SAIC-K-2001
SAIC-K-2001
EQUIPMENT ID NUMBER(S) EQUIPMENT DESCRIPTION EQPT CODE SYSTEM ID. PLANT NO.
LAYOUT DRAWING NUMBER REV. NO. PURCHASE ORDER NUMBER EC / PMCC / MCC NO.
SCHEDULED INSPECTION DATE & TIME ACTUAL INSPECTION DATE & TIME QUANTITY INSP. MH's SPENT TRAVEL TIME
SAUDI ARAMCO USE ONLY
SAUDI ARAMCO TIP NUMBER SAUDI ARAMCO ACTIVITY NUMBER WORK PERMIT REQUIRED?
ITEM
ACCEPTANCE CRITERIA REFERENCE PASS FAIL N/A RE-INSP DATE
No.
A General Requirements
Schedule Q,
The procedure has listed all inspection schedules for maintaining the
A2 Attachment IV,
quality of the Gas Compressors.
Para. 6
Schedule Q,
The procedure provides details for documentation, that the required
A3 Attachment IV,
activities have been performed.
Para. 6
REMARKS:
REFERENCE DOCUMENTS:
1. Schedule Q, Contractor's Quality Requirements,