FORM
Please utilize this template while submitting closeout reports for any observations raised on the job site.
Design, Build, Operate & Maintain of Field Operations Base for Block 10/
Project/Site Location: Walkthrough(Permanent Facility -- First response,Workshop,Ware house,Chemical
store,Steel yard,STP,Guard house 01)
Observation Action
2806
Tracking Registry No.
Shall match on ATR record
PHOTOS
BEFORE AFTER
DETAILS
What was observed? Corrective action(s) taken
CLOSEOUT CONFIRMATION
Was the corrective action(s) taken reduced the hazard to as low as reasonably practicable (ALARP) condition?
Please thick the box based on your assessment on the corrective actions taken.
Galfar Site Supervisor / Engineer Galfar HSE Manager / Field HSE Advisor
Verified By:
Yes No
Prasad Thayyil
Approved By:
Approved Rejected
Note: Only after approval shall the observation be closed in the HSE Action Tracking Register (ATR).
FORM
Please utilize this template while submitting closeout reports for any observations raised on the job site.
Design, Build, Operate & Maintain of Field Operations Base for Block 10/
Project/Site Location: Walkthrough(Permanent Facility -- First response,Workshop,Ware house,Chemical
store,Steel yard,STP,Guard house 01)
Observation Action
2807
Tracking Registry No.
Shall match on ATR record
PHOTOS
BEFORE AFTER
DETAILS
What was observed? Corrective action(s) taken
CLOSEOUT CONFIRMATION
Was the corrective action(s) taken reduced the hazard to as low as reasonably practicable (ALARP) condition?
Please thick the box based on your assessment on the corrective actions taken.
Galfar Site Supervisor / Engineer Galfar HSE Manager / Field HSE Advisor
Verified By:
Yes No
Prasad Thayyil
Approved By:
Approved Rejected
Note: Only after approval shall the observation be closed in the HSE Action Tracking Register (ATR).
FORM
Please utilize this template while submitting closeout reports for any observations raised on the job site.
Design, Build, Operate & Maintain of Field Operations Base for Block 10/
Project/Site Location: Walkthrough(Permanent Facility -- First response,Workshop,Ware house,Chemical
store,Steel yard,STP,Guard house 01)
Observation Action
2808
Tracking Registry No.
Shall match on ATR record
PHOTOS
BEFORE AFTER
DETAILS
What was observed? Corrective action(s) taken
CLOSEOUT CONFIRMATION
Was the corrective action(s) taken reduced the hazard to as low as reasonably practicable (ALARP) condition?
Please thick the box based on your assessment on the corrective actions taken.
Galfar Site Supervisor / Engineer Galfar HSE Manager / Field HSE Advisor
Verified By:
Yes No
Prasad Thayyil
Approved By:
Approved Rejected
Note: Only after approval shall the observation be closed in the HSE Action Tracking Register (ATR).