Professional Documents
Culture Documents
wap7-uf-dyloco-letter
wap7-uf-dyloco-letter
Design office has prepared product structure for the following items/assemblies.
Same are being forwarded along with their ABB drawing no. to you for study and
necessary correction wherever required.
S.B.Patel
Dy CDE/Veh-I
Copy to:
CME/P
CDE
Office of the
Chief Design Engineer
8 July 2024
No.DLW/DD/WAP7/Mechanical
Dy.CME/LOCO
DLW,Varanasi
Design office has prepared product structure for the following items/assemblies.
Same are being forwarded along with their ABB drawing no. to you for study and
necessary correction wherever required.
(S.B.Patel)
Dy CDE/Veh-I
S.no. Part no. Description Cat no. ABB/CLW C&D Unit QPL
DRG.NO. NO./ WAP7
Stock no.
1 Sheave 29140298 R/11/0003 01/4/59/71 H319/402 01 1
(S.B.Patel)
Dy CDE/Veh-I
Dy.CMM/LOCO, Dy.CME/MC