Supply ,instllation,termination and fiber cable laying ,excavation,i,backfilling of fiber cable pipes,manhol

SEW(6'' Sewer Pipe) laying and including all aceesories


θ60 PVC sleeeve continous for fiber cable (2X2'' PIPE) installation and acessories
Fiber manhole 150x150x1000mm*(EP-1 TO EP-17)
SDP -6 TO LS4 PLC control panel Power cable route(5x10mm2)

Manual excavation over HV CABLE ,Minimum 3m away from eithervside of cable


Manual excavation over HV Cable
Manual excavation adjacent to HV Cable
Trenching length

wall thickness
D13 steel bar size
Blinding concrete
All column pedestals,isolated equipment pads and all reentrant corners of concrete slab
slab /pedestail intersection
slab at T Joint inter section
Equipment pad detail
Sump detail
Stepped detail
Bollard -fixed
Bollard -Removable
weakended plane joint(wpj) walls
UNIT

length
length
N0
length

length
length
length
length
150x150x1000
Thickness
BAR
Thickness

2D13X200 Long tied to top reinfocement bent as required to suit joint


D13-SX200 Long tied to top reinforcement
50 thk blinding concrete,150mm min below from FGL,Above min-150,max -600,d13-200-LL EACH SIDE,D13-200-LL-EW.
50 thk blinding concrete,D16-200-LL,D16-250-T
D13-200-S,D13-200-RC
CHS 168X5.0 Filled with concrete,concrete footing 600x1000 Deep
CHS 168X5.0 Filled with concrete,concrete footing 800x700 Deep,10 thickx180id rolled plate tube 8 thick end plate
cut every 2nd Bar 50 clear of joint,20x20 rebate
QUANTITY

882mtr
1042mtr
17
80mtr 69 ACCORDING TO DRAWING

8mtr
37mtr 53mtr
8mtr
125mtr

250mm

50