Professional Documents
Culture Documents
5S Audit Checklist
5S Audit Checklist
Only the required tools are present at the workstation. Items not required at the current
2) 4
point are removed from the workplace.
4) Only the required equipment is present at the workstation. All obsolete, broken or
unnecessary equipment, shelves, lockers, workbenches, etc. not required or unnecessary 3
is removed from the workplace.
5) Tripping dangers such as electrical cables, etc. are removed from standing/walking areas. 3
File folders/ Paperwork is properly labeled and has a clearly defined and labeled location
7) 4
that is visible to the operators and away from work surfaces.
Equipment is clearly identified (numbered, named, color coded, etc.) and placed in a
8) 3
properly identified location. Critical maintenance points are clearly marked.
Stop switches and breakers are highly visible and located for easy access in case of
9) emergency.Fire hoses, fire extinguishers and other emergency equipment are prominently 4
displayed and are unobstructed.
The workplace layout accomodates easy exit in case of emergency.Walkways and vehicle
10) 3
paths are clearly identified and unobstructed. Exits are clearly labeled and unobstructed
5S AUDIT CHECKLIST
SCORING GUIDELINES
20 40 60 75-80 90 100
SLIGHT EFFORT MODERATE EFFORT MINIMUM ACCEPTABLE ABOVE AVERAGE Sustained Above Average Sustained
LEVEL RESULTS (3 AUDITS) Results (3 audits) OUTSTANDING
RESULTS (6 AUDITS)
16) Tools, equipment, paperwork, furniture, etc. are stored neatly at designated areas .
Documents are labeled clearly as to contents and responsibility for control and revision. 3
The date and revision number are clearly visible.
17) Equipment maintenance records are visible and clearly state when maintenance last
N/A
occurred and when next maintenance is scheduled.
18) Product waste (e.g. shavings, containers, liquids, wrappers, etc.) is consistently and often
3
cleaned up and removed from the workplace.
19) Preventive measures have been implemented to ensure the workplace meets 5S.The
work environment satisfies the requirements of the work being performed. Lighting
(brightness and color), air quality, temperature,etc..guidelines (e.g.systems that do not 3
allow waste to accumulate such as containers to collect product debris from machines).
20) The results of the previous audit are posted and clearly visible to the entire team.Areas
for improvement identified during the previous audit have been completed. 3
5S AUDIT CHECKLIST
5S Scoring Guidelines
Some attempts have been made to implement 5S, but efforts are
E 40 Moderate Effort
temporary and/or superficial.
Sustained Above Average After 3 consecutive scores of (C) 80 a score of (B) 90 may be
B 90
Results (3 audits) awarded.
Only the required tools are present at the workstation. Items not required at the current
2) 4
point are removed from the workplace.
4) Only the required equipment is present at the workstation. All obsolete, broken or
unnecessary equipment, shelves, lockers, workbenches, etc. not required or unnecessary 4
is removed from the workplace.
5) Tripping dangers such as electrical cables, etc. are removed from standing/walking areas. 4
File folders/ Paperwork is properly labeled and has a clearly defined and labeled location
7) 4
that is visible to the operators and away from work surfaces.
Equipment is clearly identified (numbered, named, color coded, etc.) and placed in a
8) 4
properly identified location. Critical maintenance points are clearly marked.
Stop switches and breakers are highly visible and located for easy access in case of
9) emergency.Fire hoses, fire extinguishers and other emergency equipment are prominently 4
displayed and are unobstructed.
The workplace layout accomodates easy exit in case of emergency.Walkways and vehicle
10) 3
paths are clearly identified and unobstructed. Exits are clearly labeled and unobstructed
5S AUDIT CHECKLIST
SCORING GUIDELINES
20 40 60 75-80 90 100
SLIGHT EFFORT MODERATE EFFORT MINIMUM ACCEPTABLE ABOVE AVERAGE Sustained Above Average Sustained
LEVEL RESULTS (3 AUDITS) Results (3 audits) OUTSTANDING
RESULTS (6 AUDITS)
16) Tools, equipment, paperwork, furniture, etc. are stored neatly at designated areas .
Documents are labeled clearly as to contents and responsibility for control and revision. 3
The date and revision number are clearly visible.
17) Equipment maintenance records are visible and clearly state when maintenance last
N/A
occurred and when next maintenance is scheduled.
18) Product waste (e.g. shavings, containers, liquids, wrappers, etc.) is consistently and often
3
cleaned up and removed from the workplace.
19) Preventive measures have been implemented to ensure the workplace meets 5S.The
work environment satisfies the requirements of the work being performed. Lighting
(brightness and color), air quality, temperature,etc..guidelines (e.g.systems that do not 3
allow waste to accumulate such as containers to collect product debris from machines).
20) The results of the previous audit are posted and clearly visible to the entire team.Areas
for improvement identified during the previous audit have been completed. 3
5S AUDIT CHECKLIST
5S Scoring Guidelines
Some attempts have been made to implement 5S, but efforts are
E 40 Moderate Effort
temporary and/or superficial.
Sustained Above Average After 3 consecutive scores of (C) 80 a score of (B) 90 may be
B 90
Results (3 audits) awarded.
Only the required tools are present at the workstation. Items not required at the current
2) 4
point are removed from the workplace.
4) Only the required equipment is present at the workstation. All obsolete, broken or
unnecessary equipment, shelves, lockers, workbenches, etc. not required or unnecessary 4
is removed from the workplace.
5) Tripping dangers such as electrical cables, etc. are removed from standing/walking areas. 3
File folders/ Paperwork is properly labeled and has a clearly defined and labeled location
7) 4
that is visible to the operators and away from work surfaces.
Equipment is clearly identified (numbered, named, color coded, etc.) and placed in a
8) 3
properly identified location. Critical maintenance points are clearly marked.
Stop switches and breakers are highly visible and located for easy access in case of
9) emergency.Fire hoses, fire extinguishers and other emergency equipment are prominently 3
displayed and are unobstructed.
The workplace layout accomodates easy exit in case of emergency.Walkways and vehicle
10) 3
paths are clearly identified and unobstructed. Exits are clearly labeled and unobstructed
5S AUDIT CHECKLIST
SCORING GUIDELINES
20 40 60 75-80 90 100
SLIGHT EFFORT MODERATE EFFORT MINIMUM ACCEPTABLE ABOVE AVERAGE Sustained Above Average Sustained
LEVEL RESULTS (3 AUDITS) Results (3 audits) OUTSTANDING
RESULTS (6 AUDITS)
16) Tools, equipment, paperwork, furniture, etc. are stored neatly at designated areas .
Documents are labeled clearly as to contents and responsibility for control and revision. 3
The date and revision number are clearly visible.
17) Equipment maintenance records are visible and clearly state when maintenance last
N/A
occurred and when next maintenance is scheduled.
18) Product waste (e.g. shavings, containers, liquids, wrappers, etc.) is consistently and often
3
cleaned up and removed from the workplace.
19) Preventive measures have been implemented to ensure the workplace meets 5S.The
work environment satisfies the requirements of the work being performed. Lighting
(brightness and color), air quality, temperature,etc..guidelines (e.g.systems that do not 3
allow waste to accumulate such as containers to collect product debris from machines).
20) The results of the previous audit are posted and clearly visible to the entire team.Areas
for improvement identified during the previous audit have been completed. 3
5S AUDIT CHECKLIST
5S Scoring Guidelines
Some attempts have been made to implement 5S, but efforts are
E 40 Moderate Effort
temporary and/or superficial.
Sustained Above Average After 3 consecutive scores of (C) 80 a score of (B) 90 may be
B 90
Results (3 audits) awarded.
Only the required tools are present at the workstation. Items not required at the current
2) 3
point are removed from the workplace.
4) Only the required equipment is present at the workstation. All obsolete, broken or
unnecessary equipment, shelves, lockers, workbenches, etc. not required or unnecessary 3
is removed from the workplace.
5) Tripping dangers such as electrical cables, etc. are removed from standing/walking areas. 3
File folders/ Paperwork is properly labeled and has a clearly defined and labeled location
7) 3
that is visible to the operators and away from work surfaces.
Equipment is clearly identified (numbered, named, color coded, etc.) and placed in a
8) 3
properly identified location. Critical maintenance points are clearly marked.
Stop switches and breakers are highly visible and located for easy access in case of
9) emergency.Fire hoses, fire extinguishers and other emergency equipment are prominently 4
displayed and are unobstructed.
The workplace layout accomodates easy exit in case of emergency.Walkways and vehicle
10) 3
paths are clearly identified and unobstructed. Exits are clearly labeled and unobstructed
5S AUDIT CHECKLIST
SCORING GUIDELINES
20 40 60 75-80 90 100
SLIGHT EFFORT MODERATE EFFORT MINIMUM ACCEPTABLE ABOVE AVERAGE Sustained Above Average Sustained
LEVEL RESULTS (3 AUDITS) Results (3 audits) OUTSTANDING
RESULTS (6 AUDITS)
16) Tools, equipment, paperwork, furniture, etc. are stored neatly at designated areas .
Documents are labeled clearly as to contents and responsibility for control and revision. 3
The date and revision number are clearly visible.
17) Equipment maintenance records are visible and clearly state when maintenance last
N/A
occurred and when next maintenance is scheduled.
18) Product waste (e.g. shavings, containers, liquids, wrappers, etc.) is consistently and often
3
cleaned up and removed from the workplace.
19) Preventive measures have been implemented to ensure the workplace meets 5S.The
work environment satisfies the requirements of the work being performed. Lighting
(brightness and color), air quality, temperature,etc..guidelines (e.g.systems that do not 3
allow waste to accumulate such as containers to collect product debris from machines).
20) The results of the previous audit are posted and clearly visible to the entire team.Areas
for improvement identified during the previous audit have been completed. 3
5S AUDIT CHECKLIST
5S Scoring Guidelines
Some attempts have been made to implement 5S, but efforts are
E 40 Moderate Effort
temporary and/or superficial.
Sustained Above Average After 3 consecutive scores of (C) 80 a score of (B) 90 may be
B 90
Results (3 audits) awarded.
Only the required tools are present at the workstation. Items not required at the current
2) 3
point are removed from the workplace.
4) Only the required equipment is present at the workstation. All obsolete, broken or
unnecessary equipment, shelves, lockers, workbenches, etc. not required or unnecessary 4
is removed from the workplace.
5) Tripping dangers such as electrical cables, etc. are removed from standing/walking areas. 4
File folders/ Paperwork is properly labeled and has a clearly defined and labeled location
7) 3
that is visible to the operators and away from work surfaces.
Equipment is clearly identified (numbered, named, color coded, etc.) and placed in a
8) 3
properly identified location. Critical maintenance points are clearly marked.
Stop switches and breakers are highly visible and located for easy access in case of
9) emergency.Fire hoses, fire extinguishers and other emergency equipment are prominently 4
displayed and are unobstructed.
The workplace layout accomodates easy exit in case of emergency.Walkways and vehicle
10) 4
paths are clearly identified and unobstructed. Exits are clearly labeled and unobstructed
5S AUDIT CHECKLIST
SCORING GUIDELINES
20 40 60 75-80 90 100
SLIGHT EFFORT MODERATE EFFORT MINIMUM ACCEPTABLE ABOVE AVERAGE Sustained Above Average Sustained
LEVEL RESULTS (3 AUDITS) Results (3 audits) OUTSTANDING
RESULTS (6 AUDITS)
16) Tools, equipment, paperwork, furniture, etc. are stored neatly at designated areas .
Documents are labeled clearly as to contents and responsibility for control and revision. 3
The date and revision number are clearly visible.
17) Equipment maintenance records are visible and clearly state when maintenance last
N/A
occurred and when next maintenance is scheduled.
18) Product waste (e.g. shavings, containers, liquids, wrappers, etc.) is consistently and often
3
cleaned up and removed from the workplace.
19) Preventive measures have been implemented to ensure the workplace meets 5S.The
work environment satisfies the requirements of the work being performed. Lighting
(brightness and color), air quality, temperature,etc..guidelines (e.g.systems that do not 3
allow waste to accumulate such as containers to collect product debris from machines).
20) The results of the previous audit are posted and clearly visible to the entire team.Areas
for improvement identified during the previous audit have been completed. 3
5S AUDIT CHECKLIST
5S Scoring Guidelines
Some attempts have been made to implement 5S, but efforts are
E 40 Moderate Effort
temporary and/or superficial.
Sustained Above Average After 3 consecutive scores of (C) 80 a score of (B) 90 may be
B 90
Results (3 audits) awarded.
20
0
May-22 Jun-22 Jul-22 Aug-22 Sep-22
Total Marks Obtained Score