KUWAIT ENERGY IRAQ LIMITED – KEIL

EPC POWER TRANSMISSION LINE TO SIBA REMOTE


AREAS

F&G INSTRUMENT HOOK-UP DRAWING

DOC NO. (SF832-D-0000-00-080-DTL-001)

6 A 03/11/2023 Issued for Review T. Alsaad A. Hamadi A. Hamadi I. Abood KEIL


Sheets Rev.
Prepared Checked Contract KEIL
No. Number Date Description Approved by
by by Approval Approval
Revision Index
Company’s logo & business name Project name

KUWAIT ENERGY IRAQ LIMITED COMPANY EPC POWER TRANSMISSION LINE


TO SIBA REMOTE AREAS
Contractor’s logo & business name Sub-Contractor logo & business name Company Document Identification

SF832-D-0000-00-080-DTL-001

AL-THAER AL-ARABI CO. TAREQ AL-QUDRA CO.

Facility name Location Scale Sheet of Sheets


Siba Gas Field Siba Gas Field Page 1 of 6

F&G INSTRUMENT HOOK-UP DRAWING

This document is property of KEIL-IRAQ


It shall neither be shown to Third Parties not used for purposes other than those for which it has been sent.
Company Document Identification
Revision Index
SF832-D-0000-00-080-DTL-001
Page 2 of 6
Rev. No.
F&G Instrument Hook-Up drawing
A

REVISION HISTORY

Rev. Date Nr. of sheets Description

A 03/11/2023 6 Issued for Review

This document is property of KEIL-IRAQ


It shall neither be shown to Third Parties not used for purposes other than those for which it has been sent.
Company Document Identification
Revision Index
SF832-D-0000-00-080-DTL-001
Page 3 of 6
Rev. No.
F&G Instrument Hook-Up drawing
A

CONTENTS

1 GENERAL ............................................................................................................................................. 4
2 DEFINITIONS ....................................................................................................................................... 4
3 REFERENCE DRAWINGS AND DOCUMENTS............................................................................. 4
4 HEAT DETECTOR HOOK-UP DRAWING ....................................................................................... 5
5 MANUAL CALL POINT HOOK-UP DRAWING ............................................................................... 5
6 SOUNDER BEACON HOOK-UP DRAWING .................................................................................. 6
7 F&G PANEL HOOK-UP DRAWING .................................................................................................. 6

This document is property of KEIL-IRAQ


It shall neither be shown to Third Parties not used for purposes other than those for which it has been sent.
Company Document Identification
Revision Index
SF832-D-0000-00-080-DTL-001
Page 4 of 6
Rev. No.
F&G Instrument Hook-Up drawing
A

1 GENERAL
The scope of work to be performed by the Contractor “ ALTHAAER ALARABI CO.” is for Power Transmission
Line to Siba Remote Areas, which mainly includes but not limits to the following works:
To supply power to various remote sites in Siba gas field, KEIL intends to construct the permanent power
transmission network to reduce the operation and maintenance expenditures. In the field there are multiple
locations that fed power through temporary and solar power sources to the various remote facilities. This
project is intended to supply permanent MV/ LV power supply to the below locations from single power
source and the existing power sources shall be used as backup.
• Siba1
• Siba4
• Hub 1
• BOC Camp
• Raw Water Intake Station (RWI)
• BOC Main Check Point

2 DEFINITIONS
COMPANY: Kuwait Energy Iraq Limited Company (KEIL)
CONTRACTOR : Al-Thaer Al-Arabi Company
SUB-CONTRACTOR: Tareq Al-Qudra Company.
Project: EPC Power Transmission Line to Siba Remote Areas.
Work: All items and services to be provided as described within this technical document.
May: Indicates freedom of choice to comply with requirements
Shall: Indicates a mandatory requirement
Should: Indicates that the requirement is strongly recommended, and should be adhered to as best as
possible.

3 REFERENCE DRAWINGS AND DOCUMENTS


The following project documents consider as part of this specifications:
SF832-D-080-DAT-003 Technical Datasheet for F&G devices
SF832-D-080-SCH-001 F&G Cable schedule
SF832-D-080-MTO-001 MTO for F&G
SF832-D-0000-00-080-DTL-002 F&G Typical Installation Drawings
SF832-D-0000-00-080-BLD-001 F&G Cable Block diagrams

This document is property of KEIL-IRAQ


It shall neither be shown to Third Parties not used for purposes other than those for which it has been sent.
Company Document Identification
Revision Index
SF832-D-0000-00-080-DTL-001
Page 5 of 6
Rev. No.
F&G Instrument Hook-Up drawing
A

4 HEAT DETECTOR HOOK-UP DRAWING


To ease installation and future removal, ensure that the threaded junction box covers are properly lubricated.
If additional lubrication is required, use a PTFE silicone free lubricant grease. When tightening the junction
box cover, ensure that the O-ring is properly engaged. The hex head set screw on the base of the junction
box, located near port 2, should be tightened to secure the cover and prevent access to the wiring
compartment without the use of a tool

5 MANUAL CALL POINT HOOK-UP DRAWING

This document is property of KEIL-IRAQ


It shall neither be shown to Third Parties not used for purposes other than those for which it has been sent.
Company Document Identification
Revision Index
SF832-D-0000-00-080-DTL-001
Page 6 of 6
Rev. No.
F&G Instrument Hook-Up drawing
A

6 SOUNDER BEACON HOOK-UP DRAWING

7 F&G PANEL HOOK-UP DRAWING

This document is property of KEIL-IRAQ