Professional Documents
Culture Documents
WS.SP.00.T.BD.01
WS.SP.00.T.BD.01
GLOBE VALVE
GATE VALVE
BALL VALVE ELBOW TURN DOWN
PIPE TEE
HOSE BIB
Earth serves Road (Not paved) (9.80)
ABLUTION FAUCET
EQUIPMENT CONNECTION
IRRIGATION MANHOLE
CALCULATION NODE
2 1/2"
APPROVED BY:
FOR CONTINUATION SEE
DWG WS.FP.00.T.BD.01
4"
2 1/2"
ISSUED BY:
FOR CONTINUATION SEE
DWG WS.FP.00.T.BD.01
4"
TO IRRIGATION FROM CITY MAIN
FOR CONTINUATION SEE SYSTEM
DWG WS.FP.00.T.BD.01
D
G
N
KI C
R
PA B
E
C
AN 15/05/14 FIRST ISSUE
L A
BU
AM REV. DATE DESCRIPTION
REPUBLIC OF IRAQ
GOVERNORATE OF BAGHDAD
MINISTRY OF HEALTH
93 146
92 147
PROJECT
4"
FROM
43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73 74 75 76 77 78 79 80 81 82
AL-FEIDHALIA TEACHING GENERAL HOSPITAL
CITY MAIN
PROJECT CONTRACTOR
NAWAFETH AL BENAA
MEP DESIGN
BASIC DESIGN STAGE
SUBJECT
WATER SUPPLY
GENERAL SURVEY PLAN
DESIGN TEAM
PAVIRO PROMACON
BASIC DESIGN STAGE PRELIMINARY DESIGN
PRINCIPAL
PRINCIPAL ARCHITECTS: ANTONIA PANOU
ARCHITECTS: PANAGIOTIS TAVANIOTIS GIANNIS DITSAS
THOMAS AMARGIANOS MEDICAL
PLANNING
MEDICAL CONSULTANT: VICKY KARKAVELA
PLANNING
CONSULTANT: ELENI KOGHYLAKI PROJECT TEAM: PAOLO CONCETTI THOMAS DITSAS
IRO STATHOPOULOU LYDA DITSA
PROJECT TEAM: PETROS TAVANIOTIS NATALIA GIAOURI FOTIS ANASTASIADIS PANOS KOUNTOURAS
CHRISTINE KELAIDI ANNA MATRAKIDOU
3D VISUALISATION: VASSILIS MITSOPOULOS
ELENI TZANOU ELIAS ARKOULIS
DRAFTING: SMARAGDA FRADELOU
3D VISUALISATION: GEORGE MAVRIKIS MYRTO THEODOROU