Professional Documents
Culture Documents
SD.FP.04.T.BD.01
SD.FP.04.T.BD.01
SD.FP.04.T.BD.01
VENT PIPE
VENT STACK
FLOOR DRAIN
LAVATORY
4"
KITCHEN SINK SINGLE OR DOUBLE BOWL WITH MIXING FAUCET
SHOWER TRAY
BOCHUM
2 1/2" 2 1/2" 2 1/2" 2 1/2" 2 1/2" 2 1/2" 2 1/2" 2 1/2"
4"
SERVICE SINK
BEDPAN WASHER
2 1/2" 2 1/2"
4"
2 1/2"
2 1/2"
APPROVED BY:
2 1/2" 2 1/2"
2 1/2"
4"
2 1/2"
ISSUED BY:
2 1/2" 2 1/2"
2 1/2"
4"
D
C
B
A 15/05/14 FIRST ISSUE
REV. DATE DESCRIPTION
REPUBLIC OF IRAQ
4" GOVERNORATE OF BAGHDAD
MINISTRY OF HEALTH
PROJECT
4"
PROJECT CONTRACTOR
NAWAFETH AL BENAA
MEP DESIGN
BASIC DESIGN STAGE
SUBJECT
SEWAGE - DRAINAGE
ROOF PLAN
DESIGN TEAM
PAVIRO PROMACON
BASIC DESIGN STAGE PRELIMINARY DESIGN
PRINCIPAL
PRINCIPAL ARCHITECTS: ANTONIA PANOU
ARCHITECTS: PANAGIOTIS TAVANIOTIS GIANNIS DITSAS
THOMAS AMARGIANOS MEDICAL
PLANNING
MEDICAL CONSULTANT: VICKY KARKAVELA
PLANNING
CONSULTANT: ELENI KOGHYLAKI PROJECT TEAM: PAOLO CONCETTI THOMAS DITSAS
IRO STATHOPOULOU LYDA DITSA
PROJECT TEAM: PETROS TAVANIOTIS NATALIA GIAOURI FOTIS ANASTASIADIS PANOS KOUNTOURAS
CHRISTINE KELAIDI ANNA MATRAKIDOU
3D VISUALISATION: VASSILIS MITSOPOULOS
ELENI TZANOU ELIAS ARKOULIS
DRAFTING: SMARAGDA FRADELOU
3D VISUALISATION: GEORGE MAVRIKIS MYRTO THEODOROU