Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

42°0'0"E 43°0'0"E 44°0'0"E 45°0'0"E 46°0'0"E

250000 300000 350000 400000 450000 500000 550000 600000

Tawke Field (DNO) Atrush Discovery (GEP)


Discovered 2006 Sarsang PSC Mateen-1 Discovery well: Atrush-1 (2011)
HKN drilling 3 exploration wells 2012/2013 Swara Tika Discovery (HKN)
Reservoirs: Jeribe and Kometan/Qamchuqa Spud June 2011, RR April 2012 Reservoirs: Cretaceous,Jurassic,Triassic
Discovery well: Swara Tika-1 (2011)
Resources: 734 mmbbls (2P) Results reported as disappointing. Resources: 513 mmbbls (contingent) + 146 mmbbls (prospective)
Reservoirs: Jurassic/Triassic (457m gross oil column)

q
Production: On target for 100,000 bopd by Dec 2012. Mangesh-1 spud Sept. 2012 Production: 30,000 bopd EPF by Q1 2013. Estimate 5000 bopd.
Gara-1 and Koshka-1 planned spud Q1 2013 Production: Planning for 10,000 bopd EPF by Q4 2012
Studies underway for 150,000 bopd CPF by 2014. MARAGHEN
Swara Tika-2 TD ~3700m. (Triassic) Atrush-1 completed workover and connected to EWT
Tawke-17(Deep) exploration well drilling ahead. Target: Jurassic/Triassic Atrush-2 TD 1750m (Butmah)
Spud Nov 2011. Currently testing
Tawke-18 spud 28 May 2012. completed as a Cretaceous producer. TD 3085m. Spud May 2012. RR Sept 2012. 3 DSTs conducted over BSAM
Tawke-19 drilling ahead. reservoir (Jurassic) aggregate 42,000 bopd (27 API). Additional BONAB
Ber Behr-1 TD 3993m (Chia Gara).
Spud Oct 2011. Susp May 2012. tests in Butmah (1450 bopd) and Adiayah (650 bopd) heavy oil.
300m Jurassic oil column but failed Atrush-3 planned spud by end 2012
SINDI AMEDI
Perenco 55% to flow (heavy oil). W/O with jet pump
Oryx Petroleum 45% to conduct EWT Q4 2012 3D seismic acquistion completed August
KRG 25% Declaration of commerciality 7 Nov. 2012
TAQA acquired 53.2% working interest from GEP (Aspect) Nov 2012
Akri Bijeel (Kalegran)
Peshkabir-1 TD 4092m (Triassic) TAWKE
Spud Sept 2011. Susp July 2012 DNO 55%
TW13
Rovi/Sarta PSCs Bijeel Field
YOLACAN Genel Enerji 25% Deralok HPP
Jurassic Sargelu test oil/water cut (27-29 API) Discovery well: Bijeel-1 (2010)
LELAC Water in Triassic/ Cretaceous.
KRG 20 %
)
=
TW16

#_
^ ==
=)
) )
TW15
)^TW11
261 MW
C
TW10 =
)==
) *
=
)=
)
TW18 TW9 TW4
=)
) =
TW5 TW7_=
) TAWKE
TW3
Q
Rovi South-1 (2010) TD 4027m.
Initial well test flowed oil and undewent EWT
Reservoirs: Jurassic
Resources: 2.4 billion barrels (STOIIP)
=)
)==
)
= TW2
200sqkm 3D seismic acquisition by end 2012 ¾C
Tawke
5000 BOPD
MT1 BLOCK I Sarta Central-A1 (2010) TD 2702m
Tested 1,000 bopd from the Jurassic. 2011 workover + EWT.
Production: 10,000 bopd EPF planned for Q2 2013
KARATCHOK

Μ
WEST PS1 Bijeel-1. workover completed. Commenced EWT
ULAYYAN KARATCHOK Q
Bijeel-3 spud Jan 2012. TD 4980m. testing on going.
Linnava-1 (WDI 319 3000hp)
FISH KHABUR Additional 5 appraisal wells to be drilled in 2012/13
37°0'0"N

TEL
4100000

4100000
GHARAB
Spud Apr 2012
RUMAILAN Completed drilling. 278m net pay Bekhme-1 TD 5000m (Triassic)

37°0'0"N
GA1
in Jurassic/Triassic. Undergoing
testing of 6 zones HAMZAH CENTRAL DOHUK
Murphy 50%
_
^ MN1
#
* Spud Mar 2011, susp Dec 2011. No commercial flow was obtained
Bakrman-1 (Mol Rig 2) spud May 7 2012. TD 3930m. Promising oil shows
SARSANG
Petroquest 30% HKN 56.25% Gulak-1 (Mol Rig 1) spud 15 July 2012. PTD 3658m.
KRG 20 % Marathon 18.75%
KRG 25 %
Drilling ahead in @ 2404m
SUFAYA Q BLOCK II
= MUSHORAH
Gulf Keystone in negotiations with several bidders for their 20% stake.
MIANDOAB
Summail-1
Spud Apr 2011, Susp. Dec 2011
= Dohuk DF C _
^ BER BEHR
Genel Energy 40% DINARTA
KS1
Tested 11.6 mmcfd in Cretaceous,= ) 500MW ST1 Hess Middle East 64%

no rate in Jurassic, Triassic - wet


heavy oil, SULEVANI
Petroquest 80%
Gulf Keystone 40%
KRG 20 % =
)
SWARA
#
* Petroceltic 16%
KRG 20 %
Dinarta / Shakrok PSCs
Harir/Safeen PSCs
3D seismic completed
KRG 20 % Q BB1
SHEIKH ADI
TIKA _
^ ST2
AT2
Shakrok-1 planned spud Q3 2013
Dinarta-1 planned spud Q4 2013 Harir-1 (KCA T-221 1500hp) spud 30th July 2012. Target: Jurassic/Triassic
Submitting Declaration of Commerciality AT3 Safeen-1 and Mirawa-1 plan spud Q1 2013.
DOHUK
Gulf Keystone 80%
KRG 20 % = )
)
ATRUSH=
Q #
* 2D seismic acquistion completed Sept 2012.
2D Seismic completed
AT1
Sheikh Adi-1 TD 3293m (Triassic)
DOHUK
SM_E1DNO 40%
Q
SUMMAIL C Dohuk
29MW SHEIKH
ATRUSH
TAQA 39.9%
Spud Aug 2010. Susp Sept 2011
Genel Energy 40%
KRG 20 % Q SM1 ADI Q
=
) Shamaran 20.1% BM1
Barsarin/Sargelu tested but unreliable flow rate due to Q
=
) SH4 SH5
Marathon 15%
KRG 25% _
^ Bina Bawi Discovery (OMV)
SA1
SHAIKAN Discovery well: Bina Bawi-3
NAOUR
low permeability. Suspended pending further testing.
KH1
AL QUSH
AQ È
)
Q
SHAIKAN SH1 Gulf Keystone 75% Q
=
) SH6
*^
)
=_
ExxonMobil 80% SH3 Reservoirs: Pilaspi , Shiranish/Kometan and U Qamchuqa
B KRG 20 % #
* =
)
# SH8 MOL (Kalegran) 20%
Q
)
= Q
=
) AKRE-BIJEEL Resources: 500-1000 mmboe contingent
Sheikh Adi-2 TD 2754m (Jurassic) SH7
Texas Keystone 5%

= Spud May 2012. Tested aggregate flow rate of 4235 bopd AlBQ
È
)
Q
)
BÈQ
È=È
)
Q
ÈQ
)=
B Bpreparing
Q
È
) Q
È= BB =
) JEBEL CShaikan CCGTKRG 20% MOL (Kalegran) 64% BJ3
Production: 5000 bopd EWT projected for early 2013 MAHABAD
from 4 Jurassic reserviors (15-18 API) B Q
)
Q
È
)Q
)
ÈQQ
È
)
Qush-1
È
)
È=
) ÈB
Q
)
= BB to spud Dec 2012
SIMRIT
= SM2
Q
) 1000 MW
Gulf Keystone 16%
KRG 20 % _
^ #
*
BJ4

Q
=
)
SI1
BJ6
#
* BB-3 2 Jurassic tests aggregate flow 4000bopd
BB-4 spud 17 June 2012. TD ~4200m.(Triassic)Currently at 2300m
Shaikan Field (Gulf Keystone)
Discovery well: Shaikan-1 (2009)
=
)
B
=
)
Q JEBEL
Q _
^ BJ1 BB-5 spud 14 Oct 2012. PTD 2400m.
Reservoirs: Jurassic/Triassic RAFAN
KAND RS1
=
)
BIJEEL BJ2
BE1
Q
)
=
ROVI Q
Resources: 13,700 mmbbls (mean OIP)
))
= == JABAL
SOUTH #
* Moving forward with Field Development Plan
=
) BUTMAH )
KAND
Production: resumed pumping 5000-7000 bopd (domestic market) = AIN SIFNI
Hunt 60% #
* BJ7C
Completed 5 well appraisal program. Constructing 2 EPFs. #
Afren 20%
*BT1
KRG 20 % Gopal HPP
620 MW
_
^ CHOMAN
4050000

4050000
Submitted Declaration of Commerciality
Shaikan-8 spud Q3 2012 for sour gas injection. =
)
B
BJ5
#
* Taq Taq Field (TTOPCO)
ROVI-SARTA
Chevron 80% Discovered: 1961
Mala Omar-1 TD ~5300m
Simrit Discovery (Hunt)
Discovery well: Simrit-1 (2011) NM1
OMV 20%
KRG 25%
_
^HR1 Spud Nov 2011. RR Jul 2012
Reservoirs: Pilaspi (26 API) , Shiranish/Kometan/U Qamchuqa (46 API)
Resources: 647 mmboe (2P)
Reservoir: Cretaceous/Jurassic/Triassic #
* #
* JS1 HARIR
OMV relinquished Mala Omar and
Shorish PSCs to the KRG Nov 2012
Production: 110,000 bopd for export. Projected 200,000 bopd by Q3 2013.
SARTA
Q SCA1
CENTRAL)
= Marathon 45%
BARDA RASH Total 35%
Simrit-2 spud Oct 2011.TD 3800m. 460m net oil pay.
3 Kurra Chine tests aggregate flow rate13,584) =
Bbopd BA
ML1 #
* Afren 60%
BARDA Komet 20%
#
*MR1
KRG 20 %
6 development well program in 2012.
Taq Taq deep exploration well plan spud Q1 2013. Target triassic.
=
)
B
(39° API). W/O rig to conduct 9 tests in Cretaceous/Jurassic on site. #
* =)
) =
RASH KRG 20 %
B ALAN
Bashiqa-1 preparing to spud Dec 2012
BASHIQA
) BR3
=
=
)
B
Simrit-3
spud Sept 12th 2012.
ExxonMobil 80%
KRG 20 % BETWATA HINDREN

Iran
SASAN Target Cretaceous/Jurassic/Triassic ExxonMobil 80%
KRG 20 %
ER1 Qush Tappa-1TD ~4800m.
TALL Q
)
È ERBIL Spud Sept 2010 RR Aug 2011
Barda Rash Field (Afren) BENENAN
'AFAR
Discovery well: Barda Rash-1 (2009)
Q^
È
) _Gas Plus Erbil 40%
DNO 40% BS1A PIRMAM
KNOC relinquished block Aug 2012
B ER2
=
)
Q ExxonMobil 80% SK1
Reservoir: Cretaceous and Jurassic (Mus/Adaiyah) B Khabat
40000 BOPD
KRG 20 %
#
*BS2
BASTORA
KRG 20 %
#
*
Resources: 1470 mmbbls recoverable
B
Production: ~2500 bopd as of Nov 2012 ATSHAN
MOSEL
¾ SHAKROK Kewa Chirmila-2 spud Aug 4 2012. Target: Pila Spi (Eocene)
BR-1 and Br-2 workover complete. W/O of BR-3 ongoing. Hess Middle East 64%
Phase II drilling program 2 + 2 wells about to commence Petroceltic 16%

Iraq
Kewa Chirmila-1 TD 2,836m (Shiranish)
MO1
B
BB5
#
* KRG 20 % Harir ICE Spud Jan 2009, RR Oct 2009
= Benenan Discovery (DNO)
SAFEEN
200 MW
C
Discovery well: Hawler -1 (2008) Marathon 45%
Reservoir: Bekhme/Najmah (Cretaceous/Jurassic) _
^ Total 35%
KRG 20 %
Ranya ICE
200 MW
Resources: 36 mmbbls recoverable (P50). 16 API DEMIR BINA
Benenan-1 spud Q3 2012. DAGH B
BB1 BAWI
Q) C Khalakan-1(DQE-51 1650hp)
Movable oil in Bekhme fm. Tested 800-1000 bopd (12-16 API) DD2 BB2È QALA DZE
Spud Mar 2012. PTD 3520m
B as a deviated multizone producer. B BB3 Repsol 80%
lower Najmah. To be completed Bastora Discovery (DNO) _
^HAWLER
IRBIL
Q SR1
)
= BINA BAWI
KRG 20 % Target: Jurassic/Triassic reservoirs
Rumoured to have completed drilling and evaluating results
Discovery well: Bastora-1/1A (2011) = Oryx 65%
C OMV 36%
4000000

4000000
ADAIYAH =
)
B
QALIAN
Reservoir: Bekhme (Cretaceous) KNOC 15%
KRG 20 % Erbil C Genel Energy 44%
Koya ICE KRG 20 %
Resources: 100 mmbbls oil recoverable (P50) 18-19 API 29MW
250 MW
Bastora-2 appraisal planned for Q4 2012 SHORISH-MALA Bazian-1 TD 4091m (Chia Gara)
CKhurmala CCGT OMAR
Spud Oct 2009 RR Aug 2010
1000 MW 500 bopd L Qamchuqa, water in U Qamchuqa
Qaiyarah and Najmah Fields (Sonangol) =
36°0'0"N

Reservoirs: Jeribe, Euphrates, Hartha (Tertiary/Cretaceous) Demir Dagh-2 spud Q3 2012


Reserves: 424 mmbbls and 200 mmbbls oil recoverable C
Pirdawd DF
TT15
) TT6
=

36°0'0"N
Production: projected 230,000 bopd by 2017. B B 1312MW =
)
TT10z

=
QASAB
)
È
B
=)
)
=
)
TT11
=Q
TTD #
* =
)TT4
=
)
TT8
= TT5
) ¾Taq Taq
Shorish-1 TAQQ=
)=
)TAQ
Spud Dec 2009, Abandoned June 2010 =)
)
B
TT13 =) =TAQ-KEWA60000 BOPD
TAQ CHIRMILA Dokan HPP
==
KHURMALA DOME
TD 2722m (L Sarmord) QUSH TT16 )=TTOPCO* 80% Miran East-1
)
=
B = Oil Shows Cretaceous. Losses most of well.
Kurdistan NOC 100%
Genel Enerji 44% Q
400MW
JAWAN È
) KRG % TAPPA
Addax Petroleum 36% C Spud 8 Mar 2012. TD 4850m
=
) KRG 20 % Reaached TD in Jurassic . OIl shows
= QT1
in U Cretaceous. Evaluation ongoing
= KHALAKAN
B
QAIYARAH
Khurmala Field (Kar Oil and Gas)
Reservoirs: Eocene, Shiranish/Kometan and Qamchuqa
= Q KC2 _
^ Gas Plus Khalakan* 80%
KRG 20 %
NAJMAH
Production: 75,000 bopd (40,000 piped to Irbil Refinery),
=
C
Mosul
)
=
B
remainder piped to Kirkuk for export. = Taq Taq HPP
BLOCK V Miran West Field (Heritage)
750 MW Under going W/O of 19 wells. = 270 MW
Discovery well: Miran West-1 (2009)
C Reservoirs: U and L Cret, Jurassic
)
=
B = = Resources: 3.75 TCF and 161 mmboe liquids (cont. + prosp)
= Production: MQ-1 EWT to commence Dec 2012. Projected
B
== Dibis ICE
640 MW
3-5,000 bopd for domestic market.
KICE pipeline CHEMCHEMAL
=. On stream by end of 2012.
TaqTaq -> Khurmala (400,000 bopd) =
)
ISMAIL = == C Pearl Petroleum* 100%
Crescent Petroleum 40%
ME1
_
^ Miran West-4 TD 1905m (U Cretaceous)
Khurmala -> Fish Khabur (1,000,000 bopd) - completion est. Aug 2013. = = Dana Gas 40% PIRAMAGRUN Spud 21 Jun 2012. Tested 1350 bopd (16-18 API) from
Q
È
) MOL (Kalegran) 10% B Repsol 80% PENJWIN Cretaceous horizontal section. Undergoing EWT
=
= OMV 10% KC1z BZ1 KRG 20 %
Q
3950000

3950000
== BAZIAN MIRAN
Genel Energy 75% Miran West-3 TD 3528m. (Butmah)
KIRKUK
== MW2 KRG 25% Spud Aug 2011. RR May 2012.
Bai Hassan Field (North Oil Co) )
= =
) =
) ¾)
MW3
È
Q U Cretaceous tested max rate 1950 bopd (15 API).
Discovered: 1953 = Bazian MW1
= BAI = 34000 BOPD
Tasluja ICE U Jurassic reservoir tested up to 22 mmscfd wet gas.
Reservoirs: Oligocene, Shiranish/Kometan and Qamchuqa
== CHEMCHEMAL Q
)
= 51MW
Resources: 1700 mmbbls + 8.9 TCF recoverable remaining
=
HASSAN = _
^
MIRANMW4
C Genel acquired final interest from Heritage to give 100% WI
Production: 198,000 bopd, projected 240,000 bopd by 2014 ==
) = = Chemchemal DF WEST
QARA =
) Kirkuk 1000MW
CHAUQ =
) 150000 BOPD
C
Kirkuk Field - Baba and Avanah domes (North Oil Co)
=
) )¾
= = QARA HANJEER
= SULAYMANIYAH
Discovered: 1927 == ExxonMobil 80%
È
Q
È
Q C
B =)=
B KRG 20 %
Reservoirs: Oligocene,Jaddala, Shiranish/Kometan and Qamchuqa =)
Kirkuk BAZIAN Rizgari Sangaw North
Resources: 10,800 mmbbls + 2.7 TCF recoverable remaining ))
== =
=
)
27000=
=
)BOPD
KNOC Bazian* 100%
KRG 20%
29MW ARBAT EAST
117km 2D seismic of Sangaw flank prospect completed
Production: 260,000 bopd. BP in talks over service contract =
) =)=
)
= ¾ ==
==
) = ExxonMobil 80%

=)
KHABBAZ KRG 20 %
to enhance production to 650,000 bopd by 2017 ) =)
È
) = ) ARBAT
Sangaw North-1 TD 4190m (Kurra Chine)
= )
) =)
)= = =
B
= = )=
B= Spud Feb 2010, Abandoned July 2011
KIRKUK H2S Gas kick, and severe control issues.
Khabbaz Field (North Oil Co) =
)
Q Jurassic/Triassic tested uncommercial rates of gas + water.
Discovered: 1976 Mullah Abdullah CGT
402MW
)=
==
Reservoirs: Jeribe, Oligocene, Kometan and Qamchuqa
Resources: 2000 mmbbls + 3 TCF recoverable remaining C Sterling initiating farm out process

Production: 29,000 bopd =


= Saidsadq ICE C
)
= Chemchemal Field 200 MW
Discovered: 1930 SANGAW NORTH
Reservoir: Pila Spi (43 API) Condensate Sterling 53.33%
Sangaw South-1 TD ~3820m Sarki fm (Jurassic)
Addax 26.67%
KHANUQAH Resources: 2.07 TCF recoverable UNASSIGNED 20% Spud July 2011. RR Dec 2011
KRG 25%
CTaza=CGT
330MW BARANAN
= == =
3900000

3900000
KOR MOR
Pearl Petroleum* 100% B
SN1
Crescent Petroleum 40%
==
= =
) Dana Gas 40%
MOL (Kalegran) 10% QD1

È
= =
OMV 10% TOPKHANA SS1 Q
=
)
QARA
Jambur Field (North Oil Co)
JAMBUR
Talisman 60% Q DAGH
HALABJA
B Discovered: 1929 UNASSIGNED 20%
SANGAW SOUTH
=
) Reservoirs: Jeribe, Euphrates, Eocene, Shiranish and Qamchuqa
KRG 20 %
KNOC 30%
Resources: 3000 mmbbls + 9.0 TCF recoverable remaining = È UNASSIGNED 50% QARA
North Salah ad Din Sonoro Energy È
= KOR MOR
ÈÈ KRG 20 % DAGH
Resources: 140 mmbbls recoverable MAKHUL Production: 50,000 bopd + 120 mmcfd, projected 80,000 bopd by 2014 =
) È
ÈB TOPKHANA Qara Dagh-1 TD 3908m (Kometan)
Target: Jeribe asphalt
= =
)=)=
B= BÈÈ TP1
Darbandikhan HPP
Spud May 2010, RR Sept 2011
=
) = 249MW
C
Drilling program to commence Q1 2013 == Q
È Tests in Shiranish and Tanjero produced oil (43-46 API)
B Kor Mor Field (Dana/Crescent)
at non-commercial rates.
KURDAMIR
Q^
_
Discovery well: Kor Mor-1 (1928) È KU2
)
35°0'0"N

Niko and partners relinquished block to KRG Nov 2012


Baiji North Reservoirs: Jeribe, Euphrates, Oligocene (Gas); Shiranish (Oil) TAZA
S.E KOR
KU3 #
* )
È KURDAMIR
150000 BOPD = Resources: 1.8 TCF recoverable Oilsearch 60%
MOR KU1 Talisman 40%

35°0'0"N
¾ = Production: 340 mmcfd + 15,000 bpd condensate
Total 20%
KRG 20 %
WesternZagros 40%
KRG 20 %
TZ1

= _
^ #
* BA1
Kurdamir Field (Talisman)
=
)
È = Discovery well: Kurdamir-1 (2010)
Baiji Salahedden
¾ 140000 BOPD =
)
Q
JUDAIDA Reservoirs: Oligocene, Eocene and U Cretaceous
= CKalar CCGT Resources: 186 mmbbls contingent + 1650 mmbbls prospective
= B
== Q == Taza-1 (Romfor 101)
= 1000 MW
Kurdamir-2 (KCA T-80 2000hp)
=
) Spud 3 July 2012. PTD 3250m (Jaddala)
= = )
AJEEL
==
È )
= While testing Jeribe drill pipe lost in hole.
Spud Oct 2011. TD 4000m (Cretaceous Shiranish)
= HAMRIN
Commenced sidetrack to test Jeribe/Euphrates formations.
GARMIAN
WesternZagros 40% 1st Oligocene test 3450 bopd. 2 additional Oligocene tests ongoing.
= È=
Q
) Gazprom Neft 40% Eocene and Cretaceous tested oil.
= == PULKHANA
KRG 20 %
= =B PU9
)
B 3D Seismic acquisition planned Q1 2013
Ajeel Field (North Oil Co) Q PU8
=
)
3850000

3850000
Discovered :1961 Topkhana-1
Q
=
)
Reservoirs: Jeribe and Euphrates
=
Spud Jan 2011, Susp Nov 2011
TD 3140m (Jaddala)
BBB SARQALA
Resources: 500 mmbbls + 496 BCF recoverable remaining PULKHANA
Production: 23,500 bopd, projected 35,000 bopd by 2014 Tested gas/condensate (61-62 API) from Oligocene
) HS1
=
MIL SQ1#
* Baram-1 projected spud Q2 2013. Target: Oligocene/Eocene.
SHAKAL
QASIM Q
MQ1 =
)
Q SK1
)
= 3D Seismic acquisition planned H1 2013
Hamrin Field (North Oil Co)
Discovered :1961 CHIA
Reservoirs: Jeribe, Euphrates/Serikagni and Oilgocene SURKH
Pulkhana Field SHAKAL
B
Q
ÈB
CS10
Resources: 1,800 mmbbls + 750 BCF recoverable remaining
Production: Projected 60,000 bopd and 60 mmcfd by 2014 Discovery well: Pulkhana-5 (1956)
Gazprom Neft 80%
KRG 20 %
B
=
)
B
B
=
)_
^
)
CHIA SURKH
Chia Surkh Field (Genel Energy)
Reservoirs: Dhiban, Euphrates, Jaddala, Shiranish and Balambo Discovered 1903
Resources: 38-328 mmbbls, P50=
Genel Energy 60%
Iraq Drilling Co began reopening 72 existing wells and drilling 113 mmbbls recoverable Petoil 20% Reservoirs: Fars, Jeribe, Jaddala and Shiranish
KRG 20 %
30 new wells in 2011/12 Resources: 73.5 mmbbls oil/condensate + 283 bcf gas (EUR)
= Pulkana-9 Spud April 2011 Susp Dec 2011. TD 2700m.
TIKRIT Shiranish/Balambo flowed limited quantities of 30-33 API oil. Chia Surkh-10 spudded 7 October 2012
Pulkana-8 tested 2,650 bopd (31.6 API) Shiranish. Suspended. =
GILABAT =
È
) PTD 2500m. Target: Tertiary reservoirs
=
)B

)
È
B
BBB
INJANA
B

Shakal Discovery Qamar Field (North Oil Co)


Discovery well: Shakal-1 (2009) Discovery well: Qamar 1 (1979)
Reservoir: Jaddala, Aaliji Reservoir: Jeribe =
È
B
KHASHM Sarqala Field (WesternZagros)
= Resources: 45 mmbbls Resources: 200 mmbbls 250 BCF recoverable
AL AHMAR Discovery well: Sarqala-1RE (June 2011)
3800000

3800000
3 Test Aggregate max of 2,450 bopd (35 API) Tested: 2200 bopd (42 API); GOR 4000
TOLAFARUSH Reservoir: Jeribe
Not Producing
Resources: 24 mmbbls (contingent), 198 mmbbls (prospective)
Production: Recommenced EWT 5-6000 bopd for export
Mil Qasim-1 TD 2425m (Upper Fars) Initial Flow test: 9444 bopd (40 API)
)
È
B Spud Aug 2011 Susp Apr 2012
=
) Hasira-1 projected spud Q2 2013. Target: Oligocene
Tested an aggregate of ~850 bopd (43-44 API) =
È
Haditha HPP
660MW JARIA
PIKA
2D/3D Seismic acquisition commenced Nov 2012
C Samarra HPP
NAU
=
DOMAN
)
=
B 75MW MANSURIYAH
=
)
Q
C
Samarra =
250000 300000 350000 400000 450000 500000 550000 600000
42°0'0"E 43°0'0"E 44°0'0"E 45°0'0"E 46°0'0"E

==
È

Well Status Fields Facility - Active Kurdistan Blocks Abbreviations


#
* Μ
Planned mmbbls Million barrels (oil)
Oil Field/Discovery Metering Station Awarded
TCF Trillion cubic feet (gas)
BCF Billion cubic feet (gas)
_
^ Drilling/Testing Gas/Condensate Field/Discovery
C Open

Kurdistan & Northern Iraq


Power Station bopd Barrels of oil per day
mmcfd Million cubic feet gas per day
Q Pipelines 0 5 10 20 30 40 50
Suspended
¾ Refinery Study EWT Extended well test

B Gas, Active
EPF Early production facility (temporary) Kilometers
Facility - Constructing
Operator Activity Map
Plugged and Abandoned Kurdamir PSC CPF Central production facility (permenant)
OIP Oil in place
= Location
Gas, Proposed
C Power Station Garmian PSC PSC
MW
Production Sharing Contract
Mega watts No Copying or Distribution without
¾
November 2012
Hydrocarbons Oil, Active Refinery HPP Hydro Power Plant
Mountain Front
ICE Internal Combustion (Heavy Fuel Oil) permission of WesternZagros
=
) Oil Oil, Proposed Facility - Proposed Country Boundaries
CGT Single Cycle Gas Turbine
CCGT Combined Cycle Gas Turbine
È
) Oil and Gas Product, Active ¾ Refinery DF Dual fuel (Gas + Fuel Oil) Data shown is to the best knowledge of WesternZagros at time of printing, however we cannot be Projection: WGS 84 UTM38N
Lakes
held responsible for outdated or incorrect information. To inform us of any discrepancies, please contact:
È Gas/Condensate C Power Station
Rivers Text box information investorrelations@westernzagros.com
Date printed: 28 November, 2012
Date last saved: 28 November, 2012
Red text indicates recently updated information
Urban Areas
File location: I:\AppData\ArcGIS\Maps\Activity Maps\121126_operator_activity_EXTERNAL.mxd

You might also like