Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

Ref.No.

: CB-2015-00059

3) Splicing Specification
Item 7: ST-2527 1829 x dia6.6 x 24 x 8 SX-EW/BSS P:15.2 N:117 C:7x19 Open
SPLICING PATTERNS : 2 STEP
Running direction
G
Unit: mm
22.5~170

Belt Width (mm) 1829

L (mm) 1650

Width
CL Ll (mm) 1500

Lr (mm) 1500

S (mm) 650
Less than
45 degree
B (mm) 150

G (mm) 50
B S S B

L
CORDS GAP (mm) 3.5
Belt Length for 1
Lr Splice With Bias (m) 3.5

Ll

SPLICING MATERIALS AND VULCANIZING

1 2 3 4

t 5

STEEL CORDS
MATERIALS 6
THICKNESS WIDTH QUANTITY
No. MATERIAL NAME CODE No.
(mm) (mm) (Per splice) (Total 1 splice)
① RUBBER CEMENT * W81-40 - - 8.3 liters 4 liters x 3
② TOP COVER Y11-59-07 5.9 ( x 4 ply) 400 7mx7 7mx7
③ TIE RUBBER W21-15-12 1.5 400 12 m x 2 12 m x 2
④ FILLER RUBBER W22-350794 3.5 t 7.9 w 4 m x 109 rolls 4 m x 109 rolls
⑤ EDGE RUBBER Y11 6.6 30 Including to (2)+(3)
⑥ BOTTOM COVER W10-35-12 3.5 ( x 2 ply) 400 12 m x 2 12 m x 2
Note : * One can of rubber cement could be applied to more than one splice.

VULCANIZING CONDITIONS
VULCANIZING SI UNIT ENGLISH UNIT
12 ± 2 kg/cm²
PRESSURE 175 ± 30 PSI
(1.2 ± 0.2 MPa)
TEMPERATURE ** 145 ± 5 °C 293 ± 9 °F
CURING TIME 80 Minutes
PRESS OPEN TEMP. *** Below 120 °C Below 248 °F

Note :
** If actual temperature is measured by thermoelectic couple directly, the tolerance temperature is 145 ºC (+10/-5ºC).
*** Technically open press at 120ºC could be no problem, however, Bridgestone strongly recommend to open press at below 60 ºC from safety point of view.
The splicing diagram is designed based on Belt SF>=6.7.
When Belt SF is less than 6.7 or dynamic efficiency test is required, please consult Bridgestone for a new splicing diagram.
Page : 18

You might also like