Architectural Services Department

Slope Upgrading Works at


Feature No. 11SW-A/R526,
King's College,
Bonham Road, Hong Kong

Project Profile for Slope Upgrading Works at


Feature No. 11SW-A/R526, King’s College

May 2018
Architectural Services Department Slope Upgrading Works at
Feature No. 11SW-A/R526,
King's College,
Bonham Road, Hong Kong

Contents
Page

1 Basic Information 1
1.1 Project Title 1
1.2 Purpose and Nature of the Project 1
1.3 Name of Project Proponent 1
1.4 Location and Scale of Project and History of Site 2
1.5 Number and Types of Designated Projects to be covered by
the Project Profile 2
1.6 Name and Telephone Number of Contact Person(s) 3

2 Outline of Planning and Implementation Programme 4


2.1 Outline of Project Planning 4
2.2 Tentative Project Programme 6
2.3 Interactions with other Projects 6

3 Major elements of the surrounding environment 7


3.1 General 7
3.2 Noise 7
3.3 Air Quality 8
3.4 Water Quality 9
3.5 Ecology 9
3.6 Landscape and Visual 10
3.7 Cultural Heritage 10

4 Possible Impact on the Environment 12


4.1 General 12
4.2 Potential Environmental Impact During Construction Phase 12
4.3 Potential Environmental Impact During Operation Phase 18

5 Environmental Protection Measures to be incorporated in the


Design and any Further Environmental Implications 19
5.1 Environmental Protection Measures 19
5.2 Environmental Monitoring and Audit 31
5.3 Severity Distribution and Duration of Environmental Effects 33
5.4 Further Implications 33

6 Use of Previously Approved Project Profiles 34

7 Public Relations 35

8 Conclusion 36

| May 2018
Architectural Services Department Slope Upgrading Works at
Feature No. 11SW-A/R526,
King's College,
Bonham Road, Hong Kong

Tables
Table 2.1 – Sequence of Proposed Slope Upgrading Works
Table 2.2 – Tentative Construction Programme
Table 3.1 – Summary of Representative Existing Noise Sensitive Receivers
Table 3.2 – Summary of Representative Existing Air Sensitive Receivers
Table 4.1 – Range of Predicted Construction Noise Levels (Unmitigated Scenario)
Table 4.2 – Estimated Quantities of Waste Materials Generated from the Project
Table 5.1 – Proposed Mitigation Measures for Different PMEs
Table 5.2 – Range of Predicted Construction Noise Levels (Mitigated Scenario)
Table 5.3 – Summary of Proposed Noise Mitigation Measures During
Construction Stage
Table 5.4 – Liming Criteria for Settlement, Tilting and Vibration Level
Monitoring During Construction
Table 8.1 – Summary of the Potential Environmental Impacts and Proposed
Mitigation Measures

Sketches
SK01 – Proposed Soil Nail System Arrangement (1)
SK02 – Proposed Soil Nail System Arrangement (2)

Figures
Figure 1 – Site Location Plan
Figure 2 – Works Layout Plan with Representative Sensitive Receivers
Figure 3 – Proposed Noise Monitoring Checkpoints during Construction Stage

Plates
Plate 1 – Direction of Plates
Plate 2 – General View of the Feature
Plate 3 – General View of the Feature at the Western Portion
Plate 4 – General View of the Feature at the Middle Portion
Plate 5 – General View of the Feature at the Eastern Portion
Plate 6 – Water Seepage at the Middle Portion of the Masonry Wall
Plate 7 – Water Seepage at the Western End of the Masonry Wall
Plate 8 – General View of the Feature Crest at the Western Portion
Plate 9 – General View of the Feature Crest at the Middle Portion
Plate 10 – General View of the Feature Crest at the Eastern Portion
Plate 11 – General View of the Feature Crest at the Eastern Portion
Plate 12 – General View of the Boys’ Changing Room
Plate 13 – General View of the Boys’ Changing Room

| May 2018