Professional Documents
Culture Documents
NG50-5-500-SAF-CN-AB-00-6002
NG50-5-500-SAF-CN-AB-00-6002
Project
NIGERIA – OML 130
AKPO Field Development Project
COMPANY ref: NG50-5-500-SAF-CN-AB-00-6002 Revision: 01 Status: IFD Class: 2 Date: 02/10/2007 Page: 1/142
CONTRACTOR ref: 8577Y-2000-CN-6000-002 -- -- -- -- --
Reserved to COMPANY
The document is:
No comments code 0
Approved code 1
Rejected code 3
date:
date:
NG50-5-500-SAF-CN-AB-00-6002_rev01
This document is the property of TOTAL and shall not be disclosed to third parties or reproduced without permission of the COMPANY.
Akpo
Project
NIGERIA – OML 130
AKPO Field Development Project
COMPANY ref: NG50-5-500-SAF-CN-AB-00-6002 Revision: 01 Status: IFD Class: 2 Date: 02/10/2007 Page: 2/142
CONTRACTOR ref: 8577Y-2000-CN-6000-002 -- -- -- -- --
CONTENTS
1. OVERVIEW ................................................................................................................................................................ 4
4. REFERENCE DOCUMENTATION........................................................................................................................ 6
4.1. TOPSIDES GENERAL EQUIPMENT LAYOUT & EQUIPMENT LAYOUT, EQUIPMENT LIST .......................................... 6
4.2. CODES & STANDARDS .......................................................................................................................................... 8
4.3. REPORTS AND TECHNICAL GUIDELINE .................................................................................................................. 8
4.4. PROJECT DOCUMENTS ........................................................................................................................................... 8
4.5. COMPANY SPECIFICATIONS ................................................................................................................................... 8
4.6. NOISE DATA SHEETS .............................................................................................................................................. 8
4.7. ABBREVIATIONS .................................................................................................................................................. 10
5. NOISE STUDY – GENERAL INFORMATION................................................................................................... 10
5.1. PROPAGATION LAW ............................................................................................................................................ 11
5.2. GROUND MODEL .................................................................................................................................................. 11
5.3. OBSTACLES MODELLING ..................................................................................................................................... 11
5.4. REFLECTION PARAMETERS .................................................................................................................................. 11
5.5. NOISE SOURCES MODELLING ............................................................................................................................... 12
5.5.1. Equipment and packages noise data......................................................................................................... 12
Sound Power Level determination for equipment and package................................................................................. 13
5.5.2. Noise sources modelling for standard equipment and packages ............................................................. 13
5.5.3. Turbo generators modelling...................................................................................................................... 14
5.5.4. Piping noise modelling .............................................................................................................................. 15
5.5.5. Noise spectrum of sources......................................................................................................................... 18
5.5.6. Equipment running conditions .................................................................................................................. 18
5.5.7. Receiver modelling .................................................................................................................................... 19
5.6. TOPSIDES EQUIPMENT CONTRIBUTION ON THE HULL DECK ............................................................................... 19
6. PROJECT DATA ...................................................................................................................................................... 20
6.1. MODULE P1......................................................................................................................................................... 27
6.2. MODULE P2......................................................................................................................................................... 33
6.3. MODULE P3......................................................................................................................................................... 37
6.4. MODULE P4......................................................................................................................................................... 42
6.5. MODULE P5......................................................................................................................................................... 44
6.6. MODULE P6......................................................................................................................................................... 46
6.7. MODULE P7......................................................................................................................................................... 50
6.8. MODULE P8......................................................................................................................................................... 53
6.9. MODULE S1......................................................................................................................................................... 56
6.10. MODULE S2......................................................................................................................................................... 62
6.11. MODULE S3......................................................................................................................................................... 67
6.12. MODULE S4......................................................................................................................................................... 72
6.13. MODULE S5......................................................................................................................................................... 74
NG50-5-500-SAF-CN-AB-00-6002_rev01
This document is the property of TOTAL and shall not be disclosed to third parties or reproduced without permission of the COMPANY.
Akpo
Project
NIGERIA – OML 130
AKPO Field Development Project
COMPANY ref: NG50-5-500-SAF-CN-AB-00-6002 Revision: 01 Status: IFD Class: 2 Date: 02/10/2007 Page: 3/142
CONTRACTOR ref: 8577Y-2000-CN-6000-002 -- -- -- -- --
NG50-5-500-SAF-CN-AB-00-6002_rev01
This document is the property of TOTAL and shall not be disclosed to third parties or reproduced without permission of the COMPANY.
Akpo
Project
NIGERIA – OML 130
AKPO Field Development Project
COMPANY ref: NG50-5-500-SAF-CN-AB-00-6002 Revision: 01 Status: IFD Class: 2 Date: 02/10/2007 Page: 4/142
CONTRACTOR ref: 8577Y-2000-CN-6000-002 -- -- -- -- --
1. Overview
The Consortium constituted by Technip France (TPF), Hyundai Heavy Industries CO. Ltd (HHI)
and Technip Offshore Nigeria Ltd (TONL) is designing for the account of TOTAL a new FPSO
project located on Nigerian offshore territory. For this offshore project called AKPO Field
development project, TOTAL has defined Noise and vibration requirements to be respected in the
different rooms/ premises and work areas of the FPSO.
For the AKPO FPSO Topsides, the Noise and Vibrations services are split in two technical parts:
1- Noise activities
2- Vibration activities
This report presents the noise studies. Vibration studies for Topsides are presented in report
NG50-5-500-SAF-CN-AB-00-6501.
NG50-5-500-SAF-CN-AB-00-6002_rev01
This document is the property of TOTAL and shall not be disclosed to third parties or reproduced without permission of the COMPANY.
Akpo
Project
NIGERIA – OML 130
AKPO Field Development Project
COMPANY ref: NG50-5-500-SAF-CN-AB-00-6002 Revision: 01 Status: IFD Class: 2 Date: 02/10/2007 Page: 5/142
CONTRACTOR ref: 8577Y-2000-CN-6000-002 -- -- -- -- --
Studies regarding noise in accommodation and Technical buildings are not included in this
document. They are in HHI scope of work.
Noise maps have been calculated:
1- On the main deck
2- On the mezzanine deck
3- On the upper deck
4- On the Top Deck
5- On the hull deck
Moreover, noise levels have been calculated at different points of a mesh located:
1- In front of the accommodation
2- In front of technical buildings
Noise prediction is carried out at normal, contingency and emergency operating conditions.
NG50-5-500-SAF-CN-AB-00-6002_rev01
This document is the property of TOTAL and shall not be disclosed to third parties or reproduced without permission of the COMPANY.
Akpo
Project
NIGERIA – OML 130
AKPO Field Development Project
COMPANY ref: NG50-5-500-SAF-CN-AB-00-6002 Revision: 01 Status: IFD Class: 2 Date: 02/10/2007 Page: 6/142
CONTRACTOR ref: 8577Y-2000-CN-6000-002 -- -- -- -- --
4. Reference documentation
4.1. Topsides General equipment layout & equipment layout, Equipment list
[G1]. NG50-5-500-PIP-DW-AB-00-2010 “General equipment Layout – Topside – Main and
Mezzanine Deck”
[G2]. NG50-5-500-PIP-DW-AB-00-2030 “General equipment Layout – Topside – Upper and Top
Deck”
[G3]. NG50-6-600-PIP-DW-AB-00-2005 “General equipment Layout – Topside – Hull Deck”
[G4]. NG50-5-500-PIP-DW-AB-00-2060 “General equipment Layout – Topside – Section A-A”
[G5]. NG50-5-500-PIP-DW-AB-00-2050 “General equipment Layout – Topside – Section B-B”
[G6]. NG50-5-500-GEN-LT-AA-00-0220 “AKPO Project FPSO Topside equipment list”
[G7]. NG50-5-500-PIP-DW-AB-00-2101 “Equipment layout Module P1 Main Deck”
[G8]. NG50-5-500-PIP-DW-AB-00-2102 “Equipment layout Module P1 Mezzanine Deck”
[G9]. NG50-5-500-PIP-DW-AB-00-2103 “Equipment layout Module P1 Upper Deck”
[G10]. NG50-5-500-PIP-DW-AB-00-2104 “Equipment layout Module P1 Top Deck”
[G11]. NG50-5-500-PIP-DW-AB-00-2105 “Equipment layout Module P1 South Elevation”
[G12]. NG50-5-500-PIP-DW-AB-00-2106 “Equipment layout Module P1 West Elevation”
[G13]. NG50-5-500-PIP-DW-AB-00-2201 “Equipment layout Module P2 Main Deck”
[G14]. NG50-5-500-PIP-DW-AB-00-2202 “Equipment layout Module P2 Mezzanine Deck”
[G15]. NG50-5-500-PIP-DW-AB-00-2203 “Equipment layout Module P2 Upper Deck”
[G16]. NG50-5-500-PIP-DW-AB-00-2204 “Equipment layout Module P2 Top Deck”
[G17]. NG50-5-500-PIP-DW-AB-00-2205 “Equipment layout Module P2 South Elevation”
[G18]. NG50-5-500-PIP-DW-AB-00-2206 “Equipment layout Module P2 West Elevation”
[G19]. NG50-5-500-PIP-DW-AB-00-2301 “Equipment layout Module P3 Main Deck”
[G20]. NG50-5-500-PIP-DW-AB-00-2303 “Equipment layout Module P3 Upper Deck”
[G21]. NG50-5-500-PIP-DW-AB-00-2305 “Equipment layout Module P3 North Elevation”
[G22]. NG50-5-500-PIP-DW-AB-00-2306 “Equipment layout Module P3 West Elevation”
[G23]. NG50-5-500-PIP-DW-AB-00-2501 “Equipment layout Module P4 Main Deck”
[G24]. NG50-5-500-PIP-DW-AB-00-2502 “Equipment layout Module P4 Mezzanine Deck”
[G25]. NG50-5-500-PIP-DW-AB-00-2503 “Equipment layout Module P4 Upper Deck”
[G26]. NG50-5-500-PIP-DW-AB-00-2504 “Equipment layout Module P4 Top Deck”
[G27]. NG50-5-500-PIP-DW-AB-00-2505 “Equipment layout Module P4 South Elevation”
[G28]. NG50-5-500-PIP-DW-AB-00-2506 “Equipment layout Module P4 West Elevation”
[G29]. NG50-5-500-PIP-DW-AB-00-2601 “Equipment layout Module P5 Main Deck”
[G30]. NG50-5-500-PIP-DW-AB-00-2602 “Equipment layout Module P5 Mezzanine Deck”
[G31]. NG50-5-500-PIP-DW-AB-00-2603 “Equipment layout Module P5 Upper Deck”
[G32]. NG50-5-500-PIP-DW-AB-00-2604 “Equipment layout Module P5 Top Deck”
[G33]. NG50-5-500-PIP-DW-AB-00-2605 “Equipment layout Module P5 South Elevation”
[G34]. NG50-5-500-PIP-DW-AB-00-2606 “Equipment layout Module P5 West Elevation”
[G35]. NG50-5-500-PIP-DW-AB-00-2701 “Equipment layout Module P6 Main Deck”
[G36]. NG50-5-500-PIP-DW-AB-00-2702 “Equipment layout Module P6 Mezzanine Deck”
[G37]. NG50-5-500-PIP-DW-AB-00-2703 “Equipment layout Module P6 Upper Deck”
[G38]. NG50-5-500-PIP-DW-AB-00-2704 “Equipment layout Module P6 Top Deck”
[G39]. NG50-5-500-PIP-DW-AB-00-2705 “Equipment layout Module P6 South Elevation”
NG50-5-500-SAF-CN-AB-00-6002_rev01
This document is the property of TOTAL and shall not be disclosed to third parties or reproduced without permission of the COMPANY.
Akpo
Project
NIGERIA – OML 130
AKPO Field Development Project
COMPANY ref: NG50-5-500-SAF-CN-AB-00-6002 Revision: 01 Status: IFD Class: 2 Date: 02/10/2007 Page: 7/142
CONTRACTOR ref: 8577Y-2000-CN-6000-002 -- -- -- -- --
NG50-5-500-SAF-CN-AB-00-6002_rev01
This document is the property of TOTAL and shall not be disclosed to third parties or reproduced without permission of the COMPANY.
Akpo
Project
NIGERIA – OML 130
AKPO Field Development Project
COMPANY ref: NG50-5-500-SAF-CN-AB-00-6002 Revision: 01 Status: IFD Class: 2 Date: 02/10/2007 Page: 8/142
CONTRACTOR ref: 8577Y-2000-CN-6000-002 -- -- -- -- --
NG50-5-500-SAF-CN-AB-00-6002_rev01
This document is the property of TOTAL and shall not be disclosed to third parties or reproduced without permission of the COMPANY.
Akpo
Project
NIGERIA – OML 130
AKPO Field Development Project
COMPANY ref: NG50-5-500-SAF-CN-AB-00-6002 Revision: 01 Status: IFD Class: 2 Date: 02/10/2007 Page: 9/142
CONTRACTOR ref: 8577Y-2000-CN-6000-002 -- -- -- -- --
5-FB-2160
NG50-5-500-SAF-DS-FB-00-6001 01 Noise data sheet HP and LP Flare TIP
5-FB-2170
NG50-5-500-SAF-DS-GA-00-6014 01 Noise data sheet Fire Water Pump 5-GX-1710 A-B-C-D
NG50-5-500-SAF-DS-JD-00-6001 00 Noise data sheet Main Crane 5-JS-9210B
NG50-5-500-SAF-DS-KB-00-6001 00 Noise data sheet LP Compressor 5-KB-5140
NG50-5-500-SAF-DS-KB-00-6002 00 Noise data sheet MP Compressor 5-KB-5240
NG50-5-500-SAF-DS-KB-00-6003 00 Noise data sheet HP Compressor 5-KB-5330 A-B
NG50-5-500-SAF-DS-KB-00-6004 00 Noise data sheet Gas Export Compressor 5-KB-5420 A-B
NG50-5-500-SAF-DS-KB-00-6005 00 Noise data sheet Gas injection Compressor 5-KB-5460
NG50-4-400-SAF-DS-YA-00-6002 00 Noise data sheet Emergency Diesel Generator 4-PY-6710
5-CA-5530
NG50-5-500-SAF-DS-UA-00-6008 01 Noise data sheet Gas Dehydration Package
5-UA-5540
Hydrocyclone & Degassing 5-UA-4130
NG50-5-500-SAF-DS-UA-00-6012 01 Noise data sheet
Packages 5-UA-4120
NG50-5-500-SAF-DS-UA-00-6005 00 Noise data sheet Electrochlorination Package 5-UA-7210
Seawater Coarse Filtration
NG50-5-500-SAF-DS-UA-00-6009 00 Noise data sheet 5-UA-7310
Package
Seawater Sand Filtration
NG50-5-500-SAF-DS-UA-00-6010 00 Noise data sheet 5-UA-7330
Package
Injection Water Deaeration
NG50-5-500-SAF-DS-UA-00-6002 00 Noise data sheet 5-UA-7420 A-B
Package
NG50-5-500-SAF-DS-UA-00-6003 00 Noise data sheet Nitrogen Generation Package 5-UB-1110 A-B
Air Compressor Package 5-UB-1310 A-B-C
NG50-5-500-SAF-DS-UA-00-6006 00 Noise data sheet
Air Dryer Package 5-UB-1330 A-B
NG50-5-500-SAF-DS-UA-00-6001 01 Noise data sheet Inert Gas Generation Package 5-UA-1210 A-B
NG50-5-500-SAF-CN-AB-00-6002_rev01
This document is the property of TOTAL and shall not be disclosed to third parties or reproduced without permission of the COMPANY.
Akpo
Project
NIGERIA – OML 130
AKPO Field Development Project
10/14
COMPANY ref: NG50-5-500-SAF-CN-AB-00-6002 Revision: 01 Status: IFD Class: 2 Date: 02/10/2007 Page:
2
CONTRACTOR ref: 8577Y-2000-CN-6000-002 -- -- -- -- --
4.7. Abbreviations
NG50-5-500-SAF-CN-AB-00-6002_rev01
This document is the property of TOTAL and shall not be disclosed to third parties or reproduced without permission of the COMPANY.
Akpo
Project
NIGERIA – OML 130
AKPO Field Development Project
11/14
COMPANY ref: NG50-5-500-SAF-CN-AB-00-6002 Revision: 01 Status: IFD Class: 2 Date: 02/10/2007 Page:
2
CONTRACTOR ref: 8577Y-2000-CN-6000-002 -- -- -- -- --
The AKPO noise calculation on Topsides is made using CADNAA software, version 3.4, developed
by DATAKUSTIC, to calculate noise levels in the environment. At this day, there’s no software
dedicated to calculate noise levels in configurations such AKPO. So a specific modelling of AKPO
has been done and described hereafter.
The international standard ISO 9613-2 has been chosen to calculate noise levels.
As only the main deck is made of plating, the main deck level has been considered as the ground
level, and the CADNAA option “no ground absorption” has been used to take into account the
reflection on ground such as in a image method.
Grating on mezzanine, upper and top decks, is considered as acoustically transparent.
In order to take into account acoustic reflections, large devices with important volume such as
rooms or large equipment have been modelled.
The obstacles modelling depend on the dimensions, the geometry, and the location. Different
obstacles modelling have been performed:
1- Rooms and big equipment such as laboratory, compressors, big pumps, packages and
turbo generators, have been modelled as reflective parallelepipeds.
2- Big vertical columns located on the main deck have been modelled as cylinders.
3- Blast walls have been modelled as screens.
4- Turbo generators have been modelled with a combination of parallelepipeds.
The reflection order is 1. It has been chosen in order to limit the calculation time (between 50 and
100 hours for one map depending on the computer performance).
The reflection coefficient of obstacles has been chosen about 0.8 to take into account the energy
dissipation by diffusion on big equipment.
The minimal distance between source and reflectors and the minimal distance between receivers
and reflectors (CADNAA parameters) have been chosen equal to 0.10m.
All surface sources have been modeled at a distance about 0.05m of the radiating wall. All point
receivers located near buildings have been modeled at a distance about 0.05m of the wall. It
allows:
1- No reflection from vertical surface sources locating in front of screens.
NG50-5-500-SAF-CN-AB-00-6002_rev01
This document is the property of TOTAL and shall not be disclosed to third parties or reproduced without permission of the COMPANY.
Akpo
Project
NIGERIA – OML 130
AKPO Field Development Project
12/14
COMPANY ref: NG50-5-500-SAF-CN-AB-00-6002 Revision: 01 Status: IFD Class: 2 Date: 02/10/2007 Page:
2
CONTRACTOR ref: 8577Y-2000-CN-6000-002 -- -- -- -- --
NG50-5-500-SAF-CN-AB-00-6002_rev01
This document is the property of TOTAL and shall not be disclosed to third parties or reproduced without permission of the COMPANY.
Akpo
Project
NIGERIA – OML 130
AKPO Field Development Project
13/14
COMPANY ref: NG50-5-500-SAF-CN-AB-00-6002 Revision: 01 Status: IFD Class: 2 Date: 02/10/2007 Page:
2
CONTRACTOR ref: 8577Y-2000-CN-6000-002 -- -- -- -- --
With:
SWL: acoustic power (dBwl).
SPL@1m: acoustic pressure 1m from equipment (dBl).
S: acoustic control measurement area in m2 1m from item surface with reference to S0= 1m2.
Two cases are considered:
1- For item located on the main deck, that means located on a reflective surface, taking into
account the hypothesis that the noise level at 1 meter is the same all around the package,
the surface S is those of a parallelepiped located at 1m from the external surface of the
package.
2- For item located on the upper, mezzanine or top deck, that means located in free field, the
Sound power level is obtained by the same expression (equation 1). However, as the lower
part of equipment can radiate noise, we have taken, as hypothesis that radiated noise
under the equipment is the same than on the other faces. The surface S is those of a
parallelepiped located at 1m from the external surface of the package; this parallelepiped
surrounds completely the package. So, for same equipment, the Sound Power level shall
be greater for equipment located on the upper, mezzanine or Top deck than for the same
equipment located on the main deck.
5.5.2.Noise sources modelling for standard equipment and packages
The noise source modelling depends on the size, the shape and the location. Different noise
sources modelling have been performed:
1- Small equipment has been modelled as point sources. Small packages consisting of
localised sources (such as control valve, small pump and motor) are modelled with point
sources.
2- Packages are modelled as a combination of point, line and area sources representing all
noise sources included in the package.
3- Large noisy equipment (except turbo generators) are modelled with area sources at a
distance lower than 0.05m of the walls:
x Vertical sources along the walls.
x One horizontal source at a distance lower than 0.05m of the ceiling.
The total Sound power level is distributed to each surface depending on the relative surface of
each one.
NG50-5-500-SAF-CN-AB-00-6002_rev01
This document is the property of TOTAL and shall not be disclosed to third parties or reproduced without permission of the COMPANY.
Akpo
Project
NIGERIA – OML 130
AKPO Field Development Project
14/14
COMPANY ref: NG50-5-500-SAF-CN-AB-00-6002 Revision: 01 Status: IFD Class: 2 Date: 02/10/2007 Page:
2
CONTRACTOR ref: 8577Y-2000-CN-6000-002 -- -- -- -- --
NG50-5-500-SAF-CN-AB-00-6002_rev01
This document is the property of TOTAL and shall not be disclosed to third parties or reproduced without permission of the COMPANY.
Akpo
Project
NIGERIA – OML 130
AKPO Field Development Project
15/14
COMPANY ref: NG50-5-500-SAF-CN-AB-00-6002 Revision: 01 Status: IFD Class: 2 Date: 02/10/2007 Page:
2
CONTRACTOR ref: 8577Y-2000-CN-6000-002 -- -- -- -- --
NG50-5-500-SAF-CN-AB-00-6002_rev01
This document is the property of TOTAL and shall not be disclosed to third parties or reproduced without permission of the COMPANY.
Akpo
Project
NIGERIA – OML 130
AKPO Field Development Project
16/14
COMPANY ref: NG50-5-500-SAF-CN-AB-00-6002 Revision: 01 Status: IFD Class: 2 Date: 02/10/2007 Page:
2
CONTRACTOR ref: 8577Y-2000-CN-6000-002 -- -- -- -- --
The total sound power level for each CV and RO is calculated for a pipe length about 60 meters
length, taking into account the attenuation of noise in the pipe (3dB for every 50 pipe diameter for
pipes carrying gas and 3dB for every 175 pipe diameters for pipes carrying liquid as mentioned in
ISO 15665). As on an FPSO pipes length is generally lower than 60 meters, and as the attenuation
due to singularities such as bends, discontinuities… is not taken into account, this approach is
basically conservative.
In order to obtain the guaranteed noise level near the CV or RO, the sound power level per meter
(Lw/m) of the modeled pipe is Lp@1m+6.
Knowing that Lw=Lw/m+10*Log(L), the length of the modeled pipe is:
NG50-5-500-SAF-CN-AB-00-6002_rev01
This document is the property of TOTAL and shall not be disclosed to third parties or reproduced without permission of the COMPANY.
Akpo
Project
NIGERIA – OML 130
AKPO Field Development Project
17/14
COMPANY ref: NG50-5-500-SAF-CN-AB-00-6002 Revision: 01 Status: IFD Class: 2 Date: 02/10/2007 Page:
2
CONTRACTOR ref: 8577Y-2000-CN-6000-002 -- -- -- -- --
L=10^((Lw-Lw/m)/10).
NG50-5-500-SAF-CN-AB-00-6002_rev01
This document is the property of TOTAL and shall not be disclosed to third parties or reproduced without permission of the COMPANY.
Akpo
Project
NIGERIA – OML 130
AKPO Field Development Project
18/14
COMPANY ref: NG50-5-500-SAF-CN-AB-00-6002 Revision: 01 Status: IFD Class: 2 Date: 02/10/2007 Page:
2
CONTRACTOR ref: 8577Y-2000-CN-6000-002 -- -- -- -- --
15 10 5 0 0 0 0 0
This spectrum is mainly low frequency. It allows an overestimation of the diffracted noise
contribution in far field.
NG50-5-500-SAF-CN-AB-00-6002_rev01
This document is the property of TOTAL and shall not be disclosed to third parties or reproduced without permission of the COMPANY.
Akpo
Project
NIGERIA – OML 130
AKPO Field Development Project
19/14
COMPANY ref: NG50-5-500-SAF-CN-AB-00-6002 Revision: 01 Status: IFD Class: 2 Date: 02/10/2007 Page:
2
CONTRACTOR ref: 8577Y-2000-CN-6000-002 -- -- -- -- --
5.5.7.Receiver modelling
Results are provided using three methods:
1- Noise mapping on the decks with colour dependent representation of the acoustic level.
In order to be representative, the map meshing has been defined to:
x 2.0m * 2.0m at 1.5m high for the main deck
x 2.0m * 2.0m at 7.5m high for the mezzanine deck
x 2.0m * 2.0m at 14.5m high for the upper deck
x 2.0m * 2.0m at 26.5m high for the Top deck
Note: Although elevation of mezzanine deck and top deck vary according to the module, a
unique mean elevation has been chosen in order to simplify the model. It cannot change
significantly the noise mapping ranges.
2- Receiver calculation for building noise evaluation. Receiver points have been located
at less than 0.1m from walls in front of the Living quarter and in front of each room of
technical buildings. The noisiest location has been chosen. For each receiver, the
calculation doesn’t take into account the noise reflection on the nearest wall in order to
obtain the incident noise on walls, which can be directly used to define the acoustic
insulation of buildings.
3- Noise mapping on the Hull deck with colour dependent representation of the acoustic
level. This noise estimation is very approximate, so only large areas with different noise
levels are presented.
Software CADNAA does not allow calculating diffraction by a horizontal screen, then the
contribution of noise on the Hull deck radiated by equipment located on the Topsides. Therefore
the estimation of noise on the Hull deck has been done using CADNAA and a specific model to
evaluate the diffracted noise by the plating edge of the main deck, and RAYPLUS to estimate:
-a- the reverberation effect on the Hull deck,
-b- the noise generated by equipment located on the hull deck.
The final results are given on the noise map. (Figure-GNM-5)
NG50-5-500-SAF-CN-AB-00-6002_rev01
This document is the property of TOTAL and shall not be disclosed to third parties or reproduced without permission of the COMPANY.
Akpo
Project
NIGERIA – OML 130
AKPO Field Development Project
20/14
COMPANY ref: NG50-5-500-SAF-CN-AB-00-6002 Revision: 01 Status: IFD Class: 2 Date: 02/10/2007 Page:
2
CONTRACTOR ref: 8577Y-2000-CN-6000-002 -- -- -- -- --
6. Project data
Drawings IFC rev 01 are used for the platform modelling.
x Equipment list IFC rev 00 dated from 2006/09/22 has been considered [G6]
x General architecture of AKPO is described on referenced drawings [G1] to [G5]
Topsides architecture and equipment locations are described on referenced drawings [G7] to
[G88].
Blast wall drawings used for the model are referenced [G88] and [G89]
General drawings overviews are main deck and mezzanine (Figure-G-1), upper deck and top deck
(Figure-G-2), section A-A (Figure-G-3) and section B-B (Figure-G-4).
Acoustic model description is given on Figure-G-5 and Figure-G-6 hereafter.
NG50-5-500-SAF-CN-AB-00-6002_rev01
This document is the property of TOTAL and shall not be disclosed to third parties or reproduced without permission of the COMPANY.
Akpo
Project
NIGERIA – OML 130
AKPO Field Development Project
21/14
COMPANY ref: NG50-5-500-SAF-CN-AB-00-6002 Revision: 01 Status: IFD Class: 2 Date: 02/10/2007 Page:
2
CONTRACTOR ref: 8577Y-2000-CN-6000-002 -- -- -- -- --
NG50-5-500-SAF-CN-AB-00-6002_rev01
This document is the property of TOTAL and shall not be disclosed to third parties or reproduced without permission of the COMPANY.
Akpo
Project
NIGERIA – OML 130
AKPO Field Development Project
22/14
COMPANY ref: NG50-5-500-SAF-CN-AB-00-6002 Revision: 01 Status: IFD Class: 2 Date: 02/10/2007 Page:
2
CONTRACTOR ref: 8577Y-2000-CN-6000-002 -- -- -- -- --
NG50-5-500-SAF-CN-AB-00-6002_rev01
This document is the property of TOTAL and shall not be disclosed to third parties or reproduced without permission of the COMPANY.
Akpo
Project
NIGERIA – OML 130
AKPO Field Development Project
23/14
COMPANY ref: NG50-5-500-SAF-CN-AB-00-6002 Revision: 01 Status: IFD Class: 2 Date: 02/10/2007 Page:
2
CONTRACTOR ref: 8577Y-2000-CN-6000-002 -- -- -- -- --
NG50-5-500-SAF-CN-AB-00-6002_rev01
This document is the property of TOTAL and shall not be disclosed to third parties or reproduced without permission of the COMPANY.
Akpo
Project
NIGERIA – OML 130
AKPO Field Development Project
24/14
COMPANY ref: NG50-5-500-SAF-CN-AB-00-6002 Revision: 01 Status: IFD Class: 2 Date: 02/10/2007 Page:
2
CONTRACTOR ref: 8577Y-2000-CN-6000-002 -- -- -- -- --
NG50-5-500-SAF-CN-AB-00-6002_rev01
This document is the property of TOTAL and shall not be disclosed to third parties or reproduced without permission of the COMPANY.
Akpo
Project
NIGERIA – OML 130
AKPO Field Development Project
25/14
COMPANY ref: NG50-5-500-SAF-CN-AB-00-6002 Revision: 01 Status: IFD Class: 2 Date: 02/10/2007 Page:
2
CONTRACTOR ref: 8577Y-2000-CN-6000-002 -- -- -- -- --
NG50-5-500-SAF-CN-AB-00-6002_rev01
This document is the property of TOTAL and shall not be disclosed to third parties or reproduced without permission of the COMPANY.
Akpo
Project
NIGERIA – OML 130
AKPO Field Development Project
26/14
COMPANY ref: NG50-5-500-SAF-CN-AB-00-6002 Revision: 01 Status: IFD Class: 2 Date: 02/10/2007 Page:
2
CONTRACTOR ref: 8577Y-2000-CN-6000-002 -- -- -- -- --
NG50-5-500-SAF-CN-AB-00-6002_rev01
This document is the property of TOTAL and shall not be disclosed to third parties or reproduced without permission of the COMPANY.
Akpo
Project
NIGERIA – OML 130
AKPO Field Development Project
27/14
COMPANY ref: NG50-5-500-SAF-CN-AB-00-6002 Revision: 01 Status: IFD Class: 2 Date: 02/10/2007 Page:
2
CONTRACTOR ref: 8577Y-2000-CN-6000-002 -- -- -- -- --
For each module input data are reviewed here after. Drawings with equipment location are
provided. Noise sources are surrounded in red.
Detailed noise sources data defined in CADNAA are listed in the Appendix 1.
6.1. Module P1
Main noise sources of this module are presented here under with data taken into account in the
calculation.
Table-P1-1
Noise DATA Noise
Cadnaa
Deck Tag Label Name Origin of LpA Lw Items in Abatement Comments
Model
data dB(A)@1m A Operation Measure
Expected Point source Lp@1m=82dBA
Cooling water 2 running, Open
MD 5gx1510a/b/c Vendor 79 99 inside guaranteed by
recirculation pumps 1 spare enclosure
Measurement building Vendor
Point source
2 running, Same noise as the
MD 5gx1510a/b/c Piping noise - - 96 inside -
1 spare pump itself
building
<75 88 No spare Point source
Seawater coarse
MD 5ua7310a/b/c Vendor Data 15' per For backwash
filtration package 90 - - -
week operation
Cooling water service Vendor Noise 1 running,
MD 5gx1520a/b 78 92 Point source - -
pumps Data Sheet 1 spare
5ua7210Electro chlorination Equipment
UD 78 99 No spare See table P1-2
5ua7220 package Data Sheet
Inert gas generator
TD 5ua1210b1/b2 Vendor Data 77 See table P1-3
package
Fresh air fan A/B for
HHI expected 1 running, High area
TD 5ka6101a/b topside modules ("P 70 94 - -
max values 1 spare source
Side")
HHI expected No spare,
TD 5ub6101a/b AHU Room P1 70 88 Point source - -
max values hypothesis
Note: Backwash function of the filters has not been taken into account in the calculation due to the
“not normal” operating condition of backwash function.
NG50-5-500-SAF-CN-AB-00-6002_rev01
This document is the property of TOTAL and shall not be disclosed to third parties or reproduced without permission of the COMPANY.
Akpo
Project
NIGERIA – OML 130
AKPO Field Development Project
28/14
COMPANY ref: NG50-5-500-SAF-CN-AB-00-6002 Revision: 01 Status: IFD Class: 2 Date: 02/10/2007 Page:
2
CONTRACTOR ref: 8577Y-2000-CN-6000-002 -- -- -- -- --
Vendor Noise
TD 5ua1210b1 Burner 75 96 No spare Point source - -
Data Sheet
NG50-5-500-SAF-CN-AB-00-6002_rev01
This document is the property of TOTAL and shall not be disclosed to third parties or reproduced without permission of the COMPANY.
Akpo
Project
NIGERIA – OML 130
AKPO Field Development Project
29/14
COMPANY ref: NG50-5-500-SAF-CN-AB-00-6002 Revision: 01 Status: IFD Class: 2 Date: 02/10/2007 Page:
2
CONTRACTOR ref: 8577Y-2000-CN-6000-002 -- -- -- -- --
Guaranteed Ambient
Cadnaa
Vendor's CP CP CP Noise from Lpa-Lp Cadnaa length
Tag Deck Line_Number_Label Lw
Data Lp Easting Northing Elevation equipment dB(A) Model m
dB(A)
dB(A) only
Lpa dB(A)
5FV 15002 79.7 70900 113881 6204 Main 20" CW515024-B01W- 82.5 2.8 simplified 104.7 79
5TV 15311 76.5 67893 116782 6255 Main 24" CW515012-B01W- 82.5 6.0 simplified 101.5 79
5PV1 71509 60.0 62742 127907 787 Main 24" SW515009-B90- 82.5 22.5 neglected NA -
5PV2 71509 60.0 62122 127907 3539 Main 24" SW515009-B90- 82.5 22.5 neglected NA -
5FV 15003 54.7 71950 113869 6342 Main 3" CW515025-B01W- 82.5 27.8 neglected NA -
RO-15202A <60 60370 105250 469 Main 6" CW515021-B01W- 82.5 27.5 neglected NA -
RO-15202B <60 60370 107600 469 Main 6" CW515020-B01W- 82.5 27.5 neglected NA -
RO-71511 75.9 58590 128800 6800 Main 24" SW571004-B90- 82.5 6.6 simplified 100.9 79
RO-15301A 77.6 64451 123592 16556 Upper 30" SW515005-B90- 80 2.4
RO-15301B 77.6 64451 117742 16556 Upper 30" SW515006-B90- 80 2.4
Detailed 111.5 172
RO-15301C 77.6 64451 112992 16556 Upper 30" SW515007-B90- 80 2.4
RO-15301D 77.6 64451 107757 16556 Upper 30" SW515008-B90- 80 2.4
NG50-5-500-SAF-CN-AB-00-6002_rev01
This document is the property of TOTAL and shall not be disclosed to third parties or reproduced without permission of the COMPANY.
Akpo
Project
NIGERIA – OML 130
AKPO Field Development Project
30/14
COMPANY ref: NG50-5-500-SAF-CN-AB-00-6002 Revision: 01 Status: IFD Class: 2 Date: 02/10/2007 Page:
2
CONTRACTOR ref: 8577Y-2000-CN-6000-002 -- -- -- -- --
NG50-5-500-SAF-CN-AB-00-6002_rev01
This document is the property of TOTAL and shall not be disclosed to third parties or reproduced without permission of the COMPANY.
Akpo
Project
NIGERIA – OML 130
AKPO Field Development Project
31/14
COMPANY ref: NG50-5-500-SAF-CN-AB-00-6002 Revision: 01 Status: IFD Class: 2 Date: 02/10/2007 Page:
2
CONTRACTOR ref: 8577Y-2000-CN-6000-002 -- -- -- -- --
NG50-5-500-SAF-CN-AB-00-6002_rev01
This document is the property of TOTAL and shall not be disclosed to third parties or reproduced without permission of the COMPANY.
Akpo
Project
NIGERIA – OML 130
AKPO Field Development Project
32/14
COMPANY ref: NG50-5-500-SAF-CN-AB-00-6002 Revision: 01 Status: IFD Class: 2 Date: 02/10/2007 Page:
2
CONTRACTOR ref: 8577Y-2000-CN-6000-002 -- -- -- -- --
NG50-5-500-SAF-CN-AB-00-6002_rev01
This document is the property of TOTAL and shall not be disclosed to third parties or reproduced without permission of the COMPANY.
Akpo
Project
NIGERIA – OML 130
AKPO Field Development Project
33/14
COMPANY ref: NG50-5-500-SAF-CN-AB-00-6002 Revision: 01 Status: IFD Class: 2 Date: 02/10/2007 Page:
2
CONTRACTOR ref: 8577Y-2000-CN-6000-002 -- -- -- -- --
6.2. Module P2
Main noise sources of this module are presented here under with data taken into account in the
calculation.
Table P2-1:
Noise DATA Noise
Deck Tag Label Name LpA Lw Items in Cadnaa Model abatement Comments
Origin of data
dB(A)@1m A operation measure
Pump acoustic
Vendor
Water injection Area source on cladding,
MD 5gx7520a/b/c measurement 86 109 No spare -
pumps reflecting surface baseplate
data
acoustic tiles
Area source on Same noise as
MD 5gx7520a/b/c Piping noise - - 107 No spare -
reflecting surface the pump itself
Water injection Vendor Point source
MD 5gx7510a/b/c 82 101 No spare Open enclosure -
booster pumps guarantee inside building
Point source Same noise as
MD 5gx7510a/b/c Piping noise - - 98 No spare -
inside building the pump itself
Injection water
TD 5ua7420a/b Requirement 78 See table P2-2
deaerations
Nitrogen buffer Intermittent -
TD 5kb1150 Requirement 80 101 No spare Point source -
compressor Activated
HHI expected No spare,
TD 5ub6102a/b AHU Room P2 70 88 Point source - -
max values hypothesis
NG50-5-500-SAF-CN-AB-00-6002_rev01
This document is the property of TOTAL and shall not be disclosed to third parties or reproduced without permission of the COMPANY.
Akpo
Project
NIGERIA – OML 130
AKPO Field Development Project
34/14
COMPANY ref: NG50-5-500-SAF-CN-AB-00-6002 Revision: 01 Status: IFD Class: 2 Date: 02/10/2007 Page:
2
CONTRACTOR ref: 8577Y-2000-CN-6000-002 -- -- -- -- --
Guaranteed Ambient
Cadnaa
Vendor's CP CP CP Noise from Lpa-Lp Cadnaa length
Tag Deck Line_Number_Label Lw
Data Lp Easting Northing Elevation equipment dB(A) Model m
dB(A)
dB(A) only
Lpa dB(A)
5FV 75106A 68.2 88771 111050 7735 Main 6" WI575009-B03- 87.5 19.3 point source 90.7 -
5FV 75106B 68.2 88771 107700 7722 Main 6" WI575010-B03- 87.5 19.3 point source 90.7 -
5FV 75106C 68.2 88771 105536 7735 Main 6" WI575011-B03- 87.5 19.3 point source 90.7 -
5FV 75202A 60.0 91972 126200 803 Main 16" WI575026-J03- 87.5 27.5 neglected NA -
5FV 75202B 60.0 91971 118100 803 Main 16" WI575027-J03- 87.5 27.5 neglected NA -
5FV 75202C 60.0 91965 110100 803 Main 16" WI575028-J03- 87.5 27.5 neglected NA -
RO-74102A <60 85815 109275 21400 Top 3" WI575014-B03- 85 30.0 neglected NA -
RO-74102B <60 94185 109275 21400 Top 3" WI575015-B03- 85 30.0 neglected NA -
5HV 75224 66.2 83600 122739 13775 Upper 14" WI575039-J03- 85 18.8 point source 91.2 -
5HV 75229 66.2 90300 121239 13775 Upper 14" WI575040-J03- 85 18.8 point source 91.2 -
5HV 75234 66.2 96300 122739 13775 Upper 14" WI575041-J03- 85 18.8 point source 91.2 -
5HV 75244 66.2 79100 122750 13775 Upper 14" WI575038-J03- 85 18.8 point source 91.2 -
NG50-5-500-SAF-CN-AB-00-6002_rev01
This document is the property of TOTAL and shall not be disclosed to third parties or reproduced without permission of the COMPANY.
Akpo
Project
NIGERIA – OML 130
AKPO Field Development Project
35/14
COMPANY ref: NG50-5-500-SAF-CN-AB-00-6002 Revision: 01 Status: IFD Class: 2 Date: 02/10/2007 Page:
2
CONTRACTOR ref: 8577Y-2000-CN-6000-002 -- -- -- -- --
NG50-5-500-SAF-CN-AB-00-6002_rev01
This document is the property of TOTAL and shall not be disclosed to third parties or reproduced without permission of the COMPANY.
Akpo
Project
NIGERIA – OML 130
AKPO Field Development Project
36/14
COMPANY ref: NG50-5-500-SAF-CN-AB-00-6002 Revision: 01 Status: IFD Class: 2 Date: 02/10/2007 Page:
2
CONTRACTOR ref: 8577Y-2000-CN-6000-002 -- -- -- -- --
5UB6102A
5UB6102B
NG50-5-500-SAF-CN-AB-00-6002_rev01
This document is the property of TOTAL and shall not be disclosed to third parties or reproduced without permission of the COMPANY.
Akpo
Project
NIGERIA – OML 130
AKPO Field Development Project
37/14
COMPANY ref: NG50-5-500-SAF-CN-AB-00-6002 Revision: 01 Status: IFD Class: 2 Date: 02/10/2007 Page:
2
CONTRACTOR ref: 8577Y-2000-CN-6000-002 -- -- -- -- --
6.3. Module P3
Main noise sources of this module are presented here under with data taken into account in the
calculation.
Table P3-1:
Noise DATA Noise
Cadnaa
Deck Tag Label Name LpA Items in abatement Comments
Origin of data LwA Model
dB(A)@1m operation measure
Area source on
5py6510 Main power generator - AC
MD Vendor data 83 105 No spare reflecting - -
a/b/c Generator
surface
Area source on
5py6510 Main power generator -
MD Vendor data 80 98 No spare reflecting - -
a/b/c Gear box
surface
Area source on
5py6510 Main power generator - GT
MD Vendor data 74 96 No spare reflecting - -
a/b/c Enclosure
surface
5py6510 Main power generator - GT
MD Vendor data 75 92 No spare Point source - -
a/b/c Enclosure vent inlet
5py6510 Main power generator - GT
MD Vendor data 72 94 No spare Point source - -
a/b/c Enclosure vent outlet
Area source on
5py6510 Main power generator -
MD Vendor data 74 94 No spare reflecting - -
a/b/c Inlet Scroll
surface
Extrapolation
5py6510 Main power generator - High area
MD from Vendor Not Available 96 No spare - -
a/b/c Vertical air inlet duct source
data
Extrapolation
5py6510 Main power generator - High area
MD from Vendor Not Available 95 No spare - -
a/b/c horizontal air inlet duct source
data
5py6510 Main power generator - Air High area
MD Vendor data Not Available 101 No spare - -
a/b/c inlet opening source
Main power generator -
5py6510
MD Exhaust WHRU expansion Vendor data 74 98 No spare Line source - WHRU sets
a/b
joint + transition to silencer
Main power generator -
5py6510
MD Exhaust WHRU silencer Vendor data 69 97 No spare Line source - WHRU sets
a/b
duct
5py6510 Main power generator -
MD Vendor data 74 112 No spare Line source - WHRU sets
a/b Exhaust WHRU outlet duct
Main power generator -
5py6510
MD Exhaust WHRU stack Vendor data 67 117 No spare Point source - WHRU sets
a/b
opening
NG50-5-500-SAF-CN-AB-00-6002_rev01
This document is the property of TOTAL and shall not be disclosed to third parties or reproduced without permission of the COMPANY.
Akpo
Project
NIGERIA – OML 130
AKPO Field Development Project
38/14
COMPANY ref: NG50-5-500-SAF-CN-AB-00-6002 Revision: 01 Status: IFD Class: 2 Date: 02/10/2007 Page:
2
CONTRACTOR ref: 8577Y-2000-CN-6000-002 -- -- -- -- --
NG50-5-500-SAF-CN-AB-00-6002_rev01
This document is the property of TOTAL and shall not be disclosed to third parties or reproduced without permission of the COMPANY.
Akpo
Project
NIGERIA – OML 130
AKPO Field Development Project
39/14
COMPANY ref: NG50-5-500-SAF-CN-AB-00-6002 Revision: 01 Status: IFD Class: 2 Date: 02/10/2007 Page:
2
CONTRACTOR ref: 8577Y-2000-CN-6000-002 -- -- -- -- --
Guaranteed Ambient
Cadnaa
Vendor's CP CP CP Noise from Lpa-Lp Cadnaa length
Tag Deck Line_Number_Label Lw
Data Lp Easting Northing Elevation equipment dB(A) Model m
dB(A)
dB(A) only
Lpa dB(A)
RO-65102A <60 127953 128908 2698 Main 2" SW565001-B90- 87.5 32.5 neglected NA -
RO-65102B <60 118953 128908 2698 Main 2" SW565002-B90- 87.5 32.5 neglected NA -
RO-65102C <60 110253 128908 2698 Main 2" SW565003-B90- 87.5 32.5 neglected NA -
RO-65103A <60 125267 113729 4434 Main 2" SW565001-B90- 87.5 32.5 neglected NA -
RO-65103B <60 116267 113729 4434 Main 2" SW565002-B90- 87.5 32.5 neglected NA -
RO-65103C <60 107567 113729 4434 Main 2" SW565003-B90- 87.5 32.5 neglected NA -
RO-65104A <60 125267 113729 4814 Main 2" SW565001-B90- 87.5 32.5 neglected NA -
RO-65104B <60 116267 113729 4814 Main 2" SW565002-B90- 87.5 32.5 neglected NA -
RO-65104C <60 107567 113729 4814 Main 2" SW565003-B90- 87.5 32.5 neglected NA -
RO-65105A <60 124086 112026 2692 Main 4" SW565001-B90- 87.5 32.5 neglected NA -
RO-65105B <60 115086 112026 2692 Main 4" SW565002-B90- 87.5 32.5 neglected NA -
RO-65105C <60 106386 112026 2692 Main 4" SW565003-B90- 87.5 32.5 neglected NA -
5FV2 16211B 63.2 112750 120154 19610 Top 8" HW516024-D01V-HC 87.5 24.3 neglected NA -
5FV 16110 80.3 105160 124300 13737 Upper 10" HW516033-D01V-HC 87.5 7.2 simplified 105.3 79
5FV2 16211A 63.2 112568 123567 13714 Upper 8" HW516019-D01V-HC 87.5 24.3 neglected NA -
NG50-5-500-SAF-CN-AB-00-6002_rev01
This document is the property of TOTAL and shall not be disclosed to third parties or reproduced without permission of the COMPANY.
Akpo
Project
NIGERIA – OML 130
AKPO Field Development Project
40/14
COMPANY ref: NG50-5-500-SAF-CN-AB-00-6002 Revision: 01 Status: IFD Class: 2 Date: 02/10/2007 Page:
2
CONTRACTOR ref: 8577Y-2000-CN-6000-002 -- -- -- -- --
NG50-5-500-SAF-CN-AB-00-6002_rev01
This document is the property of TOTAL and shall not be disclosed to third parties or reproduced without permission of the COMPANY.
Akpo
Project
NIGERIA – OML 130
AKPO Field Development Project
41/14
COMPANY ref: NG50-5-500-SAF-CN-AB-00-6002 Revision: 01 Status: IFD Class: 2 Date: 02/10/2007 Page:
2
CONTRACTOR ref: 8577Y-2000-CN-6000-002 -- -- -- -- --
NG50-5-500-SAF-CN-AB-00-6002_rev01
This document is the property of TOTAL and shall not be disclosed to third parties or reproduced without permission of the COMPANY.
Akpo
Project
NIGERIA – OML 130
AKPO Field Development Project
42/14
COMPANY ref: NG50-5-500-SAF-CN-AB-00-6002 Revision: 01 Status: IFD Class: 2 Date: 02/10/2007 Page:
2
CONTRACTOR ref: 8577Y-2000-CN-6000-002 -- -- -- -- --
6.4. Module P4
Main noise sources of this module are presented here under with data taken into account in the
calculation.
Table P4-1:
Noise DATA
Cadnaa Noise abatement
Deck Tag Label Name LpA Items in Comments
Origin of data LwA Model measure
dB(A)@1m operation
HHI expected No spare,
UD 5ub6104a/b AHU Room P4 70 88 Point source - -
max values hypothesis
Guaranteed Ambient
Cadnaa
Vendor's CP CP CP Noise from Lpa-Lp Cadnaa length
Tag Deck Line_Number_Label Lw
Data Lp Easting Northing Elevation equipment dB(A) Model m
dB(A)
dB(A) only
Lpa dB(A)
5HV 30701 <75 137170 122790 9157 Main 6" HC530067-J70-PP 77.5 7.5 simplified 92.5 45
5HV 30702 <75 138020 122790 9144 Main 8" HC530067-J70-PP 77.5 7.5 simplified 95 79
5HV 30801 <75 141100 122790 9157 Main 6" HC530077-J70-PP 77.5 7.5 simplified 92.5 45
5HV 30802 <75 141950 122790 9144 Main 8" HC530077-J70-PP 77.5 7.5 simplified 95 79
5FV 30706 <70 138900 106913 636 Main 10" HL599026-J01-HC 77.5 7.5 simplified 90 79
5FV 31213 79.7 151471 112541 25378 Top 14" HG531009-F70-PPA 82.5 2.8 simplified 102.2 45
5FV 31113B <70 155074 109069 25403 Top 16" HG531005-F70-PPA 82.5 17.5 point source 87.5 45
R0-31101B 78.3 155833 108461 26477 Top 2" HG531005-F70-PPA 82.5 4.2 point source 93.3 -
RO-31201 78.3 150728 108738 26277 Top 2" HG531009-F70-PPA 82.5 4.2 point source 93.3 -
5LV 31105B <80 143605 113645 13695 Upper 12" HL531002-F23-PP 77.5 2.5 simplified 100 79
5LDV 31106B 67.0 154443 122150 13585 Upper 6" PW531002-F23-PP 77.5 10.5 simplified 89.5 45
NG50-5-500-SAF-CN-AB-00-6002_rev01
This document is the property of TOTAL and shall not be disclosed to third parties or reproduced without permission of the COMPANY.
Akpo
Project
NIGERIA – OML 130
AKPO Field Development Project
43/14
COMPANY ref: NG50-5-500-SAF-CN-AB-00-6002 Revision: 01 Status: IFD Class: 2 Date: 02/10/2007 Page:
2
CONTRACTOR ref: 8577Y-2000-CN-6000-002 -- -- -- -- --
NG50-5-500-SAF-CN-AB-00-6002_rev01
This document is the property of TOTAL and shall not be disclosed to third parties or reproduced without permission of the COMPANY.
Akpo
Project
NIGERIA – OML 130
AKPO Field Development Project
44/14
COMPANY ref: NG50-5-500-SAF-CN-AB-00-6002 Revision: 01 Status: IFD Class: 2 Date: 02/10/2007 Page:
2
CONTRACTOR ref: 8577Y-2000-CN-6000-002 -- -- -- -- --
6.5. Module P5
Main noise sources of this module are presented here under with data taken into account in the
calculation.
Table P5-1:
Noise DATA Noise
Deck Tag Label Name LpA Items in Cadnaa Model abatement Comments
Origin of data LwA
dB(A)@1m operation measure
Crude
Vendor 1 running, Point source Open Intermittent -
MD 5gx9920a/b recirculation 82 102
measurements 1 spare inside building enclosure Activated
pump
Same noise
1 running, Point source
MD 5gx9920a/b Piping noise - - 99 - as the pump
1 spare inside building
itself
3rd stage
Vendor 1 running, Open
MD 5gx3410a/b separator 78 96 Point source -
measurements 1 spare enclosure
pumps
Same noise
1 running,
MD 5gx3410a/b Piping noise - - 93 Point source - as the pump
1 spare
itself
Note: For piping noise modeling: see paragraph 5-5-5
Guaranteed Ambient
Cadnaa
Vendor's CP CP CP Noise from Lpa-Lp Cadnaa length
Tag Deck Line_Number_Label Lw
Data Lp Easting Northing Elevation equipment dB(A) Model m
dB(A)
dB(A) only
Lpa dB(A)
5FV 34118A 79.4 176033 114445 6110 Main 8" HL534003-B03-HC 80 0.6
Detailed 102.4 47
5FV 34118B 79.4 178967 113110 6109 Main 8" HL534004-B03-HC 80 0.6
5FV 99207A 79.4 176033 108358 6045 Main 3" HL599041-F01-HC 80 0.6 point source 99.4 -
5FV 99207B 79.4 178967 106242 6045 Main 3" HL599042-F01-HC 80 0.6 point source 99.4 -
5TV 33214 67.9 187779 113687 6085 Main 6" HW533002-D01-HC 80 12.1 point source 90.4 -
5PV 31111B 84.4 161257 108812 25403 Top 16" HG531006-F70-PFP 80 -4.4 Not modeled - Contingency
5PV2 34111 79.2 176047 112842 24928 Top 14" HG534002-D49-PPA 80 0.8 Not modeled - Contingency
5PV2 32111 77.8 183921 112822 24886 Top 10" HG532001-D49-PP 80 2.2 Not modeled - Contingency
RO-32102 84.2 187841 112346 24536 Top 2" HG532001-D49-PP 80 -4.2 point source 99.2 -
RO-34132 77.6 169504 112324 24536 Top 2" HG534002-D49-PPA 80 2.4 point source 92.6 -
5LDV 31206 73.8 160800 111840 13558 Upper 4" PW531003-F23-PP 77.5 3.7 simplified 96.3 45
5LDV 34106 <50 174837 111950 13544 Upper 3" PW534001-B03-PP 77.5 32.5 neglected NA -
5LDV 32106 80.1 190435 119293 13444 Upper 3" PW532001-D03-PP 77.5 -2.6 point source 100.1 -
Note: The method used to model piping noise is described in 5-5-5
NG50-5-500-SAF-CN-AB-00-6002_rev01
This document is the property of TOTAL and shall not be disclosed to third parties or reproduced without permission of the COMPANY.
Akpo
Project
NIGERIA – OML 130
AKPO Field Development Project
45/14
COMPANY ref: NG50-5-500-SAF-CN-AB-00-6002 Revision: 01 Status: IFD Class: 2 Date: 02/10/2007 Page:
2
CONTRACTOR ref: 8577Y-2000-CN-6000-002 -- -- -- -- --
NG50-5-500-SAF-CN-AB-00-6002_rev01
This document is the property of TOTAL and shall not be disclosed to third parties or reproduced without permission of the COMPANY.
Akpo
Project
NIGERIA – OML 130
AKPO Field Development Project
46/14
COMPANY ref: NG50-5-500-SAF-CN-AB-00-6002 Revision: 01 Status: IFD Class: 2 Date: 02/10/2007 Page:
2
CONTRACTOR ref: 8577Y-2000-CN-6000-002 -- -- -- -- --
6.6. Module P6
Main noise sources of this module are presented here under with data taken into account in the
calculation.
Table P6-1:
Noise DATA Noise
Tag Cadnaa
Deck Name LpA Items in abatement Comments
Label Origin of data LwA Model
dB(A)@1m operation measure
Glycol
MD 5ua5540 Requirement 80 See table P6-2 -
regeneration skid
Anti foam & PH
UD 5ua5542 control injection Vendor data 70 See table P6-3 -
skid
5ub6106 HHI expected No spare, Point
TD AHU Room P6 70 89 - -
a/b max values hypothesis source
3500 KVA,
5pb6503 Point
TD 13,8kV/0,72kV Vendor data 52 72 no spare - -
a/b source
Power transformer
Glycol
Line Control valves noise
UD 5ua5540 regeneration skid - Vendor data - 95 No spare -
source modeled in "x" direction
Control Valves x
Glycol
Line Control valves noise
UD 5ua5540 regeneration skid - Vendor data - 95 No spare -
source modeled in "y" direction
Control Valves y
Glycol
Line Control valves noise
UD 5ua5540 regeneration skid - Vendor data - 95 No spare -
source modeled in "z" direction
Control Valves z
NG50-5-500-SAF-CN-AB-00-6002_rev01
This document is the property of TOTAL and shall not be disclosed to third parties or reproduced without permission of the COMPANY.
Akpo
Project
NIGERIA – OML 130
AKPO Field Development Project
47/14
COMPANY ref: NG50-5-500-SAF-CN-AB-00-6002 Revision: 01 Status: IFD Class: 2 Date: 02/10/2007 Page:
2
CONTRACTOR ref: 8577Y-2000-CN-6000-002 -- -- -- -- --
Guaranteed Ambient
Cadnaa
Vendor's CP CP CP Noise from Lpa-Lp Cadnaa length
Tag Deck Line_Number_Label Lw
Data Lp Easting Northing Elevation equipment dB(A) Model m
dB(A)
dB(A) only
Lpa dB(A)
5LV 22104 <80 213589 114442 516 Main 1" HL522001-F23- 80 5.0 point source 95.0 -
5LV 55206 <80 213768 119513 885 Main 3" HL555002-F23- 80 5.0 point source 95.0 -
5TV 55110A 77.1 205600 119107 8105 Main 10" CW555002-B01W 80 2.9 simplified 102.1 79
5TV 55110B 77.1 209400 119107 8105 Main 10" CW555003-B01W 80 2.9 simplified 102.1 79
RO-55313 <60 211627 110727 650 Main 3" GT555002-F23- 80 25.0 neglected NA -
RO-55316 <60 215185 110500 669 Main 2" HL555003-F23- 80 25.0 neglected NA -
5PV2 55319 83.5 213458 107695 21176 Top 24" HG555011-F21- 80 -3.5 Not modeled - Contingency
5PV1 55319 <70 209316 120888 20998 Top 16" HG555006-F21- 80 15.0 point source 87.5 -
5LV 22404 <80 212101 113684 14137 Upper 1" HL522004-B03-PP 80 5.0 point source 95 -
5LV 55216 <80 215478 115459 13530 Upper 1" HL555001-F23- 80 5.0 point source 95 -
5PV1 22108 69.8 201677 120936 13531 Upper 2" HG555012-F23- 80 10.2 point source 84.8 -
5PV2 22108 69.8 201677 119273 13531 Upper 2" HG522001-F23- 80 10.2 point source 84.8 -
5PV1 22408 66.2 207530 113675 13584 Upper 1-1/2" FG522015-F23- 80 13.8 point source 81.2 -
5PV2 22408 66.2 207930 113675 13584 Upper 1-1/2" FG522019-F23- 80 13.8 point source 81.2 -
NG50-5-500-SAF-CN-AB-00-6002_rev01
This document is the property of TOTAL and shall not be disclosed to third parties or reproduced without permission of the COMPANY.
Akpo
Project
NIGERIA – OML 130
AKPO Field Development Project
48/14
COMPANY ref: NG50-5-500-SAF-CN-AB-00-6002 Revision: 01 Status: IFD Class: 2 Date: 02/10/2007 Page:
2
CONTRACTOR ref: 8577Y-2000-CN-6000-002 -- -- -- -- --
NG50-5-500-SAF-CN-AB-00-6002_rev01
This document is the property of TOTAL and shall not be disclosed to third parties or reproduced without permission of the COMPANY.
Akpo
Project
NIGERIA – OML 130
AKPO Field Development Project
49/14
COMPANY ref: NG50-5-500-SAF-CN-AB-00-6002 Revision: 01 Status: IFD Class: 2 Date: 02/10/2007 Page:
2
CONTRACTOR ref: 8577Y-2000-CN-6000-002 -- -- -- -- --
NG50-5-500-SAF-CN-AB-00-6002_rev01
This document is the property of TOTAL and shall not be disclosed to third parties or reproduced without permission of the COMPANY.
Akpo
Project
NIGERIA – OML 130
AKPO Field Development Project
50/14
COMPANY ref: NG50-5-500-SAF-CN-AB-00-6002 Revision: 01 Status: IFD Class: 2 Date: 02/10/2007 Page:
2
CONTRACTOR ref: 8577Y-2000-CN-6000-002 -- -- -- -- --
6.7. Module P7
Main noise sources of this module are presented here under with data taken into account in the
calculation.
Subsea methanol injection pumps 5-GX-1930A/B are not activated as noise sources in the model
due to their intermittent operation.
Table P7-1:
Noise DATA Noise
Cadnaa
Deck Tag Label Name LpA Items in abatement Comments
Origin of data LwA Model
dB(A)@1m operation measure
Sub sea methanol Intermittent -
MD 5gx1930a/b Vendor Data 91 110 - - -
injection pump Not activated
Subsea methanol Point
MD 5gx1940a Vendor Data 79 96 Running - -
pressurization pump source
Topside methanol 1 running, Point
MD 5gx1920a/b Vendor Data 80 96 - -
injection pump 1 spare source
Gearbox
Gas injection Vendor High area
UD 5kb5460 81 106 No spare acoustic -
compressor Measurements source
cladding
HHI expected No spare, Point
UD 5ub6107a/b AHU Room P7 70 89 - -
max values hypothesis source
Fresh water make-up 1 running, Point
UD 5gx9315a/b Vendor data 71 87 - -
pumps 1 spare source
Guaranteed Ambient
Cadnaa
Vendor's CP CP CP Noise from Lpa-Lp Cadnaa length
Tag Deck Line_Number_Label Lw
Data Lp Easting Northing Elevation equipment dB(A) Model m
dB(A)
dB(A) only
Lpa dB(A)
5PV2 19305A 79.4 228624 111743 6530 Main 1" ME519061-L01M 82.5 3.1 point source 99.4 -
5PV1 19305A <75 227752 112143 6530 Main 2" ME519061-L01M 82.5 12.5 point source 90.0 -
RO-54502 <60 230138 119791 1232 Main 2" HC554003-J23 82.5 27.5 neglected NA -
RO-54509 80.5 230378 125210 7093 Main 2" HG554025-J21 82.5 2.0 point source 95.5 -
5PV2 16301 63.9 227116 115975 22117 Top 1" NG516004-D01V 80 16.1 point source 78.9 -
5PV1 15401 62.6 229994 110780 22116 Top 1" NG511007-B01V 80 17.4 point source 77.6 -
5PV2 15401 62.4 227216 111189 22017 Top 1" NG515003-B01 80 17.6 point source 77.4 -
5PV1 16301 <50 229382 118253 22116 Top 1" NG516003-D01V 80 35.0 neglected NA -
5PV2 19109A 69.8 228029 106407 13517 Upper 1" NG519001-B01 82.5 12.7 point source 84.8 -
NG50-5-500-SAF-CN-AB-00-6002_rev01
This document is the property of TOTAL and shall not be disclosed to third parties or reproduced without permission of the COMPANY.
Akpo
Project
NIGERIA – OML 130
AKPO Field Development Project
51/14
COMPANY ref: NG50-5-500-SAF-CN-AB-00-6002 Revision: 01 Status: IFD Class: 2 Date: 02/10/2007 Page:
2
CONTRACTOR ref: 8577Y-2000-CN-6000-002 -- -- -- -- --
NG50-5-500-SAF-CN-AB-00-6002_rev01
This document is the property of TOTAL and shall not be disclosed to third parties or reproduced without permission of the COMPANY.
Akpo
Project
NIGERIA – OML 130
AKPO Field Development Project
52/14
COMPANY ref: NG50-5-500-SAF-CN-AB-00-6002 Revision: 01 Status: IFD Class: 2 Date: 02/10/2007 Page:
2
CONTRACTOR ref: 8577Y-2000-CN-6000-002 -- -- -- -- --
NG50-5-500-SAF-CN-AB-00-6002_rev01
This document is the property of TOTAL and shall not be disclosed to third parties or reproduced without permission of the COMPANY.
Akpo
Project
NIGERIA – OML 130
AKPO Field Development Project
53/14
COMPANY ref: NG50-5-500-SAF-CN-AB-00-6002 Revision: 01 Status: IFD Class: 2 Date: 02/10/2007 Page:
2
CONTRACTOR ref: 8577Y-2000-CN-6000-002 -- -- -- -- --
6.8. Module P8
Main noise sources of this module are presented here under with data taken into account in the
calculation.
Table P8-1:
Noise DATA Noise
Cadnaa
Deck Tag Label Name LpA Lw Items in abatement Comments
Origin of data Model
dB(A)@1m A operation measure
Crude oil Vendor Area source Pump cladding,
3 running, Intermittent -
MD 5gx8310a/b/c/d offloading measurement 86 109 on reflecting baseplate
1 spare Activated
pumps data surface acoustic tiles
Area source Same noise as
3 running,
MD 5gx8310a/b/c/d Piping noise - - 107 on reflecting - the pump
1 spare
surface itself
HHI expected No spare,
UD 5ub6108a/b AHU Room P8 70 88 Point source - -
max values hypothesis
Guaranteed Ambient
Cadnaa
Vendor's CP CP CP Noise from Lpa-Lp Cadnaa length
Tag Deck Line_Number_Label Lw
Data Lp Easting Northing Elevation equipment dB(A) Model m
dB(A)
dB(A) only
Lpa dB(A)
5FV 83109A 79.9 257535 104700 13662 Upper 12" HL583011-F01V- 80 0.1
5FV 83109B 79.9 254285 116948 13662 Upper 12" HL583012-F01V- 80 0.1
Detailed 109.2 109
5FV 83109C 79.9 271899 104700 13662 Upper 12" HL583020-F01V- 80 0.1
5FV 83109D 79.9 278500 114075 13662 Upper 12" HL583021-F01V- 80 0.1
NG50-5-500-SAF-CN-AB-00-6002_rev01
This document is the property of TOTAL and shall not be disclosed to third parties or reproduced without permission of the COMPANY.
Akpo
Project
NIGERIA – OML 130
AKPO Field Development Project
54/14
COMPANY ref: NG50-5-500-SAF-CN-AB-00-6002 Revision: 01 Status: IFD Class: 2 Date: 02/10/2007 Page:
2
CONTRACTOR ref: 8577Y-2000-CN-6000-002 -- -- -- -- --
NG50-5-500-SAF-CN-AB-00-6002_rev01
This document is the property of TOTAL and shall not be disclosed to third parties or reproduced without permission of the COMPANY.
Akpo
Project
NIGERIA – OML 130
AKPO Field Development Project
55/14
COMPANY ref: NG50-5-500-SAF-CN-AB-00-6002 Revision: 01 Status: IFD Class: 2 Date: 02/10/2007 Page:
2
CONTRACTOR ref: 8577Y-2000-CN-6000-002 -- -- -- -- --
NG50-5-500-SAF-CN-AB-00-6002_rev01
This document is the property of TOTAL and shall not be disclosed to third parties or reproduced without permission of the COMPANY.
Akpo
Project
NIGERIA – OML 130
AKPO Field Development Project
56/14
COMPANY ref: NG50-5-500-SAF-CN-AB-00-6002 Revision: 01 Status: IFD Class: 2 Date: 02/10/2007 Page:
2
CONTRACTOR ref: 8577Y-2000-CN-6000-002 -- -- -- -- --
6.9. Module S1
Main noise sources of this module are presented here under with data taken into account in the
calculation.
Table S1-1:
Noise DATA Noise
Tag Cadnaa
Deck Name LpA Items in Abatement Comments
Label Origin of data LwA Model
dB(A)@1m Operation Measure
For normal
See table S1-2
5ua7330 Seawater sand operation
MD Vendor data
5ub7340 filtration package 15' per For backwash
90 - - -
week operation
5gx1610 Hot water Vendor 1 running, Point Open
MD 79 98 -
a/b circualtion pumps Measurements 1 spare source enclosure
5gx1610 1 running, Point Same noise as
MD Piping noise - - 95 -
a/b 1 spare source the pump itself
Chemical injection
MezD 5ua3840 Vendor data See table S1-3
package
5gx7320 Seawater lift Point
UD Vendor data 75 95 No spare - -
a/b/c booster pumps source
Note: Backwash function of the filters has not been taken into account in the calculation due to the
“not normal” operation condition of backwash function.
NG50-5-500-SAF-CN-AB-00-6002_rev01
This document is the property of TOTAL and shall not be disclosed to third parties or reproduced without permission of the COMPANY.
Akpo
Project
NIGERIA – OML 130
AKPO Field Development Project
57/14
COMPANY ref: NG50-5-500-SAF-CN-AB-00-6002 Revision: 01 Status: IFD Class: 2 Date: 02/10/2007 Page:
2
CONTRACTOR ref: 8577Y-2000-CN-6000-002 -- -- -- -- --
NG50-5-500-SAF-CN-AB-00-6002_rev01
This document is the property of TOTAL and shall not be disclosed to third parties or reproduced without permission of the COMPANY.
Akpo
Project
NIGERIA – OML 130
AKPO Field Development Project
58/14
COMPANY ref: NG50-5-500-SAF-CN-AB-00-6002 Revision: 01 Status: IFD Class: 2 Date: 02/10/2007 Page:
2
CONTRACTOR ref: 8577Y-2000-CN-6000-002 -- -- -- -- --
Guaranteed Ambient
Cadnaa
Vendor's CP CP CP Noise from Lpa-Lp Cadnaa length
Tag Deck Line_Number_Label Lw
Data Lp Easting Northing Elevation equipment dB(A) Model m
dB(A)
dB(A) only
Lpa dB(A)
NG50-5-500-SAF-CN-AB-00-6002_rev01
This document is the property of TOTAL and shall not be disclosed to third parties or reproduced without permission of the COMPANY.
Akpo
Project
NIGERIA – OML 130
AKPO Field Development Project
59/14
COMPANY ref: NG50-5-500-SAF-CN-AB-00-6002 Revision: 01 Status: IFD Class: 2 Date: 02/10/2007 Page:
2
CONTRACTOR ref: 8577Y-2000-CN-6000-002 -- -- -- -- --
NG50-5-500-SAF-CN-AB-00-6002_rev01
This document is the property of TOTAL and shall not be disclosed to third parties or reproduced without permission of the COMPANY.
Akpo
Project
NIGERIA – OML 130
AKPO Field Development Project
60/14
COMPANY ref: NG50-5-500-SAF-CN-AB-00-6002 Revision: 01 Status: IFD Class: 2 Date: 02/10/2007 Page:
2
CONTRACTOR ref: 8577Y-2000-CN-6000-002 -- -- -- -- --
NG50-5-500-SAF-CN-AB-00-6002_rev01
This document is the property of TOTAL and shall not be disclosed to third parties or reproduced without permission of the COMPANY.
Akpo
Project
NIGERIA – OML 130
AKPO Field Development Project
61/14
COMPANY ref: NG50-5-500-SAF-CN-AB-00-6002 Revision: 01 Status: IFD Class: 2 Date: 02/10/2007 Page:
2
CONTRACTOR ref: 8577Y-2000-CN-6000-002 -- -- -- -- --
NG50-5-500-SAF-CN-AB-00-6002_rev01
This document is the property of TOTAL and shall not be disclosed to third parties or reproduced without permission of the COMPANY.
Akpo
Project
NIGERIA – OML 130
AKPO Field Development Project
62/14
COMPANY ref: NG50-5-500-SAF-CN-AB-00-6002 Revision: 01 Status: IFD Class: 2 Date: 02/10/2007 Page:
2
CONTRACTOR ref: 8577Y-2000-CN-6000-002 -- -- -- -- --
6.10. Module S2
Main noise sources of this module are presented here under with data taken into account in the
calculation.
Table S2-1:
Noise DATA Noise
Cadnaa
Deck Tag Label Name LpA Items in Abatement Comments
Origin of data LwA Model
dB(A)@1m operation Measure
Point source
Air compressor Vendor 2 running, Noise
MD 5ub1310a/b/c 73 91 inside -
packages measurements 1 spare enclosure
building
Foam pump of foam
MD 5gx1730a/b Requirement 80 95 Not activated, operation in case of emergency & tests
system 5ub1730
HHI expected
UD HVAC HVAC Laboratory max values - 75 96 No spare Point source - -
Extrapolation
Nitrogen generation Vendor
UD 5ub1110a/b 75 97 No spare Point source - See table S2-2
package guarantee
Inert gas generator
UD 5ua1210a1/a2 Vendor Data 77 See table S2-3
package
1 running,
UD 5ub1330a/b Air drier package Vendor data 78 102 Line sources Silencer See table S2-4
1 spare
Fresh air fan A/B for
HHI expected 1 running, High area
UD 5ka6102a/b topside modules ("S 70 94 - -
max values 1 spare source
Side")
HHI expected No spare,
UD 5ub6112a/b HVAC Room S2 70 88 Point source - -
max values hypothesis
NG50-5-500-SAF-CN-AB-00-6002_rev01
This document is the property of TOTAL and shall not be disclosed to third parties or reproduced without permission of the COMPANY.
Akpo
Project
NIGERIA – OML 130
AKPO Field Development Project
63/14
COMPANY ref: NG50-5-500-SAF-CN-AB-00-6002 Revision: 01 Status: IFD Class: 2 Date: 02/10/2007 Page:
2
CONTRACTOR ref: 8577Y-2000-CN-6000-002 -- -- -- -- --
NG50-5-500-SAF-CN-AB-00-6002_rev01
This document is the property of TOTAL and shall not be disclosed to third parties or reproduced without permission of the COMPANY.
Akpo
Project
NIGERIA – OML 130
AKPO Field Development Project
64/14
COMPANY ref: NG50-5-500-SAF-CN-AB-00-6002 Revision: 01 Status: IFD Class: 2 Date: 02/10/2007 Page:
2
CONTRACTOR ref: 8577Y-2000-CN-6000-002 -- -- -- -- --
Guaranteed Ambient
Cadnaa
Vendor's CP CP CP Noise from Lpa-Lp Cadnaa length
Tag Deck Line_Number_Label Lw
Data Lp Easting Northing Elevation equipment dB(A) Model m
dB(A)
dB(A) only
Lpa dB(A)
5PV 13201 <50 82150 90432 13500 Upper 1" SA513007-B10- 85 40.0 neglected NA -
5PV 13401 <50 91833 83487 13467 Upper 1" IA513006-B10- 85 40.0 neglected NA -
RO-13203 <60 82150 91693 13500 Upper 2" SA513007-B10- 85 40.0 neglected NA -
NG50-5-500-SAF-CN-AB-00-6002_rev01
This document is the property of TOTAL and shall not be disclosed to third parties or reproduced without permission of the COMPANY.
Akpo
Project
NIGERIA – OML 130
AKPO Field Development Project
65/14
COMPANY ref: NG50-5-500-SAF-CN-AB-00-6002 Revision: 01 Status: IFD Class: 2 Date: 02/10/2007 Page:
2
CONTRACTOR ref: 8577Y-2000-CN-6000-002 -- -- -- -- --
NG50-5-500-SAF-CN-AB-00-6002_rev01
This document is the property of TOTAL and shall not be disclosed to third parties or reproduced without permission of the COMPANY.
Akpo
Project
NIGERIA – OML 130
AKPO Field Development Project
66/14
COMPANY ref: NG50-5-500-SAF-CN-AB-00-6002 Revision: 01 Status: IFD Class: 2 Date: 02/10/2007 Page:
2
CONTRACTOR ref: 8577Y-2000-CN-6000-002 -- -- -- -- --
NG50-5-500-SAF-CN-AB-00-6002_rev01
This document is the property of TOTAL and shall not be disclosed to third parties or reproduced without permission of the COMPANY.
Akpo
Project
NIGERIA – OML 130
AKPO Field Development Project
67/14
COMPANY ref: NG50-5-500-SAF-CN-AB-00-6002 Revision: 01 Status: IFD Class: 2 Date: 02/10/2007 Page:
2
CONTRACTOR ref: 8577Y-2000-CN-6000-002 -- -- -- -- --
6.11. Module S3
Main noise sources of this module are presented here under with data taken into account in the
calculation.
Table S3-1:
Noise DATA Noise
Tag
Deck Name Origin of LpA Lw Items in Cadnaa Model abatement Comments
Label
data dB(A)@1m A operation measure
Area source on
5py6510 Main power generator - AC 5py6510f in
MD Vendor data 83 105 reflecting - -
d/e/f Generator spare
surface
Area source on
5py6510 Main power generator - 5py6510f in
MD Vendor data 80 98 reflecting - -
d/e/f Gear box spare
surface
Area source on
5py6510 Main power generator - GT 5py6510f in
MD Vendor data 74 96 reflecting - -
d/e/f Enclosure spare
surface
5py6510 Main power generator - GT 5py6510f in
MD Vendor data 75 92 Point source - -
d/e/f Enclosure vent inlet spare
5py6510 Main power generator - GT 5py6510f in
MD Vendor data 72 94 Point source - -
d/e/f Enclosure vent outlet spare
Area source on
5py6510 Main power generator - Inlet 5py6510f in
MD Vendor data 74 94 reflecting - -
d/e/f Scroll spare
surface
Extrapolation
5py6510 Main power generator - Not 5py6510f in High area
MD from Vendor 96 - -
d/e/f Vertical air inlet duct Available spare source
data
Extrapolation
5py6510 Main power generator - Not 5py6510f in High area
MD from Vendor 95 - -
d/e/f horizontal air inlet duct Available spare source
data
5py6510 Main power generator - Air Not 5py6510f in High area
MD Vendor data 101 - -
d/e/f inlet opening Available spare source
Main power generator -
5py6510 WHRU
MD Exhaust WHRU expansion Vendor data 74 98 No spare Line source -
e/d sets
joint + transition to silencer
Main power generator -
5py6510 WHRU
MD Exhaust WHRU silencer Vendor data 69 97 No spare Line source -
e/d sets
duct
5py6510 Main power generator - WHRU
MD Vendor data 74 112 No spare Line source -
e/d Exhaust WHRU outlet duct sets
Main power generator -
5py6510 WHRU
MD Exhaust WHRU stack Vendor data 67 117 No spare Point source -
e/d sets
opening
NG50-5-500-SAF-CN-AB-00-6002_rev01
This document is the property of TOTAL and shall not be disclosed to third parties or reproduced without permission of the COMPANY.
Akpo
Project
NIGERIA – OML 130
AKPO Field Development Project
68/14
COMPANY ref: NG50-5-500-SAF-CN-AB-00-6002 Revision: 01 Status: IFD Class: 2 Date: 02/10/2007 Page:
2
CONTRACTOR ref: 8577Y-2000-CN-6000-002 -- -- -- -- --
NG50-5-500-SAF-CN-AB-00-6002_rev01
This document is the property of TOTAL and shall not be disclosed to third parties or reproduced without permission of the COMPANY.
Akpo
Project
NIGERIA – OML 130
AKPO Field Development Project
69/14
COMPANY ref: NG50-5-500-SAF-CN-AB-00-6002 Revision: 01 Status: IFD Class: 2 Date: 02/10/2007 Page:
2
CONTRACTOR ref: 8577Y-2000-CN-6000-002 -- -- -- -- --
Guaranteed Ambient
Cadnaa
Vendor's CP CP CP Noise from Lpa-Lp Cadnaa length
Tag Deck Line_Number_Label Lw
Data Lp Easting Northing Elevation equipment dB(A) Model m
dB(A)
dB(A) only
Lpa dB(A)
RO-65102D <60 107047 71092 2698 Main 2" SW565004-B90- 85 30.0 neglected NA -
RO-65102E <60 116047 71092 2698 Main 2" SW565005-B90- 85 30.0 neglected NA -
RO-65102F <60 124747 71092 2698 Main 2" SW565006-B90- 85 30.0 neglected NA -
RO-65103D <60 109733 86271 4434 Main 2" SW565004-B90- 85 30.0 neglected NA -
RO-65103E <60 118733 86271 4434 Main 2" SW565005-B90- 85 30.0 neglected NA -
RO-65103F <60 127433 86271 4434 Main 2" SW565006-B90- 85 30.0 neglected NA -
RO-65104D <60 109733 86271 4814 Main 2" SW565004-B90- 85 30.0 neglected NA -
RO-65104E <60 118733 86271 4814 Main 2" SW565005-B90- 85 30.0 neglected NA -
RO-65104F <60 127433 86271 4814 Main 2" SW565006-B90- 85 30.0 neglected NA -
RO-65105D <60 110914 87974 2692 Main 4" SW565004-B90- 85 30.0 neglected NA -
RO-65105E <60 119914 87974 2692 Main 4" SW565005-B90- 85 30.0 neglected NA -
RO-65105F <60 128614 87974 2692 Main 4" SW565006-B90- 85 30.0 neglected NA -
5FV2 16211D 63.2 122250 79395 19610 Top 8" HW516030-D01V-HC 85 21.8 neglected NA -
5FV2 16211C 63.2 122432 76537 13714 Upper 8" HW516027-D01V-HC 85 21.8 neglected NA -
NG50-5-500-SAF-CN-AB-00-6002_rev01
This document is the property of TOTAL and shall not be disclosed to third parties or reproduced without permission of the COMPANY.
Akpo
Project
NIGERIA – OML 130
AKPO Field Development Project
70/14
COMPANY ref: NG50-5-500-SAF-CN-AB-00-6002 Revision: 01 Status: IFD Class: 2 Date: 02/10/2007 Page:
2
CONTRACTOR ref: 8577Y-2000-CN-6000-002 -- -- -- -- --
NG50-5-500-SAF-CN-AB-00-6002_rev01
This document is the property of TOTAL and shall not be disclosed to third parties or reproduced without permission of the COMPANY.
Akpo
Project
NIGERIA – OML 130
AKPO Field Development Project
71/14
COMPANY ref: NG50-5-500-SAF-CN-AB-00-6002 Revision: 01 Status: IFD Class: 2 Date: 02/10/2007 Page:
2
CONTRACTOR ref: 8577Y-2000-CN-6000-002 -- -- -- -- --
NG50-5-500-SAF-CN-AB-00-6002_rev01
This document is the property of TOTAL and shall not be disclosed to third parties or reproduced without permission of the COMPANY.
Akpo
Project
NIGERIA – OML 130
AKPO Field Development Project
72/14
COMPANY ref: NG50-5-500-SAF-CN-AB-00-6002 Revision: 01 Status: IFD Class: 2 Date: 02/10/2007 Page:
2
CONTRACTOR ref: 8577Y-2000-CN-6000-002 -- -- -- -- --
6.12. Module S4
Main noise sources of this module are presented here under with data taken into account in the
calculation.
Table S4-1:
Noise DATA Noise
Cadnaa
Deck Tag Label Name LpA Items in abatement Comments
Origin of data LwA Model
dB(A)@1m operation measure
HHI expected No spare,
UD 5ub6114a/b AHU Room S4 70 88 Point source - -
max values hypothesis
Guaranteed Ambient
Cadnaa
Vendor's CP CP CP Noise from Lpa-Lp Cadnaa length
Tag Deck Line_Number_Label Lw
Data Lp Easting Northing Elevation equipment dB(A) Model m
dB(A)
dB(A) only
Lpa dB(A)
5HV 30101 <75 157830 77210 9156 Main 6" HC530007-J70-PP 75 5.0 simplified 92.5 45
5HV 30102 <75 156980 77210 9144 Main 8" HC530007-J70-PP 75 5.0 simplified 95 79
5HV 30201 <75 153900 77210 9157 Main 6" HC530017-J70-PP 75 5.0 simplified 92.5 45
5HV 30202 <75 153050 77210 9144 Main 8" HC530017-J70-PP 75 5.0 simplified 95 79
5HV 30301 <75 150100 77210 9156 Main 6" HC530027-J70-PP 75 5.0 simplified 92.5 45
5HV 30302 <75 150950 77210 9143 Main 8" HC530027-J70-PP 75 5.0 simplified 95 79
5HV 30401 <75 144900 77210 9156 Main 6" HC530037-J70-PP 75 5.0 simplified 92.5 45
5HV 30402 <75 144050 77210 9143 Main 8" HC530037-J70-PP 75 5.0 simplified 95 79
5HV 30501 <75 137170 77210 9157 Main 6" HC530047-J70-PP 75 5.0 simplified 92.5 45
5HV 30502 <75 138020 77210 9144 Main 8" HC530047-J70-PP 75 5.0 simplified 95 79
5HV 30601 <75 141100 77210 9157 Main 6" HC530057-J70-PP 75 5.0 simplified 92.5 45
5HV 30602 <75 141950 77210 9144 Main 8" HC530057-J70-PP 75 5.0 simplified 95 79
5FV 30106 <70 156100 93087 636 Main 10" HL599023-J01-HC 75 10.0 simplified 90 79
5FV 30306 <70 147950 93087 636 Main 10" HL599024-J01-HC 75 10.0 simplified 90 79
5FV 30506 <70 138900 93087 636 Main 10" HL599025-J01-HC 75 10.0 simplified 90 79
5PV2 41110 79.4 146442 93591 25224 Top 1 HG541002-B03-PP 82.5 3.1 point source 94.4 -
5PV1 41110 70.2 135369 84664 25245 Top 3" FG522033-B03-PP 82.5 12.3 point source 85.2 -
5FV 31113A <70 154401 90775 25403 Top 16" HG531001-F70-PPA 82.5 17.5 point source 87.5 -
RO-31101A 78.3 155833 93797 25560 Top 2" HG531001-F70-PPA 82.5 4.2 point source 93.3 -
5LV 31105A <80 143855 86355 13695 Upper 12" HL531001-F23-PP 75 0.0 simplified 100 79
5LDV 31106A 67.0 154443 77850 13585 Upper 6" PW531001-F23-PP 75 8.0 simplified 89.5 45
NG50-5-500-SAF-CN-AB-00-6002_rev01
This document is the property of TOTAL and shall not be disclosed to third parties or reproduced without permission of the COMPANY.
Akpo
Project
NIGERIA – OML 130
AKPO Field Development Project
73/14
COMPANY ref: NG50-5-500-SAF-CN-AB-00-6002 Revision: 01 Status: IFD Class: 2 Date: 02/10/2007 Page:
2
CONTRACTOR ref: 8577Y-2000-CN-6000-002 -- -- -- -- --
NG50-5-500-SAF-CN-AB-00-6002_rev01
This document is the property of TOTAL and shall not be disclosed to third parties or reproduced without permission of the COMPANY.
Akpo
Project
NIGERIA – OML 130
AKPO Field Development Project
74/14
COMPANY ref: NG50-5-500-SAF-CN-AB-00-6002 Revision: 01 Status: IFD Class: 2 Date: 02/10/2007 Page:
2
CONTRACTOR ref: 8577Y-2000-CN-6000-002 -- -- -- -- --
6.13. Module S5
Main noise sources of this module are presented here under with data taken into account in the
calculation.
Table S5-1:
Noise DATA Noise
Deck Tag Label Name LpA Items in Cadnaa Model abatement Comments
Origin of data LwA
dB(A)@1m operation measure
Crude
Vendor 1 running, Point source Open Intermittent -
MD 5gx9920c/d recirculation 82 102
measurements 1 spare inside building enclosure Activated
pump
1 running, Point source Same noise as
MD 5gx9920c/d Piping noise - - 99 -
1 spare inside building the pump itself
Crude oil Vendor 1 running, Point source Open
MD 5gx3720a/b 77 96 -
transfer pumps measurements 1 spare inside building enclosure
1 running, Point source Same noise as
MD 5gx3720a/b Piping noise - - 93 -
1 spare inside building the pump itself
Hydraulic HHI answer to
MD 5hpu001 See Table S5-2
power unit Technical Query
NG50-5-500-SAF-CN-AB-00-6002_rev01
This document is the property of TOTAL and shall not be disclosed to third parties or reproduced without permission of the COMPANY.
Akpo
Project
NIGERIA – OML 130
AKPO Field Development Project
75/14
COMPANY ref: NG50-5-500-SAF-CN-AB-00-6002 Revision: 01 Status: IFD Class: 2 Date: 02/10/2007 Page:
2
CONTRACTOR ref: 8577Y-2000-CN-6000-002 -- -- -- -- --
Guaranteed Ambient
Cadnaa
Vendor's CP CP CP Noise from Lpa-Lp Cadnaa length
Tag Deck Line_Number_Label Lw
Data Lp Easting Northing Elevation equipment dB(A) Model m
dB(A)
dB(A) only
Lpa dB(A)
5FV 19049 79.5 179148 81233 6017 Main 1" ME519096-L01M- 80 0.5 point source 99.5 -
5FV 99207C 79.4 175400 93720 5945 Main 3" HL599043-F01-HC 80 0.6 point source 99.4 -
5FV 99207D 79.4 179600 91580 5945 Main 3" HL599044-F01-HC 80 0.6 point source 99.4 -
5TV 99105 78.2 168282 78640 6084 Main 6" HW599001-D01V-HC 80 1.8 simplified 100.7 45
5LV1 36105 76.8 187913 80004 6203 Main 16" HL537003-B01- 80 3.2 simplified 101.8 79
5LV2 36105 76.8 186884 76935 6203 Main 16" HL537003-B01- 80 3.2 simplified 101.8 79
5TV 37108 76.7 186971 85023 6162 Main 12" CW537005-B01W- 80 3.3 simplified 101.7 79
5FV 19002 51.0 176000 76288 5881 Main 2" ME519011-L01M- 80 29.0 neglected NA -
5FV 19003 51.0 172000 76288 5881 Main 2" ME519014-L01M- 80 29.0 neglected NA -
5FV 19004 51.0 168000 76288 5881 Main 2" ME519017-L01M- 80 29.0 neglected NA -
5FV 19005 51.0 169300 90431 5881 Main 2" ME519020-L01M- 80 29.0 neglected NA -
5FV 19007 51.0 174500 76288 5881 Main 2" ME519012-L01M- 80 29.0 neglected NA -
5FV 19008 51.0 170500 76288 5881 Main 2" ME519015-L01M- 80 29.0 neglected NA -
5FV 19009 51.0 166500 76288 5881 Main 2" ME519018-L01M- 80 29.0 neglected NA -
5FV 19010 51.0 168800 90431 5881 Main 2" ME519021-L01M- 80 29.0 neglected NA -
5FV 19012 51.0 174000 76288 5881 Main 2" ME519013-L01M- 80 29.0 neglected NA -
5FV 19013 51.0 170000 76288 5881 Main 2" ME519016-L01M- 80 29.0 neglected NA -
5FV 19014 51.0 166000 76288 5881 Main 2" ME519019-L01M- 80 29.0 neglected NA -
5FV 19015 51.0 167300 90431 5881 Main 2" ME519022-L01M- 80 29.0 neglected NA -
5FV 19035 <50 180598 81281 6030 Main 2" ME519025-L01M- 80 35.0 neglected NA -
5FV 19038 <50 181698 81281 6030 Main 2" ME519026-L01M- 80 35.0 neglected NA -
5FV 19032 <50 171019 91970 5880 Main 2" ME519024-L01M- 80 35.0 neglected NA -
5FV 19041 <50 178048 81281 6030 Main 2" ME519027-L01M- 80 35.0 neglected NA -
5PV 31111A 84.4 161257 91180 25403 Top 16" HG531002-F70-PFP 80 -4.4 Not modeled - Contingency
5PV 36112 78.4 182995 87157 24229 Top 18" HG536002-B49-PP 80 1.6 simplified 103.4 79
5LV 41102 <80 161000 92657 13556 Upper 4" HL541001-B03-PP 80 5.0 simplified 97.5 45
5LDV 35103 75.3 185721 81142 13544 Upper 3" PW535001-B03-PP 80 4.7 point source 95.3 -
NG50-5-500-SAF-CN-AB-00-6002_rev01
This document is the property of TOTAL and shall not be disclosed to third parties or reproduced without permission of the COMPANY.
Akpo
Project
NIGERIA – OML 130
AKPO Field Development Project
76/14
COMPANY ref: NG50-5-500-SAF-CN-AB-00-6002 Revision: 01 Status: IFD Class: 2 Date: 02/10/2007 Page:
2
CONTRACTOR ref: 8577Y-2000-CN-6000-002 -- -- -- -- --
NG50-5-500-SAF-CN-AB-00-6002_rev01
This document is the property of TOTAL and shall not be disclosed to third parties or reproduced without permission of the COMPANY.
Akpo
Project
NIGERIA – OML 130
AKPO Field Development Project
77/14
COMPANY ref: NG50-5-500-SAF-CN-AB-00-6002 Revision: 01 Status: IFD Class: 2 Date: 02/10/2007 Page:
2
CONTRACTOR ref: 8577Y-2000-CN-6000-002 -- -- -- -- --
6.14. Module S6
Main noise sources of this module are presented here under with data taken into account in the
calculation.
Table S6-1:
Noise DATA Noise
Cadnaa
Deck Tag Label Name LpA Items in abatement Comments
Origin of data LwA Model
dB(A)@1m operation measure
Degassing
MD 5ua4130 Vendor data See table S6-2
package
Hydrocyclone
- 5ua4120 Canceled
package
HP Gas Vorecon
Vendor High Area
UD 5kb5330a/b Compressor train 83 108 No spare acoustic -
guarantee source
A/B enclosure
MP Gas Vendor High Area Gear acoustic
UD 5kb5240 80 104 No spare -
compressor measurements source cladding
NG50-5-500-SAF-CN-AB-00-6002_rev01
This document is the property of TOTAL and shall not be disclosed to third parties or reproduced without permission of the COMPANY.
Akpo
Project
NIGERIA – OML 130
AKPO Field Development Project
78/14
COMPANY ref: NG50-5-500-SAF-CN-AB-00-6002 Revision: 01 Status: IFD Class: 2 Date: 02/10/2007 Page:
2
CONTRACTOR ref: 8577Y-2000-CN-6000-002 -- -- -- -- --
Guaranteed Ambient
Cadnaa
Vendor's CP CP CP Noise from Lpa-Lp Cadnaa length
Tag Deck Line_Number_Label Lw
Data Lp Easting Northing Elevation equipment dB(A) Model m
dB(A)
dB(A) only
Lpa dB(A)
5LV 53206A <80 196226 76654 530 Main 2" HL553001-D03- 82.5 7.5 point source 95.0 -
5LV 53206B <80 203599 76526 530 Main 2" HL553002-D03- 82.5 7.5 point source 95.0 -
5TV 52201 78.2 214735 84131 6610 Main 8" CW552001-B01W- 82.5 4.3 simplified 103.2 79
5TV 53201A 75.9 198160 86436 6584 Main 8" CW552001-B01W- 82.5 6.6 simplified 100.9 79
5TV 53201B 75.9 198451 84564 6584 Main 6" CW553005-B01W- 82.5 6.6 simplified 98.4 45
5LV 52206 51.4 196438 81800 544 Main 3" HL552004-D03- 82.5 31.1 neglected NA -
RO-53113A 78.4 218700 94503 7512 Main 2" HG552007-D49-PPA 82.5 4.1 point source 93.4 -
RO-53113B 78.4 215000 94503 7512 Main 2" HG553002-D49-PPA 82.5 4.1 point source 93.4 -
NG50-5-500-SAF-CN-AB-00-6002_rev01
This document is the property of TOTAL and shall not be disclosed to third parties or reproduced without permission of the COMPANY.
Akpo
Project
NIGERIA – OML 130
AKPO Field Development Project
79/14
COMPANY ref: NG50-5-500-SAF-CN-AB-00-6002 Revision: 01 Status: IFD Class: 2 Date: 02/10/2007 Page:
2
CONTRACTOR ref: 8577Y-2000-CN-6000-002 -- -- -- -- --
NG50-5-500-SAF-CN-AB-00-6002_rev01
This document is the property of TOTAL and shall not be disclosed to third parties or reproduced without permission of the COMPANY.
Akpo
Project
NIGERIA – OML 130
AKPO Field Development Project
80/14
COMPANY ref: NG50-5-500-SAF-CN-AB-00-6002 Revision: 01 Status: IFD Class: 2 Date: 02/10/2007 Page:
2
CONTRACTOR ref: 8577Y-2000-CN-6000-002 -- -- -- -- --
NG50-5-500-SAF-CN-AB-00-6002_rev01
This document is the property of TOTAL and shall not be disclosed to third parties or reproduced without permission of the COMPANY.
Akpo
Project
NIGERIA – OML 130
AKPO Field Development Project
81/14
COMPANY ref: NG50-5-500-SAF-CN-AB-00-6002 Revision: 01 Status: IFD Class: 2 Date: 02/10/2007 Page:
2
CONTRACTOR ref: 8577Y-2000-CN-6000-002 -- -- -- -- --
NG50-5-500-SAF-CN-AB-00-6002_rev01
This document is the property of TOTAL and shall not be disclosed to third parties or reproduced without permission of the COMPANY.
Akpo
Project
NIGERIA – OML 130
AKPO Field Development Project
82/14
COMPANY ref: NG50-5-500-SAF-CN-AB-00-6002 Revision: 01 Status: IFD Class: 2 Date: 02/10/2007 Page:
2
CONTRACTOR ref: 8577Y-2000-CN-6000-002 -- -- -- -- --
6.15. Module S7
Main noise sources of this module are presented here under with data taken into account in the
calculation.
Table S7-1:
Noise DATA Noise
Cadnaa
Deck Tag Label Name LpA Items in abatement Comments
Origin of data LwA Model
dB(A)@1m operation measure
LP Compressor Vendor 1 running, Point
MD 5gx5130a/b 70 86 - -
scrubber pumps guarantee 1 spare source
Subsea methanol
MD 5gx1940b Vendor Data 79 96 Spare - - -
pressurisation pump
Subsea methanol Intermittent -
MD 5gx1930c/d Vendor Data 91 110 - - -
injection pumps Not activated
NG50-5-500-SAF-CN-AB-00-6002_rev01
This document is the property of TOTAL and shall not be disclosed to third parties or reproduced without permission of the COMPANY.
Akpo
Project
NIGERIA – OML 130
AKPO Field Development Project
83/14
COMPANY ref: NG50-5-500-SAF-CN-AB-00-6002 Revision: 01 Status: IFD Class: 2 Date: 02/10/2007 Page:
2
CONTRACTOR ref: 8577Y-2000-CN-6000-002 -- -- -- -- --
Guaranteed Ambient
Cadnaa
Vendor's CP CP CP Noise from Lpa-Lp Cadnaa length
Tag Deck Line_Number_Label Lw
Data Lp Easting Northing Elevation equipment dB(A) Model m
dB(A)
dB(A) only
Lpa dB(A)
5PV2 19305C 79.4 224325 89691 6500 Main 1" ME519062-L01M- 82.5 3.1 point source 99.4 -
5TV 54310A 77.1 245941 82612 662 Main 12" CW554002-B01W- 82.5 5.4 simplified 102.1 79
5TV 54310B 77.1 245841 83813 662 Main 12" CW554005-B01W- 82.5 5.4 simplified 102.1 79
5PV1 19305C <75 223986 90236 6487 Main 1" ME519062-L01M- 82.5 12.5 point source 90.0 -
5XV 54102A <70 242766 74449 7275 Main 16" HG554003-G21- 82.5 17.5 point source 87.5 -
5XV 54102B <70 242766 76687 7275 Main 16" HG554002-G21- 82.5 17.5 point source 87.5 -
5TV 51201 65.8 229366 86575 6557 Main 4" CW551001-B01W- 82.5 16.7 point source 85.8 -
5LV 51206 60.4 232245 80679 616 Main 1-1/2" HL551008-D03- 82.5 22.1 neglected NA -
RO-54109A 83.8 241269 73806 7300 Main 2" HG554003-G21- 82.5 -1.3 point source 98.8 -
RO-54109B 83.8 241269 77329 7300 Main 2" HG554002-G21- 82.5 -1.3 point source 98.8 -
RO-54315A 80.9 241663 92186 6850 Main 2" HG554008-H21- 82.5 1.6 point source 95.9 -
RO-54315B 80.9 241663 77763 6850 Main 2" HG554016-H21- 82.5 1.6 point source 95.9 -
5PV2 36111 77.2 230537 87024 23887 Top 12" HG551008-D49-PPA 82.5 5.3 simplified 97.2 25
5FV2 21100 77.0 245283 92754 23667 Top 1" FG522042-B03- 82.5 5.5 point source 92.0 -
5PV2 19109B 69.8 227241 95226 23737 Top 1" NG519002-B01- 82.5 12.7 point source 84.8 -
5PV1 19109B 64.4 230459 95075 23737 Top 1" NG511029-B01- 82.5 18.1 point source 79.4 -
5PV11 19109B <50 230274 95475 23737 Top 1" NG511029-B01- 82.5 37.5 neglected NA -
5PV1 36111 77.7 225700 87911 13650 Upper 12" HG551003-D49-PPA 85 7.3 simplified 97.7 25
NG50-5-500-SAF-CN-AB-00-6002_rev01
This document is the property of TOTAL and shall not be disclosed to third parties or reproduced without permission of the COMPANY.
Akpo
Project
NIGERIA – OML 130
AKPO Field Development Project
84/14
COMPANY ref: NG50-5-500-SAF-CN-AB-00-6002 Revision: 01 Status: IFD Class: 2 Date: 02/10/2007 Page:
2
CONTRACTOR ref: 8577Y-2000-CN-6000-002 -- -- -- -- --
NG50-5-500-SAF-CN-AB-00-6002_rev01
This document is the property of TOTAL and shall not be disclosed to third parties or reproduced without permission of the COMPANY.
Akpo
Project
NIGERIA – OML 130
AKPO Field Development Project
85/14
COMPANY ref: NG50-5-500-SAF-CN-AB-00-6002 Revision: 01 Status: IFD Class: 2 Date: 02/10/2007 Page:
2
CONTRACTOR ref: 8577Y-2000-CN-6000-002 -- -- -- -- --
NG50-5-500-SAF-CN-AB-00-6002_rev01
This document is the property of TOTAL and shall not be disclosed to third parties or reproduced without permission of the COMPANY.
Akpo
Project
NIGERIA – OML 130
AKPO Field Development Project
86/14
COMPANY ref: NG50-5-500-SAF-CN-AB-00-6002 Revision: 01 Status: IFD Class: 2 Date: 02/10/2007 Page:
2
CONTRACTOR ref: 8577Y-2000-CN-6000-002 -- -- -- -- --
NG50-5-500-SAF-CN-AB-00-6002_rev01
This document is the property of TOTAL and shall not be disclosed to third parties or reproduced without permission of the COMPANY.
Akpo
Project
NIGERIA – OML 130
AKPO Field Development Project
87/14
COMPANY ref: NG50-5-500-SAF-CN-AB-00-6002 Revision: 01 Status: IFD Class: 2 Date: 02/10/2007 Page:
2
CONTRACTOR ref: 8577Y-2000-CN-6000-002 -- -- -- -- --
Considering that Preliminary noise study has been done with more stringent hypothesizes (all
spare equipment items considered as operating, required noise levels used in the model and
higher than those provided/guaranteed/measured by Vendor), the Hull deck noise calculation has
been only updated by adding the contribution of noise sources located on the Hull deck. The
contribution of noise sources located on Topsides has not been modified compared to Preliminary
noise study.
Rayplus calculation study is presented in Appendix
Main noise sources of this module are presented here under with data taken into account in the
calculation.
Table H-1:
Tag Number Name Operation Spare Noise Data Lw Comment
Wax inhibitor and demulsifier
1 running, Lp=75dBA@1m from pump Not
injection pump Intermittent -
1 spare Lp=59dBA@1m from motor Modelled
5-GX-3845-A/B
5-UA-3810-A
Asphaltene inhibitor injection
1 running, Lp=75dBA@1m from pump
pump Continuous 92dBA
1 spare Lp=62dBA@1m from motor
5-GX-3875-A/B
Scale inhibitor and corrosion
Lp=75dBA@1m from pump
inhibitor blend injection pump Continuous 1 running 92dBA
Lp=59dBA@1m from motor
5-UA-3810-B 5-GX-3855
Biocide injection pump Lp=80dBA@1m from pump Not
Intermittent 1 running -
5-GX-3865 Lp=62dBA@1m from motor Modelled
Biocide "3" injection pump 1 running, Lp=60dBA@1m from pump
Continuous 80dBA
5-GX-3805-A/B 1 spare Lp=59dBA@1m from motor
Reverse demulsifier injection
1 running, Lp=60dBA@1m from pump
pump Continuous 80dBA
1 spare Lp=59dBA@1m from motor
5-GX-3815-A/B
Demulsifier injection pump 1 running, Lp=70dBA@1m from pump
Continuous 90dBA
5-UA-3820 5-GX-3825-A/B 1 spare Lp=67dBA@1m from motor
Wax inhibitor pump 1 running, Lp=70dBA@1m from pump Not
Intermittent -
5-GX-3885-A/B 1 spare Lp=65dBA@1m from motor Modelled
Antifoam "1" pump 1 running, Lp=60dBA@1m from pump
Continuous 80dBA
5-GX-3895-A/B 1 spare Lp=59dBA@1m from motor
Scale inhibitor injection pump 1 running, Lp=60dBA@1m from pump
Continuous 80dBA
5-GX-7755-A/B 1 spare Lp=59dBA@1m from motor
Antifoam "2" injection pump 1 running, Lp=60dBA@1m from pump
Continuous 80dBA
5-GX-7715-A/B 1 spare Lp=59dBA@1m from motor
Oxygen scavenger injection 1 running, Lp=60dBA@1m from pump
Continuous 80dBA
pump 5-GX-7725-A/B 1 spare Lp=59dBA@1m from motor
5-UA-3830
Biocide "1" injection pump 1 running, Lp=65dBA@1m from pump Not
Batch -
5-GX-7735-A/B 1 spare Lp=65dBA@1m from motor Modelled
Biocide "2" injection pump 1 running, Lp=65dBA@1m from pump Not
Batch -
5-GX-7745-A/B 1 spare Lp=65dBA@1m from motor Modelled
NG50-5-500-SAF-CN-AB-00-6002_rev01
This document is the property of TOTAL and shall not be disclosed to third parties or reproduced without permission of the COMPANY.
Akpo
Project
NIGERIA – OML 130
AKPO Field Development Project
88/14
COMPANY ref: NG50-5-500-SAF-CN-AB-00-6002 Revision: 01 Status: IFD Class: 2 Date: 02/10/2007 Page:
2
CONTRACTOR ref: 8577Y-2000-CN-6000-002 -- -- -- -- --
Table H-2:
Tag Number Name Operation Spare Noise Data Lw Comment
Lp=70dBA@1m from pump Not
5-GX-5546 Glycol transfer pump Batch 1 running -
Lp=65dBA@1m from motor Modelled
5-GX-2130A 1 running, Lp=68dBA@1m from pump Not
HP flare drum pump Intermittent -
5-GX-2130B 1 spare Lp=65dBA@1m from motor Modelled
5-GX-2150A 1 running, Lp=68dBA@1m from pump Not
LP flare drum pump Intermittent -
5-GX-2150B 1 spare Lp=65dBA@1m from motor Modelled
5-GX-3920A
5-GX-3920B 2 running, Lp=68dBA@1m from pump Not
Closed drain drum pump Intermittent -
5-GX-3920C 2 spare Lp=65dBA@1m from motor Modelled
5-GX-3920D
5-GX-9930A
2 running, Lp=73dBA@1m from pump Not
5-GX-9930B Liquid handling pump Intermittent -
1 spare Lp=66dBA@1m from motor Modelled
5-GX-9930C
Corrosion Inhibitor "3"
5-GX-3835-A/B Pumps Removed
Injection Pump
5-GX-7775-A/B
Corrosion Inhibitor "1" Pump Pumps Removed
5-GX-7785-A/B
Corrosion Inhibitor "2" Pump Pumps Removed
NG50-5-500-SAF-CN-AB-00-6002_rev01
This document is the property of TOTAL and shall not be disclosed to third parties or reproduced without permission of the COMPANY.
Akpo
Project
NIGERIA – OML 130
AKPO Field Development Project
89/14
COMPANY ref: NG50-5-500-SAF-CN-AB-00-6002 Revision: 01 Status: IFD Class: 2 Date: 02/10/2007 Page:
2
CONTRACTOR ref: 8577Y-2000-CN-6000-002 -- -- -- -- --
1 : 5-UA-3830
2 : 5-UA-3810-A/B
3 : 5-UA-3820
NG50-5-500-SAF-CN-AB-00-6002_rev01
This document is the property of TOTAL and shall not be disclosed to third parties or reproduced without permission of the COMPANY.
Akpo
Project
NIGERIA – OML 130
AKPO Field Development Project
90/14
COMPANY ref: NG50-5-500-SAF-CN-AB-00-6002 Revision: 01 Status: IFD Class: 2 Date: 02/10/2007 Page:
2
CONTRACTOR ref: 8577Y-2000-CN-6000-002 -- -- -- -- --
4 3
5
1
1
: 5-GX-2150-A/B
2 : 5-GX-2130-A/B
3 : 5-GX-9930-A/B/C
4 : 5-GX-3920-C/D
5 : 5-GX-3920-A/B
NG50-5-500-SAF-CN-AB-00-6002_rev01
This document is the property of TOTAL and shall not be disclosed to third parties or reproduced without permission of the COMPANY.
Akpo
Project
NIGERIA – OML 130
AKPO Field Development Project
91/14
COMPANY ref: NG50-5-500-SAF-CN-AB-00-6002 Revision: 01 Status: IFD Class: 2 Date: 02/10/2007 Page:
2
CONTRACTOR ref: 8577Y-2000-CN-6000-002 -- -- -- -- --
7. Results
NG50-5-500-SAF-CN-AB-00-6002_rev01
This document is the property of TOTAL and shall not be disclosed to third parties or reproduced without permission of the COMPANY.
Akpo
Project
NIGERIA – OML 130
AKPO Field Development Project
92/14
COMPANY ref: NG50-5-500-SAF-CN-AB-00-6002 Revision: 01 Status: IFD Class: 2 Date: 02/10/2007 Page:
2
CONTRACTOR ref: 8577Y-2000-CN-6000-002 -- -- -- -- --
NG50-5-500-SAF-CN-AB-00-6002_rev01
This document is the property of TOTAL and shall not be disclosed to third parties or reproduced without permission of the COMPANY.
Akpo
Project
NIGERIA – OML 130
AKPO Field Development Project
93/14
COMPANY ref: NG50-5-500-SAF-CN-AB-00-6002 Revision: 01 Status: IFD Class: 2 Date: 02/10/2007 Page:
2
CONTRACTOR ref: 8577Y-2000-CN-6000-002 -- -- -- -- --
NG50-5-500-SAF-CN-AB-00-6002_rev01
This document is the property of TOTAL and shall not be disclosed to third parties or reproduced without permission of the COMPANY.
Akpo
Project
NIGERIA – OML 130
AKPO Field Development Project
94/14
COMPANY ref: NG50-5-500-SAF-CN-AB-00-6002 Revision: 01 Status: IFD Class: 2 Date: 02/10/2007 Page:
2
CONTRACTOR ref: 8577Y-2000-CN-6000-002 -- -- -- -- --
NG50-5-500-SAF-CN-AB-00-6002_rev01
This document is the property of TOTAL and shall not be disclosed to third parties or reproduced without permission of the COMPANY.
Akpo
Project
NIGERIA – OML 130
AKPO Field Development Project
95/14
COMPANY ref: NG50-5-500-SAF-CN-AB-00-6002 Revision: 01 Status: IFD Class: 2 Date: 02/10/2007 Page:
2
CONTRACTOR ref: 8577Y-2000-CN-6000-002 -- -- -- -- --
75-77.5 d BA
77.5-80 d BA
72.5-75 d BA
70-72.5 d BA
80-82.5 d BA
AKPO Hull Deck
Figure-H-1
NG50-5-500-SAF-CN-AB-00-6002_rev01
This document is the property of TOTAL and shall not be disclosed to third parties or reproduced without permission of the COMPANY.
Akpo
Project
NIGERIA – OML 130
AKPO Field Development Project
96/14
COMPANY ref: NG50-5-500-SAF-CN-AB-00-6002 Revision: 01 Status: IFD Class: 2 Date: 02/10/2007 Page:
2
CONTRACTOR ref: 8577Y-2000-CN-6000-002 -- -- -- -- --
7.1.2. Module P1
Main Deck Mezzanine Deck Upper Deck Top Deck
NG50-5-500-SAF-CN-AB-00-6002_rev01
This document is the property of TOTAL and shall not be disclosed to third parties or reproduced without permission of the COMPANY.
Akpo
Project
NIGERIA – OML 130
AKPO Field Development Project
97/14
COMPANY ref: NG50-5-500-SAF-CN-AB-00-6002 Revision: 01 Status: IFD Class: 2 Date: 02/10/2007 Page:
2
CONTRACTOR ref: 8577Y-2000-CN-6000-002 -- -- -- -- --
Top Deck:
Ambient noise levels are included the range 82.5-85dB(A). A background noise is
created by Main power generators 5PY6510A/B/C/D/E for which company has
accepted noise guarantees above 85dB(A)@1m (please refer to module P3 and S3).
Noise sources located on P1 do not have any contribution. The highest noise levels are
locally included between 85 and 86dB(A).
Conclusion:
Main, Mezzanine and Upper Decks of module P1 shall be defined as noise restricted
areas.
NG50-5-500-SAF-CN-AB-00-6002_rev01
This document is the property of TOTAL and shall not be disclosed to third parties or reproduced without permission of the COMPANY.
Akpo
Project
NIGERIA – OML 130
AKPO Field Development Project
98/14
COMPANY ref: NG50-5-500-SAF-CN-AB-00-6002 Revision: 01 Status: IFD Class: 2 Date: 02/10/2007 Page:
2
CONTRACTOR ref: 8577Y-2000-CN-6000-002 -- -- -- -- --
7.1.3. Module P2
NG50-5-500-SAF-CN-AB-00-6002_rev01
This document is the property of TOTAL and shall not be disclosed to third parties or reproduced without permission of the COMPANY.
Akpo
Project
NIGERIA – OML 130
AKPO Field Development Project
99/14
COMPANY ref: NG50-5-500-SAF-CN-AB-00-6002 Revision: 01 Status: IFD Class: 2 Date: 02/10/2007 Page:
2
CONTRACTOR ref: 8577Y-2000-CN-6000-002 -- -- -- -- --
NG50-5-500-SAF-CN-AB-00-6002_rev01
This document is the property of TOTAL and shall not be disclosed to third parties or reproduced without permission of the COMPANY.
Akpo
Project
NIGERIA – OML 130
AKPO Field Development Project
100/1
COMPANY ref: NG50-5-500-SAF-CN-AB-00-6002 Revision: 01 Status: IFD Class: 2 Date: 02/10/2007 Page:
42
CONTRACTOR ref: 8577Y-2000-CN-6000-002 -- -- -- -- --
Main Deck:
Maximum noise levels are in the range 90-91dB(A).
Between two Main power generators in operation, we obtain the cumulative noise
contribution of both equipment items in addition to the amplification of noise by the
reflection on the next equipment item.
Each Main power generator has been purchased with noise guaranteed varying
between 80 and 83 dB(A) at one meter from each part (generator, gear, enclosure,
accessories…) accepted by Company. The resulting noise level at one meter from a
complete Main power generator is estimated around 85-86dB(A).
Noisiest equipment (LLI excluded) on module P3 is Control valve 5FV16110
guaranteed at 80dB(A)à1m.
Upper Deck:
Maximum noise levels are around 92dB(A). At this elevation, exhausts of Main power
generators 5PY6510A/B/C have a high contribution on the calculated noise levels.
Conclusion:
Main and Upper Decks of module P3 shall be defined as noise restricted areas.
NG50-5-500-SAF-CN-AB-00-6002_rev01
This document is the property of TOTAL and shall not be disclosed to third parties or reproduced without permission of the COMPANY.
Akpo
Project
NIGERIA – OML 130
AKPO Field Development Project
101/1
COMPANY ref: NG50-5-500-SAF-CN-AB-00-6002 Revision: 01 Status: IFD Class: 2 Date: 02/10/2007 Page:
42
CONTRACTOR ref: 8577Y-2000-CN-6000-002 -- -- -- -- --
7.1.5. Module P4
NG50-5-500-SAF-CN-AB-00-6002_rev01
This document is the property of TOTAL and shall not be disclosed to third parties or reproduced without permission of the COMPANY.
Akpo
Project
NIGERIA – OML 130
AKPO Field Development Project
102/1
COMPANY ref: NG50-5-500-SAF-CN-AB-00-6002 Revision: 01 Status: IFD Class: 2 Date: 02/10/2007 Page:
42
CONTRACTOR ref: 8577Y-2000-CN-6000-002 -- -- -- -- --
7.1.6. Module P5
NG50-5-500-SAF-CN-AB-00-6002_rev01
This document is the property of TOTAL and shall not be disclosed to third parties or reproduced without permission of the COMPANY.
Akpo
Project
NIGERIA – OML 130
AKPO Field Development Project
103/1
COMPANY ref: NG50-5-500-SAF-CN-AB-00-6002 Revision: 01 Status: IFD Class: 2 Date: 02/10/2007 Page:
42
CONTRACTOR ref: 8577Y-2000-CN-6000-002 -- -- -- -- --
7.1.7. Module P6
NG50-5-500-SAF-CN-AB-00-6002_rev01
This document is the property of TOTAL and shall not be disclosed to third parties or reproduced without permission of the COMPANY.
Akpo
Project
NIGERIA – OML 130
AKPO Field Development Project
104/1
COMPANY ref: NG50-5-500-SAF-CN-AB-00-6002 Revision: 01 Status: IFD Class: 2 Date: 02/10/2007 Page:
42
CONTRACTOR ref: 8577Y-2000-CN-6000-002 -- -- -- -- --
7.1.8. Module P7
Main Deck Mezzanine Deck Upper Deck Top Deck
NG50-5-500-SAF-CN-AB-00-6002_rev01
This document is the property of TOTAL and shall not be disclosed to third parties or reproduced without permission of the COMPANY.
Akpo
Project
NIGERIA – OML 130
AKPO Field Development Project
105/1
COMPANY ref: NG50-5-500-SAF-CN-AB-00-6002 Revision: 01 Status: IFD Class: 2 Date: 02/10/2007 Page:
42
CONTRACTOR ref: 8577Y-2000-CN-6000-002 -- -- -- -- --
7.1.9. Module P8
Main Deck Mezzanine Deck Upper Deck Top Deck
NG50-5-500-SAF-CN-AB-00-6002_rev01
This document is the property of TOTAL and shall not be disclosed to third parties or reproduced without permission of the COMPANY.
Akpo
Project
NIGERIA – OML 130
AKPO Field Development Project
106/1
COMPANY ref: NG50-5-500-SAF-CN-AB-00-6002 Revision: 01 Status: IFD Class: 2 Date: 02/10/2007 Page:
42
CONTRACTOR ref: 8577Y-2000-CN-6000-002 -- -- -- -- --
NG50-5-500-SAF-CN-AB-00-6002_rev01
This document is the property of TOTAL and shall not be disclosed to third parties or reproduced without permission of the COMPANY.
Akpo
Project
NIGERIA – OML 130
AKPO Field Development Project
107/1
COMPANY ref: NG50-5-500-SAF-CN-AB-00-6002 Revision: 01 Status: IFD Class: 2 Date: 02/10/2007 Page:
42
CONTRACTOR ref: 8577Y-2000-CN-6000-002 -- -- -- -- --
7.1.10. Module S1
Main Deck Upper Deck
NG50-5-500-SAF-CN-AB-00-6002_rev01
This document is the property of TOTAL and shall not be disclosed to third parties or reproduced without permission of the COMPANY.
Akpo
Project
NIGERIA – OML 130
AKPO Field Development Project
108/1
COMPANY ref: NG50-5-500-SAF-CN-AB-00-6002 Revision: 01 Status: IFD Class: 2 Date: 02/10/2007 Page:
42
CONTRACTOR ref: 8577Y-2000-CN-6000-002 -- -- -- -- --
7.1.11. Module S2
NG50-5-500-SAF-CN-AB-00-6002_rev01
This document is the property of TOTAL and shall not be disclosed to third parties or reproduced without permission of the COMPANY.
Akpo
Project
NIGERIA – OML 130
AKPO Field Development Project
109/1
COMPANY ref: NG50-5-500-SAF-CN-AB-00-6002 Revision: 01 Status: IFD Class: 2 Date: 02/10/2007 Page:
42
CONTRACTOR ref: 8577Y-2000-CN-6000-002 -- -- -- -- --
7.1.12. Module S3
Main Deck Upper Deck
Main Deck:
Maximum noise levels are in the range 88-89dB(A).
Between two Main power generators in operation, we obtain the cumulative noise
contribution of both equipment items in addition to the amplification of noise by the
reflection on the next equipment item.
The Main power generators noise guaranteed value accepted by Company varies
between 83 and 80dB(A)@1m from each equipment part (equipment part means
generator, turbine enclosure, gearbox…). The resulting noise level is estimated at 85-
86dB(A)@1m for one Main power generator set.
Noisiest equipment (LLI excluded) is Control valve 5FV216211C/D guaranteed at
63dB(A)@1m.
Upper Deck:
Maximum noise levels are around 89-90dB(A). At this elevation, exhausts of Main
power generators 5PY6510A/B/C/D/E have a high contribution on the calculated noise
levels.
Conclusion:
Main and Upper Decks of module S3 shall be defined as noise restricted areas.
NG50-5-500-SAF-CN-AB-00-6002_rev01
This document is the property of TOTAL and shall not be disclosed to third parties or reproduced without permission of the COMPANY.
Akpo
Project
NIGERIA – OML 130
AKPO Field Development Project
110/1
COMPANY ref: NG50-5-500-SAF-CN-AB-00-6002 Revision: 01 Status: IFD Class: 2 Date: 02/10/2007 Page:
42
CONTRACTOR ref: 8577Y-2000-CN-6000-002 -- -- -- -- --
7.1.13. Module S4
NG50-5-500-SAF-CN-AB-00-6002_rev01
This document is the property of TOTAL and shall not be disclosed to third parties or reproduced without permission of the COMPANY.
Akpo
Project
NIGERIA – OML 130
AKPO Field Development Project
111/1
COMPANY ref: NG50-5-500-SAF-CN-AB-00-6002 Revision: 01 Status: IFD Class: 2 Date: 02/10/2007 Page:
42
CONTRACTOR ref: 8577Y-2000-CN-6000-002 -- -- -- -- --
7.1.14. Module S5
NG50-5-500-SAF-CN-AB-00-6002_rev01
This document is the property of TOTAL and shall not be disclosed to third parties or reproduced without permission of the COMPANY.
Akpo
Project
NIGERIA – OML 130
AKPO Field Development Project
112/1
COMPANY ref: NG50-5-500-SAF-CN-AB-00-6002 Revision: 01 Status: IFD Class: 2 Date: 02/10/2007 Page:
42
CONTRACTOR ref: 8577Y-2000-CN-6000-002 -- -- -- -- --
7.1.15. Module S6
Main Deck Mezzanine Deck Upper Deck Top Deck
NG50-5-500-SAF-CN-AB-00-6002_rev01
This document is the property of TOTAL and shall not be disclosed to third parties or reproduced without permission of the COMPANY.
Akpo
Project
NIGERIA – OML 130
AKPO Field Development Project
113/1
COMPANY ref: NG50-5-500-SAF-CN-AB-00-6002 Revision: 01 Status: IFD Class: 2 Date: 02/10/2007 Page:
42
CONTRACTOR ref: 8577Y-2000-CN-6000-002 -- -- -- -- --
Upper Deck:
Maximum noise levels are in the range 87-88dB(A). They are generated by the HP and
MP gas compressor trains 5KB5330A/B and 5KB5240.
Top Deck:
Maximum noise levels are below 85dB(A).
Conclusion:
The Mezzanine and Upper Decks of module S6 shall be defined as noise restricted
area.
NG50-5-500-SAF-CN-AB-00-6002_rev01
This document is the property of TOTAL and shall not be disclosed to third parties or reproduced without permission of the COMPANY.
Akpo
Project
NIGERIA – OML 130
AKPO Field Development Project
114/1
COMPANY ref: NG50-5-500-SAF-CN-AB-00-6002 Revision: 01 Status: IFD Class: 2 Date: 02/10/2007 Page:
42
CONTRACTOR ref: 8577Y-2000-CN-6000-002 -- -- -- -- --
7.1.16. Module S7
Main Deck Mezzanine Deck Upper Deck Top Deck
Main Deck:
Ambient noise levels is in the range 82.5-85dB(A).
High noise level is mainly due to the Export gas compressor trains 5KB5420A/B
located on the upper deck. The modeling way of the compressor includes piping noise
contribution, which increases the noise at one meter from compressor train.
The noise guaranteed value accepted by Company for the LP gas compressor is
85dB(A)@1m, and the measured value during FAT is 78dB(A)@1m. The noise
guaranteed value accepted by Company for the Export gas compressor is
85dB(A)@1m, and the measured value during FAT is 86dB(A)@1m.
Noisiest equipment (LLI excepted) is the hull vent blower 5UA2116 guaranteed at
82dB(A) maximum at 1 meter.
NG50-5-500-SAF-CN-AB-00-6002_rev01
This document is the property of TOTAL and shall not be disclosed to third parties or reproduced without permission of the COMPANY.
Akpo
Project
NIGERIA – OML 130
AKPO Field Development Project
115/1
COMPANY ref: NG50-5-500-SAF-CN-AB-00-6002 Revision: 01 Status: IFD Class: 2 Date: 02/10/2007 Page:
42
CONTRACTOR ref: 8577Y-2000-CN-6000-002 -- -- -- -- --
NG50-5-500-SAF-CN-AB-00-6002_rev01
This document is the property of TOTAL and shall not be disclosed to third parties or reproduced without permission of the COMPANY.
Akpo
Project
NIGERIA – OML 130
AKPO Field Development Project
116/1
COMPANY ref: NG50-5-500-SAF-CN-AB-00-6002 Revision: 01 Status: IFD Class: 2 Date: 02/10/2007 Page:
42
CONTRACTOR ref: 8577Y-2000-CN-6000-002 -- -- -- -- --
Level (dBA)
Module Type
North South East West
Electrical Room 73 82.3 / 74.4
P1
Instrument Room 76.8 82.4 82.8 /
Electrical Room 83.2 87.1 / 84.4
P2
Instrument Room 82.7 89.4 90.8 /
Electrical Room Low Voltage 92.4 85.8 86.5 85.2
P3 Electrical Room High Voltage 91 86.3 88.7 87.7
Instrument Room 93.7 85.6 88.1 92
Electrical Room 81.4 81.6 / 86.9
P4
Instrument Room 79.2 81.2 77.9 /
Electrical Room 73 80.5 / 79.2
P6
Instrument Room 71.6 81.1 78.1 /
Electrical Room 70.4 81.4 / 78.3
P7
Instrument Room 70.7 81.4 80.3 /
Electrical Room 73 81.4 / 79
P8
Instrument Room 68.4 81.3 74.2 /
Electrical Room 85.7 78.9 86 81.6
Instrument Room 87.1 80.4 86.3 80.7
S2
Laboratory Room 81.4 74.8 / 78.9
Telecom Room 81.7 81.5 85.8 /
Electrical Room Low Voltage 85.8 90 84.2 83.7
S3 Electrical Room High Voltage 85 89.1 84.9 85.1
Instrument Room 86.3 91.2 84.7 89.3
Electrical Room 81.3 77.5 79.3 /
S4
Instrument Room 79.5 77.6 / 77.6
Electrical Room 83.3 73.9 80 /
S6
Instrument Room 83 74.3 / 81
Electrical Room 83.8 71.3 80.6 /
S7
Instrument Room 82.6 73 / 80.4
NG50-5-500-SAF-CN-AB-00-6002_rev01
This document is the property of TOTAL and shall not be disclosed to third parties or reproduced without permission of the COMPANY.
Akpo
Project
NIGERIA – OML 130
AKPO Field Development Project
117/1
COMPANY ref: NG50-5-500-SAF-CN-AB-00-6002 Revision: 01 Status: IFD Class: 2 Date: 02/10/2007 Page:
42
CONTRACTOR ref: 8577Y-2000-CN-6000-002 -- -- -- -- --
Level (dBA)
Receiver elevation
North South East West
Down (2 m) 78.6 73.9 80.4 63.1
Middle (7m) 78.2 74.7 79 63.3
Up (15m) 78.7 76.7 80.3 71.9
The noise spectrum to be considered in front of the living quarter (eastside) is:
94 88 80 74 74 71 69 71.5 80.5
NG50-5-500-SAF-CN-AB-00-6002_rev01
This document is the property of TOTAL and shall not be disclosed to third parties or reproduced without permission of the COMPANY.
Akpo
Project
NIGERIA – OML 130
AKPO Field Development Project
118/1
COMPANY ref: NG50-5-500-SAF-CN-AB-00-6002 Revision: 01 Status: IFD Class: 2 Date: 02/10/2007 Page:
42
CONTRACTOR ref: 8577Y-2000-CN-6000-002 -- -- -- -- --
5PV 31111B 84.4 161257 108812 25403 S 4 Top 16" HG531006-F70-PFP 90.4 103.4 20
5PV 31111A 84.4 161257 91180 25403 P 4 Top 16" HG531002-F70-PFP 90.4 103.4 20
5PV2 34111 79.2 176047 112842 24928 P 5 Top 14" HG534002-D49-PPA 85.2 96.8 14
5PV2 32111 77.8 183921 112822 24886 P 5 Top 10" HG532001-D49-PP 83.8 98.6 30
Main pipe going up to flare 84.4 - - - - - - - 90.4 112.6 166
According to Vendor data, the flare tips sound power levels are estimated to 146dB(A)
for HP flare 5-FB-2160 and 120dB(A) for LP flare 5-FB-2170:
Flare noise directivity effect is taken into account. The directivity index has been
defined from Heitner (1968) who gives directional corrections to apply for jet noise
(above 1000Hz). Directivity effect has not been considered for low frequencies.
Frequency (Hz)
31,5 63 125 250 500 1k 2k 4k 8k
0 0 0 0 0 0 0 0 0 0
30 0 0 0 0 0 4 4 4 4
Angle 60 0 0 0 0 0 2 2 2 2
from jet 90 0 0 0 0 0 -6 -6 -6 -6
axis (°) 120 0 0 0 0 0 -11 -11 -11 -11
150 0 0 0 0 0 -14 -14 -14 -14
180 0 0 0 0 0 -17 -17 -17 -17
NG50-5-500-SAF-CN-AB-00-6002_rev01
This document is the property of TOTAL and shall not be disclosed to third parties or reproduced without permission of the COMPANY.
Akpo
Project
NIGERIA – OML 130
AKPO Field Development Project
119/1
COMPANY ref: NG50-5-500-SAF-CN-AB-00-6002 Revision: 01 Status: IFD Class: 2 Date: 02/10/2007 Page:
42
CONTRACTOR ref: 8577Y-2000-CN-6000-002 -- -- -- -- --
NG50-5-500-SAF-CN-AB-00-6002_rev01
This document is the property of TOTAL and shall not be disclosed to third parties or reproduced without permission of the COMPANY.
Akpo
Project
NIGERIA – OML 130
AKPO Field Development Project
120/1
COMPANY ref: NG50-5-500-SAF-CN-AB-00-6002 Revision: 01 Status: IFD Class: 2 Date: 02/10/2007 Page:
42
CONTRACTOR ref: 8577Y-2000-CN-6000-002 -- -- -- -- --
NG50-5-500-SAF-CN-AB-00-6002_rev01
This document is the property of TOTAL and shall not be disclosed to third parties or reproduced without permission of the COMPANY.
Akpo
Project
NIGERIA – OML 130
AKPO Field Development Project
121/1
COMPANY ref: NG50-5-500-SAF-CN-AB-00-6002 Revision: 01 Status: IFD Class: 2 Date: 02/10/2007 Page:
42
CONTRACTOR ref: 8577Y-2000-CN-6000-002 -- -- -- -- --
NG50-5-500-SAF-CN-AB-00-6002_rev01
This document is the property of TOTAL and shall not be disclosed to third parties or reproduced without permission of the COMPANY.
Akpo
Project
NIGERIA – OML 130
AKPO Field Development Project
122/1
COMPANY ref: NG50-5-500-SAF-CN-AB-00-6002 Revision: 01 Status: IFD Class: 2 Date: 02/10/2007 Page:
42
CONTRACTOR ref: 8577Y-2000-CN-6000-002 -- -- -- -- --
NG50-5-500-SAF-CN-AB-00-6002_rev01
This document is the property of TOTAL and shall not be disclosed to third parties or reproduced without permission of the COMPANY.
Akpo
Project
NIGERIA – OML 130
AKPO Field Development Project
123/1
COMPANY ref: NG50-5-500-SAF-CN-AB-00-6002 Revision: 01 Status: IFD Class: 2 Date: 02/10/2007 Page:
42
CONTRACTOR ref: 8577Y-2000-CN-6000-002 -- -- -- -- --
Flare noise directivity effect is taken into account. The directivity index has been
defined from Heitner (1968) who gives directional corrections to apply for jet noise
(above 1000Hz). Directivity effect has not been considered for low frequencies.
Frequency (Hz)
31,5 63 125 250 500 1k 2k 4k 8k
0 0 0 0 0 0 0 0 0 0
30 0 0 0 0 0 4 4 4 4
Angle 60 0 0 0 0 0 2 2 2 2
from jet 90 0 0 0 0 0 -6 -6 -6 -6
axis (°) 120 0 0 0 0 0 -11 -11 -11 -11
150 0 0 0 0 0 -14 -14 -14 -14
180 0 0 0 0 0 -17 -17 -17 -17
NG50-5-500-SAF-CN-AB-00-6002_rev01
This document is the property of TOTAL and shall not be disclosed to third parties or reproduced without permission of the COMPANY.
Akpo
Project
NIGERIA – OML 130
AKPO Field Development Project
124/1
COMPANY ref: NG50-5-500-SAF-CN-AB-00-6002 Revision: 01 Status: IFD Class: 2 Date: 02/10/2007 Page:
42
CONTRACTOR ref: 8577Y-2000-CN-6000-002 -- -- -- -- --
Figure EF-1: Main Deck - Emergency Flaring Operation Noise Map – HP & LP flares
activated only
NG50-5-500-SAF-CN-AB-00-6002_rev01
This document is the property of TOTAL and shall not be disclosed to third parties or reproduced without permission of the COMPANY.
Akpo
Project
NIGERIA – OML 130
AKPO Field Development Project
125/1
COMPANY ref: NG50-5-500-SAF-CN-AB-00-6002 Revision: 01 Status: IFD Class: 2 Date: 02/10/2007 Page:
42
CONTRACTOR ref: 8577Y-2000-CN-6000-002 -- -- -- -- --
Figure EF-2: Mezzanine Deck Emergency Flaring Operation Noise Map – HP & LP
flares activated only
NG50-5-500-SAF-CN-AB-00-6002_rev01
This document is the property of TOTAL and shall not be disclosed to third parties or reproduced without permission of the COMPANY.
Akpo
Project
NIGERIA – OML 130
AKPO Field Development Project
126/1
COMPANY ref: NG50-5-500-SAF-CN-AB-00-6002 Revision: 01 Status: IFD Class: 2 Date: 02/10/2007 Page:
42
CONTRACTOR ref: 8577Y-2000-CN-6000-002 -- -- -- -- --
Figure EF-3: Upper Deck Emergency Flaring Operation Noise Map – HP & LP flares
activated only
NG50-5-500-SAF-CN-AB-00-6002_rev01
This document is the property of TOTAL and shall not be disclosed to third parties or reproduced without permission of the COMPANY.
Akpo
Project
NIGERIA – OML 130
AKPO Field Development Project
127/1
COMPANY ref: NG50-5-500-SAF-CN-AB-00-6002 Revision: 01 Status: IFD Class: 2 Date: 02/10/2007 Page:
42
CONTRACTOR ref: 8577Y-2000-CN-6000-002 -- -- -- -- --
Figure EF-4: Top Deck Emergency Flaring Operation Noise Map – HP & LP flares
activated only
NG50-5-500-SAF-CN-AB-00-6002_rev01
This document is the property of TOTAL and shall not be disclosed to third parties or reproduced without permission of the COMPANY.
Akpo
Project
NIGERIA – OML 130
AKPO Field Development Project
128/1
COMPANY ref: NG50-5-500-SAF-CN-AB-00-6002 Revision: 01 Status: IFD Class: 2 Date: 02/10/2007 Page:
42
CONTRACTOR ref: 8577Y-2000-CN-6000-002 -- -- -- -- --
NG50-5-500-SAF-CN-AB-00-6002_rev01
This document is the property of TOTAL and shall not be disclosed to third parties or reproduced without permission of the COMPANY.
Akpo
Project
NIGERIA – OML 130
AKPO Field Development Project
129/1
COMPANY ref: NG50-5-500-SAF-CN-AB-00-6002 Revision: 01 Status: IFD Class: 2 Date: 02/10/2007 Page:
42
CONTRACTOR ref: 8577Y-2000-CN-6000-002 -- -- -- -- --
Noise FAT
Tag Name Guarantee Noise
Lp@1m Measured
5-PY6510 Main Power Generators See N.D.S. No
5-KX-5420 Export Gas Compressor 85 dB(A) 86dB(A)
5-KB-5330 HP Gas Compressor 85 dB(A) 83dB(A)
5-KB-5460 Gas Injection Compressor 85 dB(A) 81dB(A)
5-KB-5240 MP Gas Compressor 85 dB(A) 80dB(A)
5-KB-5140 LP Gas Compressor 85 dB(A) 78dB(A)
5-GX-8310 Crude Oil Offloading Pump 87dB(A) 86dB(A)
5-GX-7520 Water Injection Pump 87dB(A) 86dB(A)
5-GX-9920 Crude Oil Recirculation Pump 82dB(A) 82dB(A)
5-GX-7320 Sea Water Booster Pump 80dB(A) 76dB(A)
5-GX-3720 Crude Oil Transfer Pump 80dB(A) 77dB(A)
5-GX-3410 3rd Stage Separator Pump 80dB(A) 77dB(A)
5-GX-1610 Hot Water Circulation 82dB(A) 79dB(A)
5-GX-7510 Water Injection Booster Pump 82dB(A) 80 dB(A)
5-GX-1510 Cooling Water Recirculation Pump 82dB(A) 81 dB(A)
NG50-5-500-SAF-CN-AB-00-6002_rev01
This document is the property of TOTAL and shall not be disclosed to third parties or reproduced without permission of the COMPANY.
Akpo
Project
NIGERIA – OML 130
AKPO Field Development Project
130/1
COMPANY ref: NG50-5-500-SAF-CN-AB-00-6002 Revision: 01 Status: IFD Class: 2 Date: 02/10/2007 Page:
42
CONTRACTOR ref: 8577Y-2000-CN-6000-002 -- -- -- -- --
The general noise maps calculated for Topsides do not take into account the measurements
uncertainties. The uncertainties on the Sound Power Level of major equipment linked with a
conservative approach in the modeling demonstrates that the noise restricted areas number and
size could be reduced, depending on final noise on site.
However, particular attention must be paid to Main power generators (for which no noise
measurements have been done during FAT) and Export compressor train (for which noise has
been measured close to the noise guarantee).
NG50-5-500-SAF-CN-AB-00-6002_rev01
This document is the property of TOTAL and shall not be disclosed to third parties or reproduced without permission of the COMPANY.
Akpo
Project
NIGERIA – OML 130
AKPO Field Development Project
131/1
COMPANY ref: NG50-5-500-SAF-CN-AB-00-6002 Revision: 01 Status: IFD Class: 2 Date: 02/10/2007 Page:
42
CONTRACTOR ref: 8577Y-2000-CN-6000-002 -- -- -- -- --
No Deck
- No Restrcted Area
NG50-5-500-SAF-CN-AB-00-6002_rev01
This document is the property of TOTAL and shall not be disclosed to third parties or reproduced without permission of the COMPANY.
Akpo
Project
NIGERIA – OML 130
AKPO Field Development Project
132/1
COMPANY ref: NG50-5-500-SAF-CN-AB-00-6002 Revision: 01 Status: IFD Class: 2 Date: 02/10/2007 Page:
42
CONTRACTOR ref: 8577Y-2000-CN-6000-002 -- -- -- -- --
In order to facilitate the implementation of Ear Protection Safety signs, specific drawings showing
the noise restricted areas are given in Appendix, for each deck of each module concerned.
NG50-5-500-SAF-CN-AB-00-6002_rev01
This document is the property of TOTAL and shall not be disclosed to third parties or reproduced without permission of the COMPANY.
Akpo
Project
NIGERIA – OML 130
AKPO Field Development Project
133/1
COMPANY ref: NG50-5-500-SAF-CN-AB-00-6002 Revision: 01 Status: IFD Class: 2 Date: 02/10/2007 Page:
42
CONTRACTOR ref: 8577Y-2000-CN-6000-002 -- -- -- -- --
NG50-5-500-SAF-CN-AB-00-6002_rev01
This document is the property of TOTAL and shall not be disclosed to third parties or reproduced without permission of the COMPANY.
Akpo
Project
NIGERIA – OML 130
AKPO Field Development Project
134/1
COMPANY ref: NG50-5-500-SAF-CN-AB-00-6002 Revision: 01 Status: IFD Class: 2 Date: 02/10/2007 Page:
42
CONTRACTOR ref: 8577Y-2000-CN-6000-002 -- -- -- -- --
NG50-5-500-SAF-CN-AB-00-6002_rev01
This document is the property of TOTAL and shall not be disclosed to third parties or reproduced without permission of the COMPANY.
Akpo
Project
NIGERIA – OML 130
AKPO Field Development Project
135/1
COMPANY ref: NG50-5-500-SAF-CN-AB-00-6002 Revision: 01 Status: IFD Class: 2 Date: 02/10/2007 Page:
42
CONTRACTOR ref: 8577Y-2000-CN-6000-002 -- -- -- -- --
Based on “Noisy Pressure Safety Valves List” [G.91], a noise calculation has been
done with PSV discharging to flare and to atmosphere in operation. These cases are
emergency cases but different from emergency flaring.The conclusion of the
calculation is presented on the noise maps below, showing noise restricted area to
anticipate in these emergency cases. The following noise maps are in accordance with
the table G.3 in §9, detailing noise restricted area to be anticipated for normal operation
and for emergency operation.
9.2.1. Noise Restricted Areas due to PSV discharging to flare
NG50-5-500-SAF-CN-AB-00-6002_rev01
This document is the property of TOTAL and shall not be disclosed to third parties or reproduced without permission of the COMPANY.
Akpo
Project
NIGERIA – OML 130
AKPO Field Development Project
136/1
COMPANY ref: NG50-5-500-SAF-CN-AB-00-6002 Revision: 01 Status: IFD Class: 2 Date: 02/10/2007 Page:
42
CONTRACTOR ref: 8577Y-2000-CN-6000-002 -- -- -- -- --
NG50-5-500-SAF-CN-AB-00-6002_rev01
This document is the property of TOTAL and shall not be disclosed to third parties or reproduced without permission of the COMPANY.
Akpo
Project
NIGERIA – OML 130
AKPO Field Development Project
137/1
COMPANY ref: NG50-5-500-SAF-CN-AB-00-6002 Revision: 01 Status: IFD Class: 2 Date: 02/10/2007 Page:
42
CONTRACTOR ref: 8577Y-2000-CN-6000-002 -- -- -- -- --
NG50-5-500-SAF-CN-AB-00-6002_rev01
This document is the property of TOTAL and shall not be disclosed to third parties or reproduced without permission of the COMPANY.
Akpo
Project
NIGERIA – OML 130
AKPO Field Development Project
138/1
COMPANY ref: NG50-5-500-SAF-CN-AB-00-6002 Revision: 01 Status: IFD Class: 2 Date: 02/10/2007 Page:
42
CONTRACTOR ref: 8577Y-2000-CN-6000-002 -- -- -- -- --
NG50-5-500-SAF-CN-AB-00-6002_rev01
This document is the property of TOTAL and shall not be disclosed to third parties or reproduced without permission of the COMPANY.
Akpo
Project
NIGERIA – OML 130
AKPO Field Development Project
139/1
COMPANY ref: NG50-5-500-SAF-CN-AB-00-6002 Revision: 01 Status: IFD Class: 2 Date: 02/10/2007 Page:
42
CONTRACTOR ref: 8577Y-2000-CN-6000-002 -- -- -- -- --
10. Synthesis
A lot of noise abatement measures have been taken to limit as much as possible the noise of the
AKPO Topsides below the 85dB(A) specification value:
- Except for LLI equipment items, the noise requirements applicable for equipment and
packages have been defined below 82dB(A)(70-75-78-80-82). These requirements have been
defined with Company at the beginning of the project and are given in the Technical Query TPCY
6-500-SAF-0012. For all equipment and valves, the requirement has been defined with an ALARP
approach.
- All control valves have been purchased with the 80dB(A)@1m noise requirement.
- All major compressor suction and discharge pipes have been noise insulated
- Silencers and enclosures have been purchased in order to reach the equipment noise
requirements. In the same way, low dB valves have been purchased to comply with control valves
noise requirements.
Globally, based on normal operation general noise maps (§7.1.1, GNM-1 to GNM-4), the
calculated noise levels are in the range 80-90dB(A).
2) Noise levels between 85 and 90 dB(A) are in areas located around LLI equipment items.
- The Main power generators (5PY6510) impact on main, mezzanine, upper and top deck
of modules P1, P2, P3, S1, S2 and S3 and on the top deck of P4, P5, S4 and S5.
- The Water injection pumps (5GX7520) impact on main, mezzanine and upper deck of
modules P1 and P2.
- The Crude oil offloading pumps (5GX8310 - intermittent) impact on main and mezzanine
deck of P8 when they operate.
- The Compressors impact on mezzanine, upper and top deck of P6, P7, S5, S6, and S7
and on main deck of S6 and S7.
3) In others areas mainly modules P4, P5, P6 and S4, S5 noise levels are in the range 80-
85dB(A).
NG50-5-500-SAF-CN-AB-00-6002_rev01
This document is the property of TOTAL and shall not be disclosed to third parties or reproduced without permission of the COMPANY.
Akpo
Project
NIGERIA – OML 130
AKPO Field Development Project
140/1
COMPANY ref: NG50-5-500-SAF-CN-AB-00-6002 Revision: 01 Status: IFD Class: 2 Date: 02/10/2007 Page:
42
CONTRACTOR ref: 8577Y-2000-CN-6000-002 -- -- -- -- --
4) Noise levels lower than 82.5dB(A) are obtained everywhere on the Hull Deck.
5) During contingency operation, noise levels are in the range 85-95dB(A) everywhere on the
Topsides.
6) During emergency operation (flaring noise), noise levels are everywhere on the Topides
lower than the 115dB(A) maximal noise limit.
NG50-5-500-SAF-CN-AB-00-6002_rev01
This document is the property of TOTAL and shall not be disclosed to third parties or reproduced without permission of the COMPANY.
Akpo
Project
NIGERIA – OML 130
AKPO Field Development Project
141/1
COMPANY ref: NG50-5-500-SAF-CN-AB-00-6002 Revision: 01 Status: IFD Class: 2 Date: 02/10/2007 Page:
42
CONTRACTOR ref: 8577Y-2000-CN-6000-002 -- -- -- -- --
NG50-5-500-SAF-CN-AB-00-6002_rev01
This document is the property of TOTAL and shall not be disclosed to third parties or reproduced without permission of the COMPANY.
Noise Restricted Area PSV Noise Restricted Area
Noise Restricted Area PSV Noise Restricted Area
3. Ear protection safety signs "WEAR HEARING PROTECTION", symbol M3, to
be implemented by Company at all personal access to noise restricted area.