+Fru)/6 = 0,73 ~ 1,10 meter
s3=w3= 0.75 h3 = 0,55 ~ 0,80 meter
Jarak blok halang : 0.82 Yd = 2,26 ~ 3,50 meter
Minimum tinggi kolam : H = h3+Yd+0.6 H1 = 4,73 meter
Elevasi tembok atas : 155,50 + 4,73 = 160,23 ~ 21,00 meter
Supplement-Report No.2

Kontrol terhadap 50 % Q100 :


Q = 189,4 m3/detik , H1 = 1,20 + 18,50 = 19,70
Grafik lengkung debit, H2 = 16,80
DH = 2,90
DH/H1 = 2,419
Yd/H1 = 1,57
Yd = 1,88
Elevasi dasar kolam : 16,80 - 1,88 = 14,92 >= 13,50 ok