Professional Documents
Culture Documents
011- PUMP ROOM SCHEMATIC DIAGRAM
011- PUMP ROOM SCHEMATIC DIAGRAM
+280
C +230
B Pool Shower
+280
OVER FLOOW CHANNEL OVER FLOOW CHANNEL GYM
COPPING COPPING +280
PLUNGE
COLD
SUNKEN SEATING
COPPING
A A
OUTDOOR BATHROOM
+280
COPPING COPPING
+280 BAY AREA
JACUZZI
B +280
DINNING AREA
COPPING
+280 +280
C LANDSCAPED AREA
FFL +150
BBQ COUNTER
BAR COUNTER
FFL +150
WINE COOLER
VEGETABLE GARDEN
DINING HALL
LOBBY
UP
1 2 3 4 5 6 7 8 9 10 11
ENTRANCE POWDER
LOBBY ROOM
(DOUBLE HT) SD
DRESS
STORAGE
KITCHEN
CAT MAIN
ENTRANCE
LADDER
LAUNDRY
BED ROOM-1
DIRTY GARAGE
KITCHEN
HELPERS'
BATHROOM
HELPERS' ROOM
CHEMICALS
1. REQUIRED PH VALUE 7.1 TO 7.4
2. VOLUME OF POOL 75M3 PROJECT :
CLIENT:
Mr Brian Al Saadi
NOTES :
1. All dimensions are in
millimeters unless
PUMP ROOM SCHEMATIC DIAGRAM stated otherwise.
2. Do not scale off this
drawing.
3. Attached Images in
this package are just
for reference, actual
WATER TREATMENT: site condition may
differ.
1. CIRCULATION RATE --- LESS THAN 4HOURS
LIST OF EQUIPMENTS: 2. FILTRATION SYSTEM --- SAND FILTER
1. SAND FILTER - 650 MM DIA -2NOS
2. FILTRATION PUMP- 2 HP - 2NOS ELECTRICAL: DESERT ROSE
LANDSCAPING L.L.C
3. CONTROL PANEL- WALL MOUNTED- 1NO 1. ALL UNDER WATER LIGHTS ARE OF LOW ahmadmukhtar63@gmail.com
4. TRANSFORMER 12V 200W - 1NOS +971-55-828 6095
VOLTAGE 12V International City, Dubai
5. JET NOZZLE PUMP 2HP - 2NOS U.A.E
2. ALL ELECTRICAL EQUIPMENT ARE
6. CHILLER PUMP 2HP- 1NOS Drawing Title:
PROTECTED WITH ELCB
7. COOLING UNIT - 1NO 3. CONTROL PANEL IS PROVIDED WITH PUMP ROOM
8. N-BS SALT SYSTEM - 1NO SCHEMATIC
EXTERNAL ISOLATOR DIAGRAM
Drawing No:
A-011
✎By: Date:
Rev: Scale: