DG Set IEM Inspection sheet

You might also like

Download as pdf or txt
Download as pdf or txt
You are on page 1of 3

GENERATING SEI

(In Quaduplicate for eacih Gen Set)

PART-I
(To be fiied by Unit)

Area Date

Diision Location
Whether maint and operation cariied
out by DEL/Contract

2 Detals of Gen Set:

(3) Make Type


(b) SMMES No.

(c) Engine Sr1 No

(d Altemator Sri No.

(e) Capacity
Date of set to work

PART-II
(Inspecting Oficer Remarks)
enerai appearance.
Whether the set is in woking
condition? If not, give reason.

5 Whether periodicai maant task


ispiayed, carried out and recorded?

6. Whether Get Set mounted properly


and working satisfactory?
Whether body and neutrai each ae
double earthed and periodical IR
tests recorded?

UiAEAKww v-.
specifh

Check the followmp ad comment

(3 tatung system
h Cooling Svstem
c)
Fuel sy stem
d Exhaust Svstem
(e Lubricatinp S stem
(1) Vanous ol level & cond1tion

(11) Ol pIessu:

(f Filter elements

() Ar

(11) Lub O

(uiFuel

gCpupling
8 Whether efficiency test caried out
durng the curent year?

Whether LPH is wsthirn the specified"


10 Whether any serious brake-down
occured for the laSt 6 months

11 Whether operating Staff properly furn


out in protective ciothing?
12 Whether SMMES Nos have been
obtained and painted on the plant?
13 1s the panel iT working condition
14 Check the following and comment
a Ali contracts and relay
.b Wiring condition
(c) Manual and Auto swit ches
15. State the condition of the
battery

1.
Suggestions/Modificadions, if any

2 General remarks of IEM:

Sig
Date Rank &Nanee

You might also like