FORM
Please utilize this template while submitting closeout reports for any observations raised on the job site.
Design, Build, Operate & Maintain of Field Operations Base for Block 10/
Project/Site Location: Walkthrough(Permanent Facility - Admin, laundry, kitchen, CFM, FM,
Gym&recreation, SS-3,SS-6 )
Observation Action
2796
Tracking Registry No.
Shall match on ATR record
PHOTOS
BEFORE AFTER
DETAILS
What was observed? Corrective action(s) taken
Barrication not available near excavation Barrication provided for the excavation
CLOSEOUT CONFIRMATION
Was the corrective action(s) taken reduced the hazard to as low as reasonably practicable (ALARP) condition?
Please thick the box based on your assessment on the corrective actions taken.
Galfar Site Supervisor / Engineer Galfar HSE Manager / Field HSE Advisor
Verified By:
Yes No
Prasad Thayyil
Approved By:
Approved Rejected
Note: Only after approval shall the observation be closed in the HSE Action Tracking Register (ATR).
FORM
Please utilize this template while submitting closeout reports for any observations raised on the job site.
Design, Build, Operate & Maintain of Field Operations Base for Block 10/
Project/Site Location: Walkthrough(Permanent Facility - Admin, laundry, kitchen, CFM, FM,
Gym&recreation, SS-3,SS-6 )
Observation Action
2797
Tracking Registry No.
Shall match on ATR record
PHOTOS
BEFORE AFTER
DETAILS
What was observed? Corrective action(s) taken
CLOSEOUT CONFIRMATION
Was the corrective action(s) taken reduced the hazard to as low as reasonably practicable (ALARP) condition?
Please thick the box based on your assessment on the corrective actions taken.
Galfar Site Supervisor / Engineer Galfar HSE Manager / Field HSE Advisor
Verified By:
Yes No
Prasad Thayyil
Approved By:
Approved Rejected
Note: Only after approval shall the observation be closed in the HSE Action Tracking Register (ATR).
FORM
Please utilize this template while submitting closeout reports for any observations raised on the job site.
Design, Build, Operate & Maintain of Field Operations Base for Block 10/
Project/Site Location: Walkthrough(Permanent Facility - Admin, laundry, kitchen, CFM, FM,
Gym&recreation, SS-3,SS-6 )
Observation Action
2798
Tracking Registry No.
Shall match on ATR record
PHOTOS
BEFORE AFTER
DETAILS
What was observed? Corrective action(s) taken
Dust accumulated in the corridors and rooms Dust removal and suprresion done
CLOSEOUT CONFIRMATION
Was the corrective action(s) taken reduced the hazard to as low as reasonably practicable (ALARP) condition?
Please thick the box based on your assessment on the corrective actions taken.
Galfar Site Supervisor / Engineer Galfar HSE Manager / Field HSE Advisor
Verified By:
Yes No
Prasad Thayyil
Approved By:
Approved Rejected
Note: Only after approval shall the observation be closed in the HSE Action Tracking Register (ATR).
FORM
Please utilize this template while submitting closeout reports for any observations raised on the job site.
Design, Build, Operate & Maintain of Field Operations Base for Block 10/
Project/Site Location: Walkthrough(Permanent Facility - Admin, laundry, kitchen, CFM, FM,
Gym&recreation, SS-3,SS-6 )
Observation Action
2799
Tracking Registry No.
Shall match on ATR record
PHOTOS
BEFORE AFTER
DETAILS
What was observed? Corrective action(s) taken
CLOSEOUT CONFIRMATION
Was the corrective action(s) taken reduced the hazard to as low as reasonably practicable (ALARP) condition?
Please thick the box based on your assessment on the corrective actions taken.
Galfar Site Supervisor / Engineer Galfar HSE Manager / Field HSE Advisor
Verified By:
Yes No
Prasad Thayyil
Approved By:
Approved Rejected
Note: Only after approval shall the observation be closed in the HSE Action Tracking Register (ATR).
FORM
Please utilize this template while submitting closeout reports for any observations raised on the job site.
Design, Build, Operate & Maintain of Field Operations Base for Block 10/
Project/Site Location: Walkthrough(Permanent Facility - Admin, laundry, kitchen, CFM, FM,
Gym&recreation, SS-3,SS-6 )
Observation Action
2800
Tracking Registry No.
Shall match on ATR record
PHOTOS
BEFORE AFTER
DETAILS
What was observed? Corrective action(s) taken
Refregerent stored inside the temporary Refregerent stored in the designated storage
chemical storage without protection area.
CLOSEOUT CONFIRMATION
Was the corrective action(s) taken reduced the hazard to as low as reasonably practicable (ALARP) condition?
Please thick the box based on your assessment on the corrective actions taken.
Galfar Site Supervisor / Engineer Galfar HSE Manager / Field HSE Advisor
Verified By:
Yes No
Prasad Thayyil
Approved By:
Approved Rejected
Note: Only after approval shall the observation be closed in the HSE Action Tracking Register (ATR).
FORM
Please utilize this template while submitting closeout reports for any observations raised on the job site.
Design, Build, Operate & Maintain of Field Operations Base for Block 10/
Project/Site Location: Walkthrough(Permanent Facility - Admin, laundry, kitchen, CFM, FM,
Gym&recreation, SS-3,SS-6 )
Observation Action
2801
Tracking Registry No.
Shall match on ATR record
PHOTOS
BEFORE AFTER
DETAILS
What was observed? Corrective action(s) taken
CLOSEOUT CONFIRMATION
Was the corrective action(s) taken reduced the hazard to as low as reasonably practicable (ALARP) condition?
Please thick the box based on your assessment on the corrective actions taken.
Galfar Site Supervisor / Engineer Galfar HSE Manager / Field HSE Advisor
Verified By:
Yes No
Prasad Thayyil
Approved By:
Approved Rejected
Note: Only after approval shall the observation be closed in the HSE Action Tracking Register (ATR).
FORM
Please utilize this template while submitting closeout reports for any observations raised on the job site.
Design, Build, Operate & Maintain of Field Operations Base for Block 10/
Project/Site Location: Walkthrough(Permanent Facility - Admin, laundry, kitchen, CFM, FM,
Gym&recreation, SS-3,SS-6 )
Observation Action
2802
Tracking Registry No.
Shall match on ATR record
PHOTOS
BEFORE AFTER
DETAILS
What was observed? Corrective action(s) taken
CLOSEOUT CONFIRMATION
Was the corrective action(s) taken reduced the hazard to as low as reasonably practicable (ALARP) condition?
Please thick the box based on your assessment on the corrective actions taken.
Galfar Site Supervisor / Engineer Galfar HSE Manager / Field HSE Advisor
Verified By:
Yes No
Prasad Thayyil
Approved By:
Approved Rejected
Note: Only after approval shall the observation be closed in the HSE Action Tracking Register (ATR).
FORM
Please utilize this template while submitting closeout reports for any observations raised on the job site.
Design, Build, Operate & Maintain of Field Operations Base for Block 10/
Project/Site Location: Walkthrough(Permanent Facility - Admin, laundry, kitchen, CFM, FM,
Gym&recreation, SS-3,SS-6 )
Observation Action
2803
Tracking Registry No.
Shall match on ATR record
PHOTOS
BEFORE AFTER
DETAILS
What was observed? Corrective action(s) taken
Earth pit covered with safety cone Hard barrication provided for the earth pit
CLOSEOUT CONFIRMATION
Was the corrective action(s) taken reduced the hazard to as low as reasonably practicable (ALARP) condition?
Please thick the box based on your assessment on the corrective actions taken.
Galfar Site Supervisor / Engineer Galfar HSE Manager / Field HSE Advisor
Verified By:
Yes No
Prasad Thayyil
Approved By:
Approved Rejected
Note: Only after approval shall the observation be closed in the HSE Action Tracking Register (ATR).