Vijayawada Dharmapuri Pipeline

Project

Document Title Quality Assurance Plan


WP Document Number 14960-1901-IC000-0003
Vendor Document Number 14960-1901-PL000-0003
Project Vijayawada Dharmapuri Pipeline Project (VDPL)
Client Hindustan Petroleum Corporation Ltd (HPCL)
EPMC Consultant WorleyParsons India Pvt Ltd ( WP)Vendor
Electronics Corporation of India Ltd
Vendor Scope SCADA & APPS System

PO Number & Date 19000018-OQ-11995/KK Dt 20.08.2019

1 05-Nov-2019 SUBMISSION AGAINST COMMENTS Kondababu Ravi Kothapalli Md Jamaluddin

0 28-Aug-2019 ISSUED FOR REVIEW/APPROVAL Kondababu Ravi Kothapalli Md Jamaluddin

REV DATE PURPOSE OF ISSUE PREPARED BY REVIEWED BY APPROVED BY

Control Instrumentation Division, ECIL Page 1 of 4


Quality Assurance Plan – Comment Resolution Sheet
S.
WP Comment ECIL Resolution
No
ECIL to provide equipment/software list as per technical List of softwares will be provided in
1. specification document no 14960-000-IC-SPC-0011 Rev.A for SCADA System FDS Document
interfacing SCADA with PIDS (14960-1901-PL000-0100)
Reference : Specification for SCADA, RTU and APPS System
2. Included
doc.no 14960-000-IC-SPC-0011 Rev.A
Customer : M/s Hindustan Petroleum Corporation Limited (HPCL)
EPMC : M/s WorleyParsons India Pvt. Ltd (WP)
3. Vendor : M/s Electronics Corporation of India Limited (ECIL) Included
P.O No : 19000018-OQ-11995/KK Dt 20.08.2019

In legend
4. Updated
(3)HPCL Client/WP and or WP appointed TPIA

5. Include web server, GPRS Server in S. No 1 Included

This will be included in RTU


(Add) Mandatory spares & Ingress Protection Certificate in Systems QAP & FAT Procedure
6.
function check of RTUs which will be submitted separately
after RTU manufacturing clearance.
M/s ECIL conveyed that RTU FAT will be at Vendor factory.
Integrated FAT will be at ECIL lab with their standard setups. The
7. Mentioned in Notes (Point no.4)
integrated system testing shall be conducted during SAT for all the
units.
Confirmed and mentioned same in
8. ECIL to submit separate QAP for RTU System
Notes (Point No.2)
Confirmed and mentioned same in
9. Submit FAT procedure for RTU System
Notes (Point No.2)
Included SCADA Server cabinet &
APPS Server cabinet in S.No-8
Include Server cabinet, APPS server cabinet, Type-2 RTU cabinet,
10. RTU Cabinets (Type-1 &Type-2)
TIC cabinet, Type-1 RTU Cabinet in S.No-7
and TIC cabinets are included in S.
No-4
Console desk is not a part of the
11. ECIL to confirm Cabinet/Console Desk with separate QAP scope. There is no separate QAP
for Server cabinets & PDB cabinets.
Note : Reference to KOM Dated 30.08.2019, ECIL has to send at
Confirmed and mentioned same in
12. least seven (7) working days advance fortification to lineup the
Notes (Point No.1)
inspections

Control Instrumentation Division, ECIL Page 2 of 4


QUALITY ASSURANCE PLAN
Ref : Specification for SCADA, RTU and APPS System doc no. 14960-000-IC-SPC-011 Rev.A
Legend:
P- Performer (1) Supplier/Manufacturer Customer : M/s Hindustan Petroleum Corporation Limited (HPCL)
EPMC : M/s WorleyParsons India Pvt. Ltd (WP)
R- Review (2) ECIL Vendor : M/s Electronics Corporation of India Limited (ECIL)
W- Witness (3) HPCL Client/WP and/or WP appointed TPIA P.O No : 19000018-OQ-11995/KK Dt 20.08.2019
Equipment Characteristc Type of Quantum Reference Acceptance Format of Agency
Sno
Description Checked Check of Check Document Criteria Record 1 2 3
1. BOM check Physical 100% ECIL P.O ECIL P.O ECIL Test Format
SCADA servers/ Web 2. Visual check Visual 100% - "
1 server/ GPRS Server/ P W R
MMI system/ Laptop 3. Configuration check Verification 100% Apprvd Tech. "
Specs/DS
FDS/PO
4. Functional check Functional 100% "
UTM/ Routers/ 1. BOM check Physical 100% ECIL P.O ECIL P.O ECIL Test Format
Netwrok Switches/ 2. Visual check Visual 100% - "
2 P W R
GPS Time Servers/
Apprvd Tech.
Printers 3. Functional check Functional 100% FDS/PO "
Specs/DS
1. BOM check Physical 100% ECIL P.O ECIL P.O ECIL Test Format
3 Video Wall Displays 2. Visual check Visual 100% - " P W R
Apprvd Tech.
3. Functional check Functional 100% Specifications
FDS/PO "
Vendor/ECIL Test
1. BOM check Physical 100% ECIL P.O ECIL P.O
Format
Type-1 RTU Cabinet/ 2. Visual check Visual 100% - “
Type-2 RTU Cabinet/
3. Configuration check Verification 100% ECIL P.O ECIL P.O “ W/
4 Mandatory spares P W
Approved GA R
&
TIC cabinets 4 GA Check Dimensional 100% drg./ Hardwired ECIL P.O “
IO List
RTU FAT
5. Functional check Functional 100% Procedure
FDS "

Control Instrumentation Division, ECIL Page 3 of 4


QUALITY ASSURANCE PLAN
Ref : Specification for SCADA, RTU and APPS System doc no. 14960-000-IC-SPC-011 Rev.A
Legend:
P- Performer (1) Supplier/Manufacturer Customer : M/s Hindustan Petroleum Corporation Limited (HPCL)
EPMC : M/s WorleyParsons India Pvt. Ltd (WP)
R- Review (2) ECIL Vendor : M/s Electronics Corporation of India Limited (ECIL)
W- Witness (3) HPCL Client/WP and/or WP appointed TPIA P.O No : 19000018-OQ-11995/KK Dt 20.08.2019
Equipment Characteristc Type of Quantum Reference Acceptance Format of Agency
Sno
Description Checked Check of Check Document Criteria Record 1 2 3
Apprvd FAT
Functional tests As per FDS ECIL/ESI Test
5 APPS Software Functional 100% procedures / P W W
PO Document Format
FDS
Approved FAT
Functional tests As per FDS
6 I-FAT Functional 100% procedures/ ECIL Test Format P W W
PO Document
FDS document
1. BOM check Physical 100% ECIL P.O ECIL P.O ECIL Test Format

SCADA Server 2. Visual check Visual 100% - "


7 P W R
cabinet/ APPS Server
Apprvd cabinet FDS
Cabinet/ PDB Cabinet 3. GA Check Dimensional 100% “
drawings. Document
Commissoining Standard Make items
8
cables & connecteros Hence Test certificates will be provided for review during SAT or commissioning stage.

Notes :
1. Inspection call and inspection venue details will be shared to M/s WP&HPCL prior to inspection at least 7 days in advance.
2. QAP & FAT Procedure for RTU, TIC Cabinets will be submitted separately after getting the manufacturing clearance for RTU and TIC cabinet systems.
3. FAT Procedure for APPS and I-FAT Procedure for SCADA Systems will be submitted separately after getting the approval for FDS.
4. Complete RTU FAT will be conducted at RTU vendor’s works and Integrated SCADA FAT will be conducted at ECIL works with standard RTU setups
available at ECIL. Integrated testing of complete SCADA and RTU systems will be carried out during SAT.

Control Instrumentation Division, ECIL Page 4 of 4