Download as pdf
Download as pdf
You are on page 1of 10
Higa.) ADNOC HS rou TAKREER&Y Leadill 5452 Sales ae sis We Refine Right OIL TERMINAL HAMRIYAH FREE ZONE SHARJAH TAKREER PROJECT NO. 5638 AMENDMENT TO DESIGN GENERAL SPECIFICATION DGS-AU-058 REV 1 SPECIALITIES rac REE ka. 0. [04-07-2010 fev. a lissued for TAKREER ‘Approval No. AMD-AU-058-5638-001 Z lofice Abu Dhabi order. 40399-00 171510-20 [socument: 1182008 rer [sheet 7 lof 40 T PARAGRAPHS REVISED THIS ISSUE Para No. Para No. Para No. Para No. Section 2.0 [Section 3.0 [Section 7.0 [Section 8.0 ‘Section 10.0 ‘Section 13.3, (ent ‘ADNOG DISTRIBUTION | TAKREER Project ‘OIL TERMINAL HAMRIYAH FREE ZONE SHARJAH oe. Ne 'AMD-AU-058-5638-001 ie "AMENDMENT TO DESIGN GENERAL SPECIFICATION DGS-AU-058 Rev 1 - SPECIALITIES. lies “Abu Dhabi “Tanie “10399-00771810-20 [ocurent 1782009. [a2 Table of Contents 1 INTRODUCTION 1.1 Definitions. 1.2 Objective 1.3 Scope 2. AMENDMENTS 2.1 Amendments to Section 2.0 CODES AND STANDARDS... 2.2 Amendments to Section 3.0 REFERENCE DOCUMENTS 2.3. Amendments to Section 7.0 DOCUMENTATION. 2.4 Amendments to Section 8.0 PRODUCT DELIVERY, STORAGE, & HANDLING... 2.5 Amendments to Section 10.0 ACCESS FLOOR SYSTEM 2.6 Amendments to Section 13.3 EQUIPMENT: 2.7 Addition of New Section 16.0. APPENDIX 4 - DGS-AU-058- REV. 1 - DESIGN GENERAL SPECIFICATION SPECIALITIES .. jient _ ADNOG DISTRIBUTION / TAKREER PPrject OL TERMINAL HAMRIYAH FREE ZONE SHARJAH page BARS Doan cone [Doc. No._AMD-AU-058-5638-001 lite: AMENDMENT TO DESIGN GENERAL SPECIFICATION DGS-AU-058 Rev 1 - SPECIALITIES lofice: Abu Dhabi TAME 1039900 /71510.20 [document 742008 [rev 0 [shoot 3 oe 70 1 INTRODUCTION ADNOC Distribution as “Owner” intends to construct @ new oil terminal, to be located in Hamriyah Free Zone, Sharjah. The oil terminal will comprise of tanks, pump-house, offices, warehouse, truck loading facilities, truck washing facilities, vehicle workshop building, parking facilities, electrical substation(s), and fire fighting station. The terminal will be connected via pipelines to new marine loading facilities (for product loading and bunkering services) at existing berths, ‘Abu Dhabi Oil Refining Company (TAKREER) also referred as “COMPANY is responsible for ‘execution of the Project 4.1 Definitions OWNER ADNOC Distribution COMPANY. ‘Abu Dhabi Oil Refining Company (TAKREER) CONSULTANT Tebodin Middle East Lid PROJECT Oil Terminal Hamriyah Free Zone, Sharjah CONTRACTOR The party, which carries out all or part of the engineering, procurement, construction, and commissioning of the Project SHALL indicates a mandatory requirement 4.2 Objective COMPANY has engaged Consultant “Tebodin Middle East Ltd, Abu Dhabi’ to prepare an EPC Tender package as per TAKREER DGS and Standards for ADNOC Distribution’s Oil Terminal at Hamriyah Free Zone, Sharjah, 13 Scope This Amendment and its attachments cover the minimum technical requirements for the ‘Specialities’ for the Oil Terminal project, Hamriyah Free Zone - Sharjah. This Amendment shall be read in conjunction with the altached Design General Specification No, DGS-AU-058, Rey. 1 and the specific requirement of the requisition(s) in which it is incorporated. i AONOG DISTRIBUTION /TAKREER SP Pee OI TeRnnaL HAKIRIVAH FREE ZONE SHARIA endipin B= Ni AMD-AU-068-6890-001 7 - a eee DGS-AU-058 Rev 1 - SPECIALITIES. lice “Abu Dhabi [AME 40399-00/71810-20 [document 1182009, lew 0 [sheet 4 [ot 70 AMENDMENTS The following clause wise amendments and additions (deletions) shall apply to Design General Specification No, DGS-AU-058 Rev. 1, Specialities for the Oil Terminal project, Hamriyah Free Zone - Sharjah. 2.4 Amendments to Section 2.0 CODES AND STANDARDS The following Reference Codes shall be replaced: Replace: BS 5378 Safety Signs and Colours Bs 5499 Fire Safety Signs, Notices and Graphic Symbols With BS 5499-5 Graphical Symbols and Signs. Safety Signs including Fire Safety Signs. Signs with Specific Safety Meanings Bs 5378-2 Safety Signs and Colours. Specification for Colorimetric and Photometric Properties of Materials, The following Reference Codes shall be added BRITISH STANDARDS (BS) BS 5306 Part-3. Fire Extinguishing Installations and Equipment on premises. Commissioning and Maintenance of Portable Fire Extinguishers. Code of Practice AMERICAN SOCIETY FOR TESTING AND MATERIALS (ASTM) ASTM E84 Standard Test Method for Surface Burning Characteristics of Building Materials, ASTM B209 Standard Specification for Aluminium and Aluminium-Alloy Sheet and Plate ASTM B241 Standard Specification for Aluminium and Aluminium-Alloy Seamless Pipe and Seamless Extruded Tube CEILINGS & INTERIOR SYSTEMS CONSTRUCTION ASSOCIATION (CISCA) CISCA Latest Edition 7 “ADNOC DISTRIBUTION /TAKREER (PP Pmt Ot Ternnat wativan rc ZONE SHARIA “AMD AU-056-6638-001 ‘AMENDMENT TO DESIGN GENERAL SPECIFICATION DGS-AU.058 Rev 1 - SPECIALITIES [sce!—Abv Dhabi AME 10909.00 7150-20 __ooanent 1182008 Jew 0 [awet'S ot 70 TEBODIN 2.2 Amendments to Section 3.0 REFERENCE DOCUMENTS The following sentence shall be added before the list of Project Specifications: “The Design General Specification (DGS) which are all referred below shall be read in conjunction with its Amendments and supplementary Technical Specifications (if any), Unless Otherwise Specified” Add the following DGS to the list given in Clause 3.0 + DGS-AU-050 Architectural Design Basis Replace: DGS-AU-S7 With: DGS-AU-057 2.3. Amendments to Section 7.0 DOCUMENTATION List of the items to be printed on each drawing shall be bulleted as follows: + Official trade name of the company * MANUFACTURERIVENDOR's drawing number © Drawing ttle giving the description of contents whereby the drawing can be identified + Asymbol or letter indicating the latest issue or revision. Following item to be added to the above listed items: + Purchase Order (PO) Number and Item Tag Numbers 2.4 Amendments to Section 8.0 PRODUCT DELIVERY, STORAGE, & HANDLING Following paragraphs to be added after first paragraph: Preparation for shioment and packing will be subject to inspection and acceptance by the CONTRACTOR'S representative. All costs incurred by any rejection shall be at the expense of the MANUFACTURER/VENDOR ‘The materials shall be shipped and delivered to the site in the VENDOR’s protective shipping containers. Should they need to be removed from their shipping containers, they shall be supported and covered so that they are protected from the adverse elements (lke environmental) and from adjacent construction activities. Material shall be packed, securely anchored, and skid mounted when required. ¥ TEBODIN leak ABNOG DISTRIBUTION TAKREER———_ Poe! OIL TERMINAL HAMIRIYAH FREE ZONE SHARIAH Dec No AND-AU-058-5696-00% — {ie AMENDMENT TO DESIGN GENERAL SPECIFICATION DGS-AULO86 Rev 1 - SPECIALITIES ice Abu Dhabi AME 1030000 71810-20 [eam 162000 ew 0 eat) E70 (Open ends of tubes and pipes shall be capped for protection. Separate, loose and spare parts shall be completely boxed. A bill of materials shall be enclosed in each package or container of parts. Exposed finished and machined surfaces, including bolting, shall be given a coating of rust Inhibiting compound. Internal metal surfaces shall be sprayed or coated with a suitable rust preventative prior to shipment. Openings shall be suitably tagged to indicate the rust preventative applied. Any finishes which become damaged shall be repaired in accordance with the respective Specification. Materials shall be protected to withstand extended period of storage at the job site for a minimum period of 18 months. Materials shall be stored indoors and elevated, protected to safe guard against all adverse environmental agents such as humidity, rain, dust, dirt, sand, ‘mud, salt air, salt spray and sea water. All materials shall be preserved in accordance with the Project Export Packaging and Preservation Specification. Items damaged due to improper handling andlor storage shall be replaced or repaired at the COMPANY's option, by the CONTRACTOR and at no cost to the COMPANY Addition: Following Sub Clauses to be added in Clause 8.0: 8.1 MATERIALS SELECTION The references of materials, manufacturers or suppliers specified in this document are intended to establish a standard of quality or a level of performance and are not intended to prevent the use of equivalent or superior products. Other references of materials, manufacturers or suppliers are acceptable after the approval of the COMPANY for the proposed application. Colours and finishing tints are generally not specified in this document. When necessary, manufacturer's standard colour palette shall be provided by CONTRACTOR for the choice/approval of the COMPANY. The CONTRACTOR shall submit an “Affidavit of Compliance” before beginning of construction. The Affidavit shall confirm that all materials meet the requirements of this, specification. 8.2 MATERIAL WARRANTY AND SAMPLES CONTRACTOR is responsible in getting warranty period (beginning from the date of shipment) for all the materials. [aient: ~~ ADNOC DISTRIBUTION / TAKREER Project OIL. TERMINAL HAMRIVAH FREE ZONE SHARJAH (Doc. No AMD-AU-058-5638-001 _ iit AMENDMENT TO DESIGN GENERAL SPECIFICATION DGS-AU-058 Rev 1 - SPECIALITIES [oice: “Abu Dhabi TAME 10399-00/71510-20 _|document: 4182009 [evo Manufacturers / suppliers (of all materials) to supply samples (in suitable size) for CONTRACTOR | COMPANY approval 2.5 Amendments to Section 10.0 ACCESS FLOOR SYSTEM Following paragraph to be added to the Section 10.2.2: ‘Adhesive shall be capable of securing a pedestal in place with sufficient bonding strength to resist the destabilizing loads. Following item to be added to the Section 10.2.9: ©. Special bracing to resist the offects of selsmic or other forces shall be provided Section 10.7 Installation’ to be modified as follows: 10.7 INSTALLATION 10.7.1 Examination a. Verify that surfaces and openings are ready to receive work b. Verify fiekd measurements are as shown on the approved shop drawings. c. Verify that required sub-floor utlties are available, in proper location, and ready to use 10.7.2 Proparation a, Clean substrata surfaces. b. Protect elements surrounding the work ofthis Section from damage or dsfiguration. 10.7.3 Installation a. Access Floor Installation shall be installed as per Manufacturer's instruction and shop drawings “as approved by COMPANY" b. Concrete floor (recess) shall be cleaned and sealed affer installation of bases with sealer such as “Seal Hard’ or ‘them Hard as manufactured by L & M Construction Chemicals, Inc. (maintain as per DGS) c. Additional pedestals shall be installed where grid pattern is interrupted by room appurtenances and at cut-outs. d. Provide positive electrical earth grounding of entire floor assembly. Teient- ADNOC DISTRIBUTION / TAKREER SP eet OL TERMINAL HAWRIVAL FREE ZONE Sia — ettdiy B:No™ AMD-AUD68-5889-001 TEBODIN eA ENDMENT TO DESIGN GENERAL SPECIFICATION DS.AU-0S8 Rev 1 = SPECIALITIES lofice; “Abu Dhabi [AME 10399-00 /71510-20 [document 1182000 _ Jrev_g Jsheet 8 Jef 10 2.6 27 Following New Sections to be added to Section 10.0: 10.8 TESTING ‘Access flooring shall be tested at the same position and elevation and in the same arrangement as shown on the DRAWINGS for installation so as to duplicate service conditions as much as possible. Floor panels, stringer and pedestal testing shall be conducted in accordance with CISCA. 40.9 CLEANING AND PROTECTION The space below the completed floor shall be free of all debris, Before any traffic or other work on the completed access floor is started, the completed floor shall be cleaned in accordance with the floor veering manufacturer's instructions. Traffic areas of clean floors shall be protected with a covering of building paper, fibreboard, or other suitable material to prevent damage to the surface. Cut-outs shall be covered with material of sufficient strength to support the loads to be encountered, Plywood or similar material shall be placed on the floor to serve as runways for installation of heavy equipment. Protection shall be maintained until the access floor system is accepted and turned over to the COMPANY. 10.10 FIRE SAFETY DETECTION SYSTEM ‘An automatic detection system shall be installed below the access floor meeting the requirements of NFPA 75 and shall have an audible and visual alarm. Air space below the access floor shall be subdivided into areas not exceeding 925 square meters by tight, non- combustible bulkheads. All penetrations for piping and cables shall be sealed to maintain bulkhead properties. Amendments to Section 13.3 EQUIPMENT Following sentence to be added below the ttle: ‘Accessories shall include, but not limited to the following: Addition of New Section 16.0 Following New Section to be added after Section 15.0: 16.0 CLEAN UP Upon completion, leave the project site clear of debris and surplus material resulting from work of this contract. All debris and surplus material shall be disposed off project limits in a manner meeting all local authority requirements, v ADNOG DISTRIBUTION] TAKREER Proget OIL TERMINAL HAMRIYAH FREE ZONE SHARJAH ‘Bos. No AMD-AU-058-5638-001 TEBODIN - seo eIN ite: AMENDMENT TO DESIGN GENERAL SPECIFICATION DGS-AU-058 Rev 1 - SPECIALITIES tice Abu Dhabi AME 10399-00/71610.20 [secure 1162009 fev 0 [wot 9 [ot 10 APPENDIX 1 - DGS-AU-058- REV. 1 - DESIGN GENERAL ‘SPECIFICATION SPECIALITIES [cient ADNOC DISTRIBUTION / TAKREER [Proect OIL TERMINAL HAMRIYAH FREE ZONE SHARJAH _ (Doc. Ne. AMD-AU-058-5638-001 is —| file: AMENDMENT TO DESIGN GENERAL SPECIFICATION DGS-AU-058 Rev 1 - SPECIALITIES lofice: Abu Dhabi JAME _10399-00 /71510-20 [document: 1182009, Jrev_o [sheet 10 Jof_ 10

You might also like