Location: B-19
Air TEMP 0C= Date: 01/01/24 Enclosed ( - ) Open ( )
Humidity %= Feeder No.19 Dead Inspection Required
Yes ( ) No ( - )
3. Check the condition locks, gates, doors, and fences of the building.
4. Check for cleanliness of the environment and free from weeds and vermin.
5. Check the condition of bushings and oil leakages of transformer. - - Dry type
6. Check the condition of the tank and oil leakages of transformer. - - Dry type
7. Checking the oil level of the transformer. - - Dry type
8. Check there is proper ventilation and lighting.
9. Check there is proper drainage and fire protection (alarms and extinguisher). There is no fire extinguisher
Other Remarks:
3. Check the condition locks, gates, doors, and fences of the building.
4. Check for cleanliness of the environment and free from weeds and vermin.
5. Check the condition of bushings and oil leakages of transformer. - - Dry type
6. Check the condition of the tank and oil leakages of transformer. - - Dry type
7. Checking the oil level of the transformer. - - Dry type
8. Check there is proper ventilation and lighting.
9. Check there is proper drainage and fire protection (alarms and extinguisher). There is no fire extinguisher
Other Remarks:
Inspected by: Hayelom Checked and Approved by: _Molalign________
Signature: Signature:
CS Number:16800928C Type: Dry type
Location: Shed 34
Air TEMP 0C= Date: 04/01/2024 Enclosed ( - ) Open ( )
Humidity %= Feeder No. Dead Inspection Required
Yes ( ) No ( - )
3. Check the condition locks, gates, doors, and fences of the building.
4. Check for cleanliness of the environment and free from weeds and vermin.
5. Check the condition of bushings and oil leakages of transformer. - - Dry type
6. Check the condition of the tank and oil leakages of transformer. - - Dry type
7. Checking the oil level of the transformer. - - Dry type
8. Check there is proper ventilation and lighting.
9. Check there is proper drainage and fire protection (alarms and extinguisher).
Other Remarks:
Inspected by: Hayelom Checked and Approved by: _Molalign________
Signature: Signature:
CS Number: WH17008-2 Location: Shed 49 Type: Dry type
3. Check the condition locks, gates, doors, and fences of the building.
4. Check for cleanliness of the environment and free from weeds and vermin.
5. Check the condition of bushings and oil leakages of transformer. - - Dry type
6. Check the condition of the tank and oil leakages of transformer. - - Dry type
7. Checking the oil level of the transformer. - - Dry type
8. Check there is proper ventilation and lighting.
9. Check there is proper drainage and fire protection (alarms and extinguisher).
Other Remarks:
Inspected by: Hayelom Checked and Approved by: _Molalign________
Signature: Signature:
CS Number: 16800936B Type: Dry type
Location: Shed 36
Air TEMP 0C= Date: 03/01/2024 Enclosed ( - ) Open ( )
Humidity %= Feeder No. Dead Inspection Required
Yes ( ) No ( - )
3. Check the condition locks, gates, doors, and fences of the building.
4. Check for cleanliness of the environment and free from weeds and vermin.
5. Check the condition of bushings and oil leakages of transformer. - - Dry type
6. Check the condition of the tank and oil leakages of transformer. - - Dry type
7. Checking the oil level of the transformer. - - Dry type
8. Check there is proper ventilation and lighting.
9. Check there is proper drainage and fire protection (alarms and extinguisher).
Other Remarks:
Inspected by: Hayelom _____ Checked and Approved by: _Molalign________
Signature: Signature:
CS Number: wh17008-1 Location: Shed 48 Type: Dry type
3. Check the condition locks, gates, doors, and fences of the building.
4. Check for cleanliness of the environment and free from weeds and vermin.
5. Check the condition of bushings and oil leakages of transformer. - - Dry type
6. Check the condition of the tank and oil leakages of transformer. - - Dry type
7. Checking the oil level of the transformer. - - Dry type
8. Check there is proper ventilation and lighting.
9. Check there is proper drainage and fire protection (alarms and extinguisher).
Other Remarks:
Inspected by: Hayelom Checked and Approved by: _Molalign________
Signature: Signature:
CS Number: wh17007-10 Location: Shed 47 Type: Dry type
3. Check the condition locks, gates, doors, and fences of the building.
4. Check for cleanliness of the environment and free from weeds and vermin.
5. Check the condition of bushings and oil leakages of transformer. - - Dry type
6. Check the condition of the tank and oil leakages of transformer. - - Dry type
7. Checking the oil level of the transformer. - - Dry type
8. Check there is proper ventilation and lighting.
9. Check there is proper drainage and fire protection (alarms and extinguisher).
Other Remarks:
Inspected by: Hayelom Checked and Approved by: _Molalign________
Signature: Signature:
CS Number: 16800930C Location: Shed 37 Type: Dry type
3. Check the condition locks, gates, doors, and fences of the building.
4. Check for cleanliness of the environment and free from weeds and vermin.
5. Check the condition of bushings and oil leakages of transformer. - - Dry type
6. Check the condition of the tank and oil leakages of transformer. - - Dry type
7. Checking the oil level of the transformer. - - Dry type
8. Check there is proper ventilation and lighting.
9. Check there is proper drainage and fire protection (alarms and extinguisher).
Other Remarks:
Inspected by: Hayelom Checked and Approved by: _Molalign________