Phase 1: ALARM
A pre-arranged signal such as siren/bell will be activated for 30 seconds. During the
drill, the siren/bell indicates earthquakes/shaking. Personnel will be alerted by the
signal.
Phase 2: RESPONSE
While the siren/bell is ongoing, everyone should move away from the windows, glass or
light fixtures. In this place everyone should perform “DUCK, COVER AND HOLD
“Under desk, tables and chairs. Remain in this position until the “shaking” stops (siren
stop)
Phase 3: EVACUATION
Once the “shaking” stops, personnel should evacuate the building and proceed using
pre-determined routes to identified evacuation areas.
Safety Committee Team, Foreman and lead man should check and make sure all
personnel are accounted for.
Phase 6: EVALUATION