x Attachment:
Undersigned certifies:
Both drawings and specification sections were thoroughly reviewed.
Processing time for frivolous RFIs will be charged back to Contractors at A/E billable rates.
Desired Response Date: 5.29.24 (However, A/E still have specified days to respond.)
Cost Impact: TBD Schedule Impact: TBD days
Drawing Impact: Submitted by: Brittany Johnson
Signed: Brittany Johnson Date: 5.24.24
Answer:
Answered by:
Signed: Date:
We Are Sending:
RFI Contract/PO Payment Report Specifications
Shop Drawings Change Order Copy of Letter Proposal/Estimate Form
Submittals Billing Schedule Proposal Request As Indicated Below
Transmitted:
For Review & Comment Approved For Execution
For Approval Approved as Noted For Pricing
For Your Information/Files Returned for Corrections As Indicated Below
Comments:
Please see the attached photos of the existing rafter tails at the roof eaves. The damage was uncovered when the roofing
and stucco was demoed for the roofing replacement. The portion of the rafter bearing on the interior appears undamaged.
We are requesting a detail to repair the rafter tails for the fascia installation. Please confirm if scabbing a 2x8 to the existing
is acceptable or if the rafters need to be removed.