Professional Documents
Culture Documents
P6
P6
5000 10000 5100 5000 9900 6100 3498 3500 5167 5167 5167 5167 5167 5167 4000 6100
6000
6000
50mm Ø PVCVTR
1800
CO
2500
6000
6000
WC FD WC WC WC FD FEMALE
LAV FCO
CR
100mm Ø PVCSP
ROOM 1
SOUND SYSTEM /
5000 CONTROL AREA
8200
ROOM 2
6000
6000
SEPTIC TANK
(4.5m x 2.3m x 2.1m)
100mm Ø PVCSP
CO
CO
STORAGE
AREA
CO
CO
100mm Ø PVCSP
6000
STAGE
42000
42000
12000
LOBBY FUNCTION HALL
6000
6000
9000
5400
6000
UP
BACK STAGE
MAIN CONTROL
100mm Ø PVCSP
6000
6000
ROOM
8200
SOUND SYSTEM /
CONTROL AREA
ELECTRICAL
ROOM
50mm Ø PVCVP
FCO
CO
UR UR UR UR
FD FD
6000
2500
WC
50mm Ø PVCVP FD
LAV
LAV
50mm Ø PVCVP
1800
FD
WC
100mm Ø PVCSP
FCO
S
I
D
6000
6000
E
W
A
L
K
5000 10000 5100 9900 6100 3498 3500 5167 5167 5167 5167 5167 5167 4000 6100
84200
PREPARED:
PROJECT NAME AND LOCATION: SHEET CONTENTS: SET NO. SHEET NO.
CADD: CHECKED: REVIEWED AND SUBMITTED: RECOMMENDED: APPROVED:
REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS CONSTRUCTION (COMPLETION) OF GLYZA M. PUEBLAS
MULTI-PURPOSE BUILDING AND SITE ENGINEER I
NATIONAL CAPITAL REGION GROUND FLOOR P-6
PLANNING AND DESIGN DIVISION DEVELOPMENT at LAKESHORE, SEWER LINE LAYOUT DESIGNED:
2ND STREET, PORT AREA MANILA BRGY. LOWER BICUTAN, TAGUIG CITY FELICIANO L. DEL ROSARIO, JR.
WENCESLAWA P. ABANADOR LYDIA G. CHUA JUBY B. CORDON, CEO ADOR G. CANLAS, CESO IV 21
ENGINEER III CHIEF, PLANNING & DESIGN DIV. ASSISTANT REGIONAL DIRECTOR REGIONAL DIRECTOR
ENGINEER II DATE: DATE: DATE: DATE: