SECTION 1 GENERAL
2 SITE CLEARANCE
3 LANDSCAPE SOFTWORKS AND ESTABLISHMENT WORKS
4 FENCING
5 DRAINAGE WORKS
6 EARTHWORKS
7 GEOTECHNICAL WORKS
8 PILING WORKS
9 CARRIAGEWAYS: SUB-BASE MATERIAL AND BITUMINOUS MATERIALS
10 CONCRETE CARRIAGEWAYS
11 MISCELLANEOUS ROADWORKS
12 TRAFFIC SIGNS, ROAD MARKINGS AND ROAD STUDS
VOLUME 2
SECTION 13 WORK FOR ELECTRICAL AND MECHANICAL INSTALLATIONS
14 FORMWORK AND FINISHES TO CONCRETE
15 STEEL REINFORCEMENT
16 CONCRETE AND JOINTS IN CONCRETE
17 PRESTRESSING
18 STEELWORK
19 HANDRAILING, LADDERS, STAIRS AND FLOORING
20 BRIDGEWORKS
21 MARINE WORKS
22 WATER SUPPLY PIPEWORKS
23 WATER RETAINING STRUCTURES
24 BUILDING WORKS
25 ENVIRONMENTAL PROTECTION
26 PRESERVATION AND PROTECTION OF TREES
4
GS (2006 Edition)
Page No.
CONTENT OF VOLUME 1
SECTION 1
GENERAL
INTERPRETATION OF DOCUMENTS
1.01 Application of the General Specification for Civil Engineering Works ....................................... 1.3
1.02 Abbreviations................................................................................................................................ 1.3
1.03 Glossary of terms .......................................................................................................................... 1.5
1.04 Trials and approval ....................................................................................................................... 1.5
1.05 British Standards, European Standards adopted as British Standards, Codes of Practice
and other standards ....................................................................................................................... 1.6
1.06 Specifications in metric and imperial units .................................................................................. 1.6
1.07 Dimensions from Drawings .......................................................................................................... 1.6
PROGRAMME
1.08 Programme.................................................................................................................................... 1.6
CONTRACTOR'S SUPERINTENDENCE
1.09 Surveyor........................................................................................................................................ 1.7
1.10 Foreman for concrete works ......................................................................................................... 1.7
1.11 Supervision of piling works .......................................................................................................... 1.7
1.12 Particulars of Agent and employees ............................................................................................. 1.8
WORK ON ROADS
1.14 Approval for temporary traffic arrangements and control .......................................................... 1.10
1.15 Temporary traffic arrangements and control............................................................................... 1.10
1.16 Particulars of temporary traffic arrangements and control ......................................................... 1.11
1.17 Use of roads and footways.......................................................................................................... 1.11
1.18 Work on roads and footways ...................................................................................................... 1.11
1.19 Reinstatement of roads and footways ......................................................................................... 1.12
5
GS (2006 Edition)
Page No.
1.25 Utilities ....................................................................................................................................... 1.14
1.26 Structures, roads and other property ........................................................................................... 1.16
1.27 Access ......................................................................................................................................... 1.16
RECORDS
1.28 Records of wage rates ................................................................................................................. 1.16
1.29 Records of correspondence ......................................................................................................... 1.16
1.30 Records and reports .................................................................................................................... 1.16
SITE CLEANLINESS
1.32 Site cleanliness ........................................................................................................................... 1.18
1.33 Prevention of mosquito breeding ................................................................................................ 1.19
1.34 Prevention of dust ....................................................................................................................... 1.19
1.34A Control of Dogs on Construction Sites ....................................................................................... 1.19
TESTING
1.37 Quality assurance schemes ......................................................................................................... 1.21
1.38 Batches, samples and specimens ................................................................................................ 1.22
1.39 Samples for testing ..................................................................................................................... 1.22
1.40 Testing ........................................................................................................................................ 1.24
1.41 Compliance of a batch ................................................................................................................ 1.25
1.42 Raw records of tests and test reports .......................................................................................... 1.25
SITE ESTABLISHMENT
1.45 Use of the Site............................................................................................................................. 1.26
1.45A Occupancy and Rental of Private Land of Ecological Values .................................................... 1.27
1.46 Submission of particulars ........................................................................................................... 1.27
1.47 Survey of the Site ....................................................................................................................... 1.27
1.48 Fences and signs on the Site ....................................................................................................... 1.27
1.49 The Engineer's Site accommodation........................................................................................... 1.28
1.50 The Contractor's Site accommodation ........................................................................................ 1.29
1.51 Site utilities and access ............................................................................................................... 1.29
1.52 Transport for the Engineer .......................................................................................................... 1.29
1.53 Clearance of the Site ................................................................................................................... 1.30
MEETINGS
6
GS (2006 Edition)
Page No.
1.54 Meetings ..................................................................................................................................... 1.30
PHOTOGRAPHS
1.55 Progress photographs and record photographs ........................................................................... 1.31
APPENDIX 1.1
STANDARDS
1.1.1 BRITISH STANDARDS ............................................................................................................ 1.32
1.1.2 AMERICAN SOCIETY FOR TESTING AND MATERIALS (ASTM) STANDARDS ........... 1.46
1.1.3 AMERICAN ASSOCIATION OF STATE HIGHWAY AND TRANSPORTATION
OFFICIALS (AASHTO) STANDARD ...................................................................................... 1.47
1.1.4 AMERICAN WATER WORKS ASSOCIATION (AWWA) STANDARDS/ AMERICAN
NATIONAL STANDARDS INSTITUTE (ANSI) ..................................................................... 1.48
1.1.5 CONSTRUCTION STANDARDS OF THE GOVERNMENT OF THE HKSAR .................... 1.48
1.1.6 SWEDISH STANDARDS .......................................................................................................... 1.48
1.1.7 AMERICAN PUBLIC HEALTH ASSOCIATION (APHA) STANDARDS ............................. 1.48
1.1.8 EUROPEAN STANDARDS ADOPTED AS BRITISH STANDARDS (BS EN) ..................... 1.48
1.1.9 EUROPEAN STANDARDS (EN) and/or INTERNATIONAL ORGANIZATION FOR
STANDARDIZATION (ISO) STANDARDS ADOPTED AS BRITISH STANDARDS
(BS EN ISO) ............................................................................................................................... 1.55
1.1.10 JAPANESE INDUSTRIAL STANDARDS (JIS) ....................................................................... 1.57
1.1.11 INTERNATIONAL ORGANIZATION FOR STANDARDIZATION (ISO)
STANDARDS............................................................................................................................. 1.57
1.1.12 WATER INDUSTRY SPECIFICATION, WATER RESEARCH CENTRE............................... 1.58
1.1.13 NATIONAL WATER COUNCIL, UK ....................................................................................... 1.58
1.1.14 AUSTRALIAN/NEW ZEALAND STANDARDS (AS/NZS) ................................................... 1.58
1.1.15 中華人民共和國行業標準 ........................................................................................................ 1.58
1.1.16 CANADIAN STANDARD ........................................................................................................ 1.58
APPENDIX 1.2
REQUIREMENTS FOR STEEL CONTAINER ROOM
1.2.1 General........................................................................................................................................ 1.59
1.2.2 Equipment ................................................................................................................................... 1.59
APPENDIX 1.3
REQUIREMENTS FOR CURING TANK
1.3.1 General........................................................................................................................................ 1.60
1.3.2 Equipment ................................................................................................................................... 1.60
1.3.3 Maintenance................................................................................................................................ 1.60
SECTION 2
SITE CLEARANCE
GENERAL
2.01 General requirements .................................................................................................................... 2.3
2.02 Pipes and manholes to be abandoned ........................................................................................... 2.3
2.03 Earthworks .................................................................................................................................... 2.3
7
GS (2006 Edition)
Page No.
SITE CLEARANCE
2.04 Demolition .................................................................................................................................... 2.3
2.05 Pipes and cables ............................................................................................................................ 2.3
2.06 Trees ............................................................................................................................................. 2.3
2.07 Reinstatement ............................................................................................................................... 2.3
2.08 Materials and equipment for re-use and storage ........................................................................... 2.4
SECTION 3
LANDSCAPE SOFTWORKS AND ESTABLISHMENT WORKS
GENERAL
3.01 General requirements .................................................................................................................... 3.3
3.02 Site clearance ................................................................................................................................ 3.3
3.03 Earthworks .................................................................................................................................... 3.3
3.04 Landscape hardworks ................................................................................................................... 3.3
3.05 Geotechnical works ...................................................................................................................... 3.3
3.06 Weather and ground conditions .................................................................................................... 3.3
3.07 Use of chemicals ........................................................................................................................... 3.3
GLOSSARY OF TERMS
3.08 Landscape softworks .................................................................................................................... 3.3
3.09 Landscape hardworks ................................................................................................................... 3.3
3.10 Establishment works ..................................................................................................................... 3.3
MATERIALS
3.11 Seedling trees ................................................................................................................................ 3.4
3.12 Whip trees ..................................................................................................................................... 3.4
3.13 Light standard trees ...................................................................................................................... 3.4
3.14 Standard trees................................................................................................................................ 3.5
3.15 Heavy standard trees ..................................................................................................................... 3.5
3.16 Semi-mature trees ......................................................................................................................... 3.5
3.17 Small shrubs ................................................................................................................................. 3.6
3.18 Large shrubs ................................................................................................................................. 3.6
3.19 Conifers ........................................................................................................................................ 3.6
3.20 Palms ............................................................................................................................................ 3.7
3.21 Bamboos ....................................................................................................................................... 3.7
3.22 Herbaceous plants ......................................................................................................................... 3.7
3.23 Ground covers............................................................................................................................... 3.8
3.24 Climbers........................................................................................................................................ 3.8
3.25 Containerised plants ..................................................................................................................... 3.8
3.26 Grass seed ..................................................................................................................................... 3.8
3.27 Turf ............................................................................................................................................... 3.9
3.28 Sprigs ............................................................................................................................................ 3.9
3.29 Plant name .................................................................................................................................... 3.9
3.30 Soil-mix ........................................................................................................................................ 3.9
3.31 Soil conditioner........................................................................................................................... 3.10
3.32 Mulch .......................................................................................................................................... 3.10
3.33 Mulch for hydroseeding.............................................................................................................. 3.10
8
GS (2006 Edition)
Page No.
3.34 Fertilizer...................................................................................................................................... 3.10
3.35 Soil binder................................................................................................................................... 3.11
3.36 Stakes, ties and guys ................................................................................................................... 3.11
3.37 Protective fabric material............................................................................................................ 3.11
SUBMISSIONS
3.38 Particulars of seed mixture, turf, sprigs, soil conditioner, soil-mix and water ........................... 3.12
3.39 Particulars of hydroseeding ........................................................................................................ 3.12
3.40 Samples of materials ................................................................................................................... 3.13
PRE-PLANTING WORKS
3.49 Preparatory works ....................................................................................................................... 3.14
3.50 Cleaning ground ......................................................................................................................... 3.14
3.51 Ripping ....................................................................................................................................... 3.14
3.52 Contaminated ground ................................................................................................................. 3.14
3.53 Soiling......................................................................................................................................... 3.14
3.54 Cultivation .................................................................................................................................. 3.15
3.55 Scarifying.................................................................................................................................... 3.15
3.56 Protection of prepared ground .................................................................................................... 3.15
3.57 Removal of material ................................................................................................................... 3.15
PLANTING
3.58 General........................................................................................................................................ 3.15
3.59 Use of excavated material........................................................................................................... 3.16
3.60 Planting ....................................................................................................................................... 3.16
3.61 Staking, tying and guying ........................................................................................................... 3.16
3.62 Mulching..................................................................................................................................... 3.16
3.63 Notch planting of seedlings ........................................................................................................ 3.16
3.64 Pit planting of seedlings, shrubs, whips, climbers, ground covers and herbaceous plants ......... 3.16
3.65 Pit planting of light standard trees and standard trees ............................................................. 3.17
3.66 Pit planting of heavy standard tree and semi-mature trees ......................................................... 3.17
3.67 Pit planting of bamboo, conifers and palms ............................................................................... 3.18
3.68 Pit planting on slopes .................................................................................................................. 3.18
GRASSING
3.69 Hydroseeding .............................................................................................................................. 3.18
3.70 Hydroseeding cover .................................................................................................................... 3.18
3.71 Surface conditions for hydroseeding .......................................................................................... 3.18
3.72 Application of hydroseeding....................................................................................................... 3.18
3.73 Protective material ...................................................................................................................... 3.19
3.74 Patching up ................................................................................................................................. 3.19
9
GS (2006 Edition)
Page No.
3.75 Post-planting fertilizer ................................................................................................................ 3.19
3.76 Turfing ........................................................................................................................................ 3.19
3.77 Sprigging .................................................................................................................................... 3.19
3.78 Completion of turfing and sprigging .......................................................................................... 3.20
ESTABLISHMENT WORKS
3.79 Establishment works ................................................................................................................... 3.20
3.80 Inspection of establishment works.............................................................................................. 3.20
3.81 Replacement of plants and grass................................................................................................. 3.20
3.82 Security of stakes, ties and guys ................................................................................................. 3.20
3.83 Firming up plants ........................................................................................................................ 3.21
3.84 Watering...................................................................................................................................... 3.21
3.85 Weeding ...................................................................................................................................... 3.21
3.86 Pruning ....................................................................................................................................... 3.21
3.87 Grass cutting ............................................................................................................................... 3.22
3.88 Litter collection........................................................................................................................... 3.22
3.89 Post-planting fertilizer ................................................................................................................ 3.22
3.90 Control of pests, fungi and disease ............................................................................................. 3.23
3.91 Forking over ............................................................................................................................... 3.23
3.92 Mulching..................................................................................................................................... 3.23
3.93 Completion of work .................................................................................................................... 3.23
TREE TRANSPLANTING
3.97 Transplanting of existing trees .................................................................................................... 3.24
SECTION 4
FENCING
GENERAL
4.01 General requirements .................................................................................................................... 4.3
4.02 Handrailing ................................................................................................................................... 4.3
4.03 Earthworks .................................................................................................................................... 4.3
4.04 Pedestrian guardrailing ................................................................................................................. 4.3
4.05 Formwork and finishes to concrete............................................................................................... 4.3
4.06 Reinforcement .............................................................................................................................. 4.3
4.07 Concrete ........................................................................................................................................ 4.3
4.08 Steelwork ...................................................................................................................................... 4.3
4.09 Vehicular parapets......................................................................................................................... 4.3
MATERIALS
4.10 Wire .............................................................................................................................................. 4.3
4.11 Chain link fence ............................................................................................................................ 4.3
4.12 Timber........................................................................................................................................... 4.3
10
GS (2006 Edition)
Page No.
4.13 Steel .............................................................................................................................................. 4.3
4.14 Bolts, nuts, washers and fittings ................................................................................................... 4.4
FABRICATION OF FENCING
4.15 Fabrication of steelwork ............................................................................................................... 4.4
4.16 Galvanizing to steel ...................................................................................................................... 4.4
4.17 Welding steel ................................................................................................................................ 4.4
SUBMISSIONS
4.20 Particulars of fencing .................................................................................................................... 4.5
4.21 Samples of materials ..................................................................................................................... 4.5
STORAGE OF MATERIALS
4.22 Storage of fencing ......................................................................................................................... 4.5
ERECTING FENCING
4.23 Alignment of fencing .................................................................................................................... 4.5
4.24 Posts for fencing ........................................................................................................................... 4.6
4.25 Erecting posts for fencing ............................................................................................................. 4.6
4.26 Fixing wire for fencing ................................................................................................................. 4.6
4.27 Fixing gates................................................................................................................................... 4.7
TOLERANCES
4.28 Tolerances: fencing ....................................................................................................................... 4.7
SECTION 5
DRAINAGE WORKS
GENERAL
5.01 General requirements .................................................................................................................... 5.3
5.02 Metalwork ..................................................................................................................................... 5.3
5.03 Earthworks .................................................................................................................................... 5.3
5.04 Formwork ..................................................................................................................................... 5.3
5.05 Concrete ........................................................................................................................................ 5.3
5.06 Materials for grout ........................................................................................................................ 5.3
5.07 Water supply pipeworks ............................................................................................................... 5.3
5.08 Cable duct systems ....................................................................................................................... 5.3
5.09 Recycled Aggregates .................................................................................................................... 5.3
GLOSSARY OF TERMS
11
GS (2006 Edition)
Page No.
5.10 Pipes ............................................................................................................................................. 5.3
MATERIALS
5.11 Precast concrete pipes and fittings ................................................................................................ 5.3
5.12 Vitrified clay pipes and fittings..................................................................................................... 5.3
5.13 DI pipes and fittings ..................................................................................................................... 5.4
5.14 Grey iron pipes and fittings .......................................................................................................... 5.4
5.15 uPVC pipes and fittings ................................................................................................................ 5.4
5.16 GI pipes and fittings ..................................................................................................................... 5.4
5.17 Bolts, nuts and washers ................................................................................................................ 5.6
5.18 Elastomeric joint rings .................................................................................................................. 5.6
5.19 Detachable couplings and flange adapters .................................................................................... 5.6
5.20 Anticorrosion tape ........................................................................................................................ 5.7
5.21 Bituminous coatings ..................................................................................................................... 5.8
5.22 Aggregates for granular bed and granular fill............................................................................... 5.8
5.23 Joint filler and compressible padding ........................................................................................... 5.9
5.24 Polyethylene sheeting ................................................................................................................... 5.9
5.25 Precast concrete manholes ............................................................................................................ 5.9
5.26 Chambers and gullies.................................................................................................................... 5.9
5.27 Step irons .................................................................................................................................... 5.10
5.28 Manhole covers, gully gratings and kerb overflow weirs made of cast iron .............................. 5.10
5.28A Gully gratings and channel gratings made of compound material ............................................. 5.10
5.29 Penstocks .................................................................................................................................... 5.12
5.30 Gate valves ................................................................................................................................. 5.13
5.31 Flap valves .................................................................................................................................. 5.13
5.32 Sludge valves .............................................................................................................................. 5.14
5.33 Air valves.................................................................................................................................... 5.14
5.34 Fittings for penstocks and valves ................................................................................................ 5.14
5.35 Filling abandoned pipes and manholes ....................................................................................... 5.15
SUBMISSIONS
5.36 Particulars of pipes, joints and fittings ....................................................................................... 5.15
5.37 Particulars of anticorrosion tape and joint filler ......................................................................... 5.15
5.38 Particulars of aggregates for granular bed .................................................................................. 5.16
5.39 Particulars of manholes, chambers and gullies ........................................................................... 5.16
5.40 Particulars of penstocks and valves ............................................................................................ 5.16
5.41 Particulars of foam concrete and PC/PFA grout ......................................................................... 5.17
5.42 Particulars of tests ....................................................................................................................... 5.17
5.43 Particulars of CCTV inspections ................................................................................................ 5.17
5.44 Particulars of diversions of flow ................................................................................................. 5.18
EXCAVATION
5.52 Excavation .................................................................................................................................. 5.19
12
GS (2006 Edition)
Page No.
CUTTING PIPES
5.55 Cutting pipes ............................................................................................................................... 5.21
JOINTING PIPES
5.56 Jointing pipes .............................................................................................................................. 5.22
5.57 Flanged joints ............................................................................................................................. 5.22
5.58 Flexible collar joints ................................................................................................................... 5.22
5.59 Push-in joints .............................................................................................................................. 5.23
5.60 Detachable joints ........................................................................................................................ 5.23
5.61 Flange adapters ........................................................................................................................... 5.23
5.62 Solvent welded joints.................................................................................................................. 5.23
5.63 Screw joints ................................................................................................................................ 5.23
PROTECTION OF JOINTS
5.64 Protection of joints...................................................................................................................... 5.24
TOLERANCES
5.70 Tolerances: pipelines for drainage works ................................................................................... 5.26
CONNECTIONS
5.71 Connections to structures............................................................................................................ 5.27
5.72 Connections to pipes ................................................................................................................... 5.27
13
GS (2006 Edition)
Page No.
MARKER BLOCKS
5.75 Marker blocks ............................................................................................................................. 5.29
CLEANING OF PIPELINES
5.78 Cleaning of pipelines .................................................................................................................. 5.30
INSPECTION OF PIPELINES
5.79 Inspection of pipelines ................................................................................................................ 5.31
5.80 Inspection of pipelines by CCTV ............................................................................................... 5.31
14
GS (2006 Edition)
Page No.
TESTING: GULLY GRATINGS AND CHANNEL GRATINGS MADE
OF COMPOUND MATERIAL
5.98A Batch ........................................................................................................................................... 5.34
5.98B Samples....................................................................................................................................... 5.34
5.98C Testing and compliance critieria ................................................................................................. 5.34
APPENDIX 5.1
CCTV INSPECTION OF PIPELINES
5.1.1 Scope .......................................................................................................................................... 5.44
5.1.2 Equipment ................................................................................................................................... 5.44
5.1.3 Procedure .................................................................................................................................... 5.44
5.1.4 Recording of results .................................................................................................................... 5.45
APPENDIX 5.2
DETERMINATION OF THE COMPACTION FRACTION VALUE
OF AGGREGATES FOR GRANULAR BED
5.2.1 Scope .......................................................................................................................................... 5.46
5.2.2 Apparatus .................................................................................................................................... 5.46
5.2.3 Procedure .................................................................................................................................... 5.46
5.2.4 Calculation .................................................................................................................................. 5.46
5.2.5 Reporting of results .................................................................................................................... 5.47
15
GS (2006 Edition)
Page No.
APPENDIX 5.3
DETERMINATION OF THE RESISTANCE TO FRACTURE OF
MANHOLE COVERS AND GULLY GRATINGS
5.3.1 Scope .......................................................................................................................................... 5.48
5.3.2 Equipment ................................................................................................................................... 5.48
5.3.3 Procedure .................................................................................................................................... 5.48
5.3.4 Reporting of results .................................................................................................................... 5.48
APPENDIX 5.4
TESTS ON GRAVITY PIPELINES FOR DRAINAGE WORKS
5.4.1 Scope .......................................................................................................................................... 5.49
5.4.2 Equipment ................................................................................................................................... 5.49
5.4.3 Procedure: before tests and inspections ...................................................................................... 5.49
5.4.4 Procedure: water test .................................................................................................................. 5.49
5.4.5 Procedure: air test ....................................................................................................................... 5.50
5.4.6 Procedure: visual inspection ....................................................................................................... 5.50
5.4.7 Procedure: infiltration test .......................................................................................................... 5.50
5.4.8 Calculation .................................................................................................................................. 5.50
5.4.9 Reporting of results .................................................................................................................... 5.50
APPENDIX 5.5
TESTS ON PRESSURE PIPELINES FOR DRAINAGE WORKS
5.5.1 Scope .......................................................................................................................................... 5.52
5.5.2 Equipment ................................................................................................................................... 5.52
5.5.3 Procedure .................................................................................................................................... 5.52
5.5.4 Calculation .................................................................................................................................. 5.53
5.5.5 Reporting of results .................................................................................................................... 5.53
SECTION 6
EARTHWORKS
GENERAL
6.01 Reclamation .................................................................................................................................. 6.3
6.02 Trip-ticket System ........................................................................................................................ 6.3
GLOSSARY OF TERMS
6.03 Areas of fill ................................................................................................................................... 6.3
6.04 Earthworks final surface ............................................................................................................... 6.3
6.05 Inert construction and demolition material ................................................................................... 6.3
6.06 Earthworks material ...................................................................................................................... 6.3
6.07 Formation...................................................................................................................................... 6.3
6.08 Intermediate areas of fill ............................................................................................................... 6.3
MATERIALS
6.09 Fill material................................................................................................................................... 6.3
16
GS (2006 Edition)
Page No.
SUBMISSIONS
6.10 Particulars of earthworks .............................................................................................................. 6.5
6.11 Particulars of blasting ................................................................................................................... 6.6
EXCAVATION
6.19 Disposal of excavated material ..................................................................................................... 6.8
6.20 Use of excavated material............................................................................................................. 6.8
6.21 Obstructions in excavations .......................................................................................................... 6.9
6.22 Excavation .................................................................................................................................... 6.9
6.23 Excavations adjacent to structures and utilities ............................................................................ 6.9
6.24 Excavations for structures, pits and trenches ................................................................................ 6.9
NOT USED
6.25 Not used ........................................................................................................................................ 6.9
6.26 Not used ........................................................................................................................................ 6.9
6.27 Not used ........................................................................................................................................ 6.9
6.28 Not used ........................................................................................................................................ 6.9
6.29 Not used ........................................................................................................................................ 6.9
BLASTING
6.30 Statutory requirements for blasting............................................................................................. 6.10
6.31 Recording vibrations and air-overpressures due to blasting ....................................................... 6.10
6.32 Preparatory work for surface blasting......................................................................................... 6.11
6.33 Notification of blasting ............................................................................................................... 6.11
6.34 Storage of explosives .................................................................................................................. 6.11
6.35 Restrictions on blasting times ..................................................................................................... 6.11
6.36 Blasting ....................................................................................................................................... 6.11
6.37 Controlled blasting ..................................................................................................................... 6.12
17
GS (2006 Edition)
Page No.
COMPACTION OF FILL MATERIAL
6.48 Compaction of fill material......................................................................................................... 6.15
6.49 Moisture content of fill material ................................................................................................. 6.15
6.50 Compaction of fill material adjacent to structures and utilities .................................................. 6.15
6.51 Compaction of rock fill material................................................................................................. 6.16
6.52 Compaction of general fill material with a large portion of coarse material .............................. 6.16
TOLERANCES
6.68 Tolerances: earthworks final surfaces and formations ................................................................ 6.25
18
GS (2006 Edition)
Page No.
TESTING: FILL MATERIAL - OPTIMUM MOISTURE CONTENT
AND MAXIMUM DRY DENSITY
6.74 Samples: optimum moisture content, maximum dry density ..................................................... 6.28
6.75 Testing: optimum moisture content, maximum dry density ....................................................... 6.28
6.76 Consistency: optimum moisture content, maximum dry density ............................................... 6.28
APPENDIX 6.2
DETERMINATION OF THE MOISTURE CONTENT OF FINE
GRAINED AND MEDIUM GRAINED MATERIAL BY THE
MICROWAVE OVEN DRYING METHOD
6.2.1 Scope .......................................................................................................................................... 6.33
6.2.2 Apparatus .................................................................................................................................... 6.33
6.2.3 Procedure .................................................................................................................................... 6.33
6.2.4 Calculation .................................................................................................................................. 6.34
6.2.5 Reporting of results .................................................................................................................... 6.34
APPENDIX 6.3
DETERMINATION OF THE MAXIMUM CONVERTED BULK
DENSITY BY THE HILF METHOD
6.3.1 Scope .......................................................................................................................................... 6.35
6.3.2 Apparatus .................................................................................................................................... 6.35
6.3.3 Procedure .................................................................................................................................... 6.35
6.3.4 Calculation .................................................................................................................................. 6.38
6.3.5 Reporting of results .................................................................................................................... 6.39
APPENDIX 6.4
ADJUSTMENT OF THE MAXIMUM CONVERTED BULK
DENSITY FOR THE DETERMINATION OF THE RELATIVE
COMPACTION
6.4.1 Scope .......................................................................................................................................... 6.40
19
GS (2006 Edition)
Page No.
6.4.2 Apparatus .................................................................................................................................... 6.40
6.4.3 Procedure .................................................................................................................................... 6.40
6.4.4 Calculation .................................................................................................................................. 6.41
6.4.5 Reporting of results .................................................................................................................... 6.41
SECTION 7
GEOTECHNICAL WORKS
GENERAL
7.01 General requirements .................................................................................................................... 7.3
7.02 Site clearance ................................................................................................................................ 7.3
7.03 Drainage works ............................................................................................................................. 7.3
7.04 Earthworks .................................................................................................................................... 7.3
7.05 Concrete ........................................................................................................................................ 7.3
7.06 Prestressed ground anchors........................................................................................................... 7.3
7.07 Reinforced fill structures .............................................................................................................. 7.3
TRIALS
7.08 Trials for geotechnical works ....................................................................................................... 7.3
GLOSSARY OF TERMS
7.09 Block Sample ................................................................................................................................ 7.4
7.10 Bulk Sample ................................................................................................................................. 7.4
7.11 Inspection Pit ................................................................................................................................ 7.4
7.12 Jar Sample..................................................................................................................................... 7.4
7.13 Sample .......................................................................................................................................... 7.4
7.14 Slope Surface Stripping ................................................................................................................ 7.4
7.15 Trial Pit ......................................................................................................................................... 7.4
7.16 Trial Trench .................................................................................................................................. 7.4
7.17 U76/U100 Sample ........................................................................................................................ 7.4
7.18 Undisturbed Soil Sample .............................................................................................................. 7.4
7.19 Ground Investigation .................................................................................................................... 7.4
7.20 Ground Investigation Site ............................................................................................................. 7.4
7.21 Investigation Station ..................................................................................................................... 7.4
7.22 Common Ground .......................................................................................................................... 7.4
7.23 Rock .............................................................................................................................................. 7.4
7.24 Boulders ........................................................................................................................................ 7.4
7.25 Cobbles ......................................................................................................................................... 7.4
7.26 Gravel ........................................................................................................................................... 7.5
7.27 Hard Strata .................................................................................................................................... 7.5
7.28 AGS Digital Format...................................................................................................................... 7.5
SUBMISSIONS
7.29 Particulars of ground investigation ............................................................................................... 7.5
20
GS (2006 Edition)
Page No.
INSPECTION PITS, TRIAL PITS AND SLOPE SURFACE
STRIPPING
7.30 Inspection pits ............................................................................................................................... 7.5
7.31 Trial pits and trial trenches ........................................................................................................... 7.5
7.32 Pumping from trial pits and trial trenches .................................................................................... 7.6
7.33 Backfilling of inspection pits, trial pits or trial trenches............................................................... 7.6
7.34 Slope surface protection stripping ................................................................................................ 7.7
7.35 Access ........................................................................................................................................... 7.7
7.36 Protection of stripped surface ....................................................................................................... 7.7
7.37 Reinstatement of stripped surface ................................................................................................. 7.7
7.38 Disturbed samples from trial pits, trial trenches or slope stripping .............................................. 7.8
7.39 Records of inspection pits............................................................................................................. 7.8
7.40 Records of trial pits and trial trenches .......................................................................................... 7.8
7.41 Photographs of trial pits or trial trenches ...................................................................................... 7.9
7.42 Slope stripping records ................................................................................................................. 7.9
IN-SITU TESTING
7.68 Standard penetration tests ........................................................................................................... 7.22
7.69 Dynamic probe tests ................................................................................................................... 7.24
7.70 Vane shear tests ........................................................................................................................... 7.24
7.71 In situ density tests ..................................................................................................................... 7.25
7.72 Falling or rising head permeability test ...................................................................................... 7.25
7.73 Response test .............................................................................................................................. 7.26
21
GS (2006 Edition)
Page No.
7.74 Constant head permeability test .................................................................................................. 7.26
7.75 Packer (water absorption) test .................................................................................................... 7.27
7.76 Impression packer tests ............................................................................................................... 7.28
7.77 Inclination and bearing measurements ....................................................................................... 7.28
MATERIALS
7.84 Cement mortar ............................................................................................................................ 7.31
7.85 Rock for masonry infilling ......................................................................................................... 7.31
7.86 Soil-cement ................................................................................................................................. 7.31
7.87 Aggregates for sprayed concrete ................................................................................................ 7.31
7.88 Reinforcement for sprayed concrete ........................................................................................... 7.31
7.89 Protective mesh and fixings ........................................................................................................ 7.31
7.90 Rock bolts ................................................................................................................................... 7.32
7.91 Grout for rock bolts .................................................................................................................... 7.32
7.92 Rock dowels ............................................................................................................................... 7.32
7.93 Grout for rock dowels ................................................................................................................. 7.32
7.94 Soil nails ..................................................................................................................................... 7.32
7.95 Soil nails with double-corrosion protection ................................................................................ 7.33
7.96 Grout for soil nails ...................................................................................................................... 7.34
7.97 Non-biodegradable mats for erosion control .............................................................................. 7.34
7.98 Biodegradable mats for erosion control ...................................................................................... 7.34
7.99 Wire mesh for erosion control .................................................................................................... 7.34
SUBMISSIONS
7.100 Particulars of access.................................................................................................................... 7.35
7.101 Particulars of sprayed concrete ................................................................................................... 7.35
7.102 Particulars of rock bolts .............................................................................................................. 7.36
7.103 Samples of materials ................................................................................................................... 7.36
7.104 Soil nails ..................................................................................................................................... 7.36
7.105 Mats for erosion control ............................................................................................................. 7.37
7.106 Wire mesh for erosion control .................................................................................................... 7.38
PRELIMINARY WORKS
7.107 Access to slopes .......................................................................................................................... 7.38
7.108 Protection fences and barriers ..................................................................................................... 7.38
7.109 Preparation for slope treatment works ........................................................................................ 7.39
Page No.
7.113 Sealing and infilling of rock joints ............................................................................................. 7.39
7.114 Concrete buttresses ..................................................................................................................... 7.40
SOIL-CEMENT FILL
7.115 Mixing soil-cement ..................................................................................................................... 7.40
7.116 Deposition and compaction of soil-cement fill ........................................................................... 7.40
SPRAYED CONCRETE
7.117 Trial panel ................................................................................................................................... 7.40
7.118 Preparation of slope surfaces ...................................................................................................... 7.40
7.119 Fixing reinforcement .................................................................................................................. 7.41
7.120 Weepholes and joints in sprayed concrete .................................................................................. 7.41
7.121 Equipment for spraying concrete ................................................................................................ 7.41
7.122 Spraying concrete ....................................................................................................................... 7.41
7.123 Curing sprayed concrete ............................................................................................................. 7.42
7.124 Inspection of sprayed concrete ................................................................................................... 7.42
7.125 Records of sprayed concrete ....................................................................................................... 7.42
ROCK BOLTS
7.127 Trials for rock bolts .................................................................................................................... 7.43
7.128 Drilling, preparing and testing rock bolt holes ........................................................................... 7.43
7.129 Fixing rock bolts ......................................................................................................................... 7.43
7.130 Grouting rock bolts ..................................................................................................................... 7.43
7.131 Proving rock bolts ....................................................................................................................... 7.44
7.132 Records of rock bolts .................................................................................................................. 7.44
ROCK DOWELS
7.133 Drilling and preparation of rock dowel holes ............................................................................. 7.45
7.134 Grouting rock dowels ................................................................................................................. 7.45
7.135 Records of rock dowels .............................................................................................................. 7.45
SOIL NAILS
7.136 Drilling for soil nails................................................................................................................... 7.45
7.137 Installation and grouting for soil nails ........................................................................................ 7.46
7.138 Pull-out tests for soil nails .......................................................................................................... 7.47
7.139 Soil-nail head .............................................................................................................................. 7.49
Page No.
GLOSSARY OF TERMS
7.154 Ground ........................................................................................................................................ 7.53
7.155 Grout ........................................................................................................................................... 7.53
7.156 Grouting ...................................................................................................................................... 7.53
7.157 Grouting stage............................................................................................................................. 7.53
7.158 Lugeon ........................................................................................................................................ 7.53
MATERIALS
7.159 Materials for grout ...................................................................................................................... 7.53
7.160 Grout for geotechnical works ..................................................................................................... 7.53
7.161 Standpipes ................................................................................................................................... 7.53
7.162 Particulars of grouting for geotechnical works ........................................................................... 7.54
7.163 Trials for grouting ....................................................................................................................... 7.54
24
GS (2006 Edition)
Page No.
TESTING: GROUT - GENERAL REQUIREMENTS
7.173 Batch: grout for geotechnical works ........................................................................................... 7.58
GLOSSARY OF TERMS
7.187 Caisson drain .............................................................................................................................. 7.61
7.188 Geotextile filter ........................................................................................................................... 7.61
7.189 Filter pipe.................................................................................................................................... 7.61
7.190 Granular filter ............................................................................................................................. 7.61
7.191 Prefabricated band drain ............................................................................................................. 7.61
7.192 Raking drain ............................................................................................................................... 7.61
7.193 Relief drain ................................................................................................................................. 7.61
7.194 Trench drain ................................................................................................................................ 7.61
MATERIALS
7.195 Granular filter material ............................................................................................................... 7.61
7.196 Geotextile filter ........................................................................................................................... 7.61
7.197 Filter pipes .................................................................................................................................. 7.61
7.198 Raking drains .............................................................................................................................. 7.62
7.199 Relief drains ................................................................................................................................ 7.63
7.200 Fill material for trench drains ..................................................................................................... 7.63
7.201 Caisson liners .............................................................................................................................. 7.63
7.202 Prefabricated band drains ........................................................................................................... 7.63
25
GS (2006 Edition)
Page No.
SUBMISSIONS
7.203 Particulars of granular filters ...................................................................................................... 7.64
7.204 Particulars of geotextile filter ..................................................................................................... 7.64
7.205 Particulars of trench drains ......................................................................................................... 7.65
7.206 Particulars of raking drains ......................................................................................................... 7.65
7.207 Particulars of relief drains........................................................................................................... 7.65
7.208 Particulars of caisson drains ....................................................................................................... 7.66
7.209 Particulars of prefabricated band drains ..................................................................................... 7.66
7.210 Particulars of filter pipes............................................................................................................. 7.66
7.211 Particulars of groundwater control, drawdown and monitoring ................................................. 7.67
7.212 Samples of materials ................................................................................................................... 7.67
GRANULAR FILTERS
7.217 Mixing granular filter material ................................................................................................... 7.68
7.218 Deposition and compaction of granular filter material ............................................................... 7.68
GEOTEXTILE FILTER
7.219 Damage to geotextile filter ......................................................................................................... 7.68
7.220 Laying geotextile filter ............................................................................................................... 7.68
7.221 Protection of geotextile filter ...................................................................................................... 7.68
7.222 Records of geotextile filter ......................................................................................................... 7.69
RAKING DRAINS
7.223 Installation of raking drains ........................................................................................................ 7.69
7.224 Drilling for raking drains ............................................................................................................ 7.69
7.225 Records of drillholes for raking drains ....................................................................................... 7.70
TRENCH DRAINS
7.226 Excavation for trench drains ....................................................................................................... 7.70
7.227 Geotextile filter surround for trench drains ................................................................................ 7.70
7.228 Bed for trench drains .................................................................................................................. 7.70
7.229 Deposition and compaction of fill material for trench drains ..................................................... 7.70
RELIEF DRAINS
7.230 Trials for relief drains ................................................................................................................. 7.71
7.231 Fixing relief drains...................................................................................................................... 7.71
CAISSON DRAINS
7.232 Construction of caisson drains .................................................................................................... 7.71
7.233 Discharge of water from caisson drains ...................................................................................... 7.71
7.234 Records of caisson drains ........................................................................................................... 7.71
26
GS (2006 Edition)
Page No.
SUBMISSIONS
7.253 Particulars of geotechnical instrumentation................................................................................ 7.76
27
GS (2006 Edition)
Page No.
SETTLEMENT PLATES
7.261 Installation of settlement plates .................................................................................................. 7.79
TILTMETER SYSTEM
7.262 Installation of tiltmeter system ................................................................................................... 7.80
TELLTALES
7.263 Installation of telltales ................................................................................................................ 7.80
STANDPIPE PIEZOMETERS
7.264 Standpipe piezometers ................................................................................................................ 7.80
7.265 Installation of standpipe piezometers ......................................................................................... 7.80
GENERAL
7.266 Scope .......................................................................................................................................... 7.82
SUBMISSIONS
7.267 Particulars of slope and retaining wall record survey ................................................................. 7.82
MATERIALS
7.268 Paint for concrete/ sprayed concrete surfaces ............................................................................. 7.83
SUBMISSION
7.269 Particulars of paint ...................................................................................................................... 7.83
APPENDIX 7.1
DYNAMIC PROBE TEST
7.1.1 Scope .......................................................................................................................................... 7.84
7.1.2 Apparatus .................................................................................................................................... 7.84
7.1.3 Procedure .................................................................................................................................... 7.84
7.1.4 Reporting of results .................................................................................................................... 7.84
28
GS (2006 Edition)
Page No.
SECTION 8
PILING WORKS
GENERAL
8.01 General requirements .................................................................................................................... 8.3
8.02 Earthworks .................................................................................................................................... 8.3
8.03 Reinforcement .............................................................................................................................. 8.3
8.04 Concrete ........................................................................................................................................ 8.3
8.05 Materials for grout ........................................................................................................................ 8.3
8.06 Grouting ........................................................................................................................................ 8.3
8.07 Prestressing ................................................................................................................................... 8.3
8.08 Steelwork ...................................................................................................................................... 8.3
8.09 Marine works ................................................................................................................................ 8.3
8.10 Code of practice for piling works ................................................................................................. 8.3
8.11 Safety of piling works................................................................................................................... 8.3
GLOSSARY OF TERMS
8.12 Hand-dug caisson ......................................................................................................................... 8.3
8.13 Barrette and Diaphragm Walls ...................................................................................................... 8.3
8.14 Large-diameter bored piles and socketted steel H-piles ............................................................... 8.4
8.15 Minipile ........................................................................................................................................ 8.4
8.16 Founding rock ............................................................................................................................... 8.4
MATERIALS
8.17 Steel piles ...................................................................................................................................... 8.4
8.18 Pile shoes ...................................................................................................................................... 8.4
8.19 Epoxy paint ................................................................................................................................... 8.5
8.20 Bituminous coating material ......................................................................................................... 8.5
8.21 Grout for piling works .................................................................................................................. 8.5
8.22 Reinforcement connectors ............................................................................................................ 8.5
SUBMISSIONS
8.29 Particulars of piling works ............................................................................................................ 8.6
8.30 Particulars of construction using bentonite slurry ........................................................................ 8.7
8.31 Particulars of hand-dug caissons .................................................................................................. 8.7
8.32 Particulars of minipiles ................................................................................................................. 8.7
29
GS (2006 Edition)
Page No.
GENERAL PILING WORKS REQUIREMENTS
8.35 Commencement of piling works ................................................................................................... 8.8
8.36 Prevention of damage due to piling works ................................................................................... 8.8
8.37 Monitoring of noise, vibration, ground movement and groundwater level .................................. 8.9
8.38 Ground investigation for piling works .......................................................................................... 8.9
8.39 Ground investigation for piles founded on rock ........................................................................... 8.9
8.40 Pre-drilling for piles founded on rock .......................................................................................... 8.9
8.41 Founding levels........................................................................................................................... 8.10
PRELIMINARY PILES
8.42 Preliminary piles ......................................................................................................................... 8.10
DRIVEN PILES
8.43 Supports for driven piles............................................................................................................. 8.10
8.44 Use of diesel hammer ................................................................................................................. 8.11
8.45 Followers .................................................................................................................................... 8.11
8.46 Marking of piles.......................................................................................................................... 8.11
8.47 Driving piles ............................................................................................................................... 8.11
8.48 Driving concrete piles ................................................................................................................. 8.11
8.49 Displaced piles ............................................................................................................................ 8.11
8.50 Re-drive checks .......................................................................................................................... 8.11
8.51 Lengthening driven piles ............................................................................................................ 8.11
8.52 Measurement of set of driven piles ............................................................................................. 8.11
HAND-DUG CAISSONS
8.54 Excavation for hand-dug caissons .............................................................................................. 8.13
8.55 Sealing and scaling of hand-dug caissons .................................................................................. 8.13
BARRETTES
8.56 Excavation for barrettes .............................................................................................................. 8.14
MINIPILES
8.57 Excavation for minipiles ............................................................................................................. 8.14
8.58 Grouting trials for minipiles ....................................................................................................... 8.14
Page No.
8.64 Temporary protection on pile head ............................................................................................. 8.15
TOLERANCES
8.71 Tolerances: steel bearing piles .................................................................................................... 8.17
8.72 Tolerances: precast concrete piles............................................................................................... 8.17
8.73 Tolerances: hand-dug caissons ................................................................................................... 8.18
8.74 Tolerances: pile installations....................................................................................................... 8.18
31
GS (2006 Edition)
Page No.
APPENDIX 8.1
DETERMINATION OF THE SETTLEMENT OF PILES BY LOAD
TEST
8.1.1 Scope .......................................................................................................................................... 8.26
8.1.2 Equipment ................................................................................................................................... 8.26
8.1.3 Procedure: before testing ............................................................................................................ 8.26
8.1.4 Procedure: load test .................................................................................................................... 8.27
8.1.5 Procedure: after testing ............................................................................................................... 8.28
8.1.6 Reporting of results .................................................................................................................... 8.28
APPENDIX 8.2
PILE DRIVING RECORD
APPENDIX 8.3
PILE DRIVING RECORD
APPENDIX 8.4
PILE RECORD
APPENDIX 8.5
PILE RECORDS
APPENDIX 8.6
BENTONITE SLURRY RECORD
APPENDIX 8.7
PILE LOAD TEST RECORD
SECTION 9
CARRIAGEWAYS: SUB-BASE MATERIAL AND BITUMINOUS
MATERIALS
GLOSSARY OF TERMS
9.01 Nominal maximum aggregate size ............................................................................................... 9.3
MATERIALS
9.02 Sub-base material using virgin material ....................................................................................... 9.3
9.03 Recycled sub-base material in lieu of virgin material .................................................................. 9.3
32
GS (2006 Edition)
Page No.
9.04 Aggregates for bituminous materials ............................................................................................ 9.4
9.05 Filler for bituminous materials ..................................................................................................... 9.5
9.06 Bitumen ........................................................................................................................................ 9.6
9.07 Bituminous emulsion .................................................................................................................... 9.6
9.08 Bituminous priming material ........................................................................................................ 9.6
SUBMISSIONS
9.11 Particulars of aggregate, filler, bitumen, bituminous emulsion and bituminous priming
materal for bituminous materials .................................................................................................. 9.8
9.12 Particulars of mixes for sub-base material and bituminous materials .......................................... 9.9
9.13 Particulars of virgin sub-base material and recycled sub-base material ..................................... 9.10
9.14 Particulars of supplier of sub-base material and bituminous materials ...................................... 9.10
9.15 Particulars of methods of laying and compacting sub-bases and bituminous materials ........... 9.111
9.16 Samples of sub-base material, aggregate, filler and bitumen ....................................................... 9.11
TRIALS
9.17 Trial areas ................................................................................................................................... 9.11
9.18 Samples: trial areas ..................................................................................................................... 9.12
9.19 Testing: trial areas ....................................................................................................................... 9.12
9.20 Compliance criteria: trial areas .................................................................................................... 9.12
9.21 Non-compliance: trial areas ......................................................................................................... 9.12
9.22 Approved mix for bituminous materials other than bituminous roadbase material .................... 9.13
9.23 Commencement of placing bituminous materials ...................................................................... 9.13
9.24 Changes in materials and methods of construction .................................................................... 9.14
PRELIMINARY WORK
9.30 Installation of utilities ................................................................................................................. 9.16
33
GS (2006 Edition)
Page No.
LAYING AND COMPACTION OF BITUMINOUS MATERIALS
9.33 Laying and compaction of bituminous materials ........................................................................ 9.18
9.34 Laying bituminous materials by paving machine ....................................................................... 9.18
9.35 Laying bituminous materials by manual methods ...................................................................... 9.19
9.36 Compaction of bituminous materials and sub-base material ...................................................... 9.19
9.37 Joints in bituminous materials .................................................................................................... 9.20
TOLERANCES
9.39 Tolerances: alignment of carriageway ........................................................................................ 9.21
9.40 Tolerances: level of carriageway ................................................................................................ 9.21
9.41 Tolerances: covers, frames and other hardware .......................................................................... 9.22
34
GS (2006 Edition)
Page No.
TESTING: BITUMINOUS FRICTION COURSE MATERIAL
9.58 Batch: bituminous friction course material................................................................................. 9.29
9.59 Samples: bituminous friction course material ............................................................................ 9.29
9.60 Testing: bituminous friction course material .............................................................................. 9.29
9.61 Compliance criteria: bituminous friction cours material ............................................................ 9.30
APPENDIX 9.1
DETERMINATION OF THE PERMEABILITY OF FRICTION
COURSE MATERIAL
9.1.1 Scope .......................................................................................................................................... 9.34
9.1.2 Apparatus .................................................................................................................................... 9.34
9.1.3 Procedure .................................................................................................................................... 9.34
9.1.4 Reporting of results .................................................................................................................... 9.34
APPENDIX 9.2
DETERMINATION OF BINDER CONTENT AND PARTICLE SIZE
DISTRIBUTION OF POLYMER MODIFIED FRICTION COURSE
MATERIAL
9.2.1 Scope .......................................................................................................................................... 9.36
9.2.2 Calibration procedure ................................................................................................................. 9.36
9.2.3 Testing ........................................................................................................................................ 9.36
9.2.4 Calculation .................................................................................................................................. 9.37
9.2.5 Reporting of results .................................................................................................................... 9.37
SECTION 10
CONCRETE CARRIAGEWAYS
GENERAL
10.01 General requirements .................................................................................................................. 10.3
10.02 Formwork and finishes ............................................................................................................... 10.3
10.03 Reinforcement ............................................................................................................................ 10.3
10.04 Concrete ...................................................................................................................................... 10.3
10.05 Curing compound ....................................................................................................................... 10.3
10.06 Earthworks .................................................................................................................................. 10.3
35
GS (2006 Edition)
Page No.
MATERIALS
10.07 Reinforcement ............................................................................................................................ 10.3
10.08 Cement mortar for cradles .......................................................................................................... 10.3
10.09 Fine aggregate............................................................................................................................. 10.3
10.10 Polyethylene sheeting ................................................................................................................. 10.3
10.11 Joint filler.................................................................................................................................... 10.3
10.12 Joint sealant ................................................................................................................................ 10.3
10.13 Bond breaker tape ....................................................................................................................... 10.4
10.14 Groove forming strip .................................................................................................................. 10.4
10.15 Sleeves for dowel bars and tie bars............................................................................................. 10.4
10.16 Epoxy resin grout........................................................................................................................ 10.4
CONCRETE
10.17 Concrete mix............................................................................................................................... 10.4
10.18 Cementitious content of concrete ............................................................................................... 10.4
SUBMISSIONS
10.19 Particulars of materials for joints ................................................................................................ 10.5
10.20 Particulars of methods of construction ....................................................................................... 10.5
10.21 Samples of materials ................................................................................................................... 10.5
TRIALS
10.22 Compliance criteria: trial-mix concrete ...................................................................................... 10.6
10.23 Trial length.................................................................................................................................. 10.6
10.24 Testing: trial length ..................................................................................................................... 10.6
10.25 Compliance criteria: trial length ................................................................................................. 10.7
10.26 Non-compliance: trial length ...................................................................................................... 10.7
10.27 Commencement of concreting .................................................................................................... 10.7
10.28 Changes in materials and methods of construction .................................................................... 10.7
STORAGE OF MATERIALS
10.29 Storage of materials for joints and polyethylene sheeting .......................................................... 10.7
PRELIMINARY WORK
10.30 Installation of utilities ................................................................................................................. 10.8
10.31 Preparation of formation and sub-base ....................................................................................... 10.8
10.32 Laying polyethylene sheeting ..................................................................................................... 10.8
FORMWORK
10.33 Formwork ................................................................................................................................... 10.8
FORMING JOINTS
10.34 Forming joints............................................................................................................................. 10.8
10.35 Transverse joints ......................................................................................................................... 10.9
10.36 Longitudinal joints ...................................................................................................................... 10.9
10.37 Isolation joints ............................................................................................................................ 10.9
36
GS (2006 Edition)
Page No.
10.38 Forming grooves ......................................................................................................................... 10.9
10.39 Protection of grooves ................................................................................................................ 10.10
10.40 Sealing joints ............................................................................................................................ 10.10
CONSTRUCTION JOINTS
10.42 Construction joints .................................................................................................................... 10.11
SURFACE FINISH
10.43 Surface regulation ..................................................................................................................... 10.11
10.44 Surface texturing....................................................................................................................... 10.12
CURING CONCRETE
10.45 Curing concrete......................................................................................................................... 10.12
TOLERANCES
10.47 Tolerances: sub-base ................................................................................................................. 10.12
10.48 Tolerances: formwork ............................................................................................................... 10.12
10.49 Tolerances: reinforcement ........................................................................................................ 10.13
10.50 Tolerances: dowel bars and tie bars .......................................................................................... 10.13
10.51 Tolerances: grooves .................................................................................................................. 10.13
10.52 Tolerances: covers, frames and other hardware ........................................................................ 10.13
10.53 Tolerances: alignment of concrete carriageway ........................................................................ 10.13
10.54 Tolerances: level of concrete carriageway ................................................................................ 10.13
TESTING: CONCRETE
10.59 Testing: workability and compressive strength of concrete ...................................................... 10.16
10.60 Compliance criteria: workability of concrete ........................................................................... 10.16
10.61 Samples: compressive strength of concrete .............................................................................. 10.16
37
GS (2006 Edition)
Page No.
TESTING: CONCRETE CORES FROM TRIAL LENGTHS
10.62 Samples: concrete cores from trial lengths ............................................................................... 10.16
10.63 Testing: concrete cores from trial lengths ................................................................................. 10.16
10.64 Compliance criteria: concrete cores from trial lengths ............................................................. 10.16
APPENDIX 10.1
DETERMINATION OF THE TEXTURE DEPTH OF
CARRIAGEWAYS
10.1.1 Scope ........................................................................................................................................ 10.18
10.1.2 Materials ................................................................................................................................... 10.18
10.1.3 Apparatus .................................................................................................................................. 10.18
10.1.4 Procedure .................................................................................................................................. 10.18
10.1.5 Calculation ................................................................................................................................ 10.19
10.1.6 Reporting of results .................................................................................................................. 10.19
SECTION 11
MISCELLANEOUS ROADWORKS
GENERAL
11.01 General requirements .................................................................................................................. 11.3
11.02 Earthworks .................................................................................................................................. 11.3
11.03 Sub-base material and bituminous materials .............................................................................. 11.3
11.04 Joints in concrete ........................................................................................................................ 11.3
11.05 Formwork ................................................................................................................................... 11.3
11.06 Reinforcement ............................................................................................................................ 11.3
11.07 Concrete ...................................................................................................................................... 11.3
11.08 Steelwork .................................................................................................................................... 11.3
MATERIALS
11.09 Cement mortar ............................................................................................................................ 11.3
11.10 Polyethylene sheeting ................................................................................................................. 11.3
MATERIALS
11.11 Concrete mix............................................................................................................................... 11.4
38
GS (2006 Edition)
Page No.
SUBMISSIONS
11.12 Particulars of concrete profile barriers ....................................................................................... 11.4
TRIALS
11.13 Trial length.................................................................................................................................. 11.4
11.14 Testing: trial length ..................................................................................................................... 11.5
11.15 Compliance criteria: trial length ................................................................................................. 11.5
11.16 Non-compliance: trial length ...................................................................................................... 11.5
11.17 Commencement of concreting .................................................................................................... 11.5
11.18 Changes in materials and methods of construction .................................................................... 11.5
TOLERANCES
11.25 Tolerances: concrete profile barriers........................................................................................... 11.6
GENERAL
11.27 Design of pedestrian guard-railing ............................................................................................. 11.8
MATERIALS
11.28 Steel ............................................................................................................................................ 11.8
11.29 Stainless steel .............................................................................................................................. 11.8
11.30 Aluminium .................................................................................................................................. 11.8
11.31 Bolts, nuts, screws, washers and rivets ....................................................................................... 11.9
11.32 Mesh infill................................................................................................................................... 11.9
39
GS (2006 Edition)
Page No.
FABRICATION OF PEDESTRIAN GUARD-RAILING
11.33 Galvanizing to steel .................................................................................................................... 11.9
11.34 Welding steel .............................................................................................................................. 11.9
SUBMISSIONS
11.35 Particulars of pedestrian guard-railing...................................................................................... 11.10
11.36 Samples of materials ................................................................................................................. 11.10
STORAGE OF MATERIALS
11.37 Storage of pedestrian guard-railing........................................................................................... 11.10
MATERIALS
11.39 Beams ....................................................................................................................................... 11.12
11.40 Posts .......................................................................................................................................... 11.12
11.41 Cleats and struts ........................................................................................................................ 11.12
11.42 Bolts and nuts ........................................................................................................................... 11.13
11.43 Washers ..................................................................................................................................... 11.13
SUBMISSIONS
11.44 Particulars of untensioned beam barriers .................................................................................. 11.13
11.45 Samples of materials ................................................................................................................. 11.14
STORAGE OF MATERIALS
11.46 Storage of beams and posts....................................................................................................... 11.14
MATERIALS
11.51 Concrete kerbs, edgings and quadrants .................................................................................... 11.16
11.52 Granite kerbs, edgings and quadrants ....................................................................................... 11.16
40
GS (2006 Edition)
Page No.
11.54 Construction of in-situ kerbs, edgings and quadrants ............................................................... 11.16
TOLERANCES
11.55 Tolerances: kerbs, edgings and quadrants................................................................................. 11.17
MATERIALS
11.56 Concrete for footways, cycletracks and paved areas ................................................................ 11.18
GLOSSARY OF TERMS
11.60 Unit ........................................................................................................................................... 11.20
MATERIALS
11.61 Units ......................................................................................................................................... 11.20
11.62 Precast concrete paving slabs ................................................................................................... 11.20
11.63 Precast concrete paving blocks ................................................................................................. 11.20
11.64 Precast concrete paving setts .................................................................................................... 11.20
11.65 Concrete .................................................................................................................................... 11.21
11.66 Additional requirements for Grade A units ............................................................................... 11.21
11.67 Sand .......................................................................................................................................... 11.21
SUBMISSIONS
11.68 Particulars of paving units ........................................................................................................ 11.22
11.69 Particulars of units - additional requirements for Grade A units ............................................... 11.22
11.70 Samples of materials ................................................................................................................. 11.22
11.71 Samples of materials - additional requirements for Grade A units ............................................ 11.23
LAYING UNITS
11.74 Laying units .............................................................................................................................. 11.23
41
GS (2006 Edition)
Page No.
11.75 Laying sand............................................................................................................................... 11.24
11.76 Bedding paving slabs ................................................................................................................ 11.24
11.77 Bedding paving blocks and setts................................................................................................ 11.24
11.78 Filling joints and compaction of units ...................................................................................... 11.25
11.79 Mortar and concrete seal ........................................................................................................... 11.25
REINSTATEMENT OF UNITS
11.80 Reinstatement of units .............................................................................................................. 11.25
TOLERANCES
11.81 Levels ....................................................................................................................................... 11.26
TESTING
11.82 Batching .................................................................................................................................... 11.26
11.83 Testing requirements for units .................................................................................................. 11.26
11.84 Bending strength test of paving slabs ........................................................................................ 11.26
11.85 Compressive strength test of paving blocks ............................................................................. 11.26
11.86 Additional testing for Grade A units: dimensional deviation of paving slabs, blocks and setts... 11.27
11.87 Additional testing for Grade A units: slip/ skid resistance of paving slabs and blocks ............... 11.27
11.88 Additional testing for Grade A units: water absorption value of paving slabs and blocks .......... 11.27
APPENDIX 11.1
DETERMINATION OF CHARACTERISTIC COMPRESSIVE
STRENGTH OF PAVING BLOCKS
11.1.1 Scope ........................................................................................................................................ 11.29
11.1.2 Apparatus .................................................................................................................................. 11.29
11.1.3 Procedure .................................................................................................................................. 11.29
11.1.4 Calculation ................................................................................................................................ 11.29
11.1.5 Reporting of results .................................................................................................................. 11.30
SECTION 12
TRAFFIC SIGNS, ROAD MARKINGS AND ROAD STUDS
GENERAL
12.01 General requirements .................................................................................................................. 12.3
12.02 Temporary traffic arrangements and control............................................................................... 12.3
12.03 Steelwork .................................................................................................................................... 12.3
12.04 Traffic signs ................................................................................................................................ 12.3
MATERIALS
12.05 Steel ............................................................................................................................................ 12.3
12.06 Stainless steel .............................................................................................................................. 12.3
12.07 Aluminium alloy ......................................................................................................................... 12.4
12.08 Bolts, nuts, screws, washers and rivets ....................................................................................... 12.4
42
GS (2006 Edition)
Page No.
12.09 Materials for faces of traffic signs .............................................................................................. 12.5
SUBMISSIONS
12.16 Particulars of traffic signs ........................................................................................................... 12.7
STORAGE OF MATERIALS
12.17 Storage of traffic signs ................................................................................................................ 12.8
GLOSSARY OF TERMS
12.22 Road Markings ......................................................................................................................... 12.10
MATERIALS
12.23 Hot-applied thermoplastic material .......................................................................................... 12.10
12.24 Cold-applied preformed material .............................................................................................. 12.10
12.25 Cold plastic road marking......................................................................................................... 12.10
12.26 Paint for road markings ............................................................................................................ 12.10
12.27 Solid glass beads ....................................................................................................................... 12.11
12.28 Functional life of the material................................................................................................... 12.11
SUBMISSIONS
12.29 Test certificate and routine testing ............................................................................................ 12.11
43
GS (2006 Edition)
Page No.
LAYING ROAD MARKINGS
12.33 Preparation of surfaces ............................................................................................................. 12.12
12.34 Laying hot-applied thermoplastic material ............................................................................... 12.12
12.35 Laying cold-applied preformed material .................................................................................. 12.13
12.36 Use of road-marking paint ........................................................................................................ 12.13
12.37 Road marking performance for road users ................................................................................. 12.13
12.38 Temporary road markings ......................................................................................................... 12.13
12.39 Skid resistance level ................................................................................................................. 12.14
TOLERANCES
12.40 Tolerances ................................................................................................................................. 12.14
MATERIALS
12.42 Road studs................................................................................................................................. 12.15
12.43 Bitumen grout ........................................................................................................................... 12.15