Download as docx, pdf, or txt
Download as docx, pdf, or txt
You are on page 1of 12

PROPOSAL FOR

DEVELOPMENT OF MARIHATAG
MUNICIPAL TREE PARK
BRGY. AROROGAN, M,ARIHATAG , SURIGAO DEL SUR

Proposal for Development of Municipal Tree ParkPage 1


PROPOSED TREE PARK SITE
DEVELOPMENT MASTER PLAN

A. MAIN ENTRANCE / CLUBHOUSE /RECEPTION BLDG.

EXISTING SITE PHOTOS

Proposal for Development of Municipal Tree ParkPage 2


MAIN ENTRANCE

RESORT CLUB HOUSE /


RECEPTION BLDG.

AREA:
Main Entrance: 125 sqm.
Clubhouse Building: 290 sqm.

AMENITIES:
Reception Area
Waiting / Lounge Area
DESIGN SCHEME PROPOSAL Admin offices
Female/Male Toilet
Staff Locker Room

B. BAYWALK AND VIEW DECK WITH BAR AREA

BAYWALK AREA APPROX. AREA:


Baywalk: 125 sqm.
Proposal for Development of Municipal Tree ParkPage 3 Clubhouse Building: 290 sqm.

AMENITIES:
Baywalk
PHOTO OF EXISTING SWIMMING POOL

DE

C. SWIMMING POOL AND AQUA FUN WATER PARK

AQUA FUN WATER PARK


APPROX. AREA:
Swimming Pool Area: 1,000 sqm.
Aqua Fun Area : 590 sqm.

AMENITIES:
Pool
-Clubhouse
-outdoor shower areas
-female and male dressing rooms
Aqua Fun
-playground with water features

SWIMMING POOL AREA

EXISTING PHOTO OF THE SWIMMING POOL AREA

Proposal for Development of Municipal Tree ParkPage 4


D. PICNIC AND CAMPING AREA with
landscaping
APPROX. AREA:
OPEN RESTAURANT Open Restaurant =300 sqm.
Camping/Picnic Area = 590 sqm.

PROPOSED AMENITIES:
Open Restaurant
-counter area and kitchen
-dining area with approx.. 10-15 pax
-spill-out dining area
-female /male toilet
-open area for live bands/acoustic nights
Picnic Area
-Outdoor benches
-well landscape and lightings

PHOTO OF EXISTING CAMPING AREA

Proposal for Development of Municipal Tree ParkPage 5


E. SHORELINE AMENITIES

PROPOSED AMENITIES:
Shoreline
-tables for guests
- “banig” or carpet with umbrella
-option for inflatable chairs

SHORELINE AMENITIES

EXISITNG COTTAGES AT SHORELINE

Proposal for Development of Municipal Tree ParkPage 6


F. 2 - STOREY DORMITORY BUILDING

APPROX. AREA
Dormitory Area: 565 sqm.
Building: 195x 2 = 390 sqm
Pocket Garden: 170 sqm

PROPOSED AMENITIES:
Dormitory Building
-8 rooms per building
-8-12 pax per room
-pocket garden
-with individual toilets
2-STOREY DORMITORY BLDG.

EXISITNG AMAKAN DORMITORY COTTAGE

DESIGN SCHEME PROPOSAL

Proposal for Development of Municipal Tree ParkPage 7


G. OUTDOOR AND SPORTS FACILITIES

WAKE BOARD

AIRSOFT FIELD

OUTDOOR OBSTACLE COURSE

PROPOSED OUTDOOR ACTIVITIES/FACILITIES

Proposal for Development of Municipal Tree ParkPage 8


PROPOSED TOWER 2

TOWER 3

TOWER 1

PROPOSED AMENITIES:

Tower 1-2:
 Hamster Ride
 Wall Climbing
Tower 2-3
 Skybike
 Monkey Bridge (Option)

Water Feature:
 Inflatable Obstacle Course

PROPOSED OUTDOOR ACTIVITIES/FACILITIES

Republic of the Philippines

Proposal for Development of Municipal Tree ParkPage 9


PROPOSED PROJECT COST
FOR THE OF DEVELOPMENT OF MUNICIPAL TREE PARK

No. Proposed Resort Structures and Amenities Amount

1 CLUBHOUSE / RECEPTION BUILDING/ MAIN ENTRANCE Php


2 CONCESSIONAIRE AREA/SOUVENIER SHOPS Php
3 SCUBA/ SURF SHOPS & WATER SPORTS Php
4 PAVILION VIEW DECK WITH BAR AREA Php
5 PROPOSED RESORT RESTAURANT Php
6 OUTDOOR SHOWER AND TOILET FACILITIES Php
7 IMPROVEMENT OF FUNCTION HALL BUILDING Php
8 IMPROVEMENT OF SWIMMING POOL AND PROPOSED AQUA FUN Php 15,000,0
9 PROPOSED 2-UNITS DORMITORY BUILDING (2-STOREY) Php 12,000,0
10 IMPROVEMENT OF PICNIC/CAMPING AREA Php
11 IMPROVEMENT OF MINI ZOO & RPROPOSED AQUARIUM PARK FACILITY Php
12 IMPROVEMENT 2 - UNITS 4 BEDROOM COTTAGE Php
13 BAYWALK AND SURFING VIEW DECK Php
14 OUTDOOR KITCHEN AND GRILLING STATION Php
15 GENERAL RESORT LANDSCAPING AND ROAD CONNECTIONS Php
TOTAL COST Php 62,500,0

No. Resort Outdoor Sports Facilities Amount


16 REPAIR AND REHABILIATION OF TOWER 1 Php
17 REPAIR OF EXISTING WALL CLIMBING Php
18 PROPOSED CONSTRUCTION OF TOWER 2 Php
19 HAMSTER RIDE FACILITIES Php
20 MONKEY BRIDGE FACILITIES Php
21 SKYBIKE FACILITIES Php
22 ZIPLINE FACILITIES Php
23 WAKE BOARDING FACILITIES Php
24 AIRSOFT FIELD FACILITIES Php
TOTAL COST Php 27,500,0

No. Resort Utility and Systems Amount

25 ELECTRICAL SYSTEMS AND SUPPLY Php


26 WATER SYSTEM AND SUPPLY Php
27 SANITARY AND SEWERAGE SYSTEM Php
28 SECURITY, I.T.AND COMMUNICATION FACILITIES Php
TOTAL COST Php 10,000,0

Grand Total Proposed Project Cost Php 100,000

Proposal for Development of Municipal Tree ParkPage 10


Proposal for Development of Municipal Tree ParkPage 11
Proposal for Development of Municipal Tree ParkPage 12

You might also like