Estimating Processes
Estimating Processes
Estimating Processes
By
Class Outline
• Construction Cost Estimates Formats
• Construction Design Process
• Budget Estimates for Design Process
• Construction Estimates Development
• Cost Estimating Process
1
Types of Construction Cost Estimate
• Construction Cost Estimate Formats
2
Design Cost Estimate Development
Cost estimates are developed and updated throughout
the project lifecycle (Design and Construction)
Design Process
Program SD DD Owner’s
Budget Budget Budget Final Cost
Estimate Estimate Estimate Estimate
Conceptual Conceptual/ Preliminary Detailed
Estimates Preliminary Estimate Estimate
Estimates
5
3
Schematic Design Budget Estimates
Schematic Design Budget Estimate
- Typically construction cost estimate transformed from
square-foot estimate into systems or assemblies
- Systems / assemblies can include;
Foundations
Substructure
Superstructure
Exterior closure
Roofing and sheet metal
MEP work
Site work
7
4
Design Development Budget Estimates
Design Development Budget Estimate
- Typically construction cost estimate prepared using
systems or assemblies format
- Primary difference is the level of details
- The value for some items are based on quantity take-off
- The estimate may include different design options
- Another option is to employ specialty contractors for
pricing individual elements
- Construction contingency – typically 5%
- All owner’s costs should be added
- Estimate narratives should be prepared by the estimator
to identify assumptions and constraints (Estimate Basis)
9
5
Estimating Process
Final
Bid
Subs
Quotations
Site G.Cs
Summary Schedule
Subcontractor Estimate
Price Recap
Recapitulation
Estimating Strategy
12