CS Number:16800931B Type: Dry type

Location: One bed room


Air TEMP 0C= Date: 08/01/24 Enclosed ( - ) Open ( )
Humidity %= Feeder No.19 Dead Inspection Required
Yes ( ) No ( - )

Transformer Weekly Inspection Checklist


N.B. Keep Your Safety First!!!
Remark (If not what measures taken or
No. Inspection Yes No
should be taken?)
1. Check there is safe working clearance and barrier free condition. 

2. Check there is correct and legible signage. 

3. Check the condition locks, gates, doors, and fences of the building. 

4. Check for cleanliness of the environment and free from weeds and vermin. 

5. Check the condition of bushings and oil leakages of transformer. - - Dry type
6. Check the condition of the tank and oil leakages of transformer. - - Dry type
7. Checking the oil level of the transformer. - - Dry type
8. Check there is proper ventilation and lighting.  Ventilation and lightings are not working.

9. Check there is proper drainage and fire protection (alarms and extinguisher).  There is no fire extinguisher

Other Remarks:
Inspected by: Hayelom Checked and Approved by: _Molalign________
Signature: Signature:
CS Number:16800934B Type: Dry type
Location: Studio
Air TEMP 0C= Date: 08/01/2024 Enclosed ( - ) Open ( )
Humidity %= Feeder No. Dead Inspection Required
Yes ( ) No ( - )

Transformer Weekly Inspection Checklist


N.B. Keep Your Safety First!!!
Remark (If not what measures taken or
No. Inspection Yes No
should be taken?)
1. Check there is safe working clearance and barrier free condition. 

2. Check there is correct and legible signage. 

3. Check the condition locks, gates, doors, and fences of the building. 

4. Check for cleanliness of the environment and free from weeds and vermin. 

5. Check the condition of bushings and oil leakages of transformer. - - Dry type
6. Check the condition of the tank and oil leakages of transformer. - - Dry type
7. Checking the oil level of the transformer. - - Dry type
8. Check there is proper ventilation and lighting. 

9. Check there is proper drainage and fire protection (alarms and extinguisher).  There is no fire extinguisher

Other Remarks:
Inspected by: Hayelom Checked and Approved by: _Molalign________
Signature: Signature:
CS Number:WH17007-1 Type: Dry type
Location: Shed 38
Air TEMP 0C= Date: 09/01/2024 Enclosed ( - ) Open ( )
Humidity %= Feeder No. Dead Inspection Required
Yes ( ) No ( - )

Transformer Weekly Inspection Checklist


N.B. Keep Your Safety First!!!
Remark (If not what measures taken or
No. Inspection Yes No
should be taken?)
1. Check there is safe working clearance and barrier free condition. 

2. Check there is correct and legible signage. 

3. Check the condition locks, gates, doors, and fences of the building. 

4. Check for cleanliness of the environment and free from weeds and vermin. 

5. Check the condition of bushings and oil leakages of transformer. - - Dry type
6. Check the condition of the tank and oil leakages of transformer. - - Dry type
7. Checking the oil level of the transformer. - - Dry type
8. Check there is proper ventilation and lighting. 

9. Check there is proper drainage and fire protection (alarms and extinguisher). 

Other Remarks:
Temperature controller of dry transformer was not working. But, We fixed it and solved problem.
Inspected by: Hayelom Checked and Approved by: _Molalign________
Signature: Signature:
CS Number: WH17007-2 Location: Shed 39 Type: Dry type

Air TEMP 0C= Date: 10/01/2024 Enclosed ( - ) Open ( )


Humidity %= Feeder No. Dead Inspection Required
Yes ( ) No ( - )

Transformer Weekly Inspection Checklist


N.B. Keep Your Safety First!!!
Remark (If not what measures taken or
No. Inspection Yes No
should be taken?)
1. Check there is safe working clearance and barrier free condition. 

2. Check there is correct and legible signage. 

3. Check the condition locks, gates, doors, and fences of the building. 

4. Check for cleanliness of the environment and free from weeds and vermin. 

5. Check the condition of bushings and oil leakages of transformer. - - Dry type
6. Check the condition of the tank and oil leakages of transformer. - - Dry type
7. Checking the oil level of the transformer. - - Dry type
8. Check there is proper ventilation and lighting. 

9. Check there is proper drainage and fire protection (alarms and extinguisher). 

Other Remarks:
Inspected by: Hayelom Checked and Approved by: _Molalign________
Signature: Signature:
CS Number: WH17007-3 Type: Dry type
Location: Shed 40
Air TEMP 0C= Date: 11/01/2024 Enclosed ( - ) Open ( )
Humidity %= Feeder No. Dead Inspection Required
Yes ( ) No ( - )

Transformer Weekly Inspection Checklist


N.B. Keep Your Safety First!!!
Remark (If not what measures taken or
No. Inspection Yes No
should be taken?)
1. Check there is safe working clearance and barrier free condition. 

2. Check there is correct and legible signage. 

3. Check the condition locks, gates, doors, and fences of the building. 

4. Check for cleanliness of the environment and free from weeds and vermin. 

5. Check the condition of bushings and oil leakages of transformer. - - Dry type
6. Check the condition of the tank and oil leakages of transformer. - - Dry type
7. Checking the oil level of the transformer. - - Dry type
8. Check there is proper ventilation and lighting. 

9. Check there is proper drainage and fire protection (alarms and extinguisher). 

Other Remarks:
Inspected by: Hayelom _____ Checked and Approved by: _Molalign________
Signature: Signature:
CS Number: WH17007-6 Location: Shed 43 Type: Dry type

Air TEMP 0C= Date: 11/01/24 Enclosed ( - ) Open ( )


Humidity %= Feeder No. Dead Inspection Required
Yes ( ) No ( - )

Transformer Weekly Inspection Checklist


N.B. Keep Your Safety First!!!
Remark (If not what measures taken or
No. Inspection Yes No
should be taken?)
1. Check there is safe working clearance and barrier free condition. 

2. Check there is correct and legible signage. 

3. Check the condition locks, gates, doors, and fences of the building. 

4. Check for cleanliness of the environment and free from weeds and vermin. 

5. Check the condition of bushings and oil leakages of transformer. - - Dry type
6. Check the condition of the tank and oil leakages of transformer. - - Dry type
7. Checking the oil level of the transformer. - - Dry type
8. Check there is proper ventilation and lighting. 

9. Check there is proper drainage and fire protection (alarms and extinguisher). 

Other Remarks:
Inspected by: Hayelom Checked and Approved by: _Molalign________
Signature: Signature:
CS Number: WH17007-9 Location: Shed 46 Type: Dry type

Air TEMP 0C= Date: 12/01/24 Enclosed ( - ) Open ( )


Humidity %= Feeder No. Dead Inspection Required
Yes ( ) No ( - )

Transformer Weekly Inspection Checklist


N.B. Keep Your Safety First!!!
Remark (If not what measures taken or
No. Inspection Yes No
should be taken?)
1. Check there is safe working clearance and barrier free condition. 

2. Check there is correct and legible signage. 

3. Check the condition locks, gates, doors, and fences of the building. 

4. Check for cleanliness of the environment and free from weeds and vermin. 

5. Check the condition of bushings and oil leakages of transformer. - - Dry type
6. Check the condition of the tank and oil leakages of transformer. - - Dry type
7. Checking the oil level of the transformer. - - Dry type
8. Check there is proper ventilation and lighting. 

9. Check there is proper drainage and fire protection (alarms and extinguisher). 

Other Remarks:
Inspected by: Hayelom Checked and Approved by: _Molalign________
Signature: Signature: