Professional Documents
Culture Documents
10. JOGGER
10. JOGGER
10. JOGGER
1N2TLSZG 5.50 12
1N1T-PKST 0.46 6
1"
w/allowanc
LOCK ST S/N 12 3.44 3.13
LOCK ST S/N 12 3.44 3.13
CHAIN ST S/N 13 4.40 4.00
3TRD O/L 10 16.50 15.00
4TRD O/L 10 19.80 18.00
5 TRD O/L 10 22.00 20.00
COVER STF/L 10 16.50 15.00
FLAT LOCK 10 13.20 12.00
MULTY NEEDLE 10 6.88 5.50
MULTY NEEDLE 10 6.88 5.50
PICOT EDGING 10 31.25 25.00
ZIG ZAG 10 16.25 13.00
0.457
0.0254
smv 18.32 line cost $1,200.00
mp 45.00 $ 1.32
w.min 600 $ 0.07
100% tgt 1474
1st day 0
2nd day 368
3rd day 516
4th day 663
5th day 811
6th day 884
7th day 958
8th day 958
9th day 958
10th day 958
11th day 1032
12th day 1032
13th day 1032
14th day 1032
15th day 1032
16th day 1032
17th day 1032
18th day 1032
19th day 1032
20th day 1032
21st day 1032
22nd day 1032
23rd day 1032
24th day 1032
25th day 1032
26th day 1032
27th day 1032
28th day 1032
29th day 1032
30th day 1032
31st day 1032
32nd day 1032
33rd day 300
Total 30071
Avg 911
Avg Eff 61.83%
EFFICIENCY LEVEL 60% 70% 80% 90% 100%
Hidden W/STN (M) 11.0 40.0 26.0 77.0 TOTAL SMV 43.25
36 ASM-1 BACK PART MARK FOR PKT ATTACH & DART MAKE
H Plain Table Table 0.60 0.48 1 1.0 100
SMV ( H ) 0.36 0.30 2.04 2.70 PLANED EFF% 85% Operators 30.40
Hidden W/STN (M) 2.0 22.0 17.0 41.0 TOTAL SMV 18.32
TOTAL MACHINE = 4
10
11
12
MANAGER
TECHNICAL MANAGER/INCHARGE MANAGER MANAGER-
PREPARED BY- RESPECTIVE IE MANAGER QUALITY INDUSTRIAL
INCHARGE CUTTING -CAD MAINTAINENCE
ENGINEERING (IE)