HSE Daily-Monthely Report april

You might also like

Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

HSE MONTHLY REPORT

From: PMS-... HSE Engineer Ahmed Barakat Area : PETROWEB

To: PMS HSE Department Habashy Aly Month: 4-2024

Project Name/Client : petroweb onshore landfall development project Date: 12/6/2023

This Project to Year


ITEMS COMMENTS
Month Date To Date

1 Personal On Board (POB) average /day 2016 18775 9172

2 MANHOURS 24192 225300 110064

3 INPUT MEASUREMENTS

SAFETY TRAINING OBSERVATION PROGRAM (STOP) /


SAFETY OBSERVATIONS AND CONVERSATIONS (SOC) 22 271 157
/SAFETY HAZARD OBSERVATION CARD (SHOC)
WALKTHROUGH 12 37 30
DEPARTMENT SELF INSPECTION 115 367 283

4 OUTPUT MEASUREMENTS
NO. OF FATALITY CASES 0 0 0
NO. OF LOST TIME INJURY CASES (LTI) 0 0 0
NO. OF Day Away From Work Cases (DWFWC) 0 0 0
NO. OF RESTRECTED WORK CASES 0 0 0
NO. OF NEAR MISS CASES 0 0 0
NO. FIRST AID CASES 0 0 0
NO. OF PROPERTY DAMAGE CASES 0 0 0
NO. OF OIL / CHEMICAL POLLUTION CASES 0 0 0
5 PROACTIVE MEASURES

1 AUDITS
INTERNAL 0 4 3

EXTERNAL / THIRD PARTY 0 5 4

TOP MANAGEMENT VISIT 1 18 7

HYGIENIC AUDIT 0 12 10

2 MEETINGS
NO. OF DEPARTMENTAL SAFETY MEETINGS 9 53 53
NO. OF SAFETY COMMITTEE 1 10 9

3 TRAININGS / DRILLS
NO. OF SAFETY INDUCTION 7 62 26
NO. OF SAFETY INDUCTION ATTENDANCE 10 187 50
NO. OF SAFETY SESSION / LECTURE 6 58 45
NO. OF TRAINEES PERSONS 60 657 488
NO. OF SAFETY TRAINING HOURS 60 670 501
NO. OF SAFETY STAND DOWN 12 50 42
NO. OF SAFETY STAND DOWN TRAINEES PERSONS 22 272 154
NO. OF FIRE DRILL 0 5 2
NO. OF EVACUATION / ABANDON DRILL 0 5 1
NO. OF MAN OVER BOARD DRILL 0 1 1
NO. OF HELICOPTER CRASH DRILL 0 0 0
NO. OF H2S DRILL 0 0 0
NO. OF MEDIVAC DRILL 0 1 0
NO. OF CONFIND SPACE DRILL 0 0 0
NO. OF OIL / CHEMICAL SPILL DRILL 0 2 2
Vechiles Kilometer 2 2 2

4 PTW SYSTEM
Total Permits to Work 252 1441 1029

A. CLIENT PERMITS 202 1219 825

B. PMS PERMITS 48 221 203


NO. OF Job Risk Assessment (R.A) / Job Safety Analysis (JSA) 142 889 485
NO. of Isolation (Mechanical / Electrical) 0 0 0
NO. of ToolBox / Pre Job Safety Meeting 163 940 536

Day's Events:

UNITS PMS TOBAR CLIENT VISITORS ….… …..... …… TOTAL COMMENTS

POB 1439 270 289 7 0 0 0 2005

HSE Engineer Client Rep.


ahmed barakat
Project start: 12/6/2023

Notes:
1-The items not implemented onboard,put N/A = not applicablee.
2-Monthly report shall be comply with daily report records.
3- Signed copy of daily /monthly reports to be send periodically by email
4-All above records as per national and international standards.

F2/ PMS-OHSP-12 Issue 2 Rev. 0