CLIENT : HPCL Rajasthan Refinery Limited (HRRL) EIL JOB No. B224
PROJECT : Rajasthan Refinery Project (RRP) UNIT No. 136

PLANT : LLDPE/HDPE SWING UNIT DOCUMENT No. B224-EFF-PID-136-0003_Rev_1


P&ID FIRE WATER BOOSTER PUMP
LICENSOR : Prosernat SA DOCUMENT TITLE LLDPE/HDPE (SWING) UNIT
EPC CONTR : MEIL Date : 01.04.2024 PREPARED BY

SL NO COMMENT / OBSERVATION RESOLUTION / AGREEMENT COMMENT / OBSERVATION REMARKS

Revision -1

Since only manual stop is envisaged, why this is included


1 Noted and updated.
here? Typ.
Indicate signals in dotted line. Comment is applicable for all
2 Noted and updated.
such cases.
As per the comment bypass line is provided. As the NRV
EPCC to include bypass line with isolation valve and NRV and and Isolation valve is provided after the bypass line
also the instantaneous male coupling for feeding the Fire there is no requirement to provide isolation valve in the
3
tender as per client’s comment. Refer email dated bypass line.
12.01.2024 2. Instead of instantaneous coupling 4 nos we are
providing 4 way breeching connection.

4 All instrumentation isolation valves shall be ball valves Noted and updated.

Indicate signals in dotted line. Comment is applicable for all


5 Noted and updated.
such cases.

6 These signals are not depicted anywhere. It is shown in the cause and effect matrix sheet.

FT will not measure pressure. It only senses the flow and


7 How will FT measure Pressure? Pls clarify. send signal to the control valve in the re circulation line.
When the flow increases the control valves operates.