Name of Work :- CONSTRUCTION OF PEDASTAL OF VISHAVKARMA TIRAHA
S.No. Item no. Item No. L B H Quantity Rate Unit Amount
Jhunjhunu / Jalore
(Red/Choclate/Black/Pink Colour)
1 2 2.50 5.00
5.00 Sqm. 3028 P.Sqm. 15140.00
Supply and fixing in cement mortar welded
hand railing made out of MS round or
square bars, flats etc. for staircase or
16 9.7 verandah as per design complete in all
respect (wooden or PVC hand railing to be
paid extra) with priming coat of red oxide.
1.32
Providing and fabricating reinforcement
for R.C.C. work including straightening,
cutting, bending, placing in position and
binding (including cost of binding wire)
3 4.13.3 all complete up to floor five level.
('Original producers' who manufacture
billet directly from iron ores and roll
the bilets to produce steel conforming
to IS:1786)
Thermo-mechanically Treated bars
(Conforming of relevent IS code)
162.90
Centering and Shuttering with plywood or
steel sheets including strutting, propping
4 4.9 bracing both ways and removal of
formwork for foundation , footings, strap
beam, raft , bases of columns etc.
6.38
Structural steel work riveted, bolted or
welded in built up sections, trusses and
framed work, including cutting, hoisting
5 9.2
(height upto 10 m) , fixing in position and
applying a priming coat of approved steel
primer all complete:
1500
Brick work with F.P.S. bricks of class
designation 75 in superstructure above
6 5.2.1
plinth level upto floor V level in all shapes
and sizes in :
Cement mortar 1 : 4 (1 cement : 4 coarse