Safe Work Method Statement SWMS No.

-66

Project Name: Haier India Industrial Park Renovation & Extension Address: Ranjangaon

Company Name: SPCPL. Activity/Trade: installation of cable tray by scissor lift .


Address: Shapoorji Pallonji & co. pvt ltd, sp infocity, incubator no.4, pune saswad road, fursungi pune: 412308. Office Contact No: +91-02066725000.
Supervisor Name: Dhanesh Contact No: 8380057265.

Person
Procedure (in steps) Possible Hazards Risk Control Measures
who will
(Break the job down into (Identify the hazards Rating (Describe what action or procedure will be taken to eliminate or minimise the risk of
injury or damage. Use the Hierarchy of Controls below as a guide ensure this
steps. Each step should associated with each (See
1. Eliminate the Hazard happens
accomplish some major task step. Examine each to below)
and be in logical sequence.) find possibilities that 2. Substitute the material or equipment
could lead to an 3. Isolate the hazard
accident or potential 4. Implement Engineering control
harm arising.) 5. Implement Administrative control
6. PPE
Manpower Mobilization Untrained M 1. Only inducted worker shall be deputed at the work place. Supervisor /
worker ,unauthorize 2. Given Tool Box Talk to all workers. What are activities to be carried out, Engineer
d entry what are the hazards, what are the precautions that are to be taken. PTP
should be conduct before start of work.
3. Height Work activity permit shall be taken before start of work from concern
engg. and HSE Dept.
4. Required PPE's use by workers.
5. Area shall be barricaded to prevent unauthorized entry.
6. Access & egress should be clear, use of required PPE's only train person
deployed for work
7. Job Specific training should be conduct.
Mobilization of Uninspected M 1. Only inspected Vehicle/Equipment shall be use at site. Supervisor /
Vehicle/Equipment equipment, 2. All documents should verify and submitted at EHS dept. Engineer
Breakdown 3. Inspected vehicle/equipment should identify through GREEN Tag. For use
and RED tag for not use.

E - Extreme Risk: The hazard has the potential to kill or permanently disable a person H - High Risk: The hazard has the potential to cause a LTI ≥ 7 days
M - Medium Risk: The hazard has the potential to cause a LTI < 7 days L - Low Risk: The hazard has the potential to cause a minor injury that will not disable a person (ie: Nil LTI)
Safe Work Method Statement SWMS No. -66

Mobilization of Hand tools Damaged hand M 1. Avoid damaged hand tools for use. Supervisor /
tools, Uninspected 2. Inspect all tools at the time of entry to site and maintain record. Engineer
hand tools 3. Only inspected hand tools shall be use at site.
4. Approved tools should be use.
5. Shifting of material manually
6. Ramp of movement shop edge
7. Use two person for shifting of material
8. Access should be free from obstruction

Unloading of cable tray at Unskilled workers, M 1. Only trained workers to be deployed and provide manual handling Supervisor /
location given by Manually fall of material, techniques. Proper access should be provide to reach in vehicles . Engineer
Size-1000 / 750 / 600 / 450/ 300 caught in between, 2. Restrict access of unauthorized person inside the lifting/ unloading area.
/150 /50 mm
Wear and tear of 3. ensure close and continuous supervision of the activity wheel stopper
PPE, movement of should be provide .
vehicle. 4. Provide manual handling technique training to the Labour
5. Vehicle movement should be done under guidance and flagman

Shifting of cable tray at work Unskilled workers, M 6. Only trained workers to be deployed and provide manual handling Supervisor /
location using scissor lift / fall of material, techniques Engineer
Cherry Picker / Scaf folding caught in between, 7. Barricade the area and restrict access of unauthorized person inside the
Size-1000 / 750 / 600 / 450/ 300 Wear and tear of lifting area.10 meter of radious and work location .
/150 /50 mm PPE, movement of 8. Properly tighten the cable tray before shifting.
vehicle. 9. ensure close and continuous supervion of the activity
10. Do not allow Labour to use scissor lift only trained operator will operate the
scissor lift. During up down movement workers should be sealed ins bucket
11. Provide manual handling technique training to the Labour
12. Conduct TBT on daily. Before start of work

E - Extreme Risk: The hazard has the potential to kill or permanently disable a person H - High Risk: The hazard has the potential to cause a LTI ≥ 7 days
M - Medium Risk: The hazard has the potential to cause a LTI < 7 days L - Low Risk: The hazard has the potential to cause a minor injury that will not disable a person (ie: Nil LTI)
Safe Work Method Statement SWMS No. -66

Cutting Of cable tray Chop Slip hazard, fall of M 1. Obtain hot work permit Supervisor /
saw machine material / person, 2. Use right PPE Engineer
fire hazard, Bursting 3. Check the credentials of welder
grinding wheel, High 4. Keep the fire extinguisher at work location
noise level, Wrong 5. Adequate supervision required
way use the 6. Remove combustible and flammable material from work location if not
machine, Flying possible cover flammable material by Class B fire blanket.
particles, Electrical 7. Provide wheel guard to the machine
hazard. 8. Inspect machine before each use
9. Cordon off the working area and do not allow unauthorised person in the
working area.
10. provide training to the operator.
11. Do not use damaged cables.
12. Do not insert bare cable in the socket, use industrial top.
13. use machine according the manual instruction.
14. Do not stand or seat in front of equipment
.

E - Extreme Risk: The hazard has the potential to kill or permanently disable a person H - High Risk: The hazard has the potential to cause a LTI ≥ 7 days
M - Medium Risk: The hazard has the potential to cause a LTI < 7 days L - Low Risk: The hazard has the potential to cause a minor injury that will not disable a person (ie: Nil LTI)
Safe Work Method Statement SWMS No. -66

Cable Tray Support on Fall of material and M 1. obtain work permit to work at height Supervisor /
column /perlin slip, trip, fall of 2. Impart training on Support erection Engineer
Material Mild Steel. person. 3. Inspect scissor lift / Cherry Picker / Scaf folding before use and check
Muscular problems green tag (safe for use).
due to lifting of 4. Only trained and authorized operator will operate scissor lift / Cherry
Steel. Picker / Scaf folding
5. Display all the legal documents of scissor lift / Cherry Picker / Scaf
folding.
6. Provide railing and proper access to the scissor lift Cherry Picker / Scaf
folding.
7. Welding of support with Appropriate Machine Using Fire Blanket and
Extinguisher.
8. While welding Premises should be empty.
9. Proper barigassion should be done
10. Responsible person monitor the Activity.
11. Use right PPE -Safety belt, hand gloves etc.]
12. Provide full body harness with positioning lanyard and use anchorage
hook to strong enough structure
13. Barricade area prior to start work
14. Continuous supervision required.
15. Provide proper illumination if required

E - Extreme Risk: The hazard has the potential to kill or permanently disable a person H - High Risk: The hazard has the potential to cause a LTI ≥ 7 days
M - Medium Risk: The hazard has the potential to cause a LTI < 7 days L - Low Risk: The hazard has the potential to cause a minor injury that will not disable a person (ie: Nil LTI)
Safe Work Method Statement SWMS No. -66

Cable tray laying on tray Fall of material and H 16. obtain work permit to work at height Supervisor /
support at 0-12 Mtr height in slip, trip, fall of 17. Impart training on cable tray erection Engineer
Refrigeration plant. person. 18. Inspect scissor lift before use and check green tag (safe for use).
Muscular problems 19. Only trained and authorized operator will operate scissor lift
due to lifting of 20. Display all the legal documents of scissor lift.
heavy cables 21. Provide railing and proper access to the scissor lift.
22. Responsible person monitor the Activity.
23. Use right PPE -Safety belt, hand gloves etc.]
24. Provide full body harness with positioning lanyard and use anchorage
hook to strong enough structure
25. Barricade area prior to start work
26. Continuous supervision required.
27. Provide proper illumination if required
28. Loose the material should not be kept in bucket
29. Underneath area not no unauthorise person allowed
30. Shift of material from bucket to support level by minimum two person
31. Bolting and tray with structure support by person

Work during night shift Illumination, fall of M 1. Night work permit to be taken from concern engg. and safety dept. Supervisor /
person, fall of 2. Ensure 200 lux illumination during dark hours. Engineer
machinery 3. Flashers to be provided if there is road adjacent.
4. Electrical cable should lead min 2 m height. No exposed electrical wire and
Earthing and 7 Mtr. height at vehicle movement area.
5. Routes shall be illuminated.
6. Ensure continuous supervision provided at work place.
7. The pit to be barricaded from all 4 sides after completion of activity.
8. It is any pit or floor opening should be hard barricades.

In Case of Emergency Panic Situation H 1. Everyone shall assemble at assembly point. Supervisor /
Engineer

E - Extreme Risk: The hazard has the potential to kill or permanently disable a person H - High Risk: The hazard has the potential to cause a LTI ≥ 7 days
M - Medium Risk: The hazard has the potential to cause a LTI < 7 days L - Low Risk: The hazard has the potential to cause a minor injury that will not disable a person (ie: Nil LTI)
Safe Work Method Statement SWMS No. -66

Personnel Summary
SUPERVISOR’S DETAILS
Supervisors Name & Qualifications: Name: Dhanesh Tuwar
Experience:
Qualifications:
Supervisor’s Responsibilities:

In addition to the above, the supervisor is to provide training in the use of this WMS, issue PPE and provide training in the same, supervise the
work, ensure conformity with this WMS, amend the WMS when additional hazards are found (and if applicable, ensure all workers receive a tool-
box talk to discuss the control measures for the additional hazards).

DESCRIPTION OF TRAINING THAT HAS BEEN GIVEN TO PEOPLE INVOLVED WITH THE WORK

H&S GENERAL INDUCTION: All workers must have successfully completed industry induction training

WORK ACTIVITY TRAINING: All workers need to have been trained in the activities outlined in this safe work method statement.

SITE INDUCTION: All workers are to be site inducted by the Principal Contractor, prior to commencing work on site.

OTHER: (List other training undertaken by workers): (eg: Confined Space, Manual Handling, Traffic Control etc)

TICKETS, PERMITS or LICENCES REQUIRED to undertake this work (ie. Certificates of Competency, Confined Spaces etc):

N.B. - Copies of the above must be shown to the Principal Contractor during site induction.

LEGISLATION, CODES OF PRACTICE and GUIDELINES applicable to this work

All work to comply with the <insert location> H&S Acts and Regulations and amendments, Workplace Injury Management & Workers Compensation Acts

Additional Codes and Standards applicable to this trade:

Document Name: Version Correct as at: Page No.


770882159.doc 6 of 8
Safe Work Method Statement SWMS No. -66

Equipment & Material Summary


PLANT and EQUIPMENT used and MAINTENANCE FREQUENCY :

Serial Plant/Equipment Contractor Government Plant Hazards Maintenance/service records and log books sighted
Registration No. identified and by Principle Contractor prior to equipment being
controlled within used on site?
(Where applicable)
WMS?
Yes No Sign Date

1
2
3

ELECTRICAL EQUIPMENT USED DURING THE WORKS (Attach Electrical Equipment Register if applicable):
Item Tag/Item Testers Name & Signature License Number Test Date Result Test Date Result
Number
____ /____ /____ ____ /____ /____
____ /____ /____ ____ /____ /____

HAZARDOUS SUBSTANCES or DANGEROUS GOODS USED IN THE WORKS and anticipated volumes (Attach MSDS if applicable):
MSDS
Purpose Location & Volume Used Controls
Date on Site Date Left Site Product Name MSDS Date Attached
(ie. Application on site) on Site (& PPE to be worn)
(Y/N)
/ / / / / /

/ / / / / /

/ / / / / /
N.B. - All workers must be trained in the safe use of all chemicals and provided with the PPE required when using and storing these chemicals. Disposal is to be as per the waste disposal methods
in the MSDS. Spillage and leaks are to be cleaned up as per the spill/leak procedures identified in the MSDS.

Document Name: Version Correct as at: Page No.


770882159.doc 7 of 8
Safe Work Method Statement SWMS No. -66

We agree that we have been consulted in the hazards and control measures and agree to complete the work in accordance with our Work
Method Statement (WMS).
We have been provided with training in all tasks outlined in our WMS and in the Codes of Practice applicable to our work.

Employee / Worker Signature Date Employee / Worker Signature Date


1. / / 8. / /
2. / / 9. / /
3. / / 10. / /
4. / / 11. / /
5. / / 12. / /
6. / / 13. / /

Reviewed by: Signature: Date:


(Principal Contractor’s Representative)

Any changes, additions or deletions made to this WMS are to be covered with the above personnel and the Principal Contractor’s representative at a Toolbox
meeting (Record date and time of Toolbox meeting below):

Date: Time:
Comments:

A copy of the Toolbox Meeting must be attached to this WMS.