CS Number:1702GY001-(1-7) Type: GIS

Air TEMP 0C= Location: back of Everest Enclosed (- ) Open ( )


Humidity %= Feeder No. 19 Date: 01/01/24 Dead Inspection Required
Yes ( ) No ( - )

Ring Main Unit Weekly Inspection Checklist


N.B. Keep Your Safety First!!!
Remark (If not what measures
No. Inspection Yes No
taken or should be taken?)
1. Check nameplate information correctness. 
2. Inspect enclosures for proper alignment, foundation fixing and grounding. 
3. Inspect all covers, panels section and doors for paint work and proper fit. 
4. Check for smooth and proper movement of racking mechanisms for alignment, - -
shutters, rollers, rails, and guides.
5. Check for proper alignment of the breaker primary and secondary contacts. 
6. Check for correct breaker position indication. 
7. Check that the control and power wiring diagram drawing document is available 
around the control box.
8. Other Remarks:

Inspected by: Hayelom Checked and Approved by: _Molalign________


Signature: Signature:
CS Number:1702GY002-(1-4) Location: B-19 Type: GIS
Air TEMP 0C= Date: 01/01/24 Enclosed (- ) Open ( )
Humidity %= Feeder No. 19 Dead Inspection Required
Yes ( ) No ( - )

Ring Main Unit Weekly Inspection Checklist


N.B. Keep Your Safety First!!!
Remark (If not what measures
No. Inspection Yes No
taken or should be taken?)
1. Check nameplate information correctness. 
2. Inspect enclosures for proper alignment, foundation fixing and grounding. 
3. Inspect all covers, panels section and doors for paint work and proper fit. 
4. Check for smooth and proper movement of racking mechanisms for alignment, - -
shutters, rollers, rails, and guides.
5. Check for proper alignment of the breaker primary and secondary contacts. 
6. Check for correct breaker position indication. 
7. Check that the control and power wiring diagram drawing document is available 
around the control box.
8. Other Remarks:

Inspected: Hayelom Checked and approved by: _Molalign________


Signature: Signature:
CS Number:1702GY004-(1-4) Location: Shed 50 Type: GIS
Air TEMP 0C= Date: 02/01/24 Enclosed (- ) Open ( )
Humidity %= Feeder No. 20 Dead Inspection Required
Yes ( ) No ( - )

Ring Main Unit Weekly Inspection Checklist


N.B. Keep Your Safety First!!!
Remark (If not what measures
No. Inspection Yes No
taken or should be taken?)
1. Check nameplate information correctness. 
2. Inspect enclosures for proper alignment, foundation fixing and grounding. 
3. Inspect all covers, panels section and doors for paint work and proper fit. 
4. Check for smooth and proper movement of racking mechanisms for alignment, - -
shutters, rollers, rails, and guides.
5. Check for proper alignment of the breaker primary and secondary contacts. 
6. Check for correct breaker position indication. 
7. Check that the control and power wiring diagram drawing document is available 
around the control box.
8. Other Remarks:

Inspected: Hayelom checked and approved by: _Molalign________


Signature: Signature:
CS Number:1702GY005-(1-4) Location: Shed 49 Type: GIS
Air TEMP 0C= Date: 02/01/24 Enclosed (- ) Open ( )
Humidity %= Feeder No. 19 Dead Inspection Required
Yes ( ) No ( - )

Ring Main Unit Weekly Inspection Checklist


N.B. Keep Your Safety First!!!
Remark (If not what measures
No. Inspection Yes No
taken or should be taken?)
1. Check nameplate information correctness. 
2. Inspect enclosures for proper alignment, foundation fixing and grounding. 
3. Inspect all covers, panels section and doors for paint work and proper fit. 
4. Check for smooth and proper movement of racking mechanisms for alignment, - -
shutters, rollers, rails, and guides.
5. Check for proper alignment of the breaker primary and secondary contacts. 
6. Check for correct breaker position indication. 
7. Check that the control and power wiring diagram drawing document is available 
around the control box.
8. Other Remarks:

Inspected by: Hayelom Checked and Approved by: _Molalign________


Signature: Signature:
CS Number:1702GY017-(1-4) Location: Shed 47 Type: GIS
Air TEMP 0C= Enclosed (- ) Open ( )
Humidity %= Feeder No. 20 Date: 03/01/24 Dead Inspection Required
Yes ( ) No ( - )

Ring Main Unit Weekly Inspection Checklist


N.B. Keep Your Safety First!!!
Remark (If not what measures
No. Inspection Yes No
taken or should be taken?)
1. Check nameplate information correctness. 
2. Inspect enclosures for proper alignment, foundation fixing and grounding. 
3. Inspect all covers, panels section and doors for paint work and proper fit. 
4. Check for smooth and proper movement of racking mechanisms for alignment, - -
shutters, rollers, rails, and guides.
5. Check for proper alignment of the breaker primary and secondary contacts. 
6. Check for correct breaker position indication. 
7. Check that the control and power wiring diagram drawing document is available 
around the control box.
8. Other Remarks:

Inspected by: Hayelom Checked and Approved by: _Molalign________


Signature: Signature:
CS Number:1602GY00066(1-3) Type: GIS
Air TEMP 0C= Location: Shed 36 Enclosed (- ) Open ( )
Humidity %= Feeder No. Date: 03/01/24 Dead Inspection Required
Yes ( ) No ( - )

Ring Main Unit Weekly Inspection Checklist


N.B. Keep Your Safety First!!!
Remark (If not what measures
No. Inspection Yes No
taken or should be taken?)
1. Check nameplate information correctness. 
2. Inspect enclosures for proper alignment, foundation fixing and grounding. 
3. Inspect all covers, panels section and doors for paint work and proper fit. 
4. Check for smooth and proper movement of racking mechanisms for alignment, - -
shutters, rollers, rails, and guides.
5. Check for proper alignment of the breaker primary and secondary contacts. 
6. Check for correct breaker position indication. 
7. Check that the control and power wiring diagram drawing document is available 
around the control box.
8. Other Remarks:

Inspected by: Hayelom Checked and Approved by: _Molalign________


Signature: Signature:
CS Number:1702GY00064-(1-4) Location: Shed 34 Type: GIS
Air TEMP 0C= Enclosed (- ) Open ( )
Humidity %= Feeder No. Date: 04/01/2024 Dead Inspection Required
Yes ( ) No ( - )

Ring Main Unit Weekly Inspection Checklist


N.B. Keep Your Safety First!!!
Remark (If not what measures
No. Inspection Yes No
taken or should be taken?)
1. Check nameplate information correctness. 
2. Inspect enclosures for proper alignment, foundation fixing and grounding. 
3. Inspect all covers, panels section and doors for paint work and proper fit. 
4. Check for smooth and proper movement of racking mechanisms for alignment, - -
shutters, rollers, rails, and guides.
5. Check for proper alignment of the breaker primary and secondary contacts. 
6. Check for correct breaker position indication. 
7. Check that the control and power wiring diagram drawing document is available 
around the control box.
8. Other Remarks:

Inspected by: Hayelom Checked and Approved by: _Molalign________


Signature: Signature:________________
CS Number:1702GY0006-(1-3) Location: Shed 48 Type: GIS
Air TEMP 0C= Date: 05/01/24 Enclosed ( - ) Open ( )
Humidity %= Feeder No. Dead Inspection Required
Yes ( ) No ( - )

Ring Main Unit Weekly Inspection Checklist


N.B. Keep Your Safety First!!!
Remark (If not what measures
No. Inspection Yes No
taken or should be taken?)
1. Check nameplate information correctness. 
2. Inspect enclosures for proper alignment, foundation fixing and grounding. 
3. Inspect all covers, panels section and doors for paint work and proper fit. 
4. Check for smooth and proper movement of racking mechanisms for alignment, - -
shutters, rollers, rails, and guides.
5. Check for proper alignment of the breaker primary and secondary contacts. 
6. Check for correct breaker position indication. 
7. Check that the control and power wiring diagram drawing document is available 
around the control box.
8. Other Remarks:

Inspected by: Hayelom Checked and Approved by: _Molalign________

Signature: Signature:___________________
CS Number:1602GY00067-(1-4) Location: Shed 37 Type: GIS
Air TEMP 0C= Date: 05/01/24 Enclosed ( - ) Open ( )
Humidity %= Feeder No. Dead Inspection Required
Yes ( ) No ( - )

Ring Main Unit Weekly Inspection Checklist


N.B. Keep Your Safety First!!!
Remark (If not what measures
No. Inspection Yes No
taken or should be taken?)
1. Check nameplate information correctness. 
2. Inspect enclosures for proper alignment, foundation fixing and grounding. 
3. Inspect all covers, panels section and doors for paint work and proper fit. 
4. Check for smooth and proper movement of racking mechanisms for alignment, - -
shutters, rollers, rails, and guides.
5. Check for proper alignment of the breaker primary and secondary contacts. 
6. Check for correct breaker position indication. 
7. Check that the control and power wiring diagram drawing document is available 
around the control box.
8. Other Remarks:

Inspected by: Hayelom Checked and Approved by: _Molalign________

Signature: Signature:___________________