Download as pdf
Download as pdf
You are on page 1of 13
b Sota @ itten Supply, Erection, Operation and Maintenance for the Conversion of the Third Stage Az-Zour South Gas Turbines to Combined Cycle Plant CCGT-3 Contract No.: MEW/C/5136/2016-2017. Handover/ Takeover Certificate Ref No. CCGT3-HO-022 Equipment Description Master key of Steam Turbine Building, Electrical Building, DC& UPS, Chiller Building, Fire water and service water pump building, HRSG building, Make up electrical Building, Sea water chlorination building, Store-1, Store-2, GAB and Grand master key Handed over by EPC Contractor: SEPCOI| System Description Master Key Equipment No. (Tag No.) | CCGT-3 Date of Transfer 14-03-2024 Title of the Party Name & Signature Date Remarks PE yo] elas leer Handed Over to O&M: SEPCOII! BEB] hs fo Witnessed By Owner: MEW Projects Witnessed By Owner: MEW O&M. (azsPs) Faun | 4/3 /ocab 14/3 19024 Steam Turbine Building Master Key List Building Room Key No. ‘ty. Steam Turbine fee : Building Mechanical Room e smiKag 3 master keys = Seer steam turbine aot : generator Steam turbine 49.2 3 generator Steam turbine 49.3 EY generator Steam turbine ee 49.4 3 generator 3 t Steam turbine ae ‘ generator Storage 43.6 3 a Staircase-2 49.7 3 ree Staircase-2 49.8 3 | ‘Area oil tank 49.9 3 : ‘Area oll tank 49.10 3 fee STB 8.3m 49.11 3 ‘AVR room 49.12 3 : STB 14.21m 49.13 3 ‘ STB 14.21m 49.19 3 é ‘STB14.21m 49.14 3 ‘AHU room 49.15 3 i: ‘AHU room| 49.16 3 ‘AHU room 49.17 3 Top floor 49.18 3 STB27m 43.20 3 Elevator electrical 49.21 3 room Electrical Building Master Key List Building Room Key No. ary. Electrical Building MK50 3 ieee SIMK50.1 3 LV panel room 50.11 3 LV panel room 50.12 LV panel room 50.13 3 LV panel room 50.110 3 iV panel room 50.14 3 MV panel room 30.16 3 Cable shaft 50.15 3 Battery room 30.17 3 Battery room 50.18 3 Battery room 50.19 3 T&C panels room 50.111 3 Data center room 50.112 3 Data center room 50.113 3 Data center room 50.118 3 Data center room 50.115 3 T&C maintenance ae i room ee SMK50.2, 3 Transformer room 50.21 3 Transformer room 50.22 3 SMK5O.3 3 Mechanical room master keys Cable vault 50.31 Cable vault 50.32 Storage room 50.35 Inert gas cylinder 5033 room Inert - ine can Staircase 1 50.37 Staircase 1 50.38 Entrance lobby 50.36 Medical room 50.39 Medical room 50.310 Staircase 2 50.311 Staircase 1 50.312 Staircase 1 50.313 Office 1 50.315 Office 2 50.316 Office 3 50.317 ‘Chemical Engineer 50.318 ‘Maintenance Meee 50.319 inistrator cee | a HSE Office 50.822 Electrical Engineer 50.323 Planning Engineer 50.324 1&C Engineer 50.325 Mechanical Engineer 50.326 Staircase 2 50.314 ‘Storage room 50.327 Gent's toilet 50.328 Gent's toilet 50.329 Gent's toilet 50.330 Gent’s toilet 50.331 Gent's toilet 50.332 Janitor’s room 50.383, Ladies toilet 50.334 Ladies toilet 50.335 kitchen: 50.336 MEW Operation office eet Plant Director 50.338 Deputy Director 50.339 Chief Engineer 50.340 Operations Manager 50.341 Meeting room 50.342 Resource room 50.343 Prayer room 50.344 Office 4 50.345 ‘Supervisor room 50.346 ‘Supervisor room 50.347 Staircase 1 50.348 ‘Storage room 50.349 HVAC room 50.350 HVAC room 50.351 HVAC room 50.352 Water tank room 50.353 Laboratory room 50.354 Cable shaft 50.355, 3 Gas cylinder room 50.356 3 DC & UPS Building Master Key List Building Room Key No. Qty. DC & UPS Bullding 7 MK6O a Electrical Room master SMK 60.1 3 key WV panel room 60.11 3 Battery room 60.42 3 Battery room 60.13 a aa Mechanical Room SMK60.2 3 master keys ‘ARU room 602i 3 Chiller Building Master Key List Room Key No. ty. Chiller Building e MKS 3 fs MCC & 1&C Room master keys ee _ MCC Room Silt 3 MCC Room S112 3 Chiller Plant Room master keys bette ; Chiller Plant Room 51.21 3 Chiller Plant Room 31.22 3 Chiller Plant Room 51.23 3 Fire water & Service water Pump Building Master Key List “Building Key No, ary. Fire water & Ser e mKs2 3 Water Pump Building Electrical room Se q master keys 7 ical panel |&C aie F Electrical pane ee ‘ room Other room master a SMK52.2 3 keys Diesel Driven Fire ah 7 water Pump Room Service &Portable oe 2 water pump room i a ice &Portable | Service &Portable mon i water pump room HVAC Room 52.24 3 Electrical Driven Fire 52.25 3 water Pump Room HRSG Electrical Building Master Key List Building Room Key No. Qty. HRSG Electrical : mat Building ate Electrical Room SMK 46 3 Electrical Room 461 3 Electrical Room wa 3 #2 Boece Ere Electrical Room Sui a7 3 Electrical Room a7 3 Electrical Room a72 3 Transformer Master Key List Building Room “Key No, Qty. Transformer ‘Main Transformer ‘SMK58 3 wT 581 3 MT 58.2 3 Unit Transformer | ‘SMKS59 3 aoe UF 594 3 ur 59.2 3 Make up Electrical Building Master Key List Building Room Key No. Qty. CT make up electrical Ks? 3 building Electrical jectrical room gee : master keys Battery room S7.ad 3 Electrical room 57.12 Electrical room 57.3 3 ‘Mechanical room SMK57.2 3 master keys | i ‘AU room eee or aa 3 ~ | Compressor room 57.22 aa 3 Transformer Room oe : master keys Transformer room 57.31 3 | Transformer room 37.32 3 Sea Water Chlorination Building Master Key List Building Room Key No. Qty. Sea Water ae Z Chlorination Building ia E/R master keys | SMK53.1 3 1&C Room 1&C Room 53.12 3 1&C Room 53.13 3 ‘Switchgear room 53.14 3 ‘Switchgear room 53.15 3 T/R master keys SMKS3.2 3 Transformer room 53.21 3 Transformer room 53.22 3 panera | SMES : Office 5131 3 Office-2 51.32 3 Office-3 51.33 3 toilet 51.34 3 toilet 51.35 3 toilet 31.36 3 Tea room 31.37 3 corridor 31.38 3 HVAC room 51.39 3 HVAC room 51310 3 ‘ADS & BDS room 51311 3 Injector room S13i2 3 Evaporator room 51313 3 Evaporator room 51314 3 Chlorine container Cae 51.315 3 General Auxiliary Building Master Key List Building Room a | ty. Hee a rn 3 General Auxiliary Building Electrical r a ae ‘SMK54.1 1&C workshop 54.11 Electrical room 54.12 Mechanical Room master keys nae Lay down area 54.21 ‘Mechanical workshop 52.22 HVAC room 54.23 HVAC Room 34.24 Store/Janitor 54.25 Pantry 54.26 Corridor 54.27 Corridor 54.28 Office-1 54.29 Office-2 54.210 Office 3 54.211 Office-4 54.212 Office-S 54.213 Gents toilet 54.214 Gents toilet 54.215 Gents toilet 54.216 Gents toilet 54.217 ladies toilet 54.218 ladies toilet 54.219 Tadies toilet 54.220 Storage Building - 1 Master Key List Building Room Key No. Qty. Storage Building-1 mines 3 Electrical pa master aren : Electrical Room 5542 3 Mechanical Room icciar kage SMK55.2 3 Store for heavy part 55.21 Store for heavy part 55.22 3 Store for heavy part 35.23 3 Oil storage room 55.24 3 Oil storage room 55.25 3 Office 1 55.26 3 Office -2 3527 3 Toilet 55.28 3 Toilet 35.29 3 Toilet 55.210 3 Tearoom 55.211 3 ‘Storage area small parts 55.212 3 HVAC room 55.213 3 HVAC room 55.214 3 Storage Building - 2 Master Key List Building Room Key No. aty. ‘Storage Building-2 MiKS6 3 Electrical fom master sm 56a z Electrical workshop S611 3 Electrical room a12 3 Electrical room 3613 a SMK56.2 3 Mechanical Room master keys Staircase 182 5621, 3 Staircase 1&2 5622 3 ‘AHU room ~ 56.23 ait ‘AHU room 56.28 3 Store for small parts 56.25 3 (om) 7 Store for small parts au 7 (om) small Store far small parts ct 5 (om) Corridor 56.28 3 Corridor 56.29 3 Office T 56.210 3 Office 2 56.211 3 Tea room 56212 3 Janitor 36.213 3 Toilet 56.214 7 Toilet 36215 3 Toilet 56.216 3 ‘Store for small parts ray : (5.3m) Store for small parts 56.218 3 (5.3m) Transformer Room SMK 56.3 3 master key ‘Aux. Dry transformer 56.31 3 Grand Master Key List Key No. ‘ty. Grand master key ‘MK 6 Electrical Room master MK 63 3 key Transformer Room kez 3 master key

You might also like