Study and Retrofit of Shuaiba Industrial Area (East Sector)
Sea Water Fire Fighting Network
UNIT PRICE TOTAL AMOUNT
ITEM DESCRIPTION UNIT QTY K.D. / FILS K.D. / FILS 33 DIVISION 33 - UTILITIES 33.17 Works shall be allowed in piece meal with Item LS pre-approval and permission. Shut down water flow for approved part of network, Chamber and/or plot connection, divert the flow via temporary connections (By-pass) to keep the network in continuous operation all time with same flow and pressure. SECTION 03 30 00 - CAST-IN-PLACE CONCRETE RC VALVE CHAMBERS:- Construct the reinforced concrete valve chambers as per MEW specifications, as rate for concrete shall include for reinforcement and all necessary formwork, allow for excavation to required depth , backfilling and compaction., blinding concrete B15, reinforced concrete B35, high tensile deformed reinforcement bars, ductile iron covers and frames, Aluminium surface box (200mm high, 160mm dia. clear opening, including rod connection between lid & box, plate for guiding valve spindle and aluminium dust cap), 150x150 mm bronze indicator plate, 150x150mm bronze owner indicator plate, aluminium access ladder (except for air release valve boxes), ventilation pipes top unit and bottom extension with hot cured polyester powder coating, Internal Epoxy Coating, horizontal & vertical tanking (water proofing membrane with wrapping protection), external epoxy coating with UV resist for cover slab,all as specified and as shown on drawings or instructed by the Engineer, allow for extra excavation, backfill, labour, plant, material and related works.
33.18 Chamber for DN 600 Gate valve No 31
33.19 Chamber for DN 500 Gate valve No 40 33.20 Chamber for DN 450 Gate valve No 3 33.21 Chamber for DN 400 Gate valve No 18 33.22 Chamber for DN 300 Gate valve No 22 33.23 Chamber for DN 250 Gate valve No 26 33.24 Chamber for DN 200 Gate valve No 4 33.25 Chamber for DN 150 Gate valve No 14 33.26 Chamber for DN 150 Gate valve for Fire hydrants No 255
DAR Al Jazera Consultants Utilities / Page 4 of 13 Dorsch Gruppe DC Abu Dhabi
Study and Retrofit of Shuaiba Industrial Area (East Sector) Sea Water Fire Fighting Network
UNIT PRICE TOTAL AMOUNT
ITEM DESCRIPTION UNIT QTY K.D. / FILS K.D. / FILS 33 DIVISION 33 - UTILITIES 33.27 Chamber for DN 600 Air Release valve No 7 33.28 Chamber for DN 500 Air Release valve No 2 33.29 Chamber for DN 400 Air Release valve No 3 33.30 Chamber for DN 300 Air Release valve No 2 33.31 Chamber for DN 250 Air Release valve No 1 33.32 Chamber for DN 600 Wash out valve No 7 33.33 Chamber for DN 500 Wash out valve No 3 33.34 Chamber for DN 400 Wash out valve No 2 33.35 Chamber for DN 300 Wash out valve No 3 33.36 Construct reinforced concrete B35 for thrust M3 1950 blocks at DI bends, tapers, reducers, tees etc., conforming to Standard Detail Drawings, for any other work to complete the fitting fixation in the best workman like and to the satisfaction of the Engineer.
SECTION 21 05 23 - GENERAL DUTY VALVES
FOR FIRE PROTECTION PIPING GATE/ BUTTERFLY VALVES: Isolation Valve (Butterfly Valve) on the new pipe network including connection with D.I pipes, D.I wall pieces, necessary fitting, accessories, Isolation valves in main lines shall be provided with SCADA devices, dismantle pieces and adaptors and all incidental works to complete as specified and shown on the drawing : 33.37 DN 600 Gate valve No 31 33.38 DN 500 Gate valve No 40 33.39 DN 450 Gate valve No 3 33.40 DN 400 Gate valve No 18 33.41 DN 300 Gate valve No 22 33.42 DN 250 Gate valve No 26 33.43 DN 200 Gate valve No 4 33.44 DN 150 Gate valve No 14 33.45 DN 150 Gate valve for Fire hydrants No 255
DAR Al Jazera Consultants Utilities / Page 5 of 13 Dorsch Gruppe DC Abu Dhabi