Discounted Quote_Livspace - Mrs. Shobha
Discounted Quote_Livspace - Mrs. Shobha
Discounted Quote_Livspace - Mrs. Shobha
3 uPVC Window - UPVC slider with 3 track chanel (Lesso or encraft brand) 12 850 10,200
- White colour frame
- 6 mm toughend glass
- Hardware with 10 yrs warranty
MASTER BEDROOM
1 Bay Window Seating - As per Design 12 1300 15,600
2 Wall Decor As per Design. Lumpsump costing is taken for budgetory purpose. 1 15000 15,000
3 uPVC Window - UPVC slider with 3 track chanel (Lesso or encraft brand) 25 850 21,250
- White colour frame
- 6 mm toughend glass
- Hardware with 10 yrs warranty
BEDROOM 2
1 Study - Carcass material- Prelam HDHMR 16.5 mm laminated both sides with 0.8 mm laminate. 12 1300 15,600
- Shutter material- 1 mm Laminate on 16.5 mm MDF
- HDHMR brand- Crossbond or ISI marked brand
- HDHMR brand- Crossbond or ISI marked brand
- Laminate brand- Merino/Greenlam or equivalent
- Hettich or equivalent soft close hardware for hinges and non soft close for telescopic runners
- Includes one internal lockable drawer, handing rod and an removable shelf
- Outer Handles upto Rs 200 per handle
2 Wall Decor As per Design. Lumpsump costing is taken for budgetory purpose. 1 15000 15,000
LIVING ROOM
1 uPVC door - UPVC slider with 3 track chanel (Lesso or encraft brand) 64 850 54,400
- White colour frame
- 6 mm toughend glass
- Hardware with 10 yrs warranty
2 Wall Decor As per Design. Lumpsump costing is taken for budgetory purpose. 1 25000 25,000
3 Mandir - Carcass material- Prelam HDHMR 16.5 mm laminated both sides with 0.8 mm laminate. 25 1400 35,000
- Shutter material- 1 mm Laminate on 16.5 mm MDF CNC Jali.
- HDHMR brand- Crossbond or ISI marked brand
- HDHMR brand- Crossbond or ISI marked brand
- Laminate brand- Merino/Greenlam or equivalent
- Hettich or equivalent soft close hardware for hinges and non soft close for telescopic runners
- Includes one internal lockable drawer, handing rod and an removable shelf
- Outer Handles upto Rs 200 per handle
4 Partition Tv Unit As per Design. Lumpsump costing is taken for budgetory purpose. 1 55000 55,000
Grand Total 920,800
Payment Terms
1) 15% - Advance on signing of contract 138120
2) 35% - At site kick off and for starting the work for production or on site 322280
3) 25% - When 50% work is completed 230200
4) 25 % - When 75% work is completed 230200