Download as doc, pdf, or txt
Download as doc, pdf, or txt
You are on page 1of 1

Job No.

NON-CONFORMANCE NCR No.


OneBase REPORT (NCR) Date
Page

Drawing No.: Item/Position No.

Other Description

DESCRIPTION OF NON-CONFORMANCE

ISSUED By
Title: Name: Sign./Date:

PROPOSED DISPOSITION

Use As Is Repair& Rework Scrap/Return to Vendor Other

DISPOSITIONED By
Title: Name: Sign./Date:

APPROVAL/ACCEPTANCE OF PROPOSED DISPOSITION

Title: Name: Sign./Date:

Title: Name: Sign./Date:

Title: Name: Sign./Date:

VERIFICATION OF DISPOSITION

Supplementary ITP is attached Yes No

Title: Name: Sign./Date:

Title: Name: Sign./Date:

Title: Name: Sign./Date:

Final disposition:

QC Manger Name: Sign./Date:

WA QC Manual Rev. 0 Date: 17/09/2023 Exhibit No. 06-01

You might also like