COMPANY ref: NG50-5-500-SAF-CN-AB-00-6002 Revision: 01 Status: IFD Class: 2 Date: 02/10/2007 Page: 1/142
CONTRACTOR ref: 8577Y-2000-CN-6000-002 -- -- -- -- --

AKPO FPSO PROJECT


FINAL NOISE REPORT ON TOPSIDES

Reserved to COMPANY
The document is:
No comments code 0

Approved code 1

Approved with minor comments code 2

Rejected code 3

Reviewed with comments code 4

date:

ASB final acceptance code 5

date:

REMARKS: Company Comments are taken into account.

01 02/10/2007 Issue for Design A.M.Ondet F.Sentier A.Trabelsi

00 14/05/2007 Issue for Design E.Poulain A.M.Ondet A.Trabelsi

AA 06/02/2007 IFR E. Poulain A.M.Ondet J.Vendé

REV DATE DESIGNATION Initiators Reviewed by Approved by

NG50-5-500-SAF-CN-AB-00-6002_rev01

This document is the property of TOTAL and shall not be disclosed to third parties or reproduced without permission of the COMPANY.
Akpo
Project
NIGERIA – OML 130
AKPO Field Development Project

COMPANY ref: NG50-5-500-SAF-CN-AB-00-6002 Revision: 01 Status: IFD Class: 2 Date: 02/10/2007 Page: 2/142
CONTRACTOR ref: 8577Y-2000-CN-6000-002 -- -- -- -- --

CONTENTS

1. OVERVIEW ................................................................................................................................................................ 4

2. AIM OF THE STUDY ................................................................................................................................................ 4

3. STRUCTURE OF THIS REPORT ........................................................................................................................... 5

4. REFERENCE DOCUMENTATION........................................................................................................................ 6
4.1. TOPSIDES GENERAL EQUIPMENT LAYOUT & EQUIPMENT LAYOUT, EQUIPMENT LIST .......................................... 6
4.2. CODES & STANDARDS .......................................................................................................................................... 8
4.3. REPORTS AND TECHNICAL GUIDELINE .................................................................................................................. 8
4.4. PROJECT DOCUMENTS ........................................................................................................................................... 8
4.5. COMPANY SPECIFICATIONS ................................................................................................................................... 8
4.6. NOISE DATA SHEETS .............................................................................................................................................. 8
4.7. ABBREVIATIONS .................................................................................................................................................. 10
5. NOISE STUDY – GENERAL INFORMATION................................................................................................... 10
5.1. PROPAGATION LAW ............................................................................................................................................ 11
5.2. GROUND MODEL .................................................................................................................................................. 11
5.3. OBSTACLES MODELLING ..................................................................................................................................... 11
5.4. REFLECTION PARAMETERS .................................................................................................................................. 11
5.5. NOISE SOURCES MODELLING ............................................................................................................................... 12
5.5.1. Equipment and packages noise data......................................................................................................... 12
Sound Power Level determination for equipment and package................................................................................. 13
5.5.2. Noise sources modelling for standard equipment and packages ............................................................. 13
5.5.3. Turbo generators modelling...................................................................................................................... 14
5.5.4. Piping noise modelling .............................................................................................................................. 15
5.5.5. Noise spectrum of sources......................................................................................................................... 18
5.5.6. Equipment running conditions .................................................................................................................. 18
5.5.7. Receiver modelling .................................................................................................................................... 19
5.6. TOPSIDES EQUIPMENT CONTRIBUTION ON THE HULL DECK ............................................................................... 19
6. PROJECT DATA ...................................................................................................................................................... 20
6.1. MODULE P1......................................................................................................................................................... 27
6.2. MODULE P2......................................................................................................................................................... 33
6.3. MODULE P3......................................................................................................................................................... 37
6.4. MODULE P4......................................................................................................................................................... 42
6.5. MODULE P5......................................................................................................................................................... 44
6.6. MODULE P6......................................................................................................................................................... 46
6.7. MODULE P7......................................................................................................................................................... 50
6.8. MODULE P8......................................................................................................................................................... 53
6.9. MODULE S1......................................................................................................................................................... 56
6.10. MODULE S2......................................................................................................................................................... 62
6.11. MODULE S3......................................................................................................................................................... 67
6.12. MODULE S4......................................................................................................................................................... 72
6.13. MODULE S5......................................................................................................................................................... 74

NG50-5-500-SAF-CN-AB-00-6002_rev01

This document is the property of TOTAL and shall not be disclosed to third parties or reproduced without permission of the COMPANY.
Akpo
Project
NIGERIA – OML 130
AKPO Field Development Project

COMPANY ref: NG50-5-500-SAF-CN-AB-00-6002 Revision: 01 Status: IFD Class: 2 Date: 02/10/2007 Page: 3/142
CONTRACTOR ref: 8577Y-2000-CN-6000-002 -- -- -- -- --

6.14. MODULE S6......................................................................................................................................................... 77


6.15. MODULE S7......................................................................................................................................................... 82
6.16. HULL DECK ......................................................................................................................................................... 87
7. RESULTS ................................................................................................................................................................... 91
7.1. NORMAL OPERATING CONDITIONS ...................................................................................................................... 91
7.1.1. Global noise maps ..................................................................................................................................... 91
7.1.2. Module P1.................................................................................................................................................. 96
7.1.3. Module P2.................................................................................................................................................. 98
7.1.4. Module P3................................................................................................................................................ 100
7.1.5. Module P4................................................................................................................................................ 101
7.1.6. Module P5................................................................................................................................................ 102
7.1.7. Module P6................................................................................................................................................ 103
7.1.8. Module P7................................................................................................................................................ 104
7.1.9. Module P8................................................................................................................................................ 105
7.1.10. Module S1 ................................................................................................................................................ 107
7.1.11. Module S2 ................................................................................................................................................ 108
7.1.12. Module S3 ................................................................................................................................................ 109
7.1.13. Module S4 ................................................................................................................................................ 110
7.1.14. Module S5 ................................................................................................................................................ 111
7.1.15. Module S6 ................................................................................................................................................ 112
7.1.16. Module S7 ................................................................................................................................................ 114
7.1.17. Calculated noise in front of technical rooms and living quarter ........................................................... 116
7.2. FLARING OPERATION ........................................................................................................................................ 118
7.2.1. Contingency Flaring................................................................................................................................ 118
7.2.2. Emergency Flaring: max design case..................................................................................................... 123
8. NOISE MEASUREMENT RESULTS.................................................................................................................. 129

9. NOISE RESTRICTED AREAS............................................................................................................................. 131


9.1. NORMAL OPERATION ........................................................................................................................................ 133
9.1.1. Main and Mezzanine Deck ...................................................................................................................... 133
9.1.2. Upper and Top Deck ............................................................................................................................... 134
9.2. CASE OF PSV DISCHARGING TO FLARE AND TO ATMOSPHERE ......................................................................... 135
9.2.1. Noise Restricted Areas due to PSV discharging to flare ........................................................................ 135
9.2.2. Noise Restricted Areas due to PSV discharging to atmosphere............................................................. 137
10. SYNTHESIS ........................................................................................................................................................ 139

10. APPENDIX: NOISE RESTRICTED AREAS................................................................................................. 141

NG50-5-500-SAF-CN-AB-00-6002_rev01

This document is the property of TOTAL and shall not be disclosed to third parties or reproduced without permission of the COMPANY.
Akpo
Project
NIGERIA – OML 130
AKPO Field Development Project

COMPANY ref: NG50-5-500-SAF-CN-AB-00-6002 Revision: 01 Status: IFD Class: 2 Date: 02/10/2007 Page: 4/142
CONTRACTOR ref: 8577Y-2000-CN-6000-002 -- -- -- -- --

1. Overview
The Consortium constituted by Technip France (TPF), Hyundai Heavy Industries CO. Ltd (HHI)
and Technip Offshore Nigeria Ltd (TONL) is designing for the account of TOTAL a new FPSO
project located on Nigerian offshore territory. For this offshore project called AKPO Field
development project, TOTAL has defined Noise and vibration requirements to be respected in the
different rooms/ premises and work areas of the FPSO.
For the AKPO FPSO Topsides, the Noise and Vibrations services are split in two technical parts:
1- Noise activities
2- Vibration activities
This report presents the noise studies. Vibration studies for Topsides are presented in report
NG50-5-500-SAF-CN-AB-00-6501.

2. Aim of the study


The aim of this study is to best-estimate final noise levels on topsides, in front of Technical Rooms
and Living Quarter walls, under normal operating conditions.
The safety concept, document reference NG50-6-600-SAF-PH-AB-00-0001_revAA, defines the
applicable noise requirements to be applied on Topsides modules.
The final noise study based on the noise maps calculation shall allow to:
1- provide predictive noise levels on topsides,
x In working areas
x In front of accommodation
x In front of technical buildings
2- Identify potential problem areas which need to be defined as noise restricted areas

NG50-5-500-SAF-CN-AB-00-6002_rev01

This document is the property of TOTAL and shall not be disclosed to third parties or reproduced without permission of the COMPANY.
Akpo
Project
NIGERIA – OML 130
AKPO Field Development Project

COMPANY ref: NG50-5-500-SAF-CN-AB-00-6002 Revision: 01 Status: IFD Class: 2 Date: 02/10/2007 Page: 5/142
CONTRACTOR ref: 8577Y-2000-CN-6000-002 -- -- -- -- --

Studies regarding noise in accommodation and Technical buildings are not included in this
document. They are in HHI scope of work.
Noise maps have been calculated:
1- On the main deck
2- On the mezzanine deck
3- On the upper deck
4- On the Top Deck
5- On the hull deck

Moreover, noise levels have been calculated at different points of a mesh located:
1- In front of the accommodation
2- In front of technical buildings

Noise prediction is carried out at normal, contingency and emergency operating conditions.

3. Structure of this report


The report is structured as follows:
1- A description of the model and the general methodology.
2- For each module, noise data for equipment are presented
3- Noise results are analyzed versus contractual requirements, on each deck and in front of
accommodation and technical buildings
4- Determination of noise restricted areas

NG50-5-500-SAF-CN-AB-00-6002_rev01

This document is the property of TOTAL and shall not be disclosed to third parties or reproduced without permission of the COMPANY.
Akpo
Project
NIGERIA – OML 130
AKPO Field Development Project

COMPANY ref: NG50-5-500-SAF-CN-AB-00-6002 Revision: 01 Status: IFD Class: 2 Date: 02/10/2007 Page: 6/142
CONTRACTOR ref: 8577Y-2000-CN-6000-002 -- -- -- -- --

4. Reference documentation

4.1. Topsides General equipment layout & equipment layout, Equipment list
[G1]. NG50-5-500-PIP-DW-AB-00-2010 “General equipment Layout – Topside – Main and
Mezzanine Deck”
[G2]. NG50-5-500-PIP-DW-AB-00-2030 “General equipment Layout – Topside – Upper and Top
Deck”
[G3]. NG50-6-600-PIP-DW-AB-00-2005 “General equipment Layout – Topside – Hull Deck”
[G4]. NG50-5-500-PIP-DW-AB-00-2060 “General equipment Layout – Topside – Section A-A”
[G5]. NG50-5-500-PIP-DW-AB-00-2050 “General equipment Layout – Topside – Section B-B”
[G6]. NG50-5-500-GEN-LT-AA-00-0220 “AKPO Project FPSO Topside equipment list”
[G7]. NG50-5-500-PIP-DW-AB-00-2101 “Equipment layout Module P1 Main Deck”
[G8]. NG50-5-500-PIP-DW-AB-00-2102 “Equipment layout Module P1 Mezzanine Deck”
[G9]. NG50-5-500-PIP-DW-AB-00-2103 “Equipment layout Module P1 Upper Deck”
[G10]. NG50-5-500-PIP-DW-AB-00-2104 “Equipment layout Module P1 Top Deck”
[G11]. NG50-5-500-PIP-DW-AB-00-2105 “Equipment layout Module P1 South Elevation”
[G12]. NG50-5-500-PIP-DW-AB-00-2106 “Equipment layout Module P1 West Elevation”
[G13]. NG50-5-500-PIP-DW-AB-00-2201 “Equipment layout Module P2 Main Deck”
[G14]. NG50-5-500-PIP-DW-AB-00-2202 “Equipment layout Module P2 Mezzanine Deck”
[G15]. NG50-5-500-PIP-DW-AB-00-2203 “Equipment layout Module P2 Upper Deck”
[G16]. NG50-5-500-PIP-DW-AB-00-2204 “Equipment layout Module P2 Top Deck”
[G17]. NG50-5-500-PIP-DW-AB-00-2205 “Equipment layout Module P2 South Elevation”
[G18]. NG50-5-500-PIP-DW-AB-00-2206 “Equipment layout Module P2 West Elevation”
[G19]. NG50-5-500-PIP-DW-AB-00-2301 “Equipment layout Module P3 Main Deck”
[G20]. NG50-5-500-PIP-DW-AB-00-2303 “Equipment layout Module P3 Upper Deck”
[G21]. NG50-5-500-PIP-DW-AB-00-2305 “Equipment layout Module P3 North Elevation”
[G22]. NG50-5-500-PIP-DW-AB-00-2306 “Equipment layout Module P3 West Elevation”
[G23]. NG50-5-500-PIP-DW-AB-00-2501 “Equipment layout Module P4 Main Deck”
[G24]. NG50-5-500-PIP-DW-AB-00-2502 “Equipment layout Module P4 Mezzanine Deck”
[G25]. NG50-5-500-PIP-DW-AB-00-2503 “Equipment layout Module P4 Upper Deck”
[G26]. NG50-5-500-PIP-DW-AB-00-2504 “Equipment layout Module P4 Top Deck”
[G27]. NG50-5-500-PIP-DW-AB-00-2505 “Equipment layout Module P4 South Elevation”
[G28]. NG50-5-500-PIP-DW-AB-00-2506 “Equipment layout Module P4 West Elevation”
[G29]. NG50-5-500-PIP-DW-AB-00-2601 “Equipment layout Module P5 Main Deck”
[G30]. NG50-5-500-PIP-DW-AB-00-2602 “Equipment layout Module P5 Mezzanine Deck”
[G31]. NG50-5-500-PIP-DW-AB-00-2603 “Equipment layout Module P5 Upper Deck”
[G32]. NG50-5-500-PIP-DW-AB-00-2604 “Equipment layout Module P5 Top Deck”
[G33]. NG50-5-500-PIP-DW-AB-00-2605 “Equipment layout Module P5 South Elevation”
[G34]. NG50-5-500-PIP-DW-AB-00-2606 “Equipment layout Module P5 West Elevation”
[G35]. NG50-5-500-PIP-DW-AB-00-2701 “Equipment layout Module P6 Main Deck”
[G36]. NG50-5-500-PIP-DW-AB-00-2702 “Equipment layout Module P6 Mezzanine Deck”
[G37]. NG50-5-500-PIP-DW-AB-00-2703 “Equipment layout Module P6 Upper Deck”
[G38]. NG50-5-500-PIP-DW-AB-00-2704 “Equipment layout Module P6 Top Deck”
[G39]. NG50-5-500-PIP-DW-AB-00-2705 “Equipment layout Module P6 South Elevation”

NG50-5-500-SAF-CN-AB-00-6002_rev01

This document is the property of TOTAL and shall not be disclosed to third parties or reproduced without permission of the COMPANY.
Akpo
Project
NIGERIA – OML 130
AKPO Field Development Project

COMPANY ref: NG50-5-500-SAF-CN-AB-00-6002 Revision: 01 Status: IFD Class: 2 Date: 02/10/2007 Page: 7/142
CONTRACTOR ref: 8577Y-2000-CN-6000-002 -- -- -- -- --

[G40]. NG50-5-500-PIP-DW-AB-00-2706 “Equipment layout Module P6 West Elevation”


[G41]. NG50-5-500-PIP-DW-AB-00-2801 “Equipment layout Module P7 Main Deck”
[G42]. NG50-5-500-PIP-DW-AB-00-2802 “Equipment layout Module P7 Mezzanine Deck”
[G43]. NG50-5-500-PIP-DW-AB-00-2803 “Equipment layout Module P7 Upper Deck”
[G44]. NG50-5-500-PIP-DW-AB-00-2804 “Equipment layout Module P7 Top Deck”
[G45]. NG50-5-500-PIP-DW-AB-00-2805 “Equipment layout Module P7 South Elevation”
[G46]. NG50-5-500-PIP-DW-AB-00-2806 “Equipment layout Module P7 West Elevation”
[G47]. NG50-5-500-PIP-DW-AB-00-2901 “Equipment layout Module P8 Main Deck”
[G48]. NG50-5-500-PIP-DW-AB-00-2902 “Equipment layout Module P8 Mezzanine Deck”
[G49]. NG50-5-500-PIP-DW-AB-00-2903 “Equipment layout Module P8 Upper Deck”
[G50]. NG50-5-500-PIP-DW-AB-00-2904 “Equipment layout Module P8 Top Deck”
[G51]. NG50-5-500-PIP-DW-AB-00-2905 “Equipment layout Module P8 South Elevation”
[G52]. NG50-5-500-PIP-DW-AB-00-2906 “Equipment layout Module P8 West Elevation”
[G53]. NG50-5-500-PIP-DW-AB-00-3101 “Equipment layout Module S1 Main Deck”
[G54]. NG50-5-500-PIP-DW-AB-00-3103 “Equipment layout Module S1 Upper Deck”
[G55]. NG50-5-500-PIP-DW-AB-00-3105 “Equipment layout Module S1 North Elevation”
[G56]. NG50-5-500-PIP-DW-AB-00-3106 “Equipment layout Module S1 West Elevation”
[G57]. NG50-5-500-PIP-DW-AB-00-3201 “Equipment layout Module S2 Main Deck”
[G58]. NG50-5-500-PIP-DW-AB-00-3203 “Equipment layout Module S2 Upper Deck”
[G59]. NG50-5-500-PIP-DW-AB-00-3205 “Equipment layout Module S2 South Elevation”
[G60]. NG50-5-500-PIP-DW-AB-00-3206 “Equipment layout Module S2 West Elevation”
[G61]. NG50-5-500-PIP-DW-AB-00-3301 “Equipment layout Module S3 Main Deck”
[G62]. NG50-5-500-PIP-DW-AB-00-3303 “Equipment layout Module S3 Upper Deck”
[G63]. NG50-5-500-PIP-DW-AB-00-3305 “Equipment layout Module S3 South Elevation”
[G64]. NG50-5-500-PIP-DW-AB-00-3306 “Equipment layout Module S3 West Elevation”
[G65]. NG50-5-500-PIP-DW-AB-00-3501 “Equipment layout Module S4 Main Deck”
[G66]. NG50-5-500-PIP-DW-AB-00-3502 “Equipment layout Module S4 Mezzanine Deck”
[G67]. NG50-5-500-PIP-DW-AB-00-3503 “Equipment layout Module S4 Upper Deck”
[G68]. NG50-5-500-PIP-DW-AB-00-3504 “Equipment layout Module S4 Top Deck”
[G69]. NG50-5-500-PIP-DW-AB-00-3505 “Equipment layout Module S4 North Elevation”
[G70]. NG50-5-500-PIP-DW-AB-00-3506 “Equipment layout Module S4 West Elevation”
[G71]. NG50-5-500-PIP-DW-AB-00-3601 “Equipment layout Module S5 Main Deck”
[G72]. NG50-5-500-PIP-DW-AB-00-3602 “Equipment layout Module S5 Mezzanine Deck”
[G73]. NG50-5-500-PIP-DW-AB-00-3603 “Equipment layout Module S5 Upper Deck”
[G74]. NG50-5-500-PIP-DW-AB-00-3604 “Equipment layout Module S5 Top Deck”
[G75]. NG50-5-500-PIP-DW-AB-00-3605 “Equipment layout Module S5 North Elevation”
[G76]. NG50-5-500-PIP-DW-AB-00-3606 “Equipment layout Module S5 West Elevation”
[G77]. NG50-5-500-PIP-DW-AB-00-3701 “Equipment layout Module S6 Main Deck”
[G78]. NG50-5-500-PIP-DW-AB-00-3702 “Equipment layout Module S6 Mezzanine Deck”
[G79]. NG50-5-500-PIP-DW-AB-00-3703 “Equipment layout Module S6 Upper Deck”
[G80]. NG50-5-500-PIP-DW-AB-00-3704 “Equipment layout Module S6 Top Deck”
[G81]. NG50-5-500-PIP-DW-AB-00-3705 “Equipment layout Module S6 North Elevation”
[G82]. NG50-5-500-PIP-DW-AB-00-3706 “Equipment layout Module S6 West Elevation”
[G83]. NG50-5-500-PIP-DW-AB-00-3801 “Equipment layout Module S7 Main Deck”
[G84]. NG50-5-500-PIP-DW-AB-00-3802 “Equipment layout Module S7 Mezzanine Deck”
[G85]. NG50-5-500-PIP-DW-AB-00-3803 “Equipment layout Module S7 Upper Deck”

NG50-5-500-SAF-CN-AB-00-6002_rev01

This document is the property of TOTAL and shall not be disclosed to third parties or reproduced without permission of the COMPANY.
Akpo
Project
NIGERIA – OML 130
AKPO Field Development Project

COMPANY ref: NG50-5-500-SAF-CN-AB-00-6002 Revision: 01 Status: IFD Class: 2 Date: 02/10/2007 Page: 8/142
CONTRACTOR ref: 8577Y-2000-CN-6000-002 -- -- -- -- --

[G86]. NG50-5-500-PIP-DW-AB-00-3804 “Equipment layout Module S7 Top Deck”


[G87]. NG50-5-500-PIP-DW-AB-00-3805 “Equipment layout Module S7 North Elevation”
[G88]. NG50-5-500-PIP-DW-AB-00-3806 “Equipment layout Module S7 West Elevation”
[G89]. NG50-5-500-STR-DW-MC-00-2552 “Module P4 - Blast Wall - Intermediate elevations”
[G90]. NG50-5-500-STR-DW-MC-00-3552 “Module S4 - Blast Wall - Intermediate elevations”
[G91]. NG50-5-500-SAF-LT-AB-00-6002 “Noisy Pressure Safety Valves List”
4.2. Codes & Standards
[GN1]. ISO 9613 “Attenuation of sound during propagation outdoors” Part1: Calculation of the
absorption of sound by the atmosphere. Part2: General method of calculation.
4.3. Reports and technical guideline
[GN2]. NG50-5-500-SAF-CN-AB-6001 “Preliminary Noise Report for Topsides”
[GN3]. NG50-5-500-SAF-SP-AB-00-6001 “Topsides Noise Study – Scope of Work”
[GN4]. NG50-5-500-SAF-CN-6000-010 “Public Address/ General Alarm Noise Study Report”
4.4. Project documents
[GN5]. NG50-6-600-SAF-PH-AB-00-0001_revAA “safety concept”
4.5. Company specifications
[GN6]. GS ENV 500: “Noise abatement in production units”

4.6. Noise data sheets

Reference Document Rev Type Equipment TAG


5-GX-1510 A-C
5-GX-1520 A-B
5-GX-1610 A-B
5-GX-3420 A-B
5-GX-3720 A-B
NG50-5-500-SAF-DS-GA-00-6001 00 Noise data sheet Pumps 910-001
5-GX-5230 A-B
5-GX-7320 A-C
5-GX-7510 A-C
5-GX-9920 A-D
5-GX-9930 A-C
5-GX-1920 A-B
NG50-5-500-SAF-DS-GA-00-6002 00 Noise data sheet Pumps 920-001 5-GX-1930 A-D
5-GX-1940 A-B
5-GX-2130 A-B
5-GX-2150 A-B
NG50-5-500-SAF-DS-GA-00-6003 00 Noise data sheet Pumps 930-001
5-GX-3920 A-B
5-GX-5130 A-B
NG50-5-500-SAF-DS-GA-00-6004 01 Noise data sheet Chemical Pump Package 5-UA-3800

NG50-5-500-SAF-CN-AB-00-6002_rev01

This document is the property of TOTAL and shall not be disclosed to third parties or reproduced without permission of the COMPANY.
Akpo
Project
NIGERIA – OML 130
AKPO Field Development Project

COMPANY ref: NG50-5-500-SAF-CN-AB-00-6002 Revision: 01 Status: IFD Class: 2 Date: 02/10/2007 Page: 9/142
CONTRACTOR ref: 8577Y-2000-CN-6000-002 -- -- -- -- --

5-FB-2160
NG50-5-500-SAF-DS-FB-00-6001 01 Noise data sheet HP and LP Flare TIP
5-FB-2170
NG50-5-500-SAF-DS-GA-00-6014 01 Noise data sheet Fire Water Pump 5-GX-1710 A-B-C-D
NG50-5-500-SAF-DS-JD-00-6001 00 Noise data sheet Main Crane 5-JS-9210B
NG50-5-500-SAF-DS-KB-00-6001 00 Noise data sheet LP Compressor 5-KB-5140
NG50-5-500-SAF-DS-KB-00-6002 00 Noise data sheet MP Compressor 5-KB-5240
NG50-5-500-SAF-DS-KB-00-6003 00 Noise data sheet HP Compressor 5-KB-5330 A-B
NG50-5-500-SAF-DS-KB-00-6004 00 Noise data sheet Gas Export Compressor 5-KB-5420 A-B
NG50-5-500-SAF-DS-KB-00-6005 00 Noise data sheet Gas injection Compressor 5-KB-5460
NG50-4-400-SAF-DS-YA-00-6002 00 Noise data sheet Emergency Diesel Generator 4-PY-6710
5-CA-5530
NG50-5-500-SAF-DS-UA-00-6008 01 Noise data sheet Gas Dehydration Package
5-UA-5540
Hydrocyclone & Degassing 5-UA-4130
NG50-5-500-SAF-DS-UA-00-6012 01 Noise data sheet
Packages 5-UA-4120
NG50-5-500-SAF-DS-UA-00-6005 00 Noise data sheet Electrochlorination Package 5-UA-7210
Seawater Coarse Filtration
NG50-5-500-SAF-DS-UA-00-6009 00 Noise data sheet 5-UA-7310
Package
Seawater Sand Filtration
NG50-5-500-SAF-DS-UA-00-6010 00 Noise data sheet 5-UA-7330
Package
Injection Water Deaeration
NG50-5-500-SAF-DS-UA-00-6002 00 Noise data sheet 5-UA-7420 A-B
Package
NG50-5-500-SAF-DS-UA-00-6003 00 Noise data sheet Nitrogen Generation Package 5-UB-1110 A-B
Air Compressor Package 5-UB-1310 A-B-C
NG50-5-500-SAF-DS-UA-00-6006 00 Noise data sheet
Air Dryer Package 5-UB-1330 A-B

NG50-5-500-SAF-DS-UA-00-6001 01 Noise data sheet Inert Gas Generation Package 5-UA-1210 A-B

NG50-5-500-SAF-DS-PA-00-6001 00 Noise data sheet Main Power Generator 5-PY-6510 A-B-C-D-E-F

NG50-5-500-SAF-DS-KA-00-6001 00 Noise data sheet Cargo Vent Recovery Blower 5-UA-2116


5-PB-6500 A-B
5-PB-6501 A-B
5-PB-6502 A-B
Power and Distribution
NG50-5-500-SAF-DS-PB-00-6001 00 Noise data sheet 5-PB-6503 A-B
Transformers
5-PB-6504 A-B
5-PB-6506 A-D
5-PB-6507 A-B
NG50-5-500-SAF-DS-GA-00-6012 00 Noise data sheet Crude oil Offloading Pumps 5-GX-8310 A-D
NG50-5-500-SAF-DS-GA-00-6011 00 Noise data sheet Water Injection Pumps 5-GX-7520 A-C
NG50-5-500-SAF-DS-KB-00-6006 00 Noise data sheet Nitrogen Buffer Compressor 5-KB-1150
NG50-4-400-SAF-DS-YA-00-6001 00 Noise data sheet Essential Diesel Generator 4-PY-6520 A-B-C

NG50-5-500-SAF-CN-AB-00-6002_rev01

This document is the property of TOTAL and shall not be disclosed to third parties or reproduced without permission of the COMPANY.
Akpo
Project
NIGERIA – OML 130
AKPO Field Development Project

10/14
COMPANY ref: NG50-5-500-SAF-CN-AB-00-6002 Revision: 01 Status: IFD Class: 2 Date: 02/10/2007 Page:
2
CONTRACTOR ref: 8577Y-2000-CN-6000-002 -- -- -- -- --

4.7. Abbreviations

Lp(dB): Sound Pressure Level in dB Lp=20xlog(P/P0) with P0 = 2.10-5 Pa


Lp(d): Sound Pressure Level expressed in dB at a point located at d meter from
the source. Lp varies with the distance from the equipment item and
depends on the environment, the presence of reflective surface.
Lw(dB): Sound Power Level in dB Lw=10xlog(w/w0) with w0=10 –12 watts
Lw(dB) corresponds to the cumulated sound energy emitted or radiated
by an equipment item in all directions. The Sound Power Level Lw and
the Sound Pressure Level Lp(d) at a distance d from the equipment in
free field (i.e. without any other noise sources and without any reflexion
on walls or obstacles) are linked by the following equation:
Lw = Lp(d) + 10 log(S/S0),
where S is the fictive area surrounding the equipment at distance d from
the equipment, and S0=1m².
5. Noise study – General information
Noise level at any point on the Topsides is obtained by adding the noise contribution of each noise
source. The contribution of a noise source depends on:
1- The generated noise level and its distribution all around the noise source.
2- The noise source spectrum.
3- The size of the noise source.
4- The distance between the noise source and the receiver.
5- The presence of reflective surfaces near the path between the noise source and the
receiver.
6- The presence of obstacles on the path between the noise source and the receiver.
Calculated Noise levels are obtained by addition of the contribution of all noise sources of the
FPSO. For each noise source, equipment or valve, the requirement has been defined at the
beginning of the project in TQ TPCY 6-500-SAF-0012 with an ALARP approach, taking into
account all constraints: feasibility, safety, weight... Noise data concerning equipment and control
valves are measured data or Vendor’s guaranteed data. The model has been built using a
conservative approach (see 5-5-4). The calculated noise maps obtained in this report have been
used to define the Public Address system. This conservative approach allows giving a best
protection of workers: Workers shall use hearing protections in defined noise-restricted areas and
Public Address shall be heard.

NG50-5-500-SAF-CN-AB-00-6002_rev01

This document is the property of TOTAL and shall not be disclosed to third parties or reproduced without permission of the COMPANY.
Akpo
Project
NIGERIA – OML 130
AKPO Field Development Project

11/14
COMPANY ref: NG50-5-500-SAF-CN-AB-00-6002 Revision: 01 Status: IFD Class: 2 Date: 02/10/2007 Page:
2
CONTRACTOR ref: 8577Y-2000-CN-6000-002 -- -- -- -- --

The AKPO noise calculation on Topsides is made using CADNAA software, version 3.4, developed
by DATAKUSTIC, to calculate noise levels in the environment. At this day, there’s no software
dedicated to calculate noise levels in configurations such AKPO. So a specific modelling of AKPO
has been done and described hereafter.

5.1. Propagation Law

The international standard ISO 9613-2 has been chosen to calculate noise levels.

5.2. Ground model

As only the main deck is made of plating, the main deck level has been considered as the ground
level, and the CADNAA option “no ground absorption” has been used to take into account the
reflection on ground such as in a image method.
Grating on mezzanine, upper and top decks, is considered as acoustically transparent.

5.3. Obstacles modelling

In order to take into account acoustic reflections, large devices with important volume such as
rooms or large equipment have been modelled.
The obstacles modelling depend on the dimensions, the geometry, and the location. Different
obstacles modelling have been performed:
1- Rooms and big equipment such as laboratory, compressors, big pumps, packages and
turbo generators, have been modelled as reflective parallelepipeds.
2- Big vertical columns located on the main deck have been modelled as cylinders.
3- Blast walls have been modelled as screens.
4- Turbo generators have been modelled with a combination of parallelepipeds.

5.4. Reflection parameters

The reflection order is 1. It has been chosen in order to limit the calculation time (between 50 and
100 hours for one map depending on the computer performance).
The reflection coefficient of obstacles has been chosen about 0.8 to take into account the energy
dissipation by diffusion on big equipment.
The minimal distance between source and reflectors and the minimal distance between receivers
and reflectors (CADNAA parameters) have been chosen equal to 0.10m.
All surface sources have been modeled at a distance about 0.05m of the radiating wall. All point
receivers located near buildings have been modeled at a distance about 0.05m of the wall. It
allows:
1- No reflection from vertical surface sources locating in front of screens.

NG50-5-500-SAF-CN-AB-00-6002_rev01

This document is the property of TOTAL and shall not be disclosed to third parties or reproduced without permission of the COMPANY.
Akpo
Project
NIGERIA – OML 130
AKPO Field Development Project

12/14
COMPANY ref: NG50-5-500-SAF-CN-AB-00-6002 Revision: 01 Status: IFD Class: 2 Date: 02/10/2007 Page:
2
CONTRACTOR ref: 8577Y-2000-CN-6000-002 -- -- -- -- --

2- No reflection on façade of buildings for the receiver points.

5.5. Noise sources modelling

5.5.1. Equipment and packages noise data


For equipment and packages noise data used for the calculation are in order of preference:
1- Vendor FAT noise measurement results when available.
2- Vendor guaranteed noise data
Requirement noise levels for all other equipment.

NG50-5-500-SAF-CN-AB-00-6002_rev01

This document is the property of TOTAL and shall not be disclosed to third parties or reproduced without permission of the COMPANY.
Akpo
Project
NIGERIA – OML 130
AKPO Field Development Project

13/14
COMPANY ref: NG50-5-500-SAF-CN-AB-00-6002 Revision: 01 Status: IFD Class: 2 Date: 02/10/2007 Page:
2
CONTRACTOR ref: 8577Y-2000-CN-6000-002 -- -- -- -- --

Sound Power Level determination for equipment and package


The Sound power level of each noisy item is obtained from the Sound pressure level at 1m.

SWL SPL@1m 10xlg S / S0 [Equ. 1]

With:
‰ SWL: acoustic power (dBwl).
‰ SPL@1m: acoustic pressure 1m from equipment (dBl).
‰ S: acoustic control measurement area in m2 1m from item surface with reference to S0= 1m2.
Two cases are considered:
1- For item located on the main deck, that means located on a reflective surface, taking into
account the hypothesis that the noise level at 1 meter is the same all around the package,
the surface S is those of a parallelepiped located at 1m from the external surface of the
package.
2- For item located on the upper, mezzanine or top deck, that means located in free field, the
Sound power level is obtained by the same expression (equation 1). However, as the lower
part of equipment can radiate noise, we have taken, as hypothesis that radiated noise
under the equipment is the same than on the other faces. The surface S is those of a
parallelepiped located at 1m from the external surface of the package; this parallelepiped
surrounds completely the package. So, for same equipment, the Sound Power level shall
be greater for equipment located on the upper, mezzanine or Top deck than for the same
equipment located on the main deck.
5.5.2.Noise sources modelling for standard equipment and packages
The noise source modelling depends on the size, the shape and the location. Different noise
sources modelling have been performed:
1- Small equipment has been modelled as point sources. Small packages consisting of
localised sources (such as control valve, small pump and motor) are modelled with point
sources.
2- Packages are modelled as a combination of point, line and area sources representing all
noise sources included in the package.
3- Large noisy equipment (except turbo generators) are modelled with area sources at a
distance lower than 0.05m of the walls:
x Vertical sources along the walls.
x One horizontal source at a distance lower than 0.05m of the ceiling.
The total Sound power level is distributed to each surface depending on the relative surface of
each one.

NG50-5-500-SAF-CN-AB-00-6002_rev01

This document is the property of TOTAL and shall not be disclosed to third parties or reproduced without permission of the COMPANY.
Akpo
Project
NIGERIA – OML 130
AKPO Field Development Project

14/14
COMPANY ref: NG50-5-500-SAF-CN-AB-00-6002 Revision: 01 Status: IFD Class: 2 Date: 02/10/2007 Page:
2
CONTRACTOR ref: 8577Y-2000-CN-6000-002 -- -- -- -- --

5.5.3.Turbo generators modelling


Turbo generators have been modelled with a composition of all noise source types:
- Vertical and horizontal sources to allow noise radiation of all the volume (enclosures,
generator, inlet duct)
- The inlet opening has been modelled by a vertical area source.
- The exhaust stack duct has been modelled by line sources (one line for each noisy
part)
- The exhaust stack opening has been modelled as point source.

NG50-5-500-SAF-CN-AB-00-6002_rev01

This document is the property of TOTAL and shall not be disclosed to third parties or reproduced without permission of the COMPANY.
Akpo
Project
NIGERIA – OML 130
AKPO Field Development Project

15/14
COMPANY ref: NG50-5-500-SAF-CN-AB-00-6002 Revision: 01 Status: IFD Class: 2 Date: 02/10/2007 Page:
2
CONTRACTOR ref: 8577Y-2000-CN-6000-002 -- -- -- -- --

5.5.4.Piping noise modelling


Three major sets of noisy pipes are:
1- Pipes linked to major pumps.
2- Pipes linked to compressors.
3- Pipes linked to control valves and restriction orifices.
In this final study, the noise generated by piping noise has been taken into account for pipes
connected to compressors, major pumps and valves. The modelling method is detailed in the next
parts.
Piping is modelled using line sources with constant linear density acoustic power. The evaluation
of the sound power level/ meter PWL’ is determined from the following rule:
Lw/m = Lp@1m + 6.

5.5.4.1. Pipes connected to major pumps


Generally, noise from pipes connected to pump is lower than those of the pump. In a pump area
the major contributor is the pump itself. As the noise from pipes connected to pumps is not known,
the following method is applied:
¾Addition of 3 dB(A) to the Sound Power Level of pump only for which acoustic insulation is
planned. Therefore the piping noise represents the same contribution than the pump itself.
It’s a conservative approach
¾Piping noise is neglected for pumps not acoustically insulated

5.5.4.2. Pipes connected to compressors


Generally, in compressor area, the main noise sources are the compressor pipes. On AKPO
Topsides, pipes connected to compressors are acoustically insulated.
The compressors piping noise is taken into account in the model by adding 3dB(A) to the sound
power level of the compressor itself. It’s a conservative approach

NG50-5-500-SAF-CN-AB-00-6002_rev01

This document is the property of TOTAL and shall not be disclosed to third parties or reproduced without permission of the COMPANY.
Akpo
Project
NIGERIA – OML 130
AKPO Field Development Project

16/14
COMPANY ref: NG50-5-500-SAF-CN-AB-00-6002 Revision: 01 Status: IFD Class: 2 Date: 02/10/2007 Page:
2
CONTRACTOR ref: 8577Y-2000-CN-6000-002 -- -- -- -- --

5.5.4.3. Pipes connected to control valves and to restriction orifices


Noise from control valves and restriction orifices is mainly radiated by the connected pipes.
Therefore the control valves and restriction orifices noise is modelled either by a line source from
the noise source (control valve or restriction orifice) to the next equipment, either by a line source
distributed over the module, either by a point source taking into account the pipe noise
contribution.
CV means Control Valves.
RO means Restriction Orifice. Only RO operating continuously have been modeled.
For each CV and RO, the following method has been applied:
¾CV/RO localisation: module and deck
¾Comparison between noise emitted by the source (Lp@1m from CV/RO) and the ambient
noise level
PSV means Pressure Safety Valves: PSV are not operating continuously and have not been
modeled.
To model noise from CV and RO, a simplified approach has been used in order to take into
account all noise sources without detailed modeling of all the pipe network.

The work way has been as follow:


- If the noise emitted by the source is more than 20dB(A) lower than module ambient noise,
the source is neglected
- If pipe diameter is lower than 3”, or if the gap between module ambient noise and those
emitted by the source is in the range 10dB(A)-20dB(A), the noise source is modeled with as
point source
- For others, a set of line sources distributed over the module has been modeled, except for
some cases where detailed pipe network has been modeled.

The total sound power level for each CV and RO is calculated for a pipe length about 60 meters
length, taking into account the attenuation of noise in the pipe (3dB for every 50 pipe diameter for
pipes carrying gas and 3dB for every 175 pipe diameters for pipes carrying liquid as mentioned in
ISO 15665). As on an FPSO pipes length is generally lower than 60 meters, and as the attenuation
due to singularities such as bends, discontinuities… is not taken into account, this approach is
basically conservative.

In order to obtain the guaranteed noise level near the CV or RO, the sound power level per meter
(Lw/m) of the modeled pipe is Lp@1m+6.
Knowing that Lw=Lw/m+10*Log(L), the length of the modeled pipe is:

NG50-5-500-SAF-CN-AB-00-6002_rev01

This document is the property of TOTAL and shall not be disclosed to third parties or reproduced without permission of the COMPANY.
Akpo
Project
NIGERIA – OML 130
AKPO Field Development Project

17/14
COMPANY ref: NG50-5-500-SAF-CN-AB-00-6002 Revision: 01 Status: IFD Class: 2 Date: 02/10/2007 Page:
2
CONTRACTOR ref: 8577Y-2000-CN-6000-002 -- -- -- -- --

L=10^((Lw-Lw/m)/10).

NG50-5-500-SAF-CN-AB-00-6002_rev01

This document is the property of TOTAL and shall not be disclosed to third parties or reproduced without permission of the COMPANY.
Akpo
Project
NIGERIA – OML 130
AKPO Field Development Project

18/14
COMPANY ref: NG50-5-500-SAF-CN-AB-00-6002 Revision: 01 Status: IFD Class: 2 Date: 02/10/2007 Page:
2
CONTRACTOR ref: 8577Y-2000-CN-6000-002 -- -- -- -- --

5.5.5.Noise spectrum of sources


When Vendor noise spectrum is not available, the noise spectrum shape used per default in our
model is the one used in the requirements.
It is given in the following table:

63 Hz 125 Hz 250 Hz 500 Hz 1000 Hz 2000 Hz 4000 Hz 8000 Hz

15 10 5 0 0 0 0 0

This spectrum is mainly low frequency. It allows an overestimation of the diffracted noise
contribution in far field.

5.5.6.Equipment running conditions


In order to estimate the noise level and to identify restricted areas on the Topsides, spare
equipment is not considered in operation.

NG50-5-500-SAF-CN-AB-00-6002_rev01

This document is the property of TOTAL and shall not be disclosed to third parties or reproduced without permission of the COMPANY.
Akpo
Project
NIGERIA – OML 130
AKPO Field Development Project

19/14
COMPANY ref: NG50-5-500-SAF-CN-AB-00-6002 Revision: 01 Status: IFD Class: 2 Date: 02/10/2007 Page:
2
CONTRACTOR ref: 8577Y-2000-CN-6000-002 -- -- -- -- --

5.5.7.Receiver modelling
Results are provided using three methods:
1- Noise mapping on the decks with colour dependent representation of the acoustic level.
In order to be representative, the map meshing has been defined to:
x 2.0m * 2.0m at 1.5m high for the main deck
x 2.0m * 2.0m at 7.5m high for the mezzanine deck
x 2.0m * 2.0m at 14.5m high for the upper deck
x 2.0m * 2.0m at 26.5m high for the Top deck
Note: Although elevation of mezzanine deck and top deck vary according to the module, a
unique mean elevation has been chosen in order to simplify the model. It cannot change
significantly the noise mapping ranges.
2- Receiver calculation for building noise evaluation. Receiver points have been located
at less than 0.1m from walls in front of the Living quarter and in front of each room of
technical buildings. The noisiest location has been chosen. For each receiver, the
calculation doesn’t take into account the noise reflection on the nearest wall in order to
obtain the incident noise on walls, which can be directly used to define the acoustic
insulation of buildings.
3- Noise mapping on the Hull deck with colour dependent representation of the acoustic
level. This noise estimation is very approximate, so only large areas with different noise
levels are presented.

5.6. Topsides equipment contribution on the Hull Deck

Software CADNAA does not allow calculating diffraction by a horizontal screen, then the
contribution of noise on the Hull deck radiated by equipment located on the Topsides. Therefore
the estimation of noise on the Hull deck has been done using CADNAA and a specific model to
evaluate the diffracted noise by the plating edge of the main deck, and RAYPLUS to estimate:
-a- the reverberation effect on the Hull deck,
-b- the noise generated by equipment located on the hull deck.
The final results are given on the noise map. (Figure-GNM-5)

NG50-5-500-SAF-CN-AB-00-6002_rev01

This document is the property of TOTAL and shall not be disclosed to third parties or reproduced without permission of the COMPANY.
Akpo
Project
NIGERIA – OML 130
AKPO Field Development Project

20/14
COMPANY ref: NG50-5-500-SAF-CN-AB-00-6002 Revision: 01 Status: IFD Class: 2 Date: 02/10/2007 Page:
2
CONTRACTOR ref: 8577Y-2000-CN-6000-002 -- -- -- -- --

6. Project data
Drawings IFC rev 01 are used for the platform modelling.
x Equipment list IFC rev 00 dated from 2006/09/22 has been considered [G6]
x General architecture of AKPO is described on referenced drawings [G1] to [G5]
Topsides architecture and equipment locations are described on referenced drawings [G7] to
[G88].
Blast wall drawings used for the model are referenced [G88] and [G89]
General drawings overviews are main deck and mezzanine (Figure-G-1), upper deck and top deck
(Figure-G-2), section A-A (Figure-G-3) and section B-B (Figure-G-4).
Acoustic model description is given on Figure-G-5 and Figure-G-6 hereafter.

NG50-5-500-SAF-CN-AB-00-6002_rev01

This document is the property of TOTAL and shall not be disclosed to third parties or reproduced without permission of the COMPANY.
Akpo
Project
NIGERIA – OML 130
AKPO Field Development Project

21/14
COMPANY ref: NG50-5-500-SAF-CN-AB-00-6002 Revision: 01 Status: IFD Class: 2 Date: 02/10/2007 Page:
2
CONTRACTOR ref: 8577Y-2000-CN-6000-002 -- -- -- -- --

Figure G-1: Main and Mezzanine Deck

NG50-5-500-SAF-CN-AB-00-6002_rev01

This document is the property of TOTAL and shall not be disclosed to third parties or reproduced without permission of the COMPANY.
Akpo
Project
NIGERIA – OML 130
AKPO Field Development Project

22/14
COMPANY ref: NG50-5-500-SAF-CN-AB-00-6002 Revision: 01 Status: IFD Class: 2 Date: 02/10/2007 Page:
2
CONTRACTOR ref: 8577Y-2000-CN-6000-002 -- -- -- -- --

Figure G-2: Upper and Top Deck

NG50-5-500-SAF-CN-AB-00-6002_rev01

This document is the property of TOTAL and shall not be disclosed to third parties or reproduced without permission of the COMPANY.
Akpo
Project
NIGERIA – OML 130
AKPO Field Development Project

23/14
COMPANY ref: NG50-5-500-SAF-CN-AB-00-6002 Revision: 01 Status: IFD Class: 2 Date: 02/10/2007 Page:
2
CONTRACTOR ref: 8577Y-2000-CN-6000-002 -- -- -- -- --

Figure G-3: Section A-A

NG50-5-500-SAF-CN-AB-00-6002_rev01

This document is the property of TOTAL and shall not be disclosed to third parties or reproduced without permission of the COMPANY.
Akpo
Project
NIGERIA – OML 130
AKPO Field Development Project

24/14
COMPANY ref: NG50-5-500-SAF-CN-AB-00-6002 Revision: 01 Status: IFD Class: 2 Date: 02/10/2007 Page:
2
CONTRACTOR ref: 8577Y-2000-CN-6000-002 -- -- -- -- --

Figure G-4: Section B-B

NG50-5-500-SAF-CN-AB-00-6002_rev01

This document is the property of TOTAL and shall not be disclosed to third parties or reproduced without permission of the COMPANY.
Akpo
Project
NIGERIA – OML 130
AKPO Field Development Project

25/14
COMPANY ref: NG50-5-500-SAF-CN-AB-00-6002 Revision: 01 Status: IFD Class: 2 Date: 02/10/2007 Page:
2
CONTRACTOR ref: 8577Y-2000-CN-6000-002 -- -- -- -- --

Figure G-5: AKPO Model 3D Special View

NG50-5-500-SAF-CN-AB-00-6002_rev01

This document is the property of TOTAL and shall not be disclosed to third parties or reproduced without permission of the COMPANY.
Akpo
Project
NIGERIA – OML 130
AKPO Field Development Project

26/14
COMPANY ref: NG50-5-500-SAF-CN-AB-00-6002 Revision: 01 Status: IFD Class: 2 Date: 02/10/2007 Page:
2
CONTRACTOR ref: 8577Y-2000-CN-6000-002 -- -- -- -- --

Figure G-6: AKPO Model 3D Isometric View

NG50-5-500-SAF-CN-AB-00-6002_rev01

This document is the property of TOTAL and shall not be disclosed to third parties or reproduced without permission of the COMPANY.
Akpo
Project
NIGERIA – OML 130
AKPO Field Development Project

27/14
COMPANY ref: NG50-5-500-SAF-CN-AB-00-6002 Revision: 01 Status: IFD Class: 2 Date: 02/10/2007 Page:
2
CONTRACTOR ref: 8577Y-2000-CN-6000-002 -- -- -- -- --

For each module input data are reviewed here after. Drawings with equipment location are
provided. Noise sources are surrounded in red.
Detailed noise sources data defined in CADNAA are listed in the Appendix 1.

6.1. Module P1

Main noise sources of this module are presented here under with data taken into account in the
calculation.
Table-P1-1
Noise DATA Noise
Cadnaa
Deck Tag Label Name Origin of LpA Lw Items in Abatement Comments
Model
data dB(A)@1m A Operation Measure
Expected Point source Lp@1m=82dBA
Cooling water 2 running, Open
MD 5gx1510a/b/c Vendor 79 99 inside guaranteed by
recirculation pumps 1 spare enclosure
Measurement building Vendor
Point source
2 running, Same noise as the
MD 5gx1510a/b/c Piping noise - - 96 inside -
1 spare pump itself
building
<75 88 No spare Point source
Seawater coarse
MD 5ua7310a/b/c Vendor Data 15' per For backwash
filtration package 90 - - -
week operation
Cooling water service Vendor Noise 1 running,
MD 5gx1520a/b 78 92 Point source - -
pumps Data Sheet 1 spare
5ua7210Electro chlorination Equipment
UD 78 99 No spare See table P1-2
5ua7220 package Data Sheet
Inert gas generator
TD 5ua1210b1/b2 Vendor Data 77 See table P1-3
package
Fresh air fan A/B for
HHI expected 1 running, High area
TD 5ka6101a/b topside modules ("P 70 94 - -
max values 1 spare source
Side")
HHI expected No spare,
TD 5ub6101a/b AHU Room P1 70 88 Point source - -
max values hypothesis

Note: For piping noise modeling: see paragraph 5-5-5

Note: Backwash function of the filters has not been taken into account in the calculation due to the
“not normal” operating condition of backwash function.

NG50-5-500-SAF-CN-AB-00-6002_rev01

This document is the property of TOTAL and shall not be disclosed to third parties or reproduced without permission of the COMPANY.
Akpo
Project
NIGERIA – OML 130
AKPO Field Development Project

28/14
COMPANY ref: NG50-5-500-SAF-CN-AB-00-6002 Revision: 01 Status: IFD Class: 2 Date: 02/10/2007 Page:
2
CONTRACTOR ref: 8577Y-2000-CN-6000-002 -- -- -- -- --

Table P1-2: Detail for package 5-UA-7210/5-UA-7220:


Noise DATA
Cadnaa Noise Abatement
Deck Tag Label Name Origin of LpA Lw Items in Comments
Model Measure
data dB(A)@1m A Operation
Dilution Vendor Data 1 running,
UD 5kx7210a/b - 98 Point source Inlet silencer Lw per fan
fans Sheet 1 spare
5gx7221a/b LP pumps Vendor Data 2 running, Lw per
UD - 90 Point source -
5gx7222a/b HP pumps Sheet 2 spare pump/motor set

Table P1-3: Detail for package 5-UA-1210 B1/B2:


Noise DATA
Cadnaa Noise Abatement
Deck Tag Label Name Origin of LpA Lw Items in Comments
Model Measure
data dB(A)@1m A Operation
Vendor Noise 1 running,
TD 5ua1210b1a/b Fan motor 81 98 Point source - Lw per motor
Data Sheet 1 spare

Vendor Noise 1 running,


TD 5ua1210b1a/b Fan 77 95 Point source - Lw per fan
Data Sheet 1 spare
Estimated
TD 5ua1210b2 Pump 65 80 No spare Point source - -
value
Gas outlet Vendor Noise Two silencers Lw=Lp+6+
TD 5ua1210b1 78 92 No spare line source
pipe Data Sheet (double unit) will 10xlog(length m)
be provided both
Gas inlet Vendor Noise in air inlet and Lw=Lp+6+
TD 5ua1210b1 83 95 No spare line source
pipe Data Sheet vent piping 10xlog(length m)

Vendor Noise
TD 5ua1210b1 Burner 75 96 No spare Point source - -
Data Sheet

NG50-5-500-SAF-CN-AB-00-6002_rev01

This document is the property of TOTAL and shall not be disclosed to third parties or reproduced without permission of the COMPANY.
Akpo
Project
NIGERIA – OML 130
AKPO Field Development Project

29/14
COMPANY ref: NG50-5-500-SAF-CN-AB-00-6002 Revision: 01 Status: IFD Class: 2 Date: 02/10/2007 Page:
2
CONTRACTOR ref: 8577Y-2000-CN-6000-002 -- -- -- -- --

Table P1-4: Control valves and restriction orifice noise:

Guaranteed Ambient
Cadnaa
Vendor's CP CP CP Noise from Lpa-Lp Cadnaa length
Tag Deck Line_Number_Label Lw
Data Lp Easting Northing Elevation equipment dB(A) Model m
dB(A)
dB(A) only
Lpa dB(A)

5FV 15002 79.7 70900 113881 6204 Main 20" CW515024-B01W- 82.5 2.8 simplified 104.7 79
5TV 15311 76.5 67893 116782 6255 Main 24" CW515012-B01W- 82.5 6.0 simplified 101.5 79
5PV1 71509 60.0 62742 127907 787 Main 24" SW515009-B90- 82.5 22.5 neglected NA -
5PV2 71509 60.0 62122 127907 3539 Main 24" SW515009-B90- 82.5 22.5 neglected NA -
5FV 15003 54.7 71950 113869 6342 Main 3" CW515025-B01W- 82.5 27.8 neglected NA -
RO-15202A <60 60370 105250 469 Main 6" CW515021-B01W- 82.5 27.5 neglected NA -
RO-15202B <60 60370 107600 469 Main 6" CW515020-B01W- 82.5 27.5 neglected NA -
RO-71511 75.9 58590 128800 6800 Main 24" SW571004-B90- 82.5 6.6 simplified 100.9 79
RO-15301A 77.6 64451 123592 16556 Upper 30" SW515005-B90- 80 2.4
RO-15301B 77.6 64451 117742 16556 Upper 30" SW515006-B90- 80 2.4
Detailed 111.5 172
RO-15301C 77.6 64451 112992 16556 Upper 30" SW515007-B90- 80 2.4
RO-15301D 77.6 64451 107757 16556 Upper 30" SW515008-B90- 80 2.4

Note: The method used to model piping noise is described in 5-5-5

NG50-5-500-SAF-CN-AB-00-6002_rev01

This document is the property of TOTAL and shall not be disclosed to third parties or reproduced without permission of the COMPANY.
Akpo
Project
NIGERIA – OML 130
AKPO Field Development Project

30/14
COMPANY ref: NG50-5-500-SAF-CN-AB-00-6002 Revision: 01 Status: IFD Class: 2 Date: 02/10/2007 Page:
2
CONTRACTOR ref: 8577Y-2000-CN-6000-002 -- -- -- -- --

Figure P1-1: Module P1 Main Deck

NG50-5-500-SAF-CN-AB-00-6002_rev01

This document is the property of TOTAL and shall not be disclosed to third parties or reproduced without permission of the COMPANY.
Akpo
Project
NIGERIA – OML 130
AKPO Field Development Project

31/14
COMPANY ref: NG50-5-500-SAF-CN-AB-00-6002 Revision: 01 Status: IFD Class: 2 Date: 02/10/2007 Page:
2
CONTRACTOR ref: 8577Y-2000-CN-6000-002 -- -- -- -- --

Figure P1-2: Module P1 Upper Deck

NG50-5-500-SAF-CN-AB-00-6002_rev01

This document is the property of TOTAL and shall not be disclosed to third parties or reproduced without permission of the COMPANY.
Akpo
Project
NIGERIA – OML 130
AKPO Field Development Project

32/14
COMPANY ref: NG50-5-500-SAF-CN-AB-00-6002 Revision: 01 Status: IFD Class: 2 Date: 02/10/2007 Page:
2
CONTRACTOR ref: 8577Y-2000-CN-6000-002 -- -- -- -- --

Figure P1-3: Module P1 Top Deck

NG50-5-500-SAF-CN-AB-00-6002_rev01

This document is the property of TOTAL and shall not be disclosed to third parties or reproduced without permission of the COMPANY.
Akpo
Project
NIGERIA – OML 130
AKPO Field Development Project

33/14
COMPANY ref: NG50-5-500-SAF-CN-AB-00-6002 Revision: 01 Status: IFD Class: 2 Date: 02/10/2007 Page:
2
CONTRACTOR ref: 8577Y-2000-CN-6000-002 -- -- -- -- --

6.2. Module P2

Main noise sources of this module are presented here under with data taken into account in the
calculation.
Table P2-1:
Noise DATA Noise
Deck Tag Label Name LpA Lw Items in Cadnaa Model abatement Comments
Origin of data
dB(A)@1m A operation measure
Pump acoustic
Vendor
Water injection Area source on cladding,
MD 5gx7520a/b/c measurement 86 109 No spare -
pumps reflecting surface baseplate
data
acoustic tiles
Area source on Same noise as
MD 5gx7520a/b/c Piping noise - - 107 No spare -
reflecting surface the pump itself
Water injection Vendor Point source
MD 5gx7510a/b/c 82 101 No spare Open enclosure -
booster pumps guarantee inside building
Point source Same noise as
MD 5gx7510a/b/c Piping noise - - 98 No spare -
inside building the pump itself
Injection water
TD 5ua7420a/b Requirement 78 See table P2-2
deaerations
Nitrogen buffer Intermittent -
TD 5kb1150 Requirement 80 101 No spare Point source -
compressor Activated
HHI expected No spare,
TD 5ub6102a/b AHU Room P2 70 88 Point source - -
max values hypothesis

Note: For piping noise modeling: see paragraph 5-5-5

Table P2-2: Detail for package 5-UA-7420 A/B:


Noise DATA Noise
Deck Tag Label Name LpA Lw Items in Cadnaa Model Abatement Comments
Origin of data
dB(A)@1m A Operation Measure
Vacuum pumps Equipment 1 running, Lw per
TD 5gx7420a1/a2 78 97 Point source -
skid A Data Sheet 1 spare pump/motor set
Vacuum pumps Equipment 1 running, Lw per
TD 5gx7420b1/b2 78 97 Point source -
skid A Data Sheet 1 spare pump/motor set

NG50-5-500-SAF-CN-AB-00-6002_rev01

This document is the property of TOTAL and shall not be disclosed to third parties or reproduced without permission of the COMPANY.
Akpo
Project
NIGERIA – OML 130
AKPO Field Development Project

34/14
COMPANY ref: NG50-5-500-SAF-CN-AB-00-6002 Revision: 01 Status: IFD Class: 2 Date: 02/10/2007 Page:
2
CONTRACTOR ref: 8577Y-2000-CN-6000-002 -- -- -- -- --

Table P2-3: Control valves and restriction orifice noise:

Guaranteed Ambient
Cadnaa
Vendor's CP CP CP Noise from Lpa-Lp Cadnaa length
Tag Deck Line_Number_Label Lw
Data Lp Easting Northing Elevation equipment dB(A) Model m
dB(A)
dB(A) only
Lpa dB(A)

5FV 75106A 68.2 88771 111050 7735 Main 6" WI575009-B03- 87.5 19.3 point source 90.7 -
5FV 75106B 68.2 88771 107700 7722 Main 6" WI575010-B03- 87.5 19.3 point source 90.7 -
5FV 75106C 68.2 88771 105536 7735 Main 6" WI575011-B03- 87.5 19.3 point source 90.7 -
5FV 75202A 60.0 91972 126200 803 Main 16" WI575026-J03- 87.5 27.5 neglected NA -
5FV 75202B 60.0 91971 118100 803 Main 16" WI575027-J03- 87.5 27.5 neglected NA -
5FV 75202C 60.0 91965 110100 803 Main 16" WI575028-J03- 87.5 27.5 neglected NA -
RO-74102A <60 85815 109275 21400 Top 3" WI575014-B03- 85 30.0 neglected NA -
RO-74102B <60 94185 109275 21400 Top 3" WI575015-B03- 85 30.0 neglected NA -
5HV 75224 66.2 83600 122739 13775 Upper 14" WI575039-J03- 85 18.8 point source 91.2 -
5HV 75229 66.2 90300 121239 13775 Upper 14" WI575040-J03- 85 18.8 point source 91.2 -
5HV 75234 66.2 96300 122739 13775 Upper 14" WI575041-J03- 85 18.8 point source 91.2 -
5HV 75244 66.2 79100 122750 13775 Upper 14" WI575038-J03- 85 18.8 point source 91.2 -

Note: The method used to model piping noise is described in 5-5-5

NG50-5-500-SAF-CN-AB-00-6002_rev01

This document is the property of TOTAL and shall not be disclosed to third parties or reproduced without permission of the COMPANY.
Akpo
Project
NIGERIA – OML 130
AKPO Field Development Project

35/14
COMPANY ref: NG50-5-500-SAF-CN-AB-00-6002 Revision: 01 Status: IFD Class: 2 Date: 02/10/2007 Page:
2
CONTRACTOR ref: 8577Y-2000-CN-6000-002 -- -- -- -- --

Figure P2-1: Module P2 Main Deck

NG50-5-500-SAF-CN-AB-00-6002_rev01

This document is the property of TOTAL and shall not be disclosed to third parties or reproduced without permission of the COMPANY.
Akpo
Project
NIGERIA – OML 130
AKPO Field Development Project

36/14
COMPANY ref: NG50-5-500-SAF-CN-AB-00-6002 Revision: 01 Status: IFD Class: 2 Date: 02/10/2007 Page:
2
CONTRACTOR ref: 8577Y-2000-CN-6000-002 -- -- -- -- --

5UB6102A

5UB6102B

Figure P2-2: Module P2 Top Deck

NG50-5-500-SAF-CN-AB-00-6002_rev01

This document is the property of TOTAL and shall not be disclosed to third parties or reproduced without permission of the COMPANY.
Akpo
Project
NIGERIA – OML 130
AKPO Field Development Project

37/14
COMPANY ref: NG50-5-500-SAF-CN-AB-00-6002 Revision: 01 Status: IFD Class: 2 Date: 02/10/2007 Page:
2
CONTRACTOR ref: 8577Y-2000-CN-6000-002 -- -- -- -- --

6.3. Module P3

Main noise sources of this module are presented here under with data taken into account in the
calculation.
Table P3-1:
Noise DATA Noise
Cadnaa
Deck Tag Label Name LpA Items in abatement Comments
Origin of data LwA Model
dB(A)@1m operation measure
Area source on
5py6510 Main power generator - AC
MD Vendor data 83 105 No spare reflecting - -
a/b/c Generator
surface
Area source on
5py6510 Main power generator -
MD Vendor data 80 98 No spare reflecting - -
a/b/c Gear box
surface
Area source on
5py6510 Main power generator - GT
MD Vendor data 74 96 No spare reflecting - -
a/b/c Enclosure
surface
5py6510 Main power generator - GT
MD Vendor data 75 92 No spare Point source - -
a/b/c Enclosure vent inlet
5py6510 Main power generator - GT
MD Vendor data 72 94 No spare Point source - -
a/b/c Enclosure vent outlet
Area source on
5py6510 Main power generator -
MD Vendor data 74 94 No spare reflecting - -
a/b/c Inlet Scroll
surface
Extrapolation
5py6510 Main power generator - High area
MD from Vendor Not Available 96 No spare - -
a/b/c Vertical air inlet duct source
data
Extrapolation
5py6510 Main power generator - High area
MD from Vendor Not Available 95 No spare - -
a/b/c horizontal air inlet duct source
data
5py6510 Main power generator - Air High area
MD Vendor data Not Available 101 No spare - -
a/b/c inlet opening source
Main power generator -
5py6510
MD Exhaust WHRU expansion Vendor data 74 98 No spare Line source - WHRU sets
a/b
joint + transition to silencer
Main power generator -
5py6510
MD Exhaust WHRU silencer Vendor data 69 97 No spare Line source - WHRU sets
a/b
duct
5py6510 Main power generator -
MD Vendor data 74 112 No spare Line source - WHRU sets
a/b Exhaust WHRU outlet duct
Main power generator -
5py6510
MD Exhaust WHRU stack Vendor data 67 117 No spare Point source - WHRU sets
a/b
opening

NG50-5-500-SAF-CN-AB-00-6002_rev01

This document is the property of TOTAL and shall not be disclosed to third parties or reproduced without permission of the COMPANY.
Akpo
Project
NIGERIA – OML 130
AKPO Field Development Project

38/14
COMPANY ref: NG50-5-500-SAF-CN-AB-00-6002 Revision: 01 Status: IFD Class: 2 Date: 02/10/2007 Page:
2
CONTRACTOR ref: 8577Y-2000-CN-6000-002 -- -- -- -- --

Main power generator -


non-
MD 5py6510c Exhaust non-WHRU Vendor data 72 95 No spare Line source -
WHRU set
expansion joint
Main power generator -
non-
MD 5py6510c Exhaust non-WHRU Vendor data 71 96 No spare Line source -
WHRU set
silencer duct
Main power generator -
non-
MD 5py6510c Exhaust non-WHRU outlet Vendor data 70 100 No spare Line source -
WHRU set
duct
Main power generator -
non-
MD 5py6510c Exhaust non-WHRU stack Vendor data 70 123 No spare Point source -
WHRU set
opening
16 MVA, 13,8kV/6,9kV
UD 5pb6500a Vendor data 65 87 No spare Point source - -
Power transformer
2500 KVA, 13,8kV/0,42kV
UD 5pb6501a Vendor data 50 70 No spare Point source - -
Power transformer utilities
2500 KVA, 13,8kV/0,42kV
UD 5pb6502a Vendor data 50 70 No spare Point source - -
Power transformer process

2500 KVA, 6,6kV/0,42kV


UD 5pb6504a Vendor data 50 70 No spare Point source - -
Power transformer essential

5pb6506 1600 KVA, 13,8kV/0,42kV


UD Vendor data 40 58 No spare Point source - -
a/b Power transformer process
5ub6103 HHI expected No spare,
UD AHU Room P3 75 96 Point source - -
a/b max values hypothesis

NG50-5-500-SAF-CN-AB-00-6002_rev01

This document is the property of TOTAL and shall not be disclosed to third parties or reproduced without permission of the COMPANY.
Akpo
Project
NIGERIA – OML 130
AKPO Field Development Project

39/14
COMPANY ref: NG50-5-500-SAF-CN-AB-00-6002 Revision: 01 Status: IFD Class: 2 Date: 02/10/2007 Page:
2
CONTRACTOR ref: 8577Y-2000-CN-6000-002 -- -- -- -- --

Table P3-2: Control valves and restriction orifices noise:

Guaranteed Ambient
Cadnaa
Vendor's CP CP CP Noise from Lpa-Lp Cadnaa length
Tag Deck Line_Number_Label Lw
Data Lp Easting Northing Elevation equipment dB(A) Model m
dB(A)
dB(A) only
Lpa dB(A)

RO-65102A <60 127953 128908 2698 Main 2" SW565001-B90- 87.5 32.5 neglected NA -
RO-65102B <60 118953 128908 2698 Main 2" SW565002-B90- 87.5 32.5 neglected NA -
RO-65102C <60 110253 128908 2698 Main 2" SW565003-B90- 87.5 32.5 neglected NA -
RO-65103A <60 125267 113729 4434 Main 2" SW565001-B90- 87.5 32.5 neglected NA -
RO-65103B <60 116267 113729 4434 Main 2" SW565002-B90- 87.5 32.5 neglected NA -
RO-65103C <60 107567 113729 4434 Main 2" SW565003-B90- 87.5 32.5 neglected NA -
RO-65104A <60 125267 113729 4814 Main 2" SW565001-B90- 87.5 32.5 neglected NA -
RO-65104B <60 116267 113729 4814 Main 2" SW565002-B90- 87.5 32.5 neglected NA -
RO-65104C <60 107567 113729 4814 Main 2" SW565003-B90- 87.5 32.5 neglected NA -
RO-65105A <60 124086 112026 2692 Main 4" SW565001-B90- 87.5 32.5 neglected NA -
RO-65105B <60 115086 112026 2692 Main 4" SW565002-B90- 87.5 32.5 neglected NA -
RO-65105C <60 106386 112026 2692 Main 4" SW565003-B90- 87.5 32.5 neglected NA -
5FV2 16211B 63.2 112750 120154 19610 Top 8" HW516024-D01V-HC 87.5 24.3 neglected NA -
5FV 16110 80.3 105160 124300 13737 Upper 10" HW516033-D01V-HC 87.5 7.2 simplified 105.3 79
5FV2 16211A 63.2 112568 123567 13714 Upper 8" HW516019-D01V-HC 87.5 24.3 neglected NA -

Note: The method used to model piping noise is described in 5-5-5

NG50-5-500-SAF-CN-AB-00-6002_rev01

This document is the property of TOTAL and shall not be disclosed to third parties or reproduced without permission of the COMPANY.
Akpo
Project
NIGERIA – OML 130
AKPO Field Development Project

40/14
COMPANY ref: NG50-5-500-SAF-CN-AB-00-6002 Revision: 01 Status: IFD Class: 2 Date: 02/10/2007 Page:
2
CONTRACTOR ref: 8577Y-2000-CN-6000-002 -- -- -- -- --

Figure P3-1: Module P3 Main Deck

NG50-5-500-SAF-CN-AB-00-6002_rev01

This document is the property of TOTAL and shall not be disclosed to third parties or reproduced without permission of the COMPANY.
Akpo
Project
NIGERIA – OML 130
AKPO Field Development Project

41/14
COMPANY ref: NG50-5-500-SAF-CN-AB-00-6002 Revision: 01 Status: IFD Class: 2 Date: 02/10/2007 Page:
2
CONTRACTOR ref: 8577Y-2000-CN-6000-002 -- -- -- -- --

Figure P3-2: Module P3 Upper Deck

NG50-5-500-SAF-CN-AB-00-6002_rev01

This document is the property of TOTAL and shall not be disclosed to third parties or reproduced without permission of the COMPANY.
Akpo
Project
NIGERIA – OML 130
AKPO Field Development Project

42/14
COMPANY ref: NG50-5-500-SAF-CN-AB-00-6002 Revision: 01 Status: IFD Class: 2 Date: 02/10/2007 Page:
2
CONTRACTOR ref: 8577Y-2000-CN-6000-002 -- -- -- -- --

6.4. Module P4

Main noise sources of this module are presented here under with data taken into account in the
calculation.
Table P4-1:
Noise DATA
Cadnaa Noise abatement
Deck Tag Label Name LpA Items in Comments
Origin of data LwA Model measure
dB(A)@1m operation
HHI expected No spare,
UD 5ub6104a/b AHU Room P4 70 88 Point source - -
max values hypothesis

Table P4-2: Control valves and restriction orifices noise:

Guaranteed Ambient
Cadnaa
Vendor's CP CP CP Noise from Lpa-Lp Cadnaa length
Tag Deck Line_Number_Label Lw
Data Lp Easting Northing Elevation equipment dB(A) Model m
dB(A)
dB(A) only
Lpa dB(A)

5HV 30701 <75 137170 122790 9157 Main 6" HC530067-J70-PP 77.5 7.5 simplified 92.5 45
5HV 30702 <75 138020 122790 9144 Main 8" HC530067-J70-PP 77.5 7.5 simplified 95 79
5HV 30801 <75 141100 122790 9157 Main 6" HC530077-J70-PP 77.5 7.5 simplified 92.5 45
5HV 30802 <75 141950 122790 9144 Main 8" HC530077-J70-PP 77.5 7.5 simplified 95 79
5FV 30706 <70 138900 106913 636 Main 10" HL599026-J01-HC 77.5 7.5 simplified 90 79
5FV 31213 79.7 151471 112541 25378 Top 14" HG531009-F70-PPA 82.5 2.8 simplified 102.2 45
5FV 31113B <70 155074 109069 25403 Top 16" HG531005-F70-PPA 82.5 17.5 point source 87.5 45
R0-31101B 78.3 155833 108461 26477 Top 2" HG531005-F70-PPA 82.5 4.2 point source 93.3 -
RO-31201 78.3 150728 108738 26277 Top 2" HG531009-F70-PPA 82.5 4.2 point source 93.3 -
5LV 31105B <80 143605 113645 13695 Upper 12" HL531002-F23-PP 77.5 2.5 simplified 100 79
5LDV 31106B 67.0 154443 122150 13585 Upper 6" PW531002-F23-PP 77.5 10.5 simplified 89.5 45

Note: The method used to model piping noise is described in 5-5-5

NG50-5-500-SAF-CN-AB-00-6002_rev01

This document is the property of TOTAL and shall not be disclosed to third parties or reproduced without permission of the COMPANY.
Akpo
Project
NIGERIA – OML 130
AKPO Field Development Project

43/14
COMPANY ref: NG50-5-500-SAF-CN-AB-00-6002 Revision: 01 Status: IFD Class: 2 Date: 02/10/2007 Page:
2
CONTRACTOR ref: 8577Y-2000-CN-6000-002 -- -- -- -- --

Figure P4-1: Module P4 Upper Deck

NG50-5-500-SAF-CN-AB-00-6002_rev01

This document is the property of TOTAL and shall not be disclosed to third parties or reproduced without permission of the COMPANY.
Akpo
Project
NIGERIA – OML 130
AKPO Field Development Project

44/14
COMPANY ref: NG50-5-500-SAF-CN-AB-00-6002 Revision: 01 Status: IFD Class: 2 Date: 02/10/2007 Page:
2
CONTRACTOR ref: 8577Y-2000-CN-6000-002 -- -- -- -- --

6.5. Module P5

Main noise sources of this module are presented here under with data taken into account in the
calculation.
Table P5-1:
Noise DATA Noise
Deck Tag Label Name LpA Items in Cadnaa Model abatement Comments
Origin of data LwA
dB(A)@1m operation measure
Crude
Vendor 1 running, Point source Open Intermittent -
MD 5gx9920a/b recirculation 82 102
measurements 1 spare inside building enclosure Activated
pump
Same noise
1 running, Point source
MD 5gx9920a/b Piping noise - - 99 - as the pump
1 spare inside building
itself
3rd stage
Vendor 1 running, Open
MD 5gx3410a/b separator 78 96 Point source -
measurements 1 spare enclosure
pumps
Same noise
1 running,
MD 5gx3410a/b Piping noise - - 93 Point source - as the pump
1 spare
itself
Note: For piping noise modeling: see paragraph 5-5-5

Table P5-2: Control valves and restriction orifices noise:

Guaranteed Ambient
Cadnaa
Vendor's CP CP CP Noise from Lpa-Lp Cadnaa length
Tag Deck Line_Number_Label Lw
Data Lp Easting Northing Elevation equipment dB(A) Model m
dB(A)
dB(A) only
Lpa dB(A)

5FV 34118A 79.4 176033 114445 6110 Main 8" HL534003-B03-HC 80 0.6
Detailed 102.4 47
5FV 34118B 79.4 178967 113110 6109 Main 8" HL534004-B03-HC 80 0.6
5FV 99207A 79.4 176033 108358 6045 Main 3" HL599041-F01-HC 80 0.6 point source 99.4 -
5FV 99207B 79.4 178967 106242 6045 Main 3" HL599042-F01-HC 80 0.6 point source 99.4 -
5TV 33214 67.9 187779 113687 6085 Main 6" HW533002-D01-HC 80 12.1 point source 90.4 -
5PV 31111B 84.4 161257 108812 25403 Top 16" HG531006-F70-PFP 80 -4.4 Not modeled - Contingency
5PV2 34111 79.2 176047 112842 24928 Top 14" HG534002-D49-PPA 80 0.8 Not modeled - Contingency
5PV2 32111 77.8 183921 112822 24886 Top 10" HG532001-D49-PP 80 2.2 Not modeled - Contingency
RO-32102 84.2 187841 112346 24536 Top 2" HG532001-D49-PP 80 -4.2 point source 99.2 -
RO-34132 77.6 169504 112324 24536 Top 2" HG534002-D49-PPA 80 2.4 point source 92.6 -
5LDV 31206 73.8 160800 111840 13558 Upper 4" PW531003-F23-PP 77.5 3.7 simplified 96.3 45
5LDV 34106 <50 174837 111950 13544 Upper 3" PW534001-B03-PP 77.5 32.5 neglected NA -
5LDV 32106 80.1 190435 119293 13444 Upper 3" PW532001-D03-PP 77.5 -2.6 point source 100.1 -
Note: The method used to model piping noise is described in 5-5-5

NG50-5-500-SAF-CN-AB-00-6002_rev01

This document is the property of TOTAL and shall not be disclosed to third parties or reproduced without permission of the COMPANY.
Akpo
Project
NIGERIA – OML 130
AKPO Field Development Project

45/14
COMPANY ref: NG50-5-500-SAF-CN-AB-00-6002 Revision: 01 Status: IFD Class: 2 Date: 02/10/2007 Page:
2
CONTRACTOR ref: 8577Y-2000-CN-6000-002 -- -- -- -- --

Figure P5-1: Module P5 Main Deck

NG50-5-500-SAF-CN-AB-00-6002_rev01

This document is the property of TOTAL and shall not be disclosed to third parties or reproduced without permission of the COMPANY.
Akpo
Project
NIGERIA – OML 130
AKPO Field Development Project

46/14
COMPANY ref: NG50-5-500-SAF-CN-AB-00-6002 Revision: 01 Status: IFD Class: 2 Date: 02/10/2007 Page:
2
CONTRACTOR ref: 8577Y-2000-CN-6000-002 -- -- -- -- --

6.6. Module P6

Main noise sources of this module are presented here under with data taken into account in the
calculation.
Table P6-1:
Noise DATA Noise
Tag Cadnaa
Deck Name LpA Items in abatement Comments
Label Origin of data LwA Model
dB(A)@1m operation measure
Glycol
MD 5ua5540 Requirement 80 See table P6-2 -
regeneration skid
Anti foam & PH
UD 5ua5542 control injection Vendor data 70 See table P6-3 -
skid
5ub6106 HHI expected No spare, Point
TD AHU Room P6 70 89 - -
a/b max values hypothesis source

3500 KVA,
5pb6503 Point
TD 13,8kV/0,72kV Vendor data 52 72 no spare - -
a/b source
Power transformer

Table P6-2: Detail for package 5-UA-5540:


Noise DATA Noise
Tag Cadnaa
Deck Name LpA Items in abatement Comments
Label Origin of data LwA Model
dB(A)@1m operation measure
80dBA required
applicable all around the
Glycol circulation
Vendor 1 running, Point package. The 82dBA for
UD 5ua5540 pump/motor noise 82 99 Noise hood
measurements 1 spare source the pump is acceptable
hood a/b
because of local source in
the package

Glycol
Line Control valves noise
UD 5ua5540 regeneration skid - Vendor data - 95 No spare -
source modeled in "x" direction
Control Valves x

Glycol
Line Control valves noise
UD 5ua5540 regeneration skid - Vendor data - 95 No spare -
source modeled in "y" direction
Control Valves y

Glycol
Line Control valves noise
UD 5ua5540 regeneration skid - Vendor data - 95 No spare -
source modeled in "z" direction
Control Valves z

NG50-5-500-SAF-CN-AB-00-6002_rev01

This document is the property of TOTAL and shall not be disclosed to third parties or reproduced without permission of the COMPANY.
Akpo
Project
NIGERIA – OML 130
AKPO Field Development Project

47/14
COMPANY ref: NG50-5-500-SAF-CN-AB-00-6002 Revision: 01 Status: IFD Class: 2 Date: 02/10/2007 Page:
2
CONTRACTOR ref: 8577Y-2000-CN-6000-002 -- -- -- -- --

Table P6-3: Detail for package 5-UA-5542:


Noise DATA Noise
Tag Cadnaa
Deck Name LpA Items in abatement Comments
Label Origin of data LwA Model
dB(A)@1m operation measure
Chemical injection Point
UD 5gx5542 Vendor data 63 79 No spare - -
pump source
Chemical injection Point
UD 5gx5543 Vendor data 63 79 No spare - -
pump source

Table P6-4: Control valves and restriction orifices noise:

Guaranteed Ambient
Cadnaa
Vendor's CP CP CP Noise from Lpa-Lp Cadnaa length
Tag Deck Line_Number_Label Lw
Data Lp Easting Northing Elevation equipment dB(A) Model m
dB(A)
dB(A) only
Lpa dB(A)

5LV 22104 <80 213589 114442 516 Main 1" HL522001-F23- 80 5.0 point source 95.0 -
5LV 55206 <80 213768 119513 885 Main 3" HL555002-F23- 80 5.0 point source 95.0 -
5TV 55110A 77.1 205600 119107 8105 Main 10" CW555002-B01W 80 2.9 simplified 102.1 79
5TV 55110B 77.1 209400 119107 8105 Main 10" CW555003-B01W 80 2.9 simplified 102.1 79
RO-55313 <60 211627 110727 650 Main 3" GT555002-F23- 80 25.0 neglected NA -
RO-55316 <60 215185 110500 669 Main 2" HL555003-F23- 80 25.0 neglected NA -
5PV2 55319 83.5 213458 107695 21176 Top 24" HG555011-F21- 80 -3.5 Not modeled - Contingency
5PV1 55319 <70 209316 120888 20998 Top 16" HG555006-F21- 80 15.0 point source 87.5 -
5LV 22404 <80 212101 113684 14137 Upper 1" HL522004-B03-PP 80 5.0 point source 95 -
5LV 55216 <80 215478 115459 13530 Upper 1" HL555001-F23- 80 5.0 point source 95 -
5PV1 22108 69.8 201677 120936 13531 Upper 2" HG555012-F23- 80 10.2 point source 84.8 -
5PV2 22108 69.8 201677 119273 13531 Upper 2" HG522001-F23- 80 10.2 point source 84.8 -
5PV1 22408 66.2 207530 113675 13584 Upper 1-1/2" FG522015-F23- 80 13.8 point source 81.2 -
5PV2 22408 66.2 207930 113675 13584 Upper 1-1/2" FG522019-F23- 80 13.8 point source 81.2 -

Note: The method used to model piping noise is described in 5-5-5


Control valve 5 PV2 55319 is not modeled because it’s not operating in normal case. Contingency
case is studied in 7-2-1

NG50-5-500-SAF-CN-AB-00-6002_rev01

This document is the property of TOTAL and shall not be disclosed to third parties or reproduced without permission of the COMPANY.
Akpo
Project
NIGERIA – OML 130
AKPO Field Development Project

48/14
COMPANY ref: NG50-5-500-SAF-CN-AB-00-6002 Revision: 01 Status: IFD Class: 2 Date: 02/10/2007 Page:
2
CONTRACTOR ref: 8577Y-2000-CN-6000-002 -- -- -- -- --

Figure P6-1: Module P6 Main Deck

NG50-5-500-SAF-CN-AB-00-6002_rev01

This document is the property of TOTAL and shall not be disclosed to third parties or reproduced without permission of the COMPANY.
Akpo
Project
NIGERIA – OML 130
AKPO Field Development Project

49/14
COMPANY ref: NG50-5-500-SAF-CN-AB-00-6002 Revision: 01 Status: IFD Class: 2 Date: 02/10/2007 Page:
2
CONTRACTOR ref: 8577Y-2000-CN-6000-002 -- -- -- -- --

Figure P6-2: Module P6 West Elevation

NG50-5-500-SAF-CN-AB-00-6002_rev01

This document is the property of TOTAL and shall not be disclosed to third parties or reproduced without permission of the COMPANY.
Akpo
Project
NIGERIA – OML 130
AKPO Field Development Project

50/14
COMPANY ref: NG50-5-500-SAF-CN-AB-00-6002 Revision: 01 Status: IFD Class: 2 Date: 02/10/2007 Page:
2
CONTRACTOR ref: 8577Y-2000-CN-6000-002 -- -- -- -- --

6.7. Module P7

Main noise sources of this module are presented here under with data taken into account in the
calculation.
Subsea methanol injection pumps 5-GX-1930A/B are not activated as noise sources in the model
due to their intermittent operation.
Table P7-1:
Noise DATA Noise
Cadnaa
Deck Tag Label Name LpA Items in abatement Comments
Origin of data LwA Model
dB(A)@1m operation measure
Sub sea methanol Intermittent -
MD 5gx1930a/b Vendor Data 91 110 - - -
injection pump Not activated
Subsea methanol Point
MD 5gx1940a Vendor Data 79 96 Running - -
pressurization pump source
Topside methanol 1 running, Point
MD 5gx1920a/b Vendor Data 80 96 - -
injection pump 1 spare source
Gearbox
Gas injection Vendor High area
UD 5kb5460 81 106 No spare acoustic -
compressor Measurements source
cladding
HHI expected No spare, Point
UD 5ub6107a/b AHU Room P7 70 89 - -
max values hypothesis source
Fresh water make-up 1 running, Point
UD 5gx9315a/b Vendor data 71 87 - -
pumps 1 spare source

Table P7-2: Control valves and restriction orifices noise:

Guaranteed Ambient
Cadnaa
Vendor's CP CP CP Noise from Lpa-Lp Cadnaa length
Tag Deck Line_Number_Label Lw
Data Lp Easting Northing Elevation equipment dB(A) Model m
dB(A)
dB(A) only
Lpa dB(A)

5PV2 19305A 79.4 228624 111743 6530 Main 1" ME519061-L01M 82.5 3.1 point source 99.4 -
5PV1 19305A <75 227752 112143 6530 Main 2" ME519061-L01M 82.5 12.5 point source 90.0 -
RO-54502 <60 230138 119791 1232 Main 2" HC554003-J23 82.5 27.5 neglected NA -
RO-54509 80.5 230378 125210 7093 Main 2" HG554025-J21 82.5 2.0 point source 95.5 -
5PV2 16301 63.9 227116 115975 22117 Top 1" NG516004-D01V 80 16.1 point source 78.9 -
5PV1 15401 62.6 229994 110780 22116 Top 1" NG511007-B01V 80 17.4 point source 77.6 -
5PV2 15401 62.4 227216 111189 22017 Top 1" NG515003-B01 80 17.6 point source 77.4 -
5PV1 16301 <50 229382 118253 22116 Top 1" NG516003-D01V 80 35.0 neglected NA -
5PV2 19109A 69.8 228029 106407 13517 Upper 1" NG519001-B01 82.5 12.7 point source 84.8 -

Note: The method used to model piping noise is described in 5-5-5

NG50-5-500-SAF-CN-AB-00-6002_rev01

This document is the property of TOTAL and shall not be disclosed to third parties or reproduced without permission of the COMPANY.
Akpo
Project
NIGERIA – OML 130
AKPO Field Development Project

51/14
COMPANY ref: NG50-5-500-SAF-CN-AB-00-6002 Revision: 01 Status: IFD Class: 2 Date: 02/10/2007 Page:
2
CONTRACTOR ref: 8577Y-2000-CN-6000-002 -- -- -- -- --

Figure P7-1: Module P7 Main Deck

NG50-5-500-SAF-CN-AB-00-6002_rev01

This document is the property of TOTAL and shall not be disclosed to third parties or reproduced without permission of the COMPANY.
Akpo
Project
NIGERIA – OML 130
AKPO Field Development Project

52/14
COMPANY ref: NG50-5-500-SAF-CN-AB-00-6002 Revision: 01 Status: IFD Class: 2 Date: 02/10/2007 Page:
2
CONTRACTOR ref: 8577Y-2000-CN-6000-002 -- -- -- -- --

Figure P7-2: Module P7 Upper Deck

NG50-5-500-SAF-CN-AB-00-6002_rev01

This document is the property of TOTAL and shall not be disclosed to third parties or reproduced without permission of the COMPANY.
Akpo
Project
NIGERIA – OML 130
AKPO Field Development Project

53/14
COMPANY ref: NG50-5-500-SAF-CN-AB-00-6002 Revision: 01 Status: IFD Class: 2 Date: 02/10/2007 Page:
2
CONTRACTOR ref: 8577Y-2000-CN-6000-002 -- -- -- -- --

6.8. Module P8

Main noise sources of this module are presented here under with data taken into account in the
calculation.
Table P8-1:
Noise DATA Noise
Cadnaa
Deck Tag Label Name LpA Lw Items in abatement Comments
Origin of data Model
dB(A)@1m A operation measure
Crude oil Vendor Area source Pump cladding,
3 running, Intermittent -
MD 5gx8310a/b/c/d offloading measurement 86 109 on reflecting baseplate
1 spare Activated
pumps data surface acoustic tiles
Area source Same noise as
3 running,
MD 5gx8310a/b/c/d Piping noise - - 107 on reflecting - the pump
1 spare
surface itself
HHI expected No spare,
UD 5ub6108a/b AHU Room P8 70 88 Point source - -
max values hypothesis

Note: For piping noise modeling: see paragraph 5-5-5

Table P8-2: Control valves and restriction orifices noise:

Guaranteed Ambient
Cadnaa
Vendor's CP CP CP Noise from Lpa-Lp Cadnaa length
Tag Deck Line_Number_Label Lw
Data Lp Easting Northing Elevation equipment dB(A) Model m
dB(A)
dB(A) only
Lpa dB(A)

5FV 83109A 79.9 257535 104700 13662 Upper 12" HL583011-F01V- 80 0.1
5FV 83109B 79.9 254285 116948 13662 Upper 12" HL583012-F01V- 80 0.1
Detailed 109.2 109
5FV 83109C 79.9 271899 104700 13662 Upper 12" HL583020-F01V- 80 0.1
5FV 83109D 79.9 278500 114075 13662 Upper 12" HL583021-F01V- 80 0.1

Note: The method used to model piping noise is described in 5-5-5

NG50-5-500-SAF-CN-AB-00-6002_rev01

This document is the property of TOTAL and shall not be disclosed to third parties or reproduced without permission of the COMPANY.
Akpo
Project
NIGERIA – OML 130
AKPO Field Development Project

54/14
COMPANY ref: NG50-5-500-SAF-CN-AB-00-6002 Revision: 01 Status: IFD Class: 2 Date: 02/10/2007 Page:
2
CONTRACTOR ref: 8577Y-2000-CN-6000-002 -- -- -- -- --

Figure P8-1: Module P8 Main Deck

NG50-5-500-SAF-CN-AB-00-6002_rev01

This document is the property of TOTAL and shall not be disclosed to third parties or reproduced without permission of the COMPANY.
Akpo
Project
NIGERIA – OML 130
AKPO Field Development Project

55/14
COMPANY ref: NG50-5-500-SAF-CN-AB-00-6002 Revision: 01 Status: IFD Class: 2 Date: 02/10/2007 Page:
2
CONTRACTOR ref: 8577Y-2000-CN-6000-002 -- -- -- -- --

Figure P8-2: Module P8 East Elevation

NG50-5-500-SAF-CN-AB-00-6002_rev01

This document is the property of TOTAL and shall not be disclosed to third parties or reproduced without permission of the COMPANY.
Akpo
Project
NIGERIA – OML 130
AKPO Field Development Project

56/14
COMPANY ref: NG50-5-500-SAF-CN-AB-00-6002 Revision: 01 Status: IFD Class: 2 Date: 02/10/2007 Page:
2
CONTRACTOR ref: 8577Y-2000-CN-6000-002 -- -- -- -- --

6.9. Module S1

Main noise sources of this module are presented here under with data taken into account in the
calculation.
Table S1-1:
Noise DATA Noise
Tag Cadnaa
Deck Name LpA Items in Abatement Comments
Label Origin of data LwA Model
dB(A)@1m Operation Measure
For normal
See table S1-2
5ua7330 Seawater sand operation
MD Vendor data
5ub7340 filtration package 15' per For backwash
90 - - -
week operation
5gx1610 Hot water Vendor 1 running, Point Open
MD 79 98 -
a/b circualtion pumps Measurements 1 spare source enclosure
5gx1610 1 running, Point Same noise as
MD Piping noise - - 95 -
a/b 1 spare source the pump itself
Chemical injection
MezD 5ua3840 Vendor data See table S1-3
package
5gx7320 Seawater lift Point
UD Vendor data 75 95 No spare - -
a/b/c booster pumps source

Note: For piping noise modeling: see paragraph 5-5-5

Note: Backwash function of the filters has not been taken into account in the calculation due to the
“not normal” operation condition of backwash function.

Table S1-2: Detail for package 5-UA-7330/5-UA-7340:


Noise DATA Noise
Tag Cadnaa
Deck Name LpA Items in Abatement Comments
Label Origin of data LwA Model
dB(A)@1m Operation Measure
Control valves of Line
MD 5ua7330 Vendor data - 95 No spare - -
vessels a/b/c/d source
Control valves of Line
MD 5ua7330 Vendor data - 95 No spare - -
vessels e/f/g/h source
Acoustic
High
Air scour blowers 1 running, enclosure &
MezD 5ub7340 Vendor data 80 99 Area -
5kx7330a/b 1 spare Inlet
source
silencer

NG50-5-500-SAF-CN-AB-00-6002_rev01

This document is the property of TOTAL and shall not be disclosed to third parties or reproduced without permission of the COMPANY.
Akpo
Project
NIGERIA – OML 130
AKPO Field Development Project

57/14
COMPANY ref: NG50-5-500-SAF-CN-AB-00-6002 Revision: 01 Status: IFD Class: 2 Date: 02/10/2007 Page:
2
CONTRACTOR ref: 8577Y-2000-CN-6000-002 -- -- -- -- --

NG50-5-500-SAF-CN-AB-00-6002_rev01

This document is the property of TOTAL and shall not be disclosed to third parties or reproduced without permission of the COMPANY.
Akpo
Project
NIGERIA – OML 130
AKPO Field Development Project

58/14
COMPANY ref: NG50-5-500-SAF-CN-AB-00-6002 Revision: 01 Status: IFD Class: 2 Date: 02/10/2007 Page:
2
CONTRACTOR ref: 8577Y-2000-CN-6000-002 -- -- -- -- --

Table S1-3: Detail for package 5-UA-3840:


Noise DATA Noise
Tag Cadnaa
Deck Name LpA Items in Abatement Comments
Label Origin of data LwA Model
dB(A)@1m Operation Measure
Non oxidising
5gx7705 1 running, Point
MezD biocide injection Vendor data 63 78 - -
a/b 1 spare source
pump
5gx7765 Polyelectrolyte 1 running, Point
MezD Vendor data 63 78 - -
a/b injection pump 1 spare source
5gx7795 Coagulant 1 running, Point
MezD Vendor data 63 78 - -
a/b injection pump 1 spare source

Table S1-4: Control valves and restriction orifices noise:

Guaranteed Ambient
Cadnaa
Vendor's CP CP CP Noise from Lpa-Lp Cadnaa length
Tag Deck Line_Number_Label Lw
Data Lp Easting Northing Elevation equipment dB(A) Model m
dB(A)
dB(A) only
Lpa dB(A)

5LV 21106 81.9 Hull Hull Deck - Not Modeled


5PV 54402 76.5 Hull Hull Deck - Not Modeled
5TV 54710 75.6 Hull Hull Deck - Not Modeled
5PV 19205 <75 Hull Hull Deck - Not Modeled
5PV12 19109A 64.4 Hull Hull Deck - Not Modeled
5PV11 19109A <50 Hull Hull Deck - Not Modeled
RO-15001 <60 69120 88715 4445 Main 3" CW515035-B01W- 80 25.0 neglected NA -
5FV 73201A 64.3 72411 73359 13784 Upper 8" SW573020-B90A- 80 15.7 point source 89.3 -
5FV 73201B 64.3 72411 81359 13784 Upper 8" SW573021-B90A- 80 15.7 point source 89.3 -
5FV 73201C 64.3 72411 89359 13784 Upper 8" SW573022-B90A- 80 15.7 point source 89.3 -

Note: The method used to model piping noise is described in 5-5-5

NG50-5-500-SAF-CN-AB-00-6002_rev01

This document is the property of TOTAL and shall not be disclosed to third parties or reproduced without permission of the COMPANY.
Akpo
Project
NIGERIA – OML 130
AKPO Field Development Project

59/14
COMPANY ref: NG50-5-500-SAF-CN-AB-00-6002 Revision: 01 Status: IFD Class: 2 Date: 02/10/2007 Page:
2
CONTRACTOR ref: 8577Y-2000-CN-6000-002 -- -- -- -- --

Figure S1-1: Module S1 Main Deck

NG50-5-500-SAF-CN-AB-00-6002_rev01

This document is the property of TOTAL and shall not be disclosed to third parties or reproduced without permission of the COMPANY.
Akpo
Project
NIGERIA – OML 130
AKPO Field Development Project

60/14
COMPANY ref: NG50-5-500-SAF-CN-AB-00-6002 Revision: 01 Status: IFD Class: 2 Date: 02/10/2007 Page:
2
CONTRACTOR ref: 8577Y-2000-CN-6000-002 -- -- -- -- --

Figure S1-2: Module S1 Mezzanine Deck

NG50-5-500-SAF-CN-AB-00-6002_rev01

This document is the property of TOTAL and shall not be disclosed to third parties or reproduced without permission of the COMPANY.
Akpo
Project
NIGERIA – OML 130
AKPO Field Development Project

61/14
COMPANY ref: NG50-5-500-SAF-CN-AB-00-6002 Revision: 01 Status: IFD Class: 2 Date: 02/10/2007 Page:
2
CONTRACTOR ref: 8577Y-2000-CN-6000-002 -- -- -- -- --

Figure S1-3: Module S1 Upper Deck

NG50-5-500-SAF-CN-AB-00-6002_rev01

This document is the property of TOTAL and shall not be disclosed to third parties or reproduced without permission of the COMPANY.
Akpo
Project
NIGERIA – OML 130
AKPO Field Development Project

62/14
COMPANY ref: NG50-5-500-SAF-CN-AB-00-6002 Revision: 01 Status: IFD Class: 2 Date: 02/10/2007 Page:
2
CONTRACTOR ref: 8577Y-2000-CN-6000-002 -- -- -- -- --

6.10. Module S2

Main noise sources of this module are presented here under with data taken into account in the
calculation.
Table S2-1:
Noise DATA Noise
Cadnaa
Deck Tag Label Name LpA Items in Abatement Comments
Origin of data LwA Model
dB(A)@1m operation Measure
Point source
Air compressor Vendor 2 running, Noise
MD 5ub1310a/b/c 73 91 inside -
packages measurements 1 spare enclosure
building
Foam pump of foam
MD 5gx1730a/b Requirement 80 95 Not activated, operation in case of emergency & tests
system 5ub1730
HHI expected
UD HVAC HVAC Laboratory max values - 75 96 No spare Point source - -
Extrapolation
Nitrogen generation Vendor
UD 5ub1110a/b 75 97 No spare Point source - See table S2-2
package guarantee
Inert gas generator
UD 5ua1210a1/a2 Vendor Data 77 See table S2-3
package
1 running,
UD 5ub1330a/b Air drier package Vendor data 78 102 Line sources Silencer See table S2-4
1 spare
Fresh air fan A/B for
HHI expected 1 running, High area
UD 5ka6102a/b topside modules ("S 70 94 - -
max values 1 spare source
Side")
HHI expected No spare,
UD 5ub6112a/b HVAC Room S2 70 88 Point source - -
max values hypothesis

Table S2-2: Detail for package 5-UA-1110A/B:

Noise DATA Noise


Cadnaa
Deck Tag Label Name Origin LpA Items in Abatement Comments
LwA Model
of data dB(A)@1m Operation Measure
Vendor guarantee
Nitrogen generation Vendor Point
UD 5ub1110a/b 65 94 No spare - around the complete
package - vent noise data source
package. The total Lw
Nitrogen generation has been divided in
Vendor Point
UD 5ub1110a/b package - control 65 94 No spare - two noise sources
data source
valve noise provided by Vendor.

NG50-5-500-SAF-CN-AB-00-6002_rev01

This document is the property of TOTAL and shall not be disclosed to third parties or reproduced without permission of the COMPANY.
Akpo
Project
NIGERIA – OML 130
AKPO Field Development Project

63/14
COMPANY ref: NG50-5-500-SAF-CN-AB-00-6002 Revision: 01 Status: IFD Class: 2 Date: 02/10/2007 Page:
2
CONTRACTOR ref: 8577Y-2000-CN-6000-002 -- -- -- -- --

Table S2-3: Detail for package 5-UA-1210A1/A2:


Noise DATA
Cadnaa Noise Abatement
Deck Tag Label Name Origin of LpA Items in Comments
LwA Model Measure
data dB(A)@1m Operation
Vendor
1 running, Point
UD 5ua1210a1a/b Fan motor Noise Data - 81 - Lw per motor
1 spare source
Sheet
Vendor
1 running, Point
UD 5ua1210a1a/b Fan Noise Data - 77 - Lw per fan
1 spare source
Sheet
Estimated Point
UD 5ua1210a2 Pump 65 80 No spare - -
value source
Vendor
line Two silencers
UD 5ua1210a1 Gas outlet pipe Noise Data 78 92 No spare -
source (double unit) will
Sheet
be provided both
Vendor
line in air inlet and
UD 5ua1210a1 Gas inlet pipe Noise Data - 83 No spare -
source vent piping
Sheet
Vendor
Point
UD 5ua1210a1 Burner Noise Data - 75 No spare - -
source
Sheet

Table S2-4: Detail for package 5-UA-1330A/B:


Noise DATA
Cadnaa Noise Abatement
Deck Tag Label Name Origin of LpA Items in Comments
LwA Model Measure
data dB(A)@1m Operation
Air drier package - 1 running, Line
UD 5ub1330a/b Vendor data - 97 - -
"x" direction 1 spare source
Air drier package - 1 running, Line
UD 5ub1330a/b Vendor data - 97 - -
"y" direction 1 spare source
Air drier package - 1 running, Line
UD 5ub1330a/b Vendor data - 97 - -
"z" direction 1 spare source

NG50-5-500-SAF-CN-AB-00-6002_rev01

This document is the property of TOTAL and shall not be disclosed to third parties or reproduced without permission of the COMPANY.
Akpo
Project
NIGERIA – OML 130
AKPO Field Development Project

64/14
COMPANY ref: NG50-5-500-SAF-CN-AB-00-6002 Revision: 01 Status: IFD Class: 2 Date: 02/10/2007 Page:
2
CONTRACTOR ref: 8577Y-2000-CN-6000-002 -- -- -- -- --

Table S2-5: Control valves and restriction orifices noise:

Guaranteed Ambient
Cadnaa
Vendor's CP CP CP Noise from Lpa-Lp Cadnaa length
Tag Deck Line_Number_Label Lw
Data Lp Easting Northing Elevation equipment dB(A) Model m
dB(A)
dB(A) only
Lpa dB(A)

5PV 13201 <50 82150 90432 13500 Upper 1" SA513007-B10- 85 40.0 neglected NA -
5PV 13401 <50 91833 83487 13467 Upper 1" IA513006-B10- 85 40.0 neglected NA -
RO-13203 <60 82150 91693 13500 Upper 2" SA513007-B10- 85 40.0 neglected NA -

Note: The method used to model piping noise is described in 5-5-5

NG50-5-500-SAF-CN-AB-00-6002_rev01

This document is the property of TOTAL and shall not be disclosed to third parties or reproduced without permission of the COMPANY.
Akpo
Project
NIGERIA – OML 130
AKPO Field Development Project

65/14
COMPANY ref: NG50-5-500-SAF-CN-AB-00-6002 Revision: 01 Status: IFD Class: 2 Date: 02/10/2007 Page:
2
CONTRACTOR ref: 8577Y-2000-CN-6000-002 -- -- -- -- --

Figure S2-1: Module S2 Main Deck

NG50-5-500-SAF-CN-AB-00-6002_rev01

This document is the property of TOTAL and shall not be disclosed to third parties or reproduced without permission of the COMPANY.
Akpo
Project
NIGERIA – OML 130
AKPO Field Development Project

66/14
COMPANY ref: NG50-5-500-SAF-CN-AB-00-6002 Revision: 01 Status: IFD Class: 2 Date: 02/10/2007 Page:
2
CONTRACTOR ref: 8577Y-2000-CN-6000-002 -- -- -- -- --

Figure S2-2: Module S2 Upper Deck

NG50-5-500-SAF-CN-AB-00-6002_rev01

This document is the property of TOTAL and shall not be disclosed to third parties or reproduced without permission of the COMPANY.
Akpo
Project
NIGERIA – OML 130
AKPO Field Development Project

67/14
COMPANY ref: NG50-5-500-SAF-CN-AB-00-6002 Revision: 01 Status: IFD Class: 2 Date: 02/10/2007 Page:
2
CONTRACTOR ref: 8577Y-2000-CN-6000-002 -- -- -- -- --

6.11. Module S3

Main noise sources of this module are presented here under with data taken into account in the
calculation.
Table S3-1:
Noise DATA Noise
Tag
Deck Name Origin of LpA Lw Items in Cadnaa Model abatement Comments
Label
data dB(A)@1m A operation measure
Area source on
5py6510 Main power generator - AC 5py6510f in
MD Vendor data 83 105 reflecting - -
d/e/f Generator spare
surface
Area source on
5py6510 Main power generator - 5py6510f in
MD Vendor data 80 98 reflecting - -
d/e/f Gear box spare
surface
Area source on
5py6510 Main power generator - GT 5py6510f in
MD Vendor data 74 96 reflecting - -
d/e/f Enclosure spare
surface
5py6510 Main power generator - GT 5py6510f in
MD Vendor data 75 92 Point source - -
d/e/f Enclosure vent inlet spare
5py6510 Main power generator - GT 5py6510f in
MD Vendor data 72 94 Point source - -
d/e/f Enclosure vent outlet spare
Area source on
5py6510 Main power generator - Inlet 5py6510f in
MD Vendor data 74 94 reflecting - -
d/e/f Scroll spare
surface
Extrapolation
5py6510 Main power generator - Not 5py6510f in High area
MD from Vendor 96 - -
d/e/f Vertical air inlet duct Available spare source
data
Extrapolation
5py6510 Main power generator - Not 5py6510f in High area
MD from Vendor 95 - -
d/e/f horizontal air inlet duct Available spare source
data
5py6510 Main power generator - Air Not 5py6510f in High area
MD Vendor data 101 - -
d/e/f inlet opening Available spare source
Main power generator -
5py6510 WHRU
MD Exhaust WHRU expansion Vendor data 74 98 No spare Line source -
e/d sets
joint + transition to silencer
Main power generator -
5py6510 WHRU
MD Exhaust WHRU silencer Vendor data 69 97 No spare Line source -
e/d sets
duct
5py6510 Main power generator - WHRU
MD Vendor data 74 112 No spare Line source -
e/d Exhaust WHRU outlet duct sets
Main power generator -
5py6510 WHRU
MD Exhaust WHRU stack Vendor data 67 117 No spare Point source -
e/d sets
opening

NG50-5-500-SAF-CN-AB-00-6002_rev01

This document is the property of TOTAL and shall not be disclosed to third parties or reproduced without permission of the COMPANY.
Akpo
Project
NIGERIA – OML 130
AKPO Field Development Project

68/14
COMPANY ref: NG50-5-500-SAF-CN-AB-00-6002 Revision: 01 Status: IFD Class: 2 Date: 02/10/2007 Page:
2
CONTRACTOR ref: 8577Y-2000-CN-6000-002 -- -- -- -- --

Main power generator -


non-
MD 5py6510f Exhaust non-WHRU Vendor data 72 95 Spare - -
WHRU set
expansion joint
Main power generator -
non-
MD 5py6510f Exhaust non-WHRU Vendor data 71 96 Spare - -
WHRU set
silencer duct
Main power generator -
non-
MD 5py6510f Exhaust non-WHRU outlet Vendor data 70 100 Spare - -
WHRU set
duct
Main power generator -
non-
MD 5py6510f Exhaust non-WHRU stack Vendor data 70 123 Spare - -
WHRU set
opening
16 MVA, 13,8kV/6,9kV
UD 5pb6500b Vendor data 65 87 No spare Point source - -
Power transformer
2500 KVA, 13,8kV/0,42kV
UD 5pb6501b Vendor data 50 70 No spare Point source - -
Power transformer utilities
2500 KVA, 13,8kV/0,42kV
UD 5pb6502b Vendor data 50 70 No spare Point source - -
Power transformer process

2500 KVA, 6,6kV/0,42kV


UD 5pb6504b Vendor data 50 70 No spare Point source - -
Power transformer essential

5pb6506 1600 KVA, 13,8kV/0,42kV


UD Vendor data 40 58 No spare Point source - -
c/d Power transformer process

5ub6113 HHI expected No spare,


UD AHU Room S3 75 96 Point source - -
a/b max values hypothesis

NG50-5-500-SAF-CN-AB-00-6002_rev01

This document is the property of TOTAL and shall not be disclosed to third parties or reproduced without permission of the COMPANY.
Akpo
Project
NIGERIA – OML 130
AKPO Field Development Project

69/14
COMPANY ref: NG50-5-500-SAF-CN-AB-00-6002 Revision: 01 Status: IFD Class: 2 Date: 02/10/2007 Page:
2
CONTRACTOR ref: 8577Y-2000-CN-6000-002 -- -- -- -- --

Table S3-2: Control valves and restriction orifices noise:

Guaranteed Ambient
Cadnaa
Vendor's CP CP CP Noise from Lpa-Lp Cadnaa length
Tag Deck Line_Number_Label Lw
Data Lp Easting Northing Elevation equipment dB(A) Model m
dB(A)
dB(A) only
Lpa dB(A)

RO-65102D <60 107047 71092 2698 Main 2" SW565004-B90- 85 30.0 neglected NA -
RO-65102E <60 116047 71092 2698 Main 2" SW565005-B90- 85 30.0 neglected NA -
RO-65102F <60 124747 71092 2698 Main 2" SW565006-B90- 85 30.0 neglected NA -
RO-65103D <60 109733 86271 4434 Main 2" SW565004-B90- 85 30.0 neglected NA -
RO-65103E <60 118733 86271 4434 Main 2" SW565005-B90- 85 30.0 neglected NA -
RO-65103F <60 127433 86271 4434 Main 2" SW565006-B90- 85 30.0 neglected NA -
RO-65104D <60 109733 86271 4814 Main 2" SW565004-B90- 85 30.0 neglected NA -
RO-65104E <60 118733 86271 4814 Main 2" SW565005-B90- 85 30.0 neglected NA -
RO-65104F <60 127433 86271 4814 Main 2" SW565006-B90- 85 30.0 neglected NA -
RO-65105D <60 110914 87974 2692 Main 4" SW565004-B90- 85 30.0 neglected NA -
RO-65105E <60 119914 87974 2692 Main 4" SW565005-B90- 85 30.0 neglected NA -
RO-65105F <60 128614 87974 2692 Main 4" SW565006-B90- 85 30.0 neglected NA -
5FV2 16211D 63.2 122250 79395 19610 Top 8" HW516030-D01V-HC 85 21.8 neglected NA -
5FV2 16211C 63.2 122432 76537 13714 Upper 8" HW516027-D01V-HC 85 21.8 neglected NA -

Note: The method used to model piping noise is described in 5-5-5

NG50-5-500-SAF-CN-AB-00-6002_rev01

This document is the property of TOTAL and shall not be disclosed to third parties or reproduced without permission of the COMPANY.
Akpo
Project
NIGERIA – OML 130
AKPO Field Development Project

70/14
COMPANY ref: NG50-5-500-SAF-CN-AB-00-6002 Revision: 01 Status: IFD Class: 2 Date: 02/10/2007 Page:
2
CONTRACTOR ref: 8577Y-2000-CN-6000-002 -- -- -- -- --

Figure S3-1: Module S3 Main Deck

NG50-5-500-SAF-CN-AB-00-6002_rev01

This document is the property of TOTAL and shall not be disclosed to third parties or reproduced without permission of the COMPANY.
Akpo
Project
NIGERIA – OML 130
AKPO Field Development Project

71/14
COMPANY ref: NG50-5-500-SAF-CN-AB-00-6002 Revision: 01 Status: IFD Class: 2 Date: 02/10/2007 Page:
2
CONTRACTOR ref: 8577Y-2000-CN-6000-002 -- -- -- -- --

Figure S3-2: Module S3 Upper Deck

NG50-5-500-SAF-CN-AB-00-6002_rev01

This document is the property of TOTAL and shall not be disclosed to third parties or reproduced without permission of the COMPANY.
Akpo
Project
NIGERIA – OML 130
AKPO Field Development Project

72/14
COMPANY ref: NG50-5-500-SAF-CN-AB-00-6002 Revision: 01 Status: IFD Class: 2 Date: 02/10/2007 Page:
2
CONTRACTOR ref: 8577Y-2000-CN-6000-002 -- -- -- -- --

6.12. Module S4

Main noise sources of this module are presented here under with data taken into account in the
calculation.
Table S4-1:
Noise DATA Noise
Cadnaa
Deck Tag Label Name LpA Items in abatement Comments
Origin of data LwA Model
dB(A)@1m operation measure
HHI expected No spare,
UD 5ub6114a/b AHU Room S4 70 88 Point source - -
max values hypothesis

Table S4-2: Control valves and restriction orifices noise:

Guaranteed Ambient
Cadnaa
Vendor's CP CP CP Noise from Lpa-Lp Cadnaa length
Tag Deck Line_Number_Label Lw
Data Lp Easting Northing Elevation equipment dB(A) Model m
dB(A)
dB(A) only
Lpa dB(A)

5HV 30101 <75 157830 77210 9156 Main 6" HC530007-J70-PP 75 5.0 simplified 92.5 45
5HV 30102 <75 156980 77210 9144 Main 8" HC530007-J70-PP 75 5.0 simplified 95 79
5HV 30201 <75 153900 77210 9157 Main 6" HC530017-J70-PP 75 5.0 simplified 92.5 45
5HV 30202 <75 153050 77210 9144 Main 8" HC530017-J70-PP 75 5.0 simplified 95 79
5HV 30301 <75 150100 77210 9156 Main 6" HC530027-J70-PP 75 5.0 simplified 92.5 45
5HV 30302 <75 150950 77210 9143 Main 8" HC530027-J70-PP 75 5.0 simplified 95 79
5HV 30401 <75 144900 77210 9156 Main 6" HC530037-J70-PP 75 5.0 simplified 92.5 45
5HV 30402 <75 144050 77210 9143 Main 8" HC530037-J70-PP 75 5.0 simplified 95 79
5HV 30501 <75 137170 77210 9157 Main 6" HC530047-J70-PP 75 5.0 simplified 92.5 45
5HV 30502 <75 138020 77210 9144 Main 8" HC530047-J70-PP 75 5.0 simplified 95 79
5HV 30601 <75 141100 77210 9157 Main 6" HC530057-J70-PP 75 5.0 simplified 92.5 45
5HV 30602 <75 141950 77210 9144 Main 8" HC530057-J70-PP 75 5.0 simplified 95 79
5FV 30106 <70 156100 93087 636 Main 10" HL599023-J01-HC 75 10.0 simplified 90 79
5FV 30306 <70 147950 93087 636 Main 10" HL599024-J01-HC 75 10.0 simplified 90 79
5FV 30506 <70 138900 93087 636 Main 10" HL599025-J01-HC 75 10.0 simplified 90 79
5PV2 41110 79.4 146442 93591 25224 Top 1 HG541002-B03-PP 82.5 3.1 point source 94.4 -
5PV1 41110 70.2 135369 84664 25245 Top 3" FG522033-B03-PP 82.5 12.3 point source 85.2 -
5FV 31113A <70 154401 90775 25403 Top 16" HG531001-F70-PPA 82.5 17.5 point source 87.5 -
RO-31101A 78.3 155833 93797 25560 Top 2" HG531001-F70-PPA 82.5 4.2 point source 93.3 -
5LV 31105A <80 143855 86355 13695 Upper 12" HL531001-F23-PP 75 0.0 simplified 100 79
5LDV 31106A 67.0 154443 77850 13585 Upper 6" PW531001-F23-PP 75 8.0 simplified 89.5 45

Note:The method used to model piping noise is described in 5-5-5

NG50-5-500-SAF-CN-AB-00-6002_rev01

This document is the property of TOTAL and shall not be disclosed to third parties or reproduced without permission of the COMPANY.
Akpo
Project
NIGERIA – OML 130
AKPO Field Development Project

73/14
COMPANY ref: NG50-5-500-SAF-CN-AB-00-6002 Revision: 01 Status: IFD Class: 2 Date: 02/10/2007 Page:
2
CONTRACTOR ref: 8577Y-2000-CN-6000-002 -- -- -- -- --

Figure S4-1: Module S4 Upper Deck

NG50-5-500-SAF-CN-AB-00-6002_rev01

This document is the property of TOTAL and shall not be disclosed to third parties or reproduced without permission of the COMPANY.
Akpo
Project
NIGERIA – OML 130
AKPO Field Development Project

74/14
COMPANY ref: NG50-5-500-SAF-CN-AB-00-6002 Revision: 01 Status: IFD Class: 2 Date: 02/10/2007 Page:
2
CONTRACTOR ref: 8577Y-2000-CN-6000-002 -- -- -- -- --

6.13. Module S5

Main noise sources of this module are presented here under with data taken into account in the
calculation.
Table S5-1:
Noise DATA Noise
Deck Tag Label Name LpA Items in Cadnaa Model abatement Comments
Origin of data LwA
dB(A)@1m operation measure
Crude
Vendor 1 running, Point source Open Intermittent -
MD 5gx9920c/d recirculation 82 102
measurements 1 spare inside building enclosure Activated
pump
1 running, Point source Same noise as
MD 5gx9920c/d Piping noise - - 99 -
1 spare inside building the pump itself
Crude oil Vendor 1 running, Point source Open
MD 5gx3720a/b 77 96 -
transfer pumps measurements 1 spare inside building enclosure
1 running, Point source Same noise as
MD 5gx3720a/b Piping noise - - 93 -
1 spare inside building the pump itself
Hydraulic HHI answer to
MD 5hpu001 See Table S5-2
power unit Technical Query

Note: For piping noise modeling: see paragraph 5-5-5

Table S5-2: Detail for hydraulic power unit 5-HPU-001:


Noise DATA Noise
Deck Tag Label Name LpA Items in Cadnaa Model Abatement Comments
Origin of data LwA
dB(A)@1m Operation Measure
HHI answer to No spare, Point source
MD 5hpu001 HP Pumps a/b 77 91 - -
Technical Query hypothesis inside building
HHI answer to No spare, Point source
MD 5hpu001 LP Pumps a/b 80 94 - -
Technical Query hypothesis inside building

NG50-5-500-SAF-CN-AB-00-6002_rev01

This document is the property of TOTAL and shall not be disclosed to third parties or reproduced without permission of the COMPANY.
Akpo
Project
NIGERIA – OML 130
AKPO Field Development Project

75/14
COMPANY ref: NG50-5-500-SAF-CN-AB-00-6002 Revision: 01 Status: IFD Class: 2 Date: 02/10/2007 Page:
2
CONTRACTOR ref: 8577Y-2000-CN-6000-002 -- -- -- -- --

Table S5-3: Control valves and restriction orifices noise:

Guaranteed Ambient
Cadnaa
Vendor's CP CP CP Noise from Lpa-Lp Cadnaa length
Tag Deck Line_Number_Label Lw
Data Lp Easting Northing Elevation equipment dB(A) Model m
dB(A)
dB(A) only
Lpa dB(A)

5FV 19049 79.5 179148 81233 6017 Main 1" ME519096-L01M- 80 0.5 point source 99.5 -
5FV 99207C 79.4 175400 93720 5945 Main 3" HL599043-F01-HC 80 0.6 point source 99.4 -
5FV 99207D 79.4 179600 91580 5945 Main 3" HL599044-F01-HC 80 0.6 point source 99.4 -
5TV 99105 78.2 168282 78640 6084 Main 6" HW599001-D01V-HC 80 1.8 simplified 100.7 45
5LV1 36105 76.8 187913 80004 6203 Main 16" HL537003-B01- 80 3.2 simplified 101.8 79
5LV2 36105 76.8 186884 76935 6203 Main 16" HL537003-B01- 80 3.2 simplified 101.8 79
5TV 37108 76.7 186971 85023 6162 Main 12" CW537005-B01W- 80 3.3 simplified 101.7 79
5FV 19002 51.0 176000 76288 5881 Main 2" ME519011-L01M- 80 29.0 neglected NA -
5FV 19003 51.0 172000 76288 5881 Main 2" ME519014-L01M- 80 29.0 neglected NA -
5FV 19004 51.0 168000 76288 5881 Main 2" ME519017-L01M- 80 29.0 neglected NA -
5FV 19005 51.0 169300 90431 5881 Main 2" ME519020-L01M- 80 29.0 neglected NA -
5FV 19007 51.0 174500 76288 5881 Main 2" ME519012-L01M- 80 29.0 neglected NA -
5FV 19008 51.0 170500 76288 5881 Main 2" ME519015-L01M- 80 29.0 neglected NA -
5FV 19009 51.0 166500 76288 5881 Main 2" ME519018-L01M- 80 29.0 neglected NA -
5FV 19010 51.0 168800 90431 5881 Main 2" ME519021-L01M- 80 29.0 neglected NA -
5FV 19012 51.0 174000 76288 5881 Main 2" ME519013-L01M- 80 29.0 neglected NA -
5FV 19013 51.0 170000 76288 5881 Main 2" ME519016-L01M- 80 29.0 neglected NA -
5FV 19014 51.0 166000 76288 5881 Main 2" ME519019-L01M- 80 29.0 neglected NA -
5FV 19015 51.0 167300 90431 5881 Main 2" ME519022-L01M- 80 29.0 neglected NA -
5FV 19035 <50 180598 81281 6030 Main 2" ME519025-L01M- 80 35.0 neglected NA -
5FV 19038 <50 181698 81281 6030 Main 2" ME519026-L01M- 80 35.0 neglected NA -
5FV 19032 <50 171019 91970 5880 Main 2" ME519024-L01M- 80 35.0 neglected NA -
5FV 19041 <50 178048 81281 6030 Main 2" ME519027-L01M- 80 35.0 neglected NA -
5PV 31111A 84.4 161257 91180 25403 Top 16" HG531002-F70-PFP 80 -4.4 Not modeled - Contingency
5PV 36112 78.4 182995 87157 24229 Top 18" HG536002-B49-PP 80 1.6 simplified 103.4 79
5LV 41102 <80 161000 92657 13556 Upper 4" HL541001-B03-PP 80 5.0 simplified 97.5 45
5LDV 35103 75.3 185721 81142 13544 Upper 3" PW535001-B03-PP 80 4.7 point source 95.3 -

Note: The method used to model piping noise is described in 5-5-5

NG50-5-500-SAF-CN-AB-00-6002_rev01

This document is the property of TOTAL and shall not be disclosed to third parties or reproduced without permission of the COMPANY.
Akpo
Project
NIGERIA – OML 130
AKPO Field Development Project

76/14
COMPANY ref: NG50-5-500-SAF-CN-AB-00-6002 Revision: 01 Status: IFD Class: 2 Date: 02/10/2007 Page:
2
CONTRACTOR ref: 8577Y-2000-CN-6000-002 -- -- -- -- --

Figure S5-1: Module S5 Main Deck

NG50-5-500-SAF-CN-AB-00-6002_rev01

This document is the property of TOTAL and shall not be disclosed to third parties or reproduced without permission of the COMPANY.
Akpo
Project
NIGERIA – OML 130
AKPO Field Development Project

77/14
COMPANY ref: NG50-5-500-SAF-CN-AB-00-6002 Revision: 01 Status: IFD Class: 2 Date: 02/10/2007 Page:
2
CONTRACTOR ref: 8577Y-2000-CN-6000-002 -- -- -- -- --

6.14. Module S6

Main noise sources of this module are presented here under with data taken into account in the
calculation.
Table S6-1:
Noise DATA Noise
Cadnaa
Deck Tag Label Name LpA Items in abatement Comments
Origin of data LwA Model
dB(A)@1m operation measure
Degassing
MD 5ua4130 Vendor data See table S6-2
package

MP Compressor 1 running, Point source


MD 5gx5230a/b Vendor data 68 85 - -
scrubber pumps 1 spare inside building

Hydrocyclone
- 5ua4120 Canceled
package
HP Gas Vorecon
Vendor High Area
UD 5kb5330a/b Compressor train 83 108 No spare acoustic -
guarantee source
A/B enclosure
MP Gas Vendor High Area Gear acoustic
UD 5kb5240 80 104 No spare -
compressor measurements source cladding

HHI expected No spare,


UD 5ub6116a/b AHU Room S6 70 88 Point source - -
max values hypothesis

Table S6-2: Detail for package 5-UA-4130:


Noise DATA Noise
Cadnaa
Deck Tag Label Name LpA Items in abatement Comments
Origin of data LwA Model
dB(A)@1m operation measure
Skimmed Oil
1 running,
MD 5ua4130 return pumps Vendor data 82 96 Point source - -
1 spare
5gx4130a/b
Skimmed Oil
1 running, Low noise
MD 5ua4130 return motors Vendor data 78 93 Point source -
1 spare motor
5xa4130a/b
IGF pumps 1 running,
MD 5ua4130 Vendor data 78 92 Point source - -
5gx4131a/b 1 spare
IGF motors 1 running,
MD 5ua4130 Vendor data 75 89 Point source - -
5xa4131a/b 1 spare
Control valves Lw per
MD 5ua4130 Vendor data 75 95 No spare Point source -
FV1/2-41112 control valve

NG50-5-500-SAF-CN-AB-00-6002_rev01

This document is the property of TOTAL and shall not be disclosed to third parties or reproduced without permission of the COMPANY.
Akpo
Project
NIGERIA – OML 130
AKPO Field Development Project

78/14
COMPANY ref: NG50-5-500-SAF-CN-AB-00-6002 Revision: 01 Status: IFD Class: 2 Date: 02/10/2007 Page:
2
CONTRACTOR ref: 8577Y-2000-CN-6000-002 -- -- -- -- --

Table S6-3: Control valves and restriction orifices noise:

Guaranteed Ambient
Cadnaa
Vendor's CP CP CP Noise from Lpa-Lp Cadnaa length
Tag Deck Line_Number_Label Lw
Data Lp Easting Northing Elevation equipment dB(A) Model m
dB(A)
dB(A) only
Lpa dB(A)

5LV 53206A <80 196226 76654 530 Main 2" HL553001-D03- 82.5 7.5 point source 95.0 -
5LV 53206B <80 203599 76526 530 Main 2" HL553002-D03- 82.5 7.5 point source 95.0 -
5TV 52201 78.2 214735 84131 6610 Main 8" CW552001-B01W- 82.5 4.3 simplified 103.2 79
5TV 53201A 75.9 198160 86436 6584 Main 8" CW552001-B01W- 82.5 6.6 simplified 100.9 79
5TV 53201B 75.9 198451 84564 6584 Main 6" CW553005-B01W- 82.5 6.6 simplified 98.4 45
5LV 52206 51.4 196438 81800 544 Main 3" HL552004-D03- 82.5 31.1 neglected NA -
RO-53113A 78.4 218700 94503 7512 Main 2" HG552007-D49-PPA 82.5 4.1 point source 93.4 -
RO-53113B 78.4 215000 94503 7512 Main 2" HG553002-D49-PPA 82.5 4.1 point source 93.4 -

Note: The method used to model piping noise is described in 5-5-5

NG50-5-500-SAF-CN-AB-00-6002_rev01

This document is the property of TOTAL and shall not be disclosed to third parties or reproduced without permission of the COMPANY.
Akpo
Project
NIGERIA – OML 130
AKPO Field Development Project

79/14
COMPANY ref: NG50-5-500-SAF-CN-AB-00-6002 Revision: 01 Status: IFD Class: 2 Date: 02/10/2007 Page:
2
CONTRACTOR ref: 8577Y-2000-CN-6000-002 -- -- -- -- --

Figure S6-1: Module S6 Main Deck

NG50-5-500-SAF-CN-AB-00-6002_rev01

This document is the property of TOTAL and shall not be disclosed to third parties or reproduced without permission of the COMPANY.
Akpo
Project
NIGERIA – OML 130
AKPO Field Development Project

80/14
COMPANY ref: NG50-5-500-SAF-CN-AB-00-6002 Revision: 01 Status: IFD Class: 2 Date: 02/10/2007 Page:
2
CONTRACTOR ref: 8577Y-2000-CN-6000-002 -- -- -- -- --

Figure S6-2: Module S6 Upper Deck

NG50-5-500-SAF-CN-AB-00-6002_rev01

This document is the property of TOTAL and shall not be disclosed to third parties or reproduced without permission of the COMPANY.
Akpo
Project
NIGERIA – OML 130
AKPO Field Development Project

81/14
COMPANY ref: NG50-5-500-SAF-CN-AB-00-6002 Revision: 01 Status: IFD Class: 2 Date: 02/10/2007 Page:
2
CONTRACTOR ref: 8577Y-2000-CN-6000-002 -- -- -- -- --

Figure S6-3: Module S6 West Elevation

NG50-5-500-SAF-CN-AB-00-6002_rev01

This document is the property of TOTAL and shall not be disclosed to third parties or reproduced without permission of the COMPANY.
Akpo
Project
NIGERIA – OML 130
AKPO Field Development Project

82/14
COMPANY ref: NG50-5-500-SAF-CN-AB-00-6002 Revision: 01 Status: IFD Class: 2 Date: 02/10/2007 Page:
2
CONTRACTOR ref: 8577Y-2000-CN-6000-002 -- -- -- -- --

6.15. Module S7

Main noise sources of this module are presented here under with data taken into account in the
calculation.
Table S7-1:
Noise DATA Noise
Cadnaa
Deck Tag Label Name LpA Items in abatement Comments
Origin of data LwA Model
dB(A)@1m operation measure
LP Compressor Vendor 1 running, Point
MD 5gx5130a/b 70 86 - -
scrubber pumps guarantee 1 spare source
Subsea methanol
MD 5gx1940b Vendor Data 79 96 Spare - - -
pressurisation pump
Subsea methanol Intermittent -
MD 5gx1930c/d Vendor Data 91 110 - - -
injection pumps Not activated

Vendor High Area Gear acoustic


UD 5kb5140 LP gas compressor 78 102 No spare -
measurements source cladding

Gas export Vendor High Area Gear acoustic


UD 5kb5420a/b 86 112 No spare -
compressor train A/B measurements source cladding
82 max Point Intermittent -
UD 5ua2116 Hull vent blower Vendor Data 103 No spare -
78 average source Activated
HHI expected No spare, Point
TD 5ub6117a/b AHU Room S7 70 89 - -
max values hypothesis source

NG50-5-500-SAF-CN-AB-00-6002_rev01

This document is the property of TOTAL and shall not be disclosed to third parties or reproduced without permission of the COMPANY.
Akpo
Project
NIGERIA – OML 130
AKPO Field Development Project

83/14
COMPANY ref: NG50-5-500-SAF-CN-AB-00-6002 Revision: 01 Status: IFD Class: 2 Date: 02/10/2007 Page:
2
CONTRACTOR ref: 8577Y-2000-CN-6000-002 -- -- -- -- --

Table S7-2: Control valves and restriction orifices noise:

Guaranteed Ambient
Cadnaa
Vendor's CP CP CP Noise from Lpa-Lp Cadnaa length
Tag Deck Line_Number_Label Lw
Data Lp Easting Northing Elevation equipment dB(A) Model m
dB(A)
dB(A) only
Lpa dB(A)

5PV2 19305C 79.4 224325 89691 6500 Main 1" ME519062-L01M- 82.5 3.1 point source 99.4 -
5TV 54310A 77.1 245941 82612 662 Main 12" CW554002-B01W- 82.5 5.4 simplified 102.1 79
5TV 54310B 77.1 245841 83813 662 Main 12" CW554005-B01W- 82.5 5.4 simplified 102.1 79
5PV1 19305C <75 223986 90236 6487 Main 1" ME519062-L01M- 82.5 12.5 point source 90.0 -
5XV 54102A <70 242766 74449 7275 Main 16" HG554003-G21- 82.5 17.5 point source 87.5 -
5XV 54102B <70 242766 76687 7275 Main 16" HG554002-G21- 82.5 17.5 point source 87.5 -
5TV 51201 65.8 229366 86575 6557 Main 4" CW551001-B01W- 82.5 16.7 point source 85.8 -
5LV 51206 60.4 232245 80679 616 Main 1-1/2" HL551008-D03- 82.5 22.1 neglected NA -
RO-54109A 83.8 241269 73806 7300 Main 2" HG554003-G21- 82.5 -1.3 point source 98.8 -
RO-54109B 83.8 241269 77329 7300 Main 2" HG554002-G21- 82.5 -1.3 point source 98.8 -
RO-54315A 80.9 241663 92186 6850 Main 2" HG554008-H21- 82.5 1.6 point source 95.9 -
RO-54315B 80.9 241663 77763 6850 Main 2" HG554016-H21- 82.5 1.6 point source 95.9 -
5PV2 36111 77.2 230537 87024 23887 Top 12" HG551008-D49-PPA 82.5 5.3 simplified 97.2 25
5FV2 21100 77.0 245283 92754 23667 Top 1" FG522042-B03- 82.5 5.5 point source 92.0 -
5PV2 19109B 69.8 227241 95226 23737 Top 1" NG519002-B01- 82.5 12.7 point source 84.8 -
5PV1 19109B 64.4 230459 95075 23737 Top 1" NG511029-B01- 82.5 18.1 point source 79.4 -
5PV11 19109B <50 230274 95475 23737 Top 1" NG511029-B01- 82.5 37.5 neglected NA -
5PV1 36111 77.7 225700 87911 13650 Upper 12" HG551003-D49-PPA 85 7.3 simplified 97.7 25

Note: The method used to model piping noise is described in 5-5-5

NG50-5-500-SAF-CN-AB-00-6002_rev01

This document is the property of TOTAL and shall not be disclosed to third parties or reproduced without permission of the COMPANY.
Akpo
Project
NIGERIA – OML 130
AKPO Field Development Project

84/14
COMPANY ref: NG50-5-500-SAF-CN-AB-00-6002 Revision: 01 Status: IFD Class: 2 Date: 02/10/2007 Page:
2
CONTRACTOR ref: 8577Y-2000-CN-6000-002 -- -- -- -- --

Figure S7-1: Module S7 Main Deck

NG50-5-500-SAF-CN-AB-00-6002_rev01

This document is the property of TOTAL and shall not be disclosed to third parties or reproduced without permission of the COMPANY.
Akpo
Project
NIGERIA – OML 130
AKPO Field Development Project

85/14
COMPANY ref: NG50-5-500-SAF-CN-AB-00-6002 Revision: 01 Status: IFD Class: 2 Date: 02/10/2007 Page:
2
CONTRACTOR ref: 8577Y-2000-CN-6000-002 -- -- -- -- --

Figure S7-2: Module S7 Upper Deck

NG50-5-500-SAF-CN-AB-00-6002_rev01

This document is the property of TOTAL and shall not be disclosed to third parties or reproduced without permission of the COMPANY.
Akpo
Project
NIGERIA – OML 130
AKPO Field Development Project

86/14
COMPANY ref: NG50-5-500-SAF-CN-AB-00-6002 Revision: 01 Status: IFD Class: 2 Date: 02/10/2007 Page:
2
CONTRACTOR ref: 8577Y-2000-CN-6000-002 -- -- -- -- --

Figure S7-3: Module S3 West Elevation

NG50-5-500-SAF-CN-AB-00-6002_rev01

This document is the property of TOTAL and shall not be disclosed to third parties or reproduced without permission of the COMPANY.
Akpo
Project
NIGERIA – OML 130
AKPO Field Development Project

87/14
COMPANY ref: NG50-5-500-SAF-CN-AB-00-6002 Revision: 01 Status: IFD Class: 2 Date: 02/10/2007 Page:
2
CONTRACTOR ref: 8577Y-2000-CN-6000-002 -- -- -- -- --

6.16. Hull Deck

Considering that Preliminary noise study has been done with more stringent hypothesizes (all
spare equipment items considered as operating, required noise levels used in the model and
higher than those provided/guaranteed/measured by Vendor), the Hull deck noise calculation has
been only updated by adding the contribution of noise sources located on the Hull deck. The
contribution of noise sources located on Topsides has not been modified compared to Preliminary
noise study.
Rayplus calculation study is presented in Appendix

Main noise sources of this module are presented here under with data taken into account in the
calculation.
Table H-1:
Tag Number Name Operation Spare Noise Data Lw Comment
Wax inhibitor and demulsifier
1 running, Lp=75dBA@1m from pump Not
injection pump Intermittent -
1 spare Lp=59dBA@1m from motor Modelled
5-GX-3845-A/B
5-UA-3810-A
Asphaltene inhibitor injection
1 running, Lp=75dBA@1m from pump
pump Continuous 92dBA
1 spare Lp=62dBA@1m from motor
5-GX-3875-A/B
Scale inhibitor and corrosion
Lp=75dBA@1m from pump
inhibitor blend injection pump Continuous 1 running 92dBA
Lp=59dBA@1m from motor
5-UA-3810-B 5-GX-3855
Biocide injection pump Lp=80dBA@1m from pump Not
Intermittent 1 running -
5-GX-3865 Lp=62dBA@1m from motor Modelled
Biocide "3" injection pump 1 running, Lp=60dBA@1m from pump
Continuous 80dBA
5-GX-3805-A/B 1 spare Lp=59dBA@1m from motor
Reverse demulsifier injection
1 running, Lp=60dBA@1m from pump
pump Continuous 80dBA
1 spare Lp=59dBA@1m from motor
5-GX-3815-A/B
Demulsifier injection pump 1 running, Lp=70dBA@1m from pump
Continuous 90dBA
5-UA-3820 5-GX-3825-A/B 1 spare Lp=67dBA@1m from motor
Wax inhibitor pump 1 running, Lp=70dBA@1m from pump Not
Intermittent -
5-GX-3885-A/B 1 spare Lp=65dBA@1m from motor Modelled
Antifoam "1" pump 1 running, Lp=60dBA@1m from pump
Continuous 80dBA
5-GX-3895-A/B 1 spare Lp=59dBA@1m from motor
Scale inhibitor injection pump 1 running, Lp=60dBA@1m from pump
Continuous 80dBA
5-GX-7755-A/B 1 spare Lp=59dBA@1m from motor
Antifoam "2" injection pump 1 running, Lp=60dBA@1m from pump
Continuous 80dBA
5-GX-7715-A/B 1 spare Lp=59dBA@1m from motor
Oxygen scavenger injection 1 running, Lp=60dBA@1m from pump
Continuous 80dBA
pump 5-GX-7725-A/B 1 spare Lp=59dBA@1m from motor
5-UA-3830
Biocide "1" injection pump 1 running, Lp=65dBA@1m from pump Not
Batch -
5-GX-7735-A/B 1 spare Lp=65dBA@1m from motor Modelled
Biocide "2" injection pump 1 running, Lp=65dBA@1m from pump Not
Batch -
5-GX-7745-A/B 1 spare Lp=65dBA@1m from motor Modelled

NG50-5-500-SAF-CN-AB-00-6002_rev01

This document is the property of TOTAL and shall not be disclosed to third parties or reproduced without permission of the COMPANY.
Akpo
Project
NIGERIA – OML 130
AKPO Field Development Project

88/14
COMPANY ref: NG50-5-500-SAF-CN-AB-00-6002 Revision: 01 Status: IFD Class: 2 Date: 02/10/2007 Page:
2
CONTRACTOR ref: 8577Y-2000-CN-6000-002 -- -- -- -- --

Table H-2:
Tag Number Name Operation Spare Noise Data Lw Comment
Lp=70dBA@1m from pump Not
5-GX-5546 Glycol transfer pump Batch 1 running -
Lp=65dBA@1m from motor Modelled
5-GX-2130A 1 running, Lp=68dBA@1m from pump Not
HP flare drum pump Intermittent -
5-GX-2130B 1 spare Lp=65dBA@1m from motor Modelled
5-GX-2150A 1 running, Lp=68dBA@1m from pump Not
LP flare drum pump Intermittent -
5-GX-2150B 1 spare Lp=65dBA@1m from motor Modelled
5-GX-3920A
5-GX-3920B 2 running, Lp=68dBA@1m from pump Not
Closed drain drum pump Intermittent -
5-GX-3920C 2 spare Lp=65dBA@1m from motor Modelled
5-GX-3920D
5-GX-9930A
2 running, Lp=73dBA@1m from pump Not
5-GX-9930B Liquid handling pump Intermittent -
1 spare Lp=66dBA@1m from motor Modelled
5-GX-9930C
Corrosion Inhibitor "3"
5-GX-3835-A/B Pumps Removed
Injection Pump
5-GX-7775-A/B
Corrosion Inhibitor "1" Pump Pumps Removed
5-GX-7785-A/B
Corrosion Inhibitor "2" Pump Pumps Removed

NG50-5-500-SAF-CN-AB-00-6002_rev01

This document is the property of TOTAL and shall not be disclosed to third parties or reproduced without permission of the COMPANY.
Akpo
Project
NIGERIA – OML 130
AKPO Field Development Project

89/14
COMPANY ref: NG50-5-500-SAF-CN-AB-00-6002 Revision: 01 Status: IFD Class: 2 Date: 02/10/2007 Page:
2
CONTRACTOR ref: 8577Y-2000-CN-6000-002 -- -- -- -- --

Figure H-1: Hull Deck HP1 and HS1

1 : 5-UA-3830
2 : 5-UA-3810-A/B
3 : 5-UA-3820

NG50-5-500-SAF-CN-AB-00-6002_rev01

This document is the property of TOTAL and shall not be disclosed to third parties or reproduced without permission of the COMPANY.
Akpo
Project
NIGERIA – OML 130
AKPO Field Development Project

90/14
COMPANY ref: NG50-5-500-SAF-CN-AB-00-6002 Revision: 01 Status: IFD Class: 2 Date: 02/10/2007 Page:
2
CONTRACTOR ref: 8577Y-2000-CN-6000-002 -- -- -- -- --

4 3

5
1

Figure H-2: Hull Deck Forward

1
: 5-GX-2150-A/B
2 : 5-GX-2130-A/B
3 : 5-GX-9930-A/B/C
4 : 5-GX-3920-C/D
5 : 5-GX-3920-A/B

NG50-5-500-SAF-CN-AB-00-6002_rev01

This document is the property of TOTAL and shall not be disclosed to third parties or reproduced without permission of the COMPANY.
Akpo
Project
NIGERIA – OML 130
AKPO Field Development Project

91/14
COMPANY ref: NG50-5-500-SAF-CN-AB-00-6002 Revision: 01 Status: IFD Class: 2 Date: 02/10/2007 Page:
2
CONTRACTOR ref: 8577Y-2000-CN-6000-002 -- -- -- -- --

7. Results

7.1. Normal operating conditions

7.1.1. Global noise maps

Figure GNM-1: Main Deck

NG50-5-500-SAF-CN-AB-00-6002_rev01

This document is the property of TOTAL and shall not be disclosed to third parties or reproduced without permission of the COMPANY.
Akpo
Project
NIGERIA – OML 130
AKPO Field Development Project

92/14
COMPANY ref: NG50-5-500-SAF-CN-AB-00-6002 Revision: 01 Status: IFD Class: 2 Date: 02/10/2007 Page:
2
CONTRACTOR ref: 8577Y-2000-CN-6000-002 -- -- -- -- --

Figure GNM-2: Mezzanine Deck

NG50-5-500-SAF-CN-AB-00-6002_rev01

This document is the property of TOTAL and shall not be disclosed to third parties or reproduced without permission of the COMPANY.
Akpo
Project
NIGERIA – OML 130
AKPO Field Development Project

93/14
COMPANY ref: NG50-5-500-SAF-CN-AB-00-6002 Revision: 01 Status: IFD Class: 2 Date: 02/10/2007 Page:
2
CONTRACTOR ref: 8577Y-2000-CN-6000-002 -- -- -- -- --

Figure GNM-3: Upper Deck

NG50-5-500-SAF-CN-AB-00-6002_rev01

This document is the property of TOTAL and shall not be disclosed to third parties or reproduced without permission of the COMPANY.
Akpo
Project
NIGERIA – OML 130
AKPO Field Development Project

94/14
COMPANY ref: NG50-5-500-SAF-CN-AB-00-6002 Revision: 01 Status: IFD Class: 2 Date: 02/10/2007 Page:
2
CONTRACTOR ref: 8577Y-2000-CN-6000-002 -- -- -- -- --

Figure GNM-4: Top Deck

NG50-5-500-SAF-CN-AB-00-6002_rev01

This document is the property of TOTAL and shall not be disclosed to third parties or reproduced without permission of the COMPANY.
Akpo
Project
NIGERIA – OML 130
AKPO Field Development Project

95/14
COMPANY ref: NG50-5-500-SAF-CN-AB-00-6002 Revision: 01 Status: IFD Class: 2 Date: 02/10/2007 Page:
2
CONTRACTOR ref: 8577Y-2000-CN-6000-002 -- -- -- -- --

75-77.5 d BA

77.5-80 d BA
72.5-75 d BA
70-72.5 d BA

80-82.5 d BA
AKPO Hull Deck

Figure-H-1

Figure GNM-5: Hull Deck

NG50-5-500-SAF-CN-AB-00-6002_rev01

This document is the property of TOTAL and shall not be disclosed to third parties or reproduced without permission of the COMPANY.
Akpo
Project
NIGERIA – OML 130
AKPO Field Development Project

96/14
COMPANY ref: NG50-5-500-SAF-CN-AB-00-6002 Revision: 01 Status: IFD Class: 2 Date: 02/10/2007 Page:
2
CONTRACTOR ref: 8577Y-2000-CN-6000-002 -- -- -- -- --

7.1.2. Module P1
Main Deck Mezzanine Deck Upper Deck Top Deck

Noise abatement measures implemented:


- Open enclosures around Cooling water recirculation pumps 5GX1510A/B/C
- Fan inlet silencer on Electrochlorination package 5UA7210/7220
- Inlet and outlet vent piping silencers on Inert gas generator package 5UA1210
- All Control valves and restriction orifices below 80dB(A)@1m

Main, Mezzanine and Upper Decks:


Highest noise levels (88dB(A)) are obtained around the Cooling water pumps
5GX1510A/B.
Main power generators and Water injection pumps create a background noise of 85-
86dB(A) on these decks, as it can be seen close to the spare Cooling water pump
5GX1510C located on the main deck. Noise abatement measures allow to limit the
noise contribution of small equipment on the maximum noise level calculated on
Module P1 which is mainly generated by Main power generators and Water injection
pumps, for which company has accepted noise guarantees above 85dB(A)@1m
(please refer to module P3 and P2 respectively).
Noisiest equipment (LLI excluded) on P1 is the pump 5GX1510 measured at
79dB(A)@1m with an open enclosure.

NG50-5-500-SAF-CN-AB-00-6002_rev01

This document is the property of TOTAL and shall not be disclosed to third parties or reproduced without permission of the COMPANY.
Akpo
Project
NIGERIA – OML 130
AKPO Field Development Project

97/14
COMPANY ref: NG50-5-500-SAF-CN-AB-00-6002 Revision: 01 Status: IFD Class: 2 Date: 02/10/2007 Page:
2
CONTRACTOR ref: 8577Y-2000-CN-6000-002 -- -- -- -- --

Top Deck:
Ambient noise levels are included the range 82.5-85dB(A). A background noise is
created by Main power generators 5PY6510A/B/C/D/E for which company has
accepted noise guarantees above 85dB(A)@1m (please refer to module P3 and S3).
Noise sources located on P1 do not have any contribution. The highest noise levels are
locally included between 85 and 86dB(A).
Conclusion:
Main, Mezzanine and Upper Decks of module P1 shall be defined as noise restricted
areas.

NG50-5-500-SAF-CN-AB-00-6002_rev01

This document is the property of TOTAL and shall not be disclosed to third parties or reproduced without permission of the COMPANY.
Akpo
Project
NIGERIA – OML 130
AKPO Field Development Project

98/14
COMPANY ref: NG50-5-500-SAF-CN-AB-00-6002 Revision: 01 Status: IFD Class: 2 Date: 02/10/2007 Page:
2
CONTRACTOR ref: 8577Y-2000-CN-6000-002 -- -- -- -- --

7.1.3. Module P2

Main Deck Mezzanine Deck Upper Deck Top Deck

Noise abatement measures implemented:


- Pump acoustic cladding around Water injection pumps 5GX7520A/B/C
- Open enclosure around Water injection booster pumps 5GX7510A/B/C
- All Control valves and restriction orifices below 80dB(A)@1m

Main and Mezzanine Decks:


Highest noise levels around 92.5dB(A) are obtained close to the Water injection pumps
5GX7520A/B/C.
This highest noise level is reached by adding the three WIP pumps noise contribution
(operating together), the pump piping noise contribution (modeled with the same noise
contribution than pump itself) and the background noise contribution generated by the
Main power generators.
The noise guaranteed value accepted by Company for the Water injection pumps is
87dB(A)@1m, and the measured value during FAT is 86dB(A)@1m. The Main power
generators noise guaranteed value accepted by Company produces a resulting noise
level estimated at 85-86dB(A)@1m for one Main power generator set.
Noisiest equipment (LLI excluded) on module P2 is Water injection booster pumps
5GX7510A/B/C guaranteed at 82dB(A) à1m.

NG50-5-500-SAF-CN-AB-00-6002_rev01

This document is the property of TOTAL and shall not be disclosed to third parties or reproduced without permission of the COMPANY.
Akpo
Project
NIGERIA – OML 130
AKPO Field Development Project

99/14
COMPANY ref: NG50-5-500-SAF-CN-AB-00-6002 Revision: 01 Status: IFD Class: 2 Date: 02/10/2007 Page:
2
CONTRACTOR ref: 8577Y-2000-CN-6000-002 -- -- -- -- --

Upper and Top Decks:


Highest noise levels around 90-92.5dB(A) are obtained close to module P3, in front of
exhausts of Main power generator 5PY6510A/B/C. On the upper deck of module P2,
Electrical rooms of modules P2 and P3 make a screen effect for noise coming from
exhausts of main power generators. It can be seen that at these elevations (upper and
Top), Water injection pumps have a minimized contribution on the maximum calculated
noise levels.
Conclusion:
Main, Mezzanine, Upper and Top Decks of module P2 shall be defined as noise
restricted areas.

NG50-5-500-SAF-CN-AB-00-6002_rev01

This document is the property of TOTAL and shall not be disclosed to third parties or reproduced without permission of the COMPANY.
Akpo
Project
NIGERIA – OML 130
AKPO Field Development Project

100/1
COMPANY ref: NG50-5-500-SAF-CN-AB-00-6002 Revision: 01 Status: IFD Class: 2 Date: 02/10/2007 Page:
42
CONTRACTOR ref: 8577Y-2000-CN-6000-002 -- -- -- -- --

7.1.4. Module P3 Main Deck Upper Deck

Noise abatement measures implemented:


- All Control valves and restriction orifices below 80dB(A)@1m

Main Deck:
Maximum noise levels are in the range 90-91dB(A).
Between two Main power generators in operation, we obtain the cumulative noise
contribution of both equipment items in addition to the amplification of noise by the
reflection on the next equipment item.
Each Main power generator has been purchased with noise guaranteed varying
between 80 and 83 dB(A) at one meter from each part (generator, gear, enclosure,
accessories…) accepted by Company. The resulting noise level at one meter from a
complete Main power generator is estimated around 85-86dB(A).
Noisiest equipment (LLI excluded) on module P3 is Control valve 5FV16110
guaranteed at 80dB(A)à1m.
Upper Deck:
Maximum noise levels are around 92dB(A). At this elevation, exhausts of Main power
generators 5PY6510A/B/C have a high contribution on the calculated noise levels.
Conclusion:
Main and Upper Decks of module P3 shall be defined as noise restricted areas.

NG50-5-500-SAF-CN-AB-00-6002_rev01

This document is the property of TOTAL and shall not be disclosed to third parties or reproduced without permission of the COMPANY.
Akpo
Project
NIGERIA – OML 130
AKPO Field Development Project

101/1
COMPANY ref: NG50-5-500-SAF-CN-AB-00-6002 Revision: 01 Status: IFD Class: 2 Date: 02/10/2007 Page:
42
CONTRACTOR ref: 8577Y-2000-CN-6000-002 -- -- -- -- --

7.1.5. Module P4

Main Deck Mezzanine Deck Upper Deck Top Deck

Noise abatement measures implemented:


- All Control valves and restriction orifices below 80dB(A)@1m

Main, Mezzanine and Upper Deck:


These decks are protected from noise emitted by Main power generators
5PY6510A/B/C/D/E thanks to the blast walls. The ambient noise level is included
between 80 and 82.5dB(A) on the main, mezzanine and upper decks of module P4.
The main noise sources on the module P4 are the control valves. Very locally the
maximum noise levels are observed in the range 87-88dB(A) just at the end of blast
wall.
Top Deck:
This deck is not protected from noise emitted by Main power generators
5PY6510A/B/C thanks to the blast wall. The blast wall height is too small. That is why
high noise levels are more spread on the overall deck. Maximum noise levels are in the
range 85-87dB(A).
Conclusion:
Only the Top Deck of module P4 shall be defined as noise restricted area.

NG50-5-500-SAF-CN-AB-00-6002_rev01

This document is the property of TOTAL and shall not be disclosed to third parties or reproduced without permission of the COMPANY.
Akpo
Project
NIGERIA – OML 130
AKPO Field Development Project

102/1
COMPANY ref: NG50-5-500-SAF-CN-AB-00-6002 Revision: 01 Status: IFD Class: 2 Date: 02/10/2007 Page:
42
CONTRACTOR ref: 8577Y-2000-CN-6000-002 -- -- -- -- --

7.1.6. Module P5

Main Deck Mezzanine Deck Upper Deck Top Deck

Noise abatement measures implemented:


- All Control valves and restriction orifices below 80dB(A)@1m
- Open enclosure around Crude oil recirculation pumps 5GX9920A/B
- Open enclosure around 3rd stage separator pumps 5GX3410A/B

Main, Mezzanine, Upper and Top Deck:


Ambient noise level is included in the range 80-85dB(A) with a local noisy area around
87-88dB(A) on the main deck around Crude recirculation pump 5GX9920A.
The local maximum noise level is obtained by adding the pump noise, the piping noise
and the contribution of all sources of the FPSO.
The noisiest equipment on module P5 is 5GX9920 guaranteed and measured at
82dB(A)@1m during FAT. These pumps operate intermittently. When this equipment
item will not operate, noise levels will be in the range 80-82.5dB(A).
Conclusion:
No one deck of module P5 shall be defined as noise restricted area.

NG50-5-500-SAF-CN-AB-00-6002_rev01

This document is the property of TOTAL and shall not be disclosed to third parties or reproduced without permission of the COMPANY.
Akpo
Project
NIGERIA – OML 130
AKPO Field Development Project

103/1
COMPANY ref: NG50-5-500-SAF-CN-AB-00-6002 Revision: 01 Status: IFD Class: 2 Date: 02/10/2007 Page:
42
CONTRACTOR ref: 8577Y-2000-CN-6000-002 -- -- -- -- --

7.1.7. Module P6

Main Deck Mezzanine Deck Upper Deck Top Deck

Noise abatement measures implemented:


- Noise hood around Glycol circulation pump and motor 5UA5540
- All Control valves and restriction orifices below 80dB(A)@1m

Main, Mezzanine, Upper and Top Deck:


Ambient noise level is included in the range 80-85dB(A) generated by control valves
modeled on this module and by HP & MP Gas compressor trains 5KB5330A/B &
5KB5240 located on the upper deck of module S6. Maximum noise levels are in the
range 86-87dB(A) locally close to Glycol regeneration skid 5UA5540 and locally close
to control valves.
Noisiest equipment on module P6 is the Glycol regeneration package with a
guaranteed noise level of 80dB(A)@1m.
Conclusion:
No one deck of module P6 shall be defined as noise restricted area.

NG50-5-500-SAF-CN-AB-00-6002_rev01

This document is the property of TOTAL and shall not be disclosed to third parties or reproduced without permission of the COMPANY.
Akpo
Project
NIGERIA – OML 130
AKPO Field Development Project

104/1
COMPANY ref: NG50-5-500-SAF-CN-AB-00-6002 Revision: 01 Status: IFD Class: 2 Date: 02/10/2007 Page:
42
CONTRACTOR ref: 8577Y-2000-CN-6000-002 -- -- -- -- --

7.1.8. Module P7
Main Deck Mezzanine Deck Upper Deck Top Deck

Noise abatement measures implemented:


- Noise hood around Gearbox of Gas injection compressor 5KB5460
- All Control valves and restriction orifices below 80dB(A)@1m

Main Mezzanine, Upper and Top Deck:


Ambient noise level is included in the range 80-85dB(A). Maximum noise levels are
observed locally around 87-88dB(A).
These maximum noise levels are reached close to Subsea methanol pressurization
and Topside methanol injection pumps 5GX1940A and 5GX1920A on the main and
mezzanine decks and close to the Gas injection compressor train 5KB5460 including
piping noise on the upper deck. These maximum noise levels are also reached towards
module P8 where the Crude oil offloading pumps 5GX8310A/B/C/D generate high
noise level accepted by Company (please refer to module P8).
The noise guaranteed value accepted by Company for the Gas injection compressor is
85dB(A)@1m, and the measured value during FAT is 81dB(A)@1m.
Noisiest equipment (LLI excluded) on module P7 is the Topside methanol injection
pump with the guaranteed noise level of 80dB(A)@1m
Conclusion:
Although maximum noise levels exceed locally the 85dB(A), no one deck of module P7
shall be defined as noise restricted area.

NG50-5-500-SAF-CN-AB-00-6002_rev01

This document is the property of TOTAL and shall not be disclosed to third parties or reproduced without permission of the COMPANY.
Akpo
Project
NIGERIA – OML 130
AKPO Field Development Project

105/1
COMPANY ref: NG50-5-500-SAF-CN-AB-00-6002 Revision: 01 Status: IFD Class: 2 Date: 02/10/2007 Page:
42
CONTRACTOR ref: 8577Y-2000-CN-6000-002 -- -- -- -- --

7.1.9. Module P8
Main Deck Mezzanine Deck Upper Deck Top Deck

Noise abatement measures implemented:


- Acoustic cladding around Crude oil offloading pumps 5GX8310
- All Control valves and restriction orifices below 80dB(A)@1m

Main and Mezzanine Deck:


Highest noise levels around 91dB(A) are obtained on the main deck close to the Crude
oil offloading pumps 5GX8310A/B/C/D. This pump operating intermittently (24h every 5
days), noise levels will be below 85dB(A) when equipment item will be off.
This highest noise level is reached by adding the three pumps noise contribution
(operating together), the pump piping noise contribution (same than pump itself) and
the background noise contribution generated by the Compressor trains located on P7,
S6 and S7 modules.
The noise guaranteed value accepted by Company for the Crude oil offloading pumps
is 87dB(A)@1m, and the measured value during FAT is 86dB(A)@1m.
Noisiest equipment (LLI excluded) on module P8 are the control valves with the
guaranteed noise level of 80dB(A)@1m.

NG50-5-500-SAF-CN-AB-00-6002_rev01

This document is the property of TOTAL and shall not be disclosed to third parties or reproduced without permission of the COMPANY.
Akpo
Project
NIGERIA – OML 130
AKPO Field Development Project

106/1
COMPANY ref: NG50-5-500-SAF-CN-AB-00-6002 Revision: 01 Status: IFD Class: 2 Date: 02/10/2007 Page:
42
CONTRACTOR ref: 8577Y-2000-CN-6000-002 -- -- -- -- --

Upper and Top Deck:


Ambient noise level is included between 80 and 85dB(A). Maximum noise levels are
locally in the range 86-87dB(A) next to 5GX8310B on the upper deck. This local
maximum noise level is due to a concentration of noise coming from pipes connected
to control valves 5FV83109A/B/C/D. Maximum noise levels do not exceed 85dB(A) on
the top deck.
Conclusion:
The Crude oil offloading pumps 5GX8310A/B/C operates intermittently. In order to
protect workers, the main deck shall be defined as noise restricted area.

NG50-5-500-SAF-CN-AB-00-6002_rev01

This document is the property of TOTAL and shall not be disclosed to third parties or reproduced without permission of the COMPANY.
Akpo
Project
NIGERIA – OML 130
AKPO Field Development Project

107/1
COMPANY ref: NG50-5-500-SAF-CN-AB-00-6002 Revision: 01 Status: IFD Class: 2 Date: 02/10/2007 Page:
42
CONTRACTOR ref: 8577Y-2000-CN-6000-002 -- -- -- -- --

7.1.10. Module S1
Main Deck Upper Deck

Noise abatement measures:


- All Control valves and restriction orifices below 80dB(A)@1m
- Open enclosure around Hot water circulation pumps 5GX1610A/B
- Acoustic enclosure and Inlet silencer for Air scour blowers 5KX7330A/B

Main and Upper Deck:


Ambient noise level is around 83dB(A). The maximum noise levels are locally observed
in the range 87-88dB(A) on the main deck, and in the range 85-86dB(A) on the upper
deck.
The ambient noise level of 83dB(A) is generated by the 5 Main power generators in
operation 5PY6510A/B/C/D/E and by the Water injection pumps 5GX7520A/B/C for
which Company has accepted noise guarantees above 85dB(A)@1m (please refer to
module P3/S3 and S2). The maximum noise levels are the combination of the Hot
water circulation pumps 5GX1610A/B, of the exhaust of Main power generators
5PY6510C (non-WHRU) and of pipe connected to restriction orifices located on module
P1 and to pumps located on module P2.
Noisiest equipment (LLI excluded) on module S1 are the Air scour blower with a noise
level of 80dB(A)@1m.
Conclusion:
Main and Upper Decks of module S1 shall be locally defined as noise restricted area.

NG50-5-500-SAF-CN-AB-00-6002_rev01

This document is the property of TOTAL and shall not be disclosed to third parties or reproduced without permission of the COMPANY.
Akpo
Project
NIGERIA – OML 130
AKPO Field Development Project

108/1
COMPANY ref: NG50-5-500-SAF-CN-AB-00-6002 Revision: 01 Status: IFD Class: 2 Date: 02/10/2007 Page:
42
CONTRACTOR ref: 8577Y-2000-CN-6000-002 -- -- -- -- --

7.1.11. Module S2

Main Deck Upper Deck

Noise abatement measures:


- All Control valves and restriction orifices below 80dB(A)@1m
- Silencer for Air drier package 5UB1330A/B
- Acoustic enclosure around Air compressor package 5UB1310A/B/C
- Inlet and outlet vent piping silencer on Inert gas generator package 5UA1210

Main and Upper Deck:


Maximum noise levels are in the range 87-88dB(A). Main contributors of these
maximum noise levels are the Water injection pumps 5GX7520A/B/C and the Main
power generators 5PY6510A/B/C/D/E for which Company has accepted noise
guarantees above 85dB(A)@1m (please refer to modules P2 and P3/S3).
Noisiest equipment (LLI excluded) on module S2 are the Air drier package
5UB1330A/B with a guaranteed noise level of 78dB(A)@1m.
Conclusions:
The Main and Upper Decks of module S2 shall be defined as noise restricted area.

NG50-5-500-SAF-CN-AB-00-6002_rev01

This document is the property of TOTAL and shall not be disclosed to third parties or reproduced without permission of the COMPANY.
Akpo
Project
NIGERIA – OML 130
AKPO Field Development Project

109/1
COMPANY ref: NG50-5-500-SAF-CN-AB-00-6002 Revision: 01 Status: IFD Class: 2 Date: 02/10/2007 Page:
42
CONTRACTOR ref: 8577Y-2000-CN-6000-002 -- -- -- -- --

7.1.12. Module S3
Main Deck Upper Deck

Noise abatement measures:


- All Control valves and restriction orifices below 80dB(A)@1m

Main Deck:
Maximum noise levels are in the range 88-89dB(A).
Between two Main power generators in operation, we obtain the cumulative noise
contribution of both equipment items in addition to the amplification of noise by the
reflection on the next equipment item.
The Main power generators noise guaranteed value accepted by Company varies
between 83 and 80dB(A)@1m from each equipment part (equipment part means
generator, turbine enclosure, gearbox…). The resulting noise level is estimated at 85-
86dB(A)@1m for one Main power generator set.
Noisiest equipment (LLI excluded) is Control valve 5FV216211C/D guaranteed at
63dB(A)@1m.
Upper Deck:
Maximum noise levels are around 89-90dB(A). At this elevation, exhausts of Main
power generators 5PY6510A/B/C/D/E have a high contribution on the calculated noise
levels.
Conclusion:
Main and Upper Decks of module S3 shall be defined as noise restricted areas.

NG50-5-500-SAF-CN-AB-00-6002_rev01

This document is the property of TOTAL and shall not be disclosed to third parties or reproduced without permission of the COMPANY.
Akpo
Project
NIGERIA – OML 130
AKPO Field Development Project

110/1
COMPANY ref: NG50-5-500-SAF-CN-AB-00-6002 Revision: 01 Status: IFD Class: 2 Date: 02/10/2007 Page:
42
CONTRACTOR ref: 8577Y-2000-CN-6000-002 -- -- -- -- --

7.1.13. Module S4

Main Deck Mezzanine Deck Upper Deck Top Deck

Noise abatement measures:


- All Control valves and restriction orifices below 80dB(A)@1m

Main, Mezzanine and Upper Deck:


These decks are protected from noise emitted by Main power generators
5PY6510A/B/C/D/E thanks to the blast walls. The noise level is included between 80
and 82.5dB(A) on the main, mezzanine and upper decks of module S4. The main noise
sources on the module S4 are the control valves. Very locally the maximum noise
levels are observed around 85dB(A) just at the end of blast wall.
Top Deck:
This deck is not protected from noise emitted by Main power generators
5PY6510A/B/CD/E thanks to the blast wall. The blast wall height is too small. That is
why high noise levels are more spread on the overall deck. Maximum noise levels are
close to 85dB(A). In this calculation the Main power generator 5PY6510E located next
to this module is in spare. When it will run, higher noise levels comparable to those
obtained on P4 shall be obtained (85-86dB(A)).
Conclusion: Only the Top Deck of module S4 shall be defined as noise restricted
area.

NG50-5-500-SAF-CN-AB-00-6002_rev01

This document is the property of TOTAL and shall not be disclosed to third parties or reproduced without permission of the COMPANY.
Akpo
Project
NIGERIA – OML 130
AKPO Field Development Project

111/1
COMPANY ref: NG50-5-500-SAF-CN-AB-00-6002 Revision: 01 Status: IFD Class: 2 Date: 02/10/2007 Page:
42
CONTRACTOR ref: 8577Y-2000-CN-6000-002 -- -- -- -- --

7.1.14. Module S5

Main Deck Mezzanine Deck Upper Deck Top Deck

Noise abatement measures:


- All Control valves and restriction orifices below 80dB(A)@1m
- Open enclosure around Crude recirculation pump 5GX9920C/D
- Open enclosure around Crude oil transfer pump 5GX3720A/B
Main, Mezzanine, Upper and Top Deck:
Ambient noise level is included in the range 80-85dB(A) with a local noisy area around
87-88dB(A) on the main deck around Crude recirculation pump 5GX9920C/D.
This local maximum noise level is obtained by adding the pump noise, the piping noise
and the contribution of all sources of the FPSO. Others maximum noise levels around
87dB(A) are obtained locally close to control valves on the mezzanine deck.
Noisiest equipment on module S5 is the Crude recirculation pump 5GX9920C/D
guaranteed and measured during FAT at 82dB(A)@1m. This pump operates
intermittently. When this equipment item will not operate, noise levels will be in the
range 80-82.5dB(A).
Conclusion:
No one deck of module S5 shall be defined as noise restricted area.

NG50-5-500-SAF-CN-AB-00-6002_rev01

This document is the property of TOTAL and shall not be disclosed to third parties or reproduced without permission of the COMPANY.
Akpo
Project
NIGERIA – OML 130
AKPO Field Development Project

112/1
COMPANY ref: NG50-5-500-SAF-CN-AB-00-6002 Revision: 01 Status: IFD Class: 2 Date: 02/10/2007 Page:
42
CONTRACTOR ref: 8577Y-2000-CN-6000-002 -- -- -- -- --

7.1.15. Module S6
Main Deck Mezzanine Deck Upper Deck Top Deck

Noise abatement measures:


- All Control valves and restriction orifices below 80dB(A)@1m
- Noise enclosure around the vorecon of HP gas compressor 5KB5330A/B
- Noise hood around the gearbox of MP gas compressor 5KB5240
Main Deck:
Maximum noise levels are in the range 86-87dB(A) locally around Degassing package
5UA4130 and close to control valves modelled as point sources on this module.
The background noise close to 85dB(A) is mainly due to HP and MP Gas compressor
trains 5KB5330A/B and 5KB5240 located on upper deck.
The noise guaranteed value accepted by Company for the HP gas compressor is
85dB(A)@1m, and the measured value during FAT is 83dB(A)@1m. The noise
guaranteed value accepted by Company for the MP gas compressor is 85dB(A)@1m,
and the measured value during FAT is 80dB(A)@1m.
Noisiest equipment (LLI excluded) on module S6 is the Degassing package 5UA4130
guaranteed at 80dB(A)@1m.
Mezzanine Deck:
Maximum noise levels are in the range 85-86dB(A).
The control valves and restriction orifices modeled on this module associated to the
high background noise generated by HP and MP Gas compressor trains 5KB5330A/B
and 5KB5240 generate noise levels above 85dB(A).

NG50-5-500-SAF-CN-AB-00-6002_rev01

This document is the property of TOTAL and shall not be disclosed to third parties or reproduced without permission of the COMPANY.
Akpo
Project
NIGERIA – OML 130
AKPO Field Development Project

113/1
COMPANY ref: NG50-5-500-SAF-CN-AB-00-6002 Revision: 01 Status: IFD Class: 2 Date: 02/10/2007 Page:
42
CONTRACTOR ref: 8577Y-2000-CN-6000-002 -- -- -- -- --

Upper Deck:
Maximum noise levels are in the range 87-88dB(A). They are generated by the HP and
MP gas compressor trains 5KB5330A/B and 5KB5240.
Top Deck:
Maximum noise levels are below 85dB(A).
Conclusion:
The Mezzanine and Upper Decks of module S6 shall be defined as noise restricted
area.

NG50-5-500-SAF-CN-AB-00-6002_rev01

This document is the property of TOTAL and shall not be disclosed to third parties or reproduced without permission of the COMPANY.
Akpo
Project
NIGERIA – OML 130
AKPO Field Development Project

114/1
COMPANY ref: NG50-5-500-SAF-CN-AB-00-6002 Revision: 01 Status: IFD Class: 2 Date: 02/10/2007 Page:
42
CONTRACTOR ref: 8577Y-2000-CN-6000-002 -- -- -- -- --

7.1.16. Module S7
Main Deck Mezzanine Deck Upper Deck Top Deck

Noise abatement measures:


- All Control valves and restriction orifices below 80dB(A)@1m
- Noise hood around the gearbox of LP gas compressor 5KB5140
- Noise hood around the gearbox of Export gas compressor 5KB5420A/B

Main Deck:
Ambient noise levels is in the range 82.5-85dB(A).
High noise level is mainly due to the Export gas compressor trains 5KB5420A/B
located on the upper deck. The modeling way of the compressor includes piping noise
contribution, which increases the noise at one meter from compressor train.
The noise guaranteed value accepted by Company for the LP gas compressor is
85dB(A)@1m, and the measured value during FAT is 78dB(A)@1m. The noise
guaranteed value accepted by Company for the Export gas compressor is
85dB(A)@1m, and the measured value during FAT is 86dB(A)@1m.
Noisiest equipment (LLI excepted) is the hull vent blower 5UA2116 guaranteed at
82dB(A) maximum at 1 meter.

NG50-5-500-SAF-CN-AB-00-6002_rev01

This document is the property of TOTAL and shall not be disclosed to third parties or reproduced without permission of the COMPANY.
Akpo
Project
NIGERIA – OML 130
AKPO Field Development Project

115/1
COMPANY ref: NG50-5-500-SAF-CN-AB-00-6002 Revision: 01 Status: IFD Class: 2 Date: 02/10/2007 Page:
42
CONTRACTOR ref: 8577Y-2000-CN-6000-002 -- -- -- -- --

Mezzanine and Upper Deck:


Maximum noise levels are in the range 88-90dB(A), mainly due to the Export gas
compressor trains 5KB5420A/B. For mezzanine deck, the contribution of the export
compressor is lower than on the upper deck but control valves and restriction orifices
increase locally the calculated noise level.
Top Deck:
Ambient noise level is in the range 82-86dB(A).
Conclusion:
The Mezzanine and Upper Decks of module S7 shall be defined as noise restricted.

NG50-5-500-SAF-CN-AB-00-6002_rev01

This document is the property of TOTAL and shall not be disclosed to third parties or reproduced without permission of the COMPANY.
Akpo
Project
NIGERIA – OML 130
AKPO Field Development Project

116/1
COMPANY ref: NG50-5-500-SAF-CN-AB-00-6002 Revision: 01 Status: IFD Class: 2 Date: 02/10/2007 Page:
42
CONTRACTOR ref: 8577Y-2000-CN-6000-002 -- -- -- -- --

7.1.17. Calculated noise in front of technical rooms and living quarter


7.1.17.1. In front of technical rooms
Here under are the results of the noise levels calculated in front of each technical building. Noise
levels greater than 85 dB(A) are in red police. North, South, East and West directions are indicated
compared to the North Plan (please refer to figures G1 and G2 in §7)
Table R-1:

Level (dBA)
Module Type
North South East West
Electrical Room 73 82.3 / 74.4
P1
Instrument Room 76.8 82.4 82.8 /
Electrical Room 83.2 87.1 / 84.4
P2
Instrument Room 82.7 89.4 90.8 /
Electrical Room Low Voltage 92.4 85.8 86.5 85.2
P3 Electrical Room High Voltage 91 86.3 88.7 87.7
Instrument Room 93.7 85.6 88.1 92
Electrical Room 81.4 81.6 / 86.9
P4
Instrument Room 79.2 81.2 77.9 /
Electrical Room 73 80.5 / 79.2
P6
Instrument Room 71.6 81.1 78.1 /
Electrical Room 70.4 81.4 / 78.3
P7
Instrument Room 70.7 81.4 80.3 /
Electrical Room 73 81.4 / 79
P8
Instrument Room 68.4 81.3 74.2 /
Electrical Room 85.7 78.9 86 81.6
Instrument Room 87.1 80.4 86.3 80.7
S2
Laboratory Room 81.4 74.8 / 78.9
Telecom Room 81.7 81.5 85.8 /
Electrical Room Low Voltage 85.8 90 84.2 83.7
S3 Electrical Room High Voltage 85 89.1 84.9 85.1
Instrument Room 86.3 91.2 84.7 89.3
Electrical Room 81.3 77.5 79.3 /
S4
Instrument Room 79.5 77.6 / 77.6
Electrical Room 83.3 73.9 80 /
S6
Instrument Room 83 74.3 / 81
Electrical Room 83.8 71.3 80.6 /
S7
Instrument Room 82.6 73 / 80.4

NG50-5-500-SAF-CN-AB-00-6002_rev01

This document is the property of TOTAL and shall not be disclosed to third parties or reproduced without permission of the COMPANY.
Akpo
Project
NIGERIA – OML 130
AKPO Field Development Project

117/1
COMPANY ref: NG50-5-500-SAF-CN-AB-00-6002 Revision: 01 Status: IFD Class: 2 Date: 02/10/2007 Page:
42
CONTRACTOR ref: 8577Y-2000-CN-6000-002 -- -- -- -- --

7.1.17.2. In front of living quarter


Here under are the noise levels calculated in front of the living quarter.
Table R-2:

Level (dBA)
Receiver elevation
North South East West
Down (2 m) 78.6 73.9 80.4 63.1
Middle (7m) 78.2 74.7 79 63.3
Up (15m) 78.7 76.7 80.3 71.9

The noise spectrum to be considered in front of the living quarter (eastside) is:

63 Hz 125 Hz 250 Hz 500 Hz 1000 Hz 2000 Hz 4000 Hz 8000 Hz dB(A)

94 88 80 74 74 71 69 71.5 80.5

NG50-5-500-SAF-CN-AB-00-6002_rev01

This document is the property of TOTAL and shall not be disclosed to third parties or reproduced without permission of the COMPANY.
Akpo
Project
NIGERIA – OML 130
AKPO Field Development Project

118/1
COMPANY ref: NG50-5-500-SAF-CN-AB-00-6002 Revision: 01 Status: IFD Class: 2 Date: 02/10/2007 Page:
42
CONTRACTOR ref: 8577Y-2000-CN-6000-002 -- -- -- -- --

7.2. Flaring Operation

7.2.1. Contingency Flaring


7.2.1.1. Data and modelling
During contingency flaring all noise sources used for normal operation are activated,
both Gas Export Compressors excluded. In addition, three control valves are in
operation: PV-31111A and PV-31111B, PV-32111, and PV-34111. This case is the
worst contingency case regarding noise emission.
The noise of the control valves operating in contingency case are modelled by line
sources. The total sound power level of the line sources is 114 dB(A). The lines have
been modelled considering the sound power level per meter was equal to Lp@1m from
the plus 6dB(A). Input data used in model for control valves are presented here under:

Lp@1m CP CP CP Lw/m Lw length


Tag Location Line_Number_Label
dB(A) East North Height dB(A)/m dB(A) m

5PV 31111B 84.4 161257 108812 25403 S 4 Top 16" HG531006-F70-PFP 90.4 103.4 20
5PV 31111A 84.4 161257 91180 25403 P 4 Top 16" HG531002-F70-PFP 90.4 103.4 20
5PV2 34111 79.2 176047 112842 24928 P 5 Top 14" HG534002-D49-PPA 85.2 96.8 14
5PV2 32111 77.8 183921 112822 24886 P 5 Top 10" HG532001-D49-PP 83.8 98.6 30
Main pipe going up to flare 84.4 - - - - - - - 90.4 112.6 166

According to Vendor data, the flare tips sound power levels are estimated to 146dB(A)
for HP flare 5-FB-2160 and 120dB(A) for LP flare 5-FB-2170:

Frequency Hz 31.5 63 125 250 500 1k 2k 4k 8k dB(A)


LP Contingency Flaring
Lw dBlin 133 132 125 116 113 115 113 108 101 120
5-FB-2170
HP Contingency Flaring
Lw dBlin 146 145 136 135 135 138 140 141 138 146
5-FB-2160

Flare noise directivity effect is taken into account. The directivity index has been
defined from Heitner (1968) who gives directional corrections to apply for jet noise
(above 1000Hz). Directivity effect has not been considered for low frequencies.
Frequency (Hz)
31,5 63 125 250 500 1k 2k 4k 8k
0 0 0 0 0 0 0 0 0 0
30 0 0 0 0 0 4 4 4 4
Angle 60 0 0 0 0 0 2 2 2 2
from jet 90 0 0 0 0 0 -6 -6 -6 -6
axis (°) 120 0 0 0 0 0 -11 -11 -11 -11
150 0 0 0 0 0 -14 -14 -14 -14
180 0 0 0 0 0 -17 -17 -17 -17

NG50-5-500-SAF-CN-AB-00-6002_rev01

This document is the property of TOTAL and shall not be disclosed to third parties or reproduced without permission of the COMPANY.
Akpo
Project
NIGERIA – OML 130
AKPO Field Development Project

119/1
COMPANY ref: NG50-5-500-SAF-CN-AB-00-6002 Revision: 01 Status: IFD Class: 2 Date: 02/10/2007 Page:
42
CONTRACTOR ref: 8577Y-2000-CN-6000-002 -- -- -- -- --

7.2.1.2. Noise maps

Figure CF-1: Main Deck Contingency Flaring Operation Noise Map

NG50-5-500-SAF-CN-AB-00-6002_rev01

This document is the property of TOTAL and shall not be disclosed to third parties or reproduced without permission of the COMPANY.
Akpo
Project
NIGERIA – OML 130
AKPO Field Development Project

120/1
COMPANY ref: NG50-5-500-SAF-CN-AB-00-6002 Revision: 01 Status: IFD Class: 2 Date: 02/10/2007 Page:
42
CONTRACTOR ref: 8577Y-2000-CN-6000-002 -- -- -- -- --

Figure CF-2: Mezzanine Deck Contingency Flaring Operation Noise Map

NG50-5-500-SAF-CN-AB-00-6002_rev01

This document is the property of TOTAL and shall not be disclosed to third parties or reproduced without permission of the COMPANY.
Akpo
Project
NIGERIA – OML 130
AKPO Field Development Project

121/1
COMPANY ref: NG50-5-500-SAF-CN-AB-00-6002 Revision: 01 Status: IFD Class: 2 Date: 02/10/2007 Page:
42
CONTRACTOR ref: 8577Y-2000-CN-6000-002 -- -- -- -- --

Figure CF-3: Upper Deck Contingency Flaring Operation Noise

NG50-5-500-SAF-CN-AB-00-6002_rev01

This document is the property of TOTAL and shall not be disclosed to third parties or reproduced without permission of the COMPANY.
Akpo
Project
NIGERIA – OML 130
AKPO Field Development Project

122/1
COMPANY ref: NG50-5-500-SAF-CN-AB-00-6002 Revision: 01 Status: IFD Class: 2 Date: 02/10/2007 Page:
42
CONTRACTOR ref: 8577Y-2000-CN-6000-002 -- -- -- -- --

Figure CF-4: Top Deck Contingency Flaring Operation Noise Map

NG50-5-500-SAF-CN-AB-00-6002_rev01

This document is the property of TOTAL and shall not be disclosed to third parties or reproduced without permission of the COMPANY.
Akpo
Project
NIGERIA – OML 130
AKPO Field Development Project

123/1
COMPANY ref: NG50-5-500-SAF-CN-AB-00-6002 Revision: 01 Status: IFD Class: 2 Date: 02/10/2007 Page:
42
CONTRACTOR ref: 8577Y-2000-CN-6000-002 -- -- -- -- --

7.2.1.3. Noise maps analysis


During contingency flaring, the noise levels are included in the range 85-95dB(A) on
the main, mezzanine, upper and top deck.

7.2.2. Emergency Flaring: max design case


7.2.2.1. Data and modelling
Only both LP and HP flares are activated during emergency flaring.
According to Vendor data, the flare tips sound power levels are estimated to 170dB(A)
for HP flare 5-FB-2160 and 122dB(A) for LP flare 5-FB-2170:
Frequency Hz 31.5 63 125 250 500 1k 2k 4k 8k dB(A)
LP Emergency Flaring
Lw flare 135 134 127 118 115 117 115 110 103 122
5-FB-2170
HP Emergency Flaring
Lw flare 167 166 156 158 159 162 164 165 162 170
5-FB-2160

Noise requirement for emergency flaring is limited to 115dB(A) at operator location.

Flare noise directivity effect is taken into account. The directivity index has been
defined from Heitner (1968) who gives directional corrections to apply for jet noise
(above 1000Hz). Directivity effect has not been considered for low frequencies.
Frequency (Hz)
31,5 63 125 250 500 1k 2k 4k 8k
0 0 0 0 0 0 0 0 0 0
30 0 0 0 0 0 4 4 4 4
Angle 60 0 0 0 0 0 2 2 2 2
from jet 90 0 0 0 0 0 -6 -6 -6 -6
axis (°) 120 0 0 0 0 0 -11 -11 -11 -11
150 0 0 0 0 0 -14 -14 -14 -14
180 0 0 0 0 0 -17 -17 -17 -17

NG50-5-500-SAF-CN-AB-00-6002_rev01

This document is the property of TOTAL and shall not be disclosed to third parties or reproduced without permission of the COMPANY.
Akpo
Project
NIGERIA – OML 130
AKPO Field Development Project

124/1
COMPANY ref: NG50-5-500-SAF-CN-AB-00-6002 Revision: 01 Status: IFD Class: 2 Date: 02/10/2007 Page:
42
CONTRACTOR ref: 8577Y-2000-CN-6000-002 -- -- -- -- --

7.2.2.2. Noise maps

Figure EF-1: Main Deck - Emergency Flaring Operation Noise Map – HP & LP flares
activated only

NG50-5-500-SAF-CN-AB-00-6002_rev01

This document is the property of TOTAL and shall not be disclosed to third parties or reproduced without permission of the COMPANY.
Akpo
Project
NIGERIA – OML 130
AKPO Field Development Project

125/1
COMPANY ref: NG50-5-500-SAF-CN-AB-00-6002 Revision: 01 Status: IFD Class: 2 Date: 02/10/2007 Page:
42
CONTRACTOR ref: 8577Y-2000-CN-6000-002 -- -- -- -- --

Figure EF-2: Mezzanine Deck Emergency Flaring Operation Noise Map – HP & LP
flares activated only

NG50-5-500-SAF-CN-AB-00-6002_rev01

This document is the property of TOTAL and shall not be disclosed to third parties or reproduced without permission of the COMPANY.
Akpo
Project
NIGERIA – OML 130
AKPO Field Development Project

126/1
COMPANY ref: NG50-5-500-SAF-CN-AB-00-6002 Revision: 01 Status: IFD Class: 2 Date: 02/10/2007 Page:
42
CONTRACTOR ref: 8577Y-2000-CN-6000-002 -- -- -- -- --

Figure EF-3: Upper Deck Emergency Flaring Operation Noise Map – HP & LP flares
activated only

NG50-5-500-SAF-CN-AB-00-6002_rev01

This document is the property of TOTAL and shall not be disclosed to third parties or reproduced without permission of the COMPANY.
Akpo
Project
NIGERIA – OML 130
AKPO Field Development Project

127/1
COMPANY ref: NG50-5-500-SAF-CN-AB-00-6002 Revision: 01 Status: IFD Class: 2 Date: 02/10/2007 Page:
42
CONTRACTOR ref: 8577Y-2000-CN-6000-002 -- -- -- -- --

Figure EF-4: Top Deck Emergency Flaring Operation Noise Map – HP & LP flares
activated only

NG50-5-500-SAF-CN-AB-00-6002_rev01

This document is the property of TOTAL and shall not be disclosed to third parties or reproduced without permission of the COMPANY.
Akpo
Project
NIGERIA – OML 130
AKPO Field Development Project

128/1
COMPANY ref: NG50-5-500-SAF-CN-AB-00-6002 Revision: 01 Status: IFD Class: 2 Date: 02/10/2007 Page:
42
CONTRACTOR ref: 8577Y-2000-CN-6000-002 -- -- -- -- --

7.2.2.3. Noise maps analysis


Regarding overall noise limit requirement for emergency conditions, the 115dB(A) is
never exceeded whatever the deck and operator location.

NG50-5-500-SAF-CN-AB-00-6002_rev01

This document is the property of TOTAL and shall not be disclosed to third parties or reproduced without permission of the COMPANY.
Akpo
Project
NIGERIA – OML 130
AKPO Field Development Project

129/1
COMPANY ref: NG50-5-500-SAF-CN-AB-00-6002 Revision: 01 Status: IFD Class: 2 Date: 02/10/2007 Page:
42
CONTRACTOR ref: 8577Y-2000-CN-6000-002 -- -- -- -- --

8. Noise measurement results


On AKPO project, the noise measurements have been done through intensity measurement
following ISO 9614-2 standard for the biggest equipment. Here below a table summarizing the
noise measurement results obtained for main equipment items measured during FAT.
Table G-4:

Noise FAT
Tag Name Guarantee Noise
Lp@1m Measured
5-PY6510 Main Power Generators See N.D.S. No
5-KX-5420 Export Gas Compressor 85 dB(A) 86dB(A)
5-KB-5330 HP Gas Compressor 85 dB(A) 83dB(A)
5-KB-5460 Gas Injection Compressor 85 dB(A) 81dB(A)
5-KB-5240 MP Gas Compressor 85 dB(A) 80dB(A)
5-KB-5140 LP Gas Compressor 85 dB(A) 78dB(A)
5-GX-8310 Crude Oil Offloading Pump 87dB(A) 86dB(A)
5-GX-7520 Water Injection Pump 87dB(A) 86dB(A)
5-GX-9920 Crude Oil Recirculation Pump 82dB(A) 82dB(A)
5-GX-7320 Sea Water Booster Pump 80dB(A) 76dB(A)
5-GX-3720 Crude Oil Transfer Pump 80dB(A) 77dB(A)
5-GX-3410 3rd Stage Separator Pump 80dB(A) 77dB(A)
5-GX-1610 Hot Water Circulation 82dB(A) 79dB(A)
5-GX-7510 Water Injection Booster Pump 82dB(A) 80 dB(A)
5-GX-1510 Cooling Water Recirculation Pump 82dB(A) 81 dB(A)

NG50-5-500-SAF-CN-AB-00-6002_rev01

This document is the property of TOTAL and shall not be disclosed to third parties or reproduced without permission of the COMPANY.
Akpo
Project
NIGERIA – OML 130
AKPO Field Development Project

130/1
COMPANY ref: NG50-5-500-SAF-CN-AB-00-6002 Revision: 01 Status: IFD Class: 2 Date: 02/10/2007 Page:
42
CONTRACTOR ref: 8577Y-2000-CN-6000-002 -- -- -- -- --

The general noise maps calculated for Topsides do not take into account the measurements
uncertainties. The uncertainties on the Sound Power Level of major equipment linked with a
conservative approach in the modeling demonstrates that the noise restricted areas number and
size could be reduced, depending on final noise on site.
However, particular attention must be paid to Main power generators (for which no noise
measurements have been done during FAT) and Export compressor train (for which noise has
been measured close to the noise guarantee).

NG50-5-500-SAF-CN-AB-00-6002_rev01

This document is the property of TOTAL and shall not be disclosed to third parties or reproduced without permission of the COMPANY.
Akpo
Project
NIGERIA – OML 130
AKPO Field Development Project

131/1
COMPANY ref: NG50-5-500-SAF-CN-AB-00-6002 Revision: 01 Status: IFD Class: 2 Date: 02/10/2007 Page:
42
CONTRACTOR ref: 8577Y-2000-CN-6000-002 -- -- -- -- --

9. Noise Restricted Areas


So, due to normal or emergency operation, the following areas shall be declared as restricted.
Table G-3:
Main Deck Mezzanine Deck Upper Deck Top Deck
Normal Normal Normal Normal
Emergency Emergency Emergency Emergency
Operation Operation Operation Operation
P1 Yes - Yes - Yes - Yes -
S1 Yes - Yes -

Main Deck Mezzanine Deck Upper Deck Top Deck


Normal Normal Normal Normal
Emergency Emergency Emergency Emergency
Operation Operation Operation Operation
P2 Yes - Yes Locally Yes - Yes Locally
S2 Yes - Yes -

Main Deck Mezzanine Deck Upper Deck Top Deck


Normal Normal Normal Normal
Emergency Emergency Emergency Emergency
Operation Operation Operation Operation
P3 Yes Locally Yes Locally
S3 Yes Locally Yes Locally

Main Deck Mezzanine Deck Upper Deck Top Deck


Normal Normal Normal Normal
Emergency Emergency Emergency Emergency
Operation Operation Operation Operation
P4 - - - Locally - Locally Yes Locally
S4 - - - - - - Yes -

Main Deck Mezzanine Deck Upper Deck Top Deck


Normal Normal Normal Normal
Emergency Emergency Emergency Emergency
Operation Operation Operation Operation
P5 - - - - - Locally - -
S5 - - - - - - - -

Main Deck Mezzanine Deck Upper Deck Top Deck


Normal Normal Normal Normal
Emergency Emergency Emergency Emergency
Operation Operation Operation Operation
P6 - - - - - - - -
S6 - - Yes - Yes - - -

Main Deck Mezzanine Deck Upper Deck Top Deck


Normal Normal Normal Normal
Emergency Emergency Emergency Emergency
Operation Operation Operation Operation
P7 - Locally - Locally - Locally - Locally
S7 - Locally Yes Locally Yes Locally - Locally

Main Deck Mezzanine Deck Upper Deck Top Deck


Normal Normal Normal Normal
Emergency Emergency Emergency Emergency
Operation Operation Operation Operation
P8 Yes Locally - Locally - Locally - Locally
S8

No Deck
- No Restrcted Area

NA means Not Applicable.

NG50-5-500-SAF-CN-AB-00-6002_rev01

This document is the property of TOTAL and shall not be disclosed to third parties or reproduced without permission of the COMPANY.
Akpo
Project
NIGERIA – OML 130
AKPO Field Development Project

132/1
COMPANY ref: NG50-5-500-SAF-CN-AB-00-6002 Revision: 01 Status: IFD Class: 2 Date: 02/10/2007 Page:
42
CONTRACTOR ref: 8577Y-2000-CN-6000-002 -- -- -- -- --

In order to facilitate the implementation of Ear Protection Safety signs, specific drawings showing
the noise restricted areas are given in Appendix, for each deck of each module concerned.

NG50-5-500-SAF-CN-AB-00-6002_rev01

This document is the property of TOTAL and shall not be disclosed to third parties or reproduced without permission of the COMPANY.
Akpo
Project
NIGERIA – OML 130
AKPO Field Development Project

133/1
COMPANY ref: NG50-5-500-SAF-CN-AB-00-6002 Revision: 01 Status: IFD Class: 2 Date: 02/10/2007 Page:
42
CONTRACTOR ref: 8577Y-2000-CN-6000-002 -- -- -- -- --

9.1. Normal Operation

9.1.1. Main and Mezzanine Deck

NG50-5-500-SAF-CN-AB-00-6002_rev01

This document is the property of TOTAL and shall not be disclosed to third parties or reproduced without permission of the COMPANY.
Akpo
Project
NIGERIA – OML 130
AKPO Field Development Project

134/1
COMPANY ref: NG50-5-500-SAF-CN-AB-00-6002 Revision: 01 Status: IFD Class: 2 Date: 02/10/2007 Page:
42
CONTRACTOR ref: 8577Y-2000-CN-6000-002 -- -- -- -- --

9.1.2. Upper and Top Deck

NG50-5-500-SAF-CN-AB-00-6002_rev01

This document is the property of TOTAL and shall not be disclosed to third parties or reproduced without permission of the COMPANY.
Akpo
Project
NIGERIA – OML 130
AKPO Field Development Project

135/1
COMPANY ref: NG50-5-500-SAF-CN-AB-00-6002 Revision: 01 Status: IFD Class: 2 Date: 02/10/2007 Page:
42
CONTRACTOR ref: 8577Y-2000-CN-6000-002 -- -- -- -- --

9.2. Case of PSV discharging to flare and to atmosphere

Based on “Noisy Pressure Safety Valves List” [G.91], a noise calculation has been
done with PSV discharging to flare and to atmosphere in operation. These cases are
emergency cases but different from emergency flaring.The conclusion of the
calculation is presented on the noise maps below, showing noise restricted area to
anticipate in these emergency cases. The following noise maps are in accordance with
the table G.3 in §9, detailing noise restricted area to be anticipated for normal operation
and for emergency operation.
9.2.1. Noise Restricted Areas due to PSV discharging to flare

NG50-5-500-SAF-CN-AB-00-6002_rev01

This document is the property of TOTAL and shall not be disclosed to third parties or reproduced without permission of the COMPANY.
Akpo
Project
NIGERIA – OML 130
AKPO Field Development Project

136/1
COMPANY ref: NG50-5-500-SAF-CN-AB-00-6002 Revision: 01 Status: IFD Class: 2 Date: 02/10/2007 Page:
42
CONTRACTOR ref: 8577Y-2000-CN-6000-002 -- -- -- -- --

NG50-5-500-SAF-CN-AB-00-6002_rev01

This document is the property of TOTAL and shall not be disclosed to third parties or reproduced without permission of the COMPANY.
Akpo
Project
NIGERIA – OML 130
AKPO Field Development Project

137/1
COMPANY ref: NG50-5-500-SAF-CN-AB-00-6002 Revision: 01 Status: IFD Class: 2 Date: 02/10/2007 Page:
42
CONTRACTOR ref: 8577Y-2000-CN-6000-002 -- -- -- -- --

9.2.2. Noise Restricted Areas due to PSV discharging to atmosphere

NG50-5-500-SAF-CN-AB-00-6002_rev01

This document is the property of TOTAL and shall not be disclosed to third parties or reproduced without permission of the COMPANY.
Akpo
Project
NIGERIA – OML 130
AKPO Field Development Project

138/1
COMPANY ref: NG50-5-500-SAF-CN-AB-00-6002 Revision: 01 Status: IFD Class: 2 Date: 02/10/2007 Page:
42
CONTRACTOR ref: 8577Y-2000-CN-6000-002 -- -- -- -- --

NG50-5-500-SAF-CN-AB-00-6002_rev01

This document is the property of TOTAL and shall not be disclosed to third parties or reproduced without permission of the COMPANY.
Akpo
Project
NIGERIA – OML 130
AKPO Field Development Project

139/1
COMPANY ref: NG50-5-500-SAF-CN-AB-00-6002 Revision: 01 Status: IFD Class: 2 Date: 02/10/2007 Page:
42
CONTRACTOR ref: 8577Y-2000-CN-6000-002 -- -- -- -- --

10. Synthesis
A lot of noise abatement measures have been taken to limit as much as possible the noise of the
AKPO Topsides below the 85dB(A) specification value:
- Except for LLI equipment items, the noise requirements applicable for equipment and
packages have been defined below 82dB(A)(70-75-78-80-82). These requirements have been
defined with Company at the beginning of the project and are given in the Technical Query TPCY
6-500-SAF-0012. For all equipment and valves, the requirement has been defined with an ALARP
approach.
- All control valves have been purchased with the 80dB(A)@1m noise requirement.
- All major compressor suction and discharge pipes have been noise insulated
- Silencers and enclosures have been purchased in order to reach the equipment noise
requirements. In the same way, low dB valves have been purchased to comply with control valves
noise requirements.
Globally, based on normal operation general noise maps (§7.1.1, GNM-1 to GNM-4), the
calculated noise levels are in the range 80-90dB(A).

1) Noise levels about 90 dB(A) are reached near:


- Main power generators (gas turbine, gear box, AC generator) (5PY6510) on the main
and upper deck of P3 and S3
- Water injection pumps (5GX7520) on the main , mezzanine and upper deck of P2
- Crude oil offloading pumps (5GX8310 - intermittent) on the main deck of P8 when they
operate.

2) Noise levels between 85 and 90 dB(A) are in areas located around LLI equipment items.
- The Main power generators (5PY6510) impact on main, mezzanine, upper and top deck
of modules P1, P2, P3, S1, S2 and S3 and on the top deck of P4, P5, S4 and S5.
- The Water injection pumps (5GX7520) impact on main, mezzanine and upper deck of
modules P1 and P2.
- The Crude oil offloading pumps (5GX8310 - intermittent) impact on main and mezzanine
deck of P8 when they operate.
- The Compressors impact on mezzanine, upper and top deck of P6, P7, S5, S6, and S7
and on main deck of S6 and S7.

3) In others areas mainly modules P4, P5, P6 and S4, S5 noise levels are in the range 80-
85dB(A).

NG50-5-500-SAF-CN-AB-00-6002_rev01

This document is the property of TOTAL and shall not be disclosed to third parties or reproduced without permission of the COMPANY.
Akpo
Project
NIGERIA – OML 130
AKPO Field Development Project

140/1
COMPANY ref: NG50-5-500-SAF-CN-AB-00-6002 Revision: 01 Status: IFD Class: 2 Date: 02/10/2007 Page:
42
CONTRACTOR ref: 8577Y-2000-CN-6000-002 -- -- -- -- --

4) Noise levels lower than 82.5dB(A) are obtained everywhere on the Hull Deck.
5) During contingency operation, noise levels are in the range 85-95dB(A) everywhere on the
Topsides.
6) During emergency operation (flaring noise), noise levels are everywhere on the Topides
lower than the 115dB(A) maximal noise limit.

NG50-5-500-SAF-CN-AB-00-6002_rev01

This document is the property of TOTAL and shall not be disclosed to third parties or reproduced without permission of the COMPANY.
Akpo
Project
NIGERIA – OML 130
AKPO Field Development Project

141/1
COMPANY ref: NG50-5-500-SAF-CN-AB-00-6002 Revision: 01 Status: IFD Class: 2 Date: 02/10/2007 Page:
42
CONTRACTOR ref: 8577Y-2000-CN-6000-002 -- -- -- -- --

APPENDIX: Noise Restricted Areas

NG50-5-500-SAF-CN-AB-00-6002_rev01

This document is the property of TOTAL and shall not be disclosed to third parties or reproduced without permission of the COMPANY.
Noise Restricted Area PSV Noise Restricted Area
Noise Restricted Area PSV Noise Restricted Area
3. Ear protection safety signs "WEAR HEARING PROTECTION", symbol M3, to
be implemented by Company at all personal access to noise restricted area.

Noise Restricted Area


2. Ear protection safety signs "WEAR HEARING PROTECTION", symbol M3,
to be implemented in accordance with noise restricted area layout
Noise Restricted Area
3. Ear protection safety signs "WEAR HEARING PROTECTION", symbol
M3, to be implemented by Company at all personal access to noise restricted
area.

Noise Restricted Area


3. Ear protection safety signs "WEAR HEARING PROTECTION", symbol
M3, to be implemented by Company at all personal access to noise restricted
area.

PSV Noise Restricted Area


3. Ear protection safety signs "WEAR HEARING PROTECTION", symbol
M3, to be implemented by Company at all personal access to noise restricted
area.

Noise Restricted Area


3. Ear protection safety signs "WEAR HEARING PROTECTION", symbol M3, to
be implemented by Company at all personal access to noise restricted area.

Noise Restricted Area


3. Ear protection safety signs "WEAR HEARING PROTECTION", symbol M3, to be
implemented by Company at all personal access to noise restricted area.

Noise Restricted Area


3. Ear protection safety signs "WEAR HEARING PROTECTION", symbol M3, to be
implemented by Company at all personal access to noise restricted area.

Noise Restricted Area

...\NG50-5-500-PIP-DW-AB-00-3301-R 09/13/2006 03:30:18 PM


3. Ear protection safety signs "WEAR HEARING PROTECTION", symbol
M3, to be implemented by Company at all personal access to noise restricted
area.

PSV Noise Restricted Area


2. Ear protection safety signs "WEAR HEARING PROTECTION", symbol M3, to
be implemented by Company at all personal access to noise restricted area.

Noise Restricted Area


2. Ear protection safety signs "WEAR HEARING PROTECTION", symbol M3, to
be implemented by Company at all personal access to noise restricted area.

Noise Restricted Area


3. Ear protection safety signs "WEAR HEARING PROTECTION", symbol
M3, to be implemented by Company at all personal access to noise restricted
area.

PSV Noise Restricted Area


2. Ear protection safety signs "WEAR HEARING PROTECTION", symbol
M3, to be implemented by Company at all personal access to noise restricted
area.

PSV Noise Restricted Area


NOTE:
3. Ear protection safety signs "WEAR HEARING PROTECTION", symbol M3,
to be implemented by Company at all personal access to noise restricted area.

Noise Restricted Area


3. Ear protection safety signs "WEAR HEARING PROTECTION", symbol M3, to be
implemented by Company at all personal access to noise restricted area.

Noise Restricted Area


Noise Restricted Area
NOTE: 3. Ear protection safety signs "WEAR HEARING PROTECTION", symbol M3,
to be implemented by Company at all personal access to noise restricted area.
3. Ear protection safety signs "WEAR HEARING PROTECTION", symbol M3,
to be implemented by Company at all personal access to noise restricted area.

Noise Restricted Area


PSV Noise Restricted Area
2. Ear protection safety signs "WEAR HEARING PROTECTION", symbol M3,
to be implemented by Company at all personal access to noise restricted area.

Noise Restricted Area


3. Ear protection safety signs "WEAR HEARING PROTECTION", symbol M3, to be
implemented by Company at all personal access to noise restricted area.

Noise Restricted Area


5. Ear protection safety signs "WEAR HEARING PROTECTION", symbol M3, to be
implemented by Company at all personal access to noise restricted area.

Noise Restricted Area


3. Ear protection safety signs "WEAR HEARING PROTECTION", symbol M3
to be implemented by Company at all personal access to noise restricted area

PSV Noise Restricted Area


4. Ear protection safety signs "WEAR HEARING PROTECTION", symbol M3,
to be implemented by Company at all personal access to noise restricted area

PSV Noise Restricted Area


3. Ear protection safety signs "WEAR HEARING PROTECTION", symbol M3, to be
implemented by Company at all personal access to noise restricted area.

Noise Restricted Area


5. Ear protection safety signs "WEAR HEARING PROTECTION", symbol M3, to be
implemented by Company at all personal access to noise restricted area.

Noise Restricted Area


5. Ear protection safety signs "WEAR HEARING PROTECTION", symbol M3, to be
implemented by Company at all personal access to noise restricted area.

Noise Restricted Area


Noise Restricted Area
3. Ear protection safety signs "WEAR HEARING PROTECTION", symbol
M3, to be implemented by Company at all personal access to noise
restricted area.
Noise Restricted Area

PSV Noise Restricted Area

3. Ear protection safety signs "WEAR HEARING PROTECTION", symbol


M3, to be implemented by Company at all personal access to noise
restricted area.
3. Ear protection safety signs "WEAR HEARING PROTECTION", symbol M3, to be
implemented by Company at all personal access to noise restricted area
Noise Restricted Area
Noise Restricted Area

3. Ear protection safety signs "WEAR HEARING PROTECTION", symbol M3, to be


implemented by Company at all personal access to noise restricted area.
3. Ear protection safety signs "WEAR HEARING PROTECTION", symbol M3, to be
implemented by Company at all personal access to noise restricted area.

PSV Noise Restricted Area


3. Ear protection safety signs "WEAR HEARING PROTECTION", symbol M3, to be
implemented by Company at all personal access to noise restricted area.

PSV Noise Restricted Area


3. Ear protection safety signs "WEAR HEARING PROTECTION", symbol M3, to be
implemented by Company at all personal access to noise restricted area.

Noise Restricted Area


3. Ear protection safety signs "WEAR HEARING PROTECTION", symbol M3, to be
implemented by Company at all personal access to noise restricted area.