Professional Documents
Culture Documents
1
1
2021-06-01) <S-075001-03FRM>
Date:
Item
No Result
Yes / No
The result of evaluation for last BTM:-
Each leg of the passage plan reviewed by the Bridge Team collectively and contents of
2
Bridge Note book confirmed
The navigational hazards for each leg been identified
List the Hazards likely to be encountered (add additional sheets as required)
8 Matters related to use of Engines, BT, availability of power etc discussed by Master and
CE.
Duty officers been explicitly ordered to report vessel’s position, speed, drift, UKC,
9 movement of other vessels, tug maneuvers etc. to Master including if hazardous
conditions are developing
10 Means of internal communication amongst Bridge Team members and with F&A
Stations, if applicable, been confirmed
Others: Share previous experience through the same port/area :
11
Deck Cadet:
Master: C/Engineer:
Page 1 of 1