NYK SMS Manual (Rev.

2021-06-01) <S-075001-03FRM>

Bridge Team Management Meeting - Briefing


Vessel : ALTAIR LEADER
Voy: 89 From: BALBOA To: CALLAO

Date:
Item
No Result

Yes / No
The result of evaluation for last BTM:-

State Lessons Learned:


1

Each leg of the passage plan reviewed by the Bridge Team collectively and contents of
2
Bridge Note book confirmed
The navigational hazards for each leg been identified
List the Hazards likely to be encountered (add additional sheets as required)

Any critical maneuvers involved e.g. turning in a basin, stern approach,


4
joining/leaving/crossing TSS, berthing/un-berthing, anchoring etc.
5 Simulation of the critical maneuvers been carried out
6 Bridge manning level been confirmed
Roles of each team member been confirmed
Assignment of Roles for Bridge Team Name / Rank
Maneuvering:

Position fixing / Monitoring safe passage of vessel :


Lookout by Radar/Visual :
Steering :
7
Engine / BT Movement :
Pilot Escort (if any) :
rd
3 Party Communication :
Reporting Tug Actions :
Record keeping :
Bridge Team members clearly understand the expectations from them.

8 Matters related to use of Engines, BT, availability of power etc discussed by Master and
CE.
Duty officers been explicitly ordered to report vessel’s position, speed, drift, UKC,
9 movement of other vessels, tug maneuvers etc. to Master including if hazardous
conditions are developing

10 Means of internal communication amongst Bridge Team members and with F&A
Stations, if applicable, been confirmed
Others: Share previous experience through the same port/area :
11

Chief Officer: AB-A:

2nd Officer: AB-B:

3rd Officer: AB-C:

Deck Cadet:

Master: C/Engineer:

Page 1 of 1