PCC Conerete Measuremant

Mix Ratio cemant sand aggegateSum of Mix Day volume


M20 1 1.5 3 5.5 Concrete Dry volume 1.54

Measurement total of Qty nos 12

நீளம் அகலம்
உயர
ம் m total Measurement 3.398

ft ft in m^3 totel Day volume 5.233

total of unit 0.9514


4 5 6 0.283
1.2192 1.524 0.1524 total qty of unit 11.417
Home

Mix Design
volune 1.25 net volume

Cemant
1 Bags
1
Sand 1
1 Unit

Aggegate 3 Unit
3
Foundation Work

Home Measurement
Eaethwork Excavation in Foundation ft m m3
Footing number of
Length Width Height total of Total volume
Dimension footing Volume footing
1 4 4 5
F1 2.27 27.18 m3
1.219 1.2192 1.524 12

1 4 5 6
F2
1.219 1.524 1.8288
3.40 12
40.78 m3

total quantity
24 67.96 m3

Soft soil Profit 20 % 1 0.2 1.2


Hard soil Profit 20 % 4 0.8 4.8

2 Super structure
Labour cost
Hard soil
Soft soil man bower 900 Labour cost
JCB

man bower 500 JCB hrs 1 900 2 1


1 500 12000 6000 0 0 2 4

0
6000 0 0

1.00 500.00 12000.00 ### 0.00 0.00 2.00 4.00

#DIV/0!
Amount per m^
#DIV/0!
Go

total

500
4

4.00
RCC Conerete Measuremant
Sum of
Mix Ratio cemant sand aggegate
Mix
Day volume
M20 1 1.5 3 5.5 Concrete Dry volume 1.54

Measurement total of Qty nos 15


நீளம்அகலம் உயரம் m total Measurement 0.23
ft ft in ft^3 totel Day volume 0.35
4 4 6 total of unit 0.06
0.2265
1.2192 1.2192 0.1524 total qty of unit 0.95

Automatic Brick work Calcu


Brick work All output Data
Length Width Height Volume of 1 Brick Without Mortar

Brick m m m
Voiume of 1 Brick With Mortar
size 1 1 1 Volume of Brick Wall

1 1 1 m Number of Brick Required

Length Width Thikness Wet


Morter Required
Brick m m m 0.03
work 1 1 1
1 1 1 m
Morter Cement Sand Sum
Ratio 1 6 7
mm m
Mortar Thickess
10 0.01

Foundation Footing

Measurement
நீளம்அகலம் உயரம் m
mm mm mm m^3
1600 1800 200
0.576
1.6 1.8 0.2
A1 A2 H m^3
300 600 150 0.5184
0.3 0.6 0.15 0.72
0.18 2.88 0.05 0.189

Total footing 0.765


Home

Mix Design volune 1.25 net volume

Cemant 1 Bags 1
mm m ft in

Sand 1 Unit 1 381 0.381 1.25 15

Aggegate 3 Unit 3 381 1 15

1000 0.381

work Calcuation
ut Data Cement
Sand

1.000 Bage cum kg m^2 ft^2

1.030 0.16 0.01 8.05 0.03 0.36


1.00

0.97 Brick 1.00 No.s


Dry Cement 0.00 Bage
0.04 Sand 0.00 cft
Footing steel size ft Cutting Laangth

X Axis Y Axis Height 900 900 Band Cover Spacing X axis


LDia of Bar
ft ft ft ft ft ft

5.91 4.92 0.9 0.04 2 50 150 6.59


5.91 4.92 0.9 0.58 0.04 2 0.16 0.49

Column cutting length of stirrups


Column size Dia of Dia of 45 90
Cover Hooks 135 Band
A B Bar halt Band Band
mm mm mm mm mm mm mm mm mm

305 230 25 6 0 2 0 3 2

(2*B14)+(2*C14)-(8*D14)+(G14*10*E14)-(I14*2*E14)-(J14*3*E14)-(8*F14)

cutting length = (2*a)+(2*b)+(2*10*d)-(3*2*d)-(3*2*d)

weight of stirrups = d2/162*cutting length

Measurement
நீளம்அகலம்உயரம் m
Cutting Laangth Numbars of Bar
Y axis X axis Y axis

5.6 10 12

Length of
Bar
mm mm 1 9 in
footing
918 in 0.0393700787 0.354331 36.14173
Footing Conerete Measuremant
Mix Ratiocemant sand aggegateSum of Mix Day volume
M5 1 5 10 16 Concrete Dry volume 1.54
M7.5 1 4 8 13 Plaster Dry voiume 1.33

M10 1 3 6 10 rick work Dry volum 0.33


M15 1 2 4 7
M20 1 1.5 3 5.5
M25 1 1 2 4

Measurement
mm m^2 sq mm
cm cu cm sq cm
m m^2 m^3
km cu km sq km
in cu in sq in

ft ft^2 sq ft
yd cu yd sq yd
mi cu mi sq mi
Nm cu Nm sq Nm
mil cu mil sq mil
Construction Material price list
No's Material Barnd Kg Price
Steel Brand
1 TATA