NOTE:-

DOOR WINDOW DETAILS 1. ALL DIMENSIONS ARE IN MM. & LEVELS ARE IN METER.
OVER HEAD OVER HEAD
OVER HEAD OVER HEAD
WATER TANK WATER TANK
WATER TANK WATER TANK
RCC SLAB RCC SLAB 450 450 2. ALL BRICK WORK TO BE DONE IN CEMENT MORTAR 1:6 EXCEPT 115
450 450 WALL WHICH WILL BE CONSTRUCTED IN CEMENT MORTOR 1:4.
Parapet Parapet 600

1400
LVL.

450
LVL.
3. PLINTH LEVEL WILL BE KEPT AS DECIDED BY RVNL/PMC.

1370

1140
HEAD

2440
HEAD ROOM
ROOM 4. 40 TH.DPC WITH TWO COATS OF BITUMEN APPLIED ON IT WILL BE
Terrace Terrace Vent. V

1150

1150
Floor LVL. Floor LVL. PROVIDED TO ALL WALLS AS SPECIFIED.
900 900
Window W1 Window W2 5. BATH AND W.C. FLOOR LEVEL WILL BE KEPT LOWER BY 10/20MM TO
PREVENT FLOW OF WATER OUTSIDE.
SW
900 750 533 534 533

3200

3200
8940

6. 40THK C.C FLOOR FINISH SMOOTH TO BE PROVIDED THROUGHOUT


1st Floor 1st Floor THE BUILDING WITH 100MM HIGH SKIRTING. W.C. AND BATH TO BE

1370
2100

2100
7550
LVL. LVL. W W1 W2 W2 W1 W
PROVIDED WITH SUITABLE TILES ON WALL AS DECIDED BY THE
INCHARGE.
1590
Door d1 Door d2 Window W 7. 1:6 CEMENT PLASTER WITH WHITE WILL BE PROVIDED INSIDE THE

3200

3200
QUARTER. COLOUR WASH/DISTEMPER AS SPECIFIED.
Plinth Plinth
D1 D1
LVL. LVL. W1 W1 W2 W2 W1 W1 8. OUTSIDE OF THE QUARTER SHALL BE CEMENT PLASTERED 1:6 EXCEPT
OUTSIDE WADROBE. OUTSIDE OF WALLS AND BALCONY INCLUDING
PLINTH LEVEL DECIDED
BY RVNL/PMC
PLINTH LEVEL DECIDED
BY RVNL/PMC
HUNG PORTION, WITH WHITE WASH/COL. WASH .

REAR ELEVATION 9.ALL DOORS & WINDOWS SHALL BE PAINTED WITH SUITABLE COLOUR AS
FRONT ELEVATION HEAD ROOM HEAD ROOM DECIDED BY ENGINEER INCHARGE.
LVL. ROOF LVL.

10. 50THK RCC JALI SHALL BE PROVIDED INFRONT OF S/CASE WALL AS

1390
Parapet Parapet HEAD ROOM SPECIFIED.

2440
LVL. LVL.
Terrace TRADE- 250 MM
RISER- 178 MM
Terrace Terrace Floor LVL. 11. 100MM MUD PHUSKA SHALL BE PROVIDED OVER ROOF OF THE
1150

1150

1150

2440
Floor LVL. Floor LVL.
GLAZING BUILDING AS PER IRS-1987. 12. COOLER STAND MADE OF IRON
300 Thk.R.C.C. 300 Thk. R.C.C. BEAM
SECTION TO BE PROVIDED ON THE WINDOWS, WHEREVER
1100

BEAM
BRICK WALL
DESIRABLE AS PER APPROVAL OF SITE ENGINEER.
BRICK WALL

3200

3200
1370

2100
KITCHEN ROOM 3075 ROOM
1st Floor

3054
1st Floor 1st Floor LVL.
7550

7550
125mm Thk. LVL. LVL. 1000
730

TOILET ROOM ROOM ROOM R.C.C. SLAB ROOM TOILET


50
425 Thk. R.C.C. 400 Thk.R.C.C. BEAM
1100

825
BEAM BRICK WALL

150
150 BRICK WALL

3054
3200

3200
KITCHEN
1370

3025 ROOM 3075 ROOM

2342
2100

2100
Plinth Plinth Plinth
LVL. LVL. LVL.
730

TOILET ROOM ROOM ROOM ROOM TOILET


1000
GL ± 00 GL ± 00
PLINTH LEVEL DECIDED PLINTH LEVEL DECIDED
PLINTH LEVEL DECIDED PLINTH LEVEL DECIDED
BY RVNL/PMC BY RVNL/PMC
BY RVNL/PMC BY RVNL/PMC

SECTION A-A SECTION B-B SECTION C-C


40 THK CC(1:2:4)FLOOR FINISH 40 TH CC(1:2:4)FLOOR FINISH
100mm P.C.C.(1:4:8) 100mm P.C.C.(1:4:8)
100 THK SAND FELING 100 TH SAND FELING
RAMMED EARTH RAMMED EARTH

B B

W2 W2 W2 W2

OVER HEAD OVER HEAD


450 WIDE 450 WIDE WATER TANK

SLOPE

SLOPE
KITCHEN KITCHEN KITCHEN KITCHEN WATER TANK
CHAJA
UP
2440X1880 2440X1880
UP
CHAJA 2440X1880 2440X1880
LEGEND
450 WIDE 450 WIDE
W1 W1 W1 W1 W W1 W1 W CHAJA
D2 D2 D2 D2 CHAJA D2 D2 - 230/115 THK. BRICK WORK PL - PLINTH LEVEL
V TOILET
TOILET V V TOILET TOILET
V SL THK - THICKNESS
1220x1030 D2 D2 1220x1030 D2 1220x1030
D2 O PE
A 1220x1030 A A A PE
SLO - CONCRETE
VER VER VER VER
TYP - TYPICAL
ROOM ROOM ROOM ROOM
2898x2365 3050x2745 3050x2745 2898x2365 2898x2365 3050x2745 3050x2745 2898x2365
BATH D2 D2 BATH D2 D2 - SAND FILLING
V 1220x1220 BATH
V V 1220x1220
BATH
1220x1220 V OPEN TERRACE
C 1220x1220 C
D1 D1 D1 D1
D1 D1 D1 D1 RAIL VIKAS NIGAM LIMITED
1200 x 610 D1 D1 1200 x 610 1200 x 610 D1 D1 1200 x 610
CUPBOARD CUPBOARD CUPBOARD CUPBOARD
7515

D1 D1 STAFF QUARTER BUILDING TYPE-II AT DHOLPUR


1000

ROOM ROOM ROOM ROOM


3050x3050 3050x3050 3050x3050 3050x3050
UP NAME OF PROJECT : MATHURA - DHOLPUR 3rd LINE RAILWAY PROJECT - PKG-1.
3
ROOM 4 2 ROOM ROOM ROOM HEADROOM
3050x3960 5 1 3050x3960 3050x3960 3050x3960
6 UP
7 D1 D1
D1 8 SL
PE

SLOPE

SLOPE
W1 W1 W1 W1 O
9 O PE
10 20 SL
UP 11 19 UP D1 UP TITLE: Staff Quarter Building (Type-II-28-UNITS)
VERANDAH VERANDAH VERANDAH VERANDAH
12 18
13 17
W1 14 16
15
W1 W1 W1 ARCHITECTURAL PLAN,ELEVATION & SECTION DETAILS
STAIRCASE
STAIRCASE
2135X4788 CONTRACTOR: STS-KEC (JV)
905

1200 x 610 2135X4885 1200 x 610 1200 x 610 1200 x 610


CUPBOARD D1 CUPBOARD CUPBOARD CUPBOARD DRAWN:- SUBHASMITA
W Designer:-
DESIGN:- BIDHU
B B SR ENGINEERING, BHUBANESWAR.
C C APRO:- R.N MOHAPATRA

15715
TERRACE FLOOR PLAN Ref Dwg No.------ O/258/04/ALD.SH. NO.1

GROUND FLOOR PLAN FIRST FLOOR PLAN DRAWING NO : SQB/DH-II/ARCT/07


(FOR DETAILS OF LINTEL & CHAJA REFER (FOR DETAILS OF LINTEL & CHAJA REFER REVISION NO: 0; DATE: 03.09.2018
DRAWING NO - SQB/T-II/STR/05) DRAWING NO - SQB/T-II/STR/05) SCALE: 1:100, 1:50,

SCHEDULE OF DOORS & WINDOWS

SL
NO NAME SIZE

1 D1 900X2100
STS-KEC (JV) PMC LASA CLIENT : RVNL
2 D2 750X2100 DESIGNATION SIGNATURE DESIGNATION SIGNATURE DESIGNATION SIGNATURE
3 W 1590X1370

4 W1 900X1370 DRAWN BY
PM CPM/RVNL
5 W2 900X1140

6 V 600x450 CHECKED BY DGM/P/RVNL


RE/CIVIL
STAIR
7 1590x3500
W
APPROVED BY
16630 NOTE:-

1 2 5 6 16 17 19 20 1. ALL DIMENSIONS ARE IN MM. & LEVELS ARE IN METER.

9 10 11 12 13 2. THIS DRAWING SHOULD BE READ IN


4 7 8 18 CONJUNCTION WITH ARCHITECTURAL

14 15 DRAWING NO SQB/T-II/ARCT/07.

203 203 3. ANY DISCREPANCY IN THE DRG. SHOULD BE

610 1392 1887 980 668 1023 407 1183 1183 407 1023 668 980 1887 1392 610 BROUGHT TO THE KNOWLEDGE OF CONSULTANT
BEFORE EXECUTION.
4. DRAWING IS NOT TO BE SCALED ONLY WRITTEN
3740 3740 DIMENSION SHOULD BE FOLLOWED .
5. ALL THE BRICKS SHALL BE OF FIRST CLASS.

A 2440 2440
6. LOAD HAS BEEN TAKEN FOR (G+1) FLOORS ONLY.

2110

2110

2110

2110
7. THE MIX FOR ALL P.C.C. WORK SHALL BE M-7.5 (1:4:8).
1070 8. ALL THE MORTAR FOR THE BRICK WORK IN
2110

1880

1880
FOUNDATION WORK SHALL BE OF RATIO 1:6 FOR

886

886
230 MM THK WALL & 1:4 FOR 115 MM THK. WALL.
3483 520 520 3483

B 1220 1220
2898 3050 3050 2898
1203

1030

1030
2595

2595
190

2
115

2365

2365
C

2745

2745
190
1220

1220
1335

D 610
2
610
E
58

F LEGEND
10675

323

2500

2500
668

PL - PLINTH LEVEL
3050 3050 - 230/115 THK. BRICK WORK
THK - THICKNESS

G 230 2135
-

-
CONCRETE

SAND FILLING
TYP - TYPICAL
440

C/C - CENTER TO CENTER


3050

3050
1 1 FFL - FINISHED FLOOR LEVEL
FGL - FINISHED GROUND LEVEL
420 420
H
1735

610 610 RAIL VIKAS NIGAM LIMITED


4570

4570
1735

1735
3050 3050 STAFF QUARTER BUILDING TYPE-II AT DHOLPUR

I NAME OF PROJECT : MATHURA - DHOLPUR 3rd LINE


4750

RAILWAY PROJECT - PKG-1.


1290

J 3280 3280

3a
235

3a

1525

1525
K
905 375

TITLE: Staff Quarter Building (Type-II-28UNITS)


L 780 780
610

610
FOUNDATION LAYOUT

3a
1070 1070
3
3a

CONTRACTOR: STS-KEC (JV)


1430 1430
M
905

905

DRAWN:- KIRAN
Designer:-
DESIGN:- BIDHU
SR ENGINEERING, BHUBANESWAR. APRO:- R.N MOHAPATRA

3435 Ref Dwg No.------


O/258/04/ALD.SH. NO.1
3

DRAWING NO : SQB/DH-II/STR/01

FOUNDATION LAYOUT REVISION NO: 0; DATE: 03.09.2018

SCALE: 1:100, 1:50,


STS-KEC (JV) PMC LASA CLIENT : RVNL
(FOR LOCATION OF DETAIL OF SECTION 1-1, 2-2,3-3 & 3a-3a DESIGNATION SIGNATURE DESIGNATION SIGNATURE DESIGNATION SIGNATURE

REFER DRAWING NO - SQB/T-II/STR/04) DRAWN BY


PM CPM/RVNL

CHECKED BY DGM/P/RVNL
RE/CIVIL

APPROVED BY
NOTE:-

1. ALL DIMENSIONS ARE IN MM. & LEVELS ARE IN METER.

2. THIS DRAWING SHOULD BE READ IN


CONJUNCTION WITH RELEVANT ARCHITECTURAL
DRAWINGS.

P. L. P. L. 3. ANY DISCREPANCY IN THE DRG. SHOULD BE


D.P.C 40MM THK.
BROUGHT TO THE KNOWLEDGE OF CONSULTANT

300
BEFORE EXECUTION.
4. DRAWING IS NOT TO BE SCALED ONLY WRITTEN
G. L. G. L. DIMENSION SHOULD BE FOLLOWED .

230 5.

6.
ALL THE BRICKS SHALL BE OF FIRST CLASS.

LOAD HAS BEEN TAKEN FOR (G+1) FLOORS ONLY.

75 P.C.C 75 7.
8.
9.
THE MIX FOR ALL P.C.C. WORK SHALL BE M-7.5 (1:4:8).
THE MIX FOR ALL R.C.C. WORK SHALL BE M-20 (1:1.5:3)
ALL THE MORTAR FOR THE BRICK WORK IN

380 FOUNDATION WORK SHALL BE OF RATIO 1:6

100
10. CLEAR COVER TO MAIN REINFORCEMENT SHALL BE
SECTION 3a-3a SLAB - 15MM.

(SHOWING TYPICAL DETAIL OF


TOE WALL FOR VERANDAH )

ROOF SLAB
ROOF LVL. 230
ROOF SLAB ROOF LVL. 230

125
115
125

125
ROOF LVL.

125

125
FIRST FLOOR SLAB FIRST FLOOR SLAB FIRST FLOOR SLAB
125 FIRST FLOOR SLAB FIRST FLOOR SLAB

125

125
125

125

P. L. P. L.
P. L. D.P.C 40MM THK. P. L.
D.P.C 40MM THK. D.P.C 40MM THK.
PLINTH LEVEL PLINTH LEVEL PLINTH LEVEL
LEGEND
DECIDED BY DECIDED BY DECIDED BY
RVNL/PMC RVNL/PMC G. L. RVNL/PMC - 230/115 THK. BRICK WORK PL - PLINTH LEVEL
THK - THICKNESS
G. L. G. L.
345 - CONCRETE
TYP - TYPICAL
150 300 230 150 - SAND FILLING # - DIAMETER
345 C/C - CENTER TO CENTER
150 460 150 460 FFL
FGL
-
-
FINISHED FLOOR LEVEL
FINISHED GROUND LEVEL

150 575 150 575


RAIL VIKAS NIGAM LIMITED
150 690 150 690

150 805 450 345


150 805 STAFF QUARTER BUILDING TYPE-III AT DHOLPUR

15075 920
75 15075 920
75
NAME OF PROJECT :

75 75 MATHURA - DHOLPUR 3rd LINE


150 P.C.C 150 P.C.C RAILWAY PROJECT - PKG-1.
150 P.C.C
1070
495
1070
SECTION 1-1 SECTION 2-2 SECTION 3-3 TITLE: Staff Quarter Building (Type-II-28-UNITS)
FOUNDATION & SLAB DETAIL
(SHOWING TYPICAL DETAIL OF (SHOWING TYPICAL DETAIL OF (SHOWING TYPICAL DETAIL OF
230MM THK. WALL) 115MM THK. WALL) STAIRCASE WALL)
CONTRACTOR: STS-KEC (JV)
DRAWN:- KIRAN
Designer:-
DESIGN:- BIDHU
SR ENGINEERING, BHUBANESWAR. APRO:- R.N MOHAPATRA

Ref Dwg No.------


(FOR LOCATION REFER DRAWING NO - SQB/T-II/STR/01) O/258/04/ALD.SH. NO.1

SQB/DH-II/STR/04
DRAWING NO :

REVISION NO: 0; DATE: 03.09.2018

SCALE: 1:100, 1:50,


STS-KEC (JV) PMC LASA CLIENT : RVNL
DESIGNATION SIGNATURE DESIGNATION SIGNATURE DESIGNATION SIGNATURE

DRAWN BY
PM CPM/RVNL

CHECKED BY DGM/P/RVNL
RE/CIVIL

APPROVED BY
NOTE:-

LINTEL BEAM 1. ALL DIMENSIONS ARE IN MM. & LEVELS ARE IN METER.
TOP REINF.
2. THIS DRAWING SHOULD BE READ IN
CONJUNCTION WITH RELEVANT ARCHITECTURAL
a DRAWINGS.
3. ANY DISCREPANCY IN THE DRG. SHOULD BE

d
BROUGHT TO THE KNOWLEDGE OF CONSULTANT
BEFORE EXECUTION.
BOTTOM REINF. 4. DRAWING IS NOT TO BE SCALED ONLY WRITTEN
b
STPS. L DIMENSION SHOULD BE FOLLOWED .

5. ALL THE BRICKS SHALL BE OF FIRST CLASS.


300 SPAN 300
TYP. CHAJJA DETAIL 6. LOAD HAS BEEN TAKEN FOR (G+1) FLOORS ONLY.
TYP. LINTEL DETAIL 7. THE MIX FOR ALL P.C.C. WORK SHALL BE M-7.5 (1:4:8).
8. THE MIX FOR ALL R.C.C. WORK SHALL BE M-20 (1:1.5:3)
LINTEL BEAM
CHAJA 9. CLEAR COVER TO MAIN REINFORCEMENT SHALL
BE FOR LINTEL - 25MM & CHAJA - 15MM.

200/230

75
450

SCHEDULE OF LINTELS

2100
SPAN B D BOT. TOP
STPS. REMARK FLOOR LEVEL

(mm) (mm) (mm) REINF. REINF.


(TYPICAL SECTION OF LINTEL
WITH CHAJA)
UPTO 750 115 200 2-10# 2-10# 8#@150C/C LEGEND

230 200 2-10# 2-10# 8#@150C/C - 230/115 THK. BRICK WORK PL - PLINTH LEVEL
THK - THICKNESS

200 2-12# 2-10# 8#@150C/C - CONCRETE


TYP - TYPICAL
1000 115 LINTEL BEAM

200/230
- SAND FILLING # - DIAMETER

230 200 2-12# 2-10# 8#@150C/C FFL - FINISHED FLOOR LEVEL


C/C - CENTER TO CENTER

FGL - FINISHED GROUND LEVEL

8#@150C/C

2100
1200 115 200 2-12# 2-10#
8#@150C/C RAIL VIKAS NIGAM LIMITED
230 200 2-12# 2-10#
1500 230 250 2-12# 2-12# 8#@150C/C FLOOR LEVEL STAFF QUARTER BUILDING TYPE-II AT DHOLPUR
NAME OF PROJECT : MATHURA - DHOLPUR 3rd LINE
2000 230 250 2-12# 2-10# 8#@150C/C RAILWAY PROJECT - PKG-1.

(TYPICAL SECTION OF LINTEL


230 115 WITHOUT CHAJA)

SCHEDULE OF CHAJJA TITLE: Staff Quarter Building (Type-II-28-UNITS)


LINTEL & CHAJA DETAIL
L d REINFORCEMENT 2- #10 2- #10 CONTRACTOR: STS-KEC (JV)
(mm) (mm) b a DRAWN:- KIRAN
Designer:-
DESIGN:- BIDHU
8#@150C/C 8#@150C/C
200

200
SR ENGINEERING, BHUBANESWAR. APRO:- R.N MOHAPATRA

600 75 8#@150C/C 4-8#


Ref Dwg No.------
O/258/04/ALD.SH. NO.1
450 75 8#@150C/C 3-8# 2- #10 2- #10 DRAWING NO : SQB/DH-II/STR/05

REVISION NO: 0; DATE: 03.09.2018

MASONRY SCALE: 1:100, 1:50,


MASONRY WALL (TYP)
WALL (TYP) STS-KEC (JV) PMC LASA CLIENT : RVNL
DESIGNATION SIGNATURE DESIGNATION SIGNATURE DESIGNATION SIGNATURE

LINTEL BEAM:- LINTEL BEAM:-


230x200 115x200 DRAWN BY
PM CPM/RVNL

TYP. DETAIL OF LINTEL WITHOUT OPENING CHECKED BY


RE/CIVIL DGM/P/RVNL

APPROVED BY
NOTE:-

9
10#-150 C/C 1. ALL DIMENSIONS ARE IN MM. & LEVELS ARE IN METER.
12#-100 C/C

11 slab reinforcement
not shown
60
2.

3.
THIS DRAWING SHOULD BE READ IN CONJUNCTION
WITH RELEVANT ARCHITECTURAL DRAWING.

ANY DISCREPANCY IN THE DRG. SHOULD BE


20 0 BROUGHT TO THE KNOWLEDGE OF CONSULTANT
X 1038
BEFORE EXECUTION.

4. DRAWING IS NOT TO BE SCALED ONLY WRITTEN


230 Thkl.
18 250 DIMENSION SHOULD BE FOLLOWED .
Brick wall

178
12#-100 C/C 8#-200 C/C 1O#-150C/C 5.. CLEAR COVER TO MAIN REINFORCEMENT SHALL BE
30
0 BEAM -25MM, SLAB- 15MM.

.
THK
6. MINIMUM DEVELOPMENT OVER LAP FOR TOR STEEL

150
15 SHALL BE 50d, WHERE "d" IS DIA OF MAIN
REINFORCEMENT.THE LAP SHALL BE STAGGERED AND
12#-100 C/C AVOIDED AT THE POINT OF MAXIMUM BENDING

1000
MOMENT .

Y1 230 Thkl.
SECTION Y-Y 7. ALL THE BRICKS SHALL BE OF FIRST CLASS.

Brick wall (FOR FLIGHT NO 2 &4) 12#-100C/C 8. LOAD HAS BEEN TAKEN FOR (G+1) FLOORS ONLY.

UP3 9. THE MIX FOR ALL R.C.C. WORK SHALL BE M-20 (1:1.5:3).

10#-100 C/C 10. ALL THE REINFORCEMENT SHALL BE Fe-500.

4 2
PLINTH LVL. 1000
5 1 250
2
6

178
PARKING LVL.
Y1 10#-150 C/C
1 1MTR

7 10#-150 C/C

8 Y 10#-100 C/C
8#-200 C/C
15
0
9 SECTION Y1-Y1 80
1038
10 20
11 19 8#-200 C/C
12#-100 C/C
250
12 18 12#-100 C/C

178
230 Thkl. 230 Thkl.
13 17 Brick wall Brick wall
14 16

15
15 12#-100 C/C 00
10

0T
1000 SECTION X-X

HK
12#-100 C/C LEGEND
PLINTH LVL.
STAIRCASE (FOR FLIGHT NO 1 )

.
3 - 230/115 THK. BRICK WORK PL - PLINTH LEVEL

2 8#-200 C/C - CONCRETE


THK - THICKNESS
TYP - TYPICAL

2135X4480 10#-150 C/C


1
PARKING LVL.
FFL -
- SAND FILLING

FINISHED FLOOR LEVEL


Ø
C/C
-
-
DIAMETER
CENTER TO CENTER

A
FGL - FINISHED GROUND LEVEL

10#-150 C/C
RAIL VIKAS NIGAM LIMITED

15 STAFF QUARTER BUILDING TYPE-II AT DHOLPUR


0
80 NAME OF PROJECT : MATHURA - DHOLPUR 3rd LINE
X Y 1038 RAILWAY PROJECT - PKG-1.

12#-100 C/C
8#-200 C/C
178 250 12#-100 C/C
TITLE: Staff Quarter Building (Type-II-28-UNITS)
STAIRCASE DETAIL
230 Thkl. 230 Thkl.
Brick wall Brick wall CONTRACTOR: STS-KEC (JV)
DRAWN:- KIRAN

3#16 Designer:-
DESIGN:- BIDHU
15

0 SR ENGINEERING, BHUBANESWAR.
12#-100 C/C
00
APRO:- R.N MOHAPATRA
0T

1 Ref Dwg No.------


1000 O/258/04/ALD.SH. NO.1
HK

12#-100 C/C
.

3 DRAWING NO : SQB/DH-II/STR/06
8#150 C/C
SECTION X-X
8#-200 C/C REVISION NO: 0; DATE: 03.09.2018

SCALE: 1:100, 1:50,

25mmThk.BEARING 10#-150 C/C (FOR FLIGHT NO 3 ) STS-KEC (JV) PMC LASA CLIENT : RVNL
DESIGNATION SIGNATURE DESIGNATION SIGNATURE DESIGNATION SIGNATURE
PLASTER
DRAWN BY
PM CPM/RVNL

3#16 CHECKED BY
RE/CIVIL DGM/P/RVNL

DETAIL OF 'B' APPROVED BY


5 6 16 17 19 20 NOTE:-
1 2 4 7 8 9 10 11 12 13 18 1. ALL DIMENSIONS ARE IN MM. & LEVELS ARE IN METER.
14 15 2. THIS DRAWING SHOULD BE READ IN
203 203
CONJUNCTION WITH RELEVANT ARCHITECTURAL
610 1393 1887 980 668 1023 408 1183 1183 408 1023 668 980 1887 1393 610 DRAWINGS.
7 7
3. ANY DISCREPANCY IN THE DRG. SHOULD BE
A BROUGHT TO THE KNOWLEDGE OF CONSULTANT
BEFORE EXECUTION.

2110 S1 S1 4. DRAWING IS NOT TO BE SCALED ONLY WRITTEN


DIMENSION SHOULD BE FOLLOWED .
5. ALL THE BRICKS SHALL BE OF FIRST CLASS.

B 6.
7.
LOAD HAS BEEN TAKEN FOR (G+1) FLOORS ONLY.
THE MIX FOR ALL P.C.C. WORK SHALL BE M-7.5 (1:4:8).
7 7
1203

4 4 5 S1 5
S1 8. THE MIX FOR ALL R.C.C. WORK SHALL BE M-20 (1:1.5:3).
9. CLEAR COVER TO MAIN REINFORCEMENT SHALL BE FOR
C
RB-3
S1 S1 SLAB - 15MM.

RB-3
5 5
S1 S1
1335

S1
D S1
E RB-1
58

RB-1
RB-2 RB-2
F
323
668
440

G
S1 S1

H S1 3
1735

4 2 S1
5 1
6

6
6 UP
7
I 8
9
1290

J S1a
10
11
20
19
S1a
235

12 18 LEGEND
13 17
K - 230/115 THK. BRICK WORK PL - PLINTH LEVEL
905 375

14 16 THK - THICKNESS
15
L STAIRCASE
-

-
CONCRETE

SAND FILLING
TYP - TYPICAL
6

6
Ø - DIAMETER
2135X4885 FFL - FINISHED FLOOR LEVEL
C/C - CENTER TO CENTER

M FGL - FINISHED GROUND LEVEL

RAIL VIKAS NIGAM LIMITED

SLAB SCHEDULE STAFF QUARTER BUILDING TYPE-II AT DHOLPUR

FIRST FLOOR BEAM & SLAB LAYOUT SLAB


MKD.
THICKNESS
MM
REINFORCEMENT (Bottom)
SHORT SPAN LONG SPAN
REINFORCEMENT (Top)
SHORT SPAN LONG SPAN NAME OF PROJECT : MATHURA - DHOLPUR 3rd LINE
S-1 125 8mm@200c/c 8mm@200/c 8mm@200c/c 8mm@200c/c RAILWAY PROJECT - PKG-1.
1 5 S1a 125 8mm@200c/c 8mm@200c/c
L
230 5 10
230 THK. 115 THK.
2#12
BRICK WALL BRICK WALL
L
R.C.C. 2 #12 230 2#12
300 SLAB Throughout A
8#150C/C L
400

TITLE: Staff Quarter Building (Type-II-28-UNITS)


CYNDER FILLING 2 #12
Throughout
B
8#150C/C

400
Beam renf. not 2#16 FIRST FLOOR BEAM & SLAB LAYOUT & DETAIL
125 shown for clarity 0.15L 0.15L
8#200c/c 2 #16 2 #16
Throughout 2#16 CONTRACTOR: STS-KEC (JV)
8#200c/c
A 2#16
8#150 2 #12 DRAWN:- KIRAN
SECTION A-A 2 #16
Throughout B
2#12 Designer:-
SECTION 5-5 RB1 DESIGN:- BIDHU
(230X400)
8#150 SECTION B-B SR ENGINEERING, BHUBANESWAR.
(TYPICAL DETAIL OF RB2
APRO:- R.N MOHAPATRA
BEAM BETWEEN GRID -1&5
SUNKEN SLAB FOR TOILET) (230X400) Ref Dwg No.------
BEAM BETWEEN GRID -5&10 O/258/04/ALD.SH. NO.1
125mm Thk. 100mm Thk.
8#-200 C/C
L B D R.C.C SLAB R.C.C SLAB DRAWING NO : SQB/DH-II/STR/02
230 THK. 230 THK. 230 2#12 CYNDER FILLING L
BRICK WALL BRICK WALL L SUNKEN SLAB 8#-200 C/C
REVISION NO: 0; DATE: 03.09.2018
R.C.C. 2 #12 400
C 8#-200 C/C 100mm SCALE: 1:100, 1:50,
50 SLAB Throughout 8#150C/C 0.25 L 0.25 L (TYP)
425

STS-KEC (JV) PMC LASA CLIENT : RVNL


125 8#-200 C/C 8#-200 C/C 8#-200 C/C
125mm

8#200c/c 400 TYP 230THK. DESIGNATION SIGNATURE DESIGNATION SIGNATURE DESIGNATION SIGNATURE
2 #12 BEAM RENF. NOT
0.15 L 0.15 L
8#200c/c Throughout C 2#12 SHOWN FOR CLARITY 8#-400 C/C BRICK WALL
DRAWN BY
8#150 115 THK. ALTERNATELY 230THK. SECTION - "6-6" PM CPM/RVNL
SECTION 7-7 RB3 SECTION C-C BRICK WALL PLACED
BRICK WALL (SHOWING TYP SLAB DETAIL CHECKED BY DGM/P/RVNL
RE/CIVIL
(TYPICAL DETAIL OF (230X425) SECTION - "4-4" (SHOWING SLAB DETAIL)
OF 1ST FLOOR BALCONY)
SUNKEN SLAB FOR KITCHEN) BEAM BETWEEN GRID -B&D APPROVED BY
NOTE:-

5 6 16 17 19 20
1 2 4 7 8 9 10 11 12 13 18 1. ALL DIMENSIONS ARE IN MM. & LEVELS ARE IN METER.

14 15 2. THIS DRAWING SHOULD BE READ IN


CONJUNCTION WITH RELEVANT ARCHITECTURAL
203 203
DRAWINGS.
610 1393 1887 980 668 1023 408 1183 1183 408 1023 668 980 1887 1393 610
3. ANY DISCREPANCY IN THE DRG. SHOULD BE

A BROUGHT TO THE KNOWLEDGE OF CONSULTANT


BEFORE EXECUTION.
4. DRAWING IS NOT TO BE SCALED ONLY WRITTEN
2110

S1 S1 DIMENSION SHOULD BE FOLLOWED .


5. ALL THE BRICKS SHALL BE OF FIRST CLASS.
6. LOAD HAS BEEN TAKEN FOR (G+1) FLOORS ONLY.
B 7. THE MIX FOR ALL P.C.C. WORK SHALL BE M-7.5 (1:4:8).
1203

8. THE MIX FOR ALL R.C.C. WORK SHALL BE M-20 (1:1.5:3).


9 9 S1
S1 9. CLEAR COVER TO MAIN REINFORCEMENT SHALL BE FOR
RB-6

SLAB - 15MM.

RB-6
C S1
S1 S1 S1
1335

S1
D S1
E RB-5
58

RB-5
RB-4 RB-4
F
323

10
668
440

G
S1 UP S1

H S1 3
1735

4 S1
5
8

8
6
7
I 8
9
1290

J S1a
10
11
20
19 S1a LEGEND
235

12 18
- 230/115 THK. BRICK WORK PL - PLINTH LEVEL
13 17 2845 1250 1335

K THK - THICKNESS
905 375

14 16 125 Thk. R.C.C.


8# -200c/c
8# -200c/c - CONCRETE
TYP - TYPICAL
15
L STAIRCASE
SLAB 400
40
0 - SAND FILLING Ø
C/C
-
-
DIAMETER
CENTER TO CENTER
8

8
16
2135X4788 44 FFL - FINISHED FLOOR LEVEL
8# -200c/c
8# -200c/c FGL - FINISHED GROUND LEVEL

M 40
0
8# -200c/c

400
RAIL VIKAS NIGAM LIMITED
10

SECTION 10-10
TERRACE BEAM & SLAB LAYOUT SHOWING DETAIL OF STAIRCASE HEAD ROOM
STAFF QUARTER BUILDING TYPE-II AT DHOLPUR

HEAD ROOM LAYOUT SLAB RENFORCEMENT.


NAME OF PROJECT : MATHURA - DHOLPUR 3rd LINE
RAILWAY PROJECT - PKG-1.
SLAB SCHEDULE
SLAB THICKNESS REINFORCEMENT (Bottom) REINFORCEMENT (Top) 5 10
MKD. MM SHORT SPAN LONG SPAN SHORT SPAN LONG SPAN
1 5 230 230
2#12 L 2#12
S-1 125 8mm@200c/c 8mm@200/c 8mm@200c/c 8mm@200c/c L
S-2 8mm@150c/c 8mm@250c/c 8mm@150c/c 8mm@250c/c 2 #12 2 #12
125 E
Throughout D Throughout TITLE: Staff Quarter Building (Type-II-28-UNITS)
S1a 125 8mm@150c/c 8mm@250c/c 8#150C/C 8#150C/C

300
300

TERRACE BEAM & SLAB LAYOUT & DETAIL


0.15L 0.15L
0.15L
2 #12 2 #16 0.15L 2 #12
2 #16 2#16 CONTRACTOR: STS-KEC (JV)
Throughout D
2#16 Throughout E

8#150 8#150 2#12 DRAWN:- KIRAN


2#12 RB4 Designer:-
RB5 SECTION D-D SECTION E-E DESIGN:- BIDHU
(230X300) SR ENGINEERING, BHUBANESWAR.
(230X300) APRO:- R.N MOHAPATRA
BEAM BETWEEN GRID -1&5 BEAM BETWEEN GRID -5&10
Ref Dwg No.------
B D O/258/04/ALD.SH. NO.1
125mm Thk.
S2 230 R.C.C SLAB
8#-200 C/C
DRAWING NO : SQB/DH-II/STR/03
2#12
L 8#-200 C/C
L
8#-200 C/C
2 #12 REVISION NO: 0; DATE: 10.08.2018
F 0.25 L 0.25 L
Throughout 8#-200 C/C SCALE: 1:100, 1:50,
300

8#150C/C 8#-200 C/C 8#-200 C/C 8#-200 C/C


125mm

STS-KEC (JV) PMC LASA CLIENT : RVNL


2 #12 0.15 L 0.15 L
8#-400 C/C DESIGNATION SIGNATURE DESIGNATION SIGNATURE DESIGNATION SIGNATURE
Throughout F
230THK.
115 THK. ALTERNATELY 230THK. BRICK WALL
8#150 2#12 PLACED DRAWN BY
BRICK WALL BRICK WALL PM CPM/RVNL
SECTION F-F SECTION - "8-8"
RB6 (SHOWING TYP.SLAB DETAIL FOR ROOF
SECTION - "4-4" (SHOWING SLAB DETAIL) CHECKED BY DGM/P/RVNL
(230X300) RE/CIVIL
OF 1ST FLOOR BALCONY)
BEAM BETWEEN GRID -B&D APPROVED BY