Professional Documents
Culture Documents
MYM_Y0281-DHK_X3219_WO_25088
MYM_Y0281-DHK_X3219_WO_25088
Printed on : 06-Jul-2024
Objective: Huawei 100 MW BH Project: Coupler Solution : Converting (1+0) link to (2+0)
Note: Must be check interference, If found interference pls halt this activities and inform me from site.
Coupler : Microwave Accessory,Coupler,7/8G (3db) : 2 Coupler Count :2 Modem (ISV3) : 2
EPLA required between existing 8G link and newly installed ODU(7G-XMC-3)
IF SLot 4 at both end.
Page 1/2
Ref : 25088 WO
Equipment Mapper
Page 2/2